CN208907670U - A kind of construction site air cleaning cooling device - Google Patents

A kind of construction site air cleaning cooling device Download PDF

Info

Publication number
CN208907670U
CN208907670U CN201821817407.3U CN201821817407U CN208907670U CN 208907670 U CN208907670 U CN 208907670U CN 201821817407 U CN201821817407 U CN 201821817407U CN 208907670 U CN208907670 U CN 208907670U
Authority
CN
China
Prior art keywords
cabinet
fixed
air
pipe
construction site
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821817407.3U
Other languages
Chinese (zh)
Inventor
袁鸿健
刘晓东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Liteng Construction Engineering Co Ltd
Original Assignee
Jiangsu Liteng Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Liteng Construction Engineering Co Ltd filed Critical Jiangsu Liteng Construction Engineering Co Ltd
Priority to CN201821817407.3U priority Critical patent/CN208907670U/en
Application granted granted Critical
Publication of CN208907670U publication Critical patent/CN208907670U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of construction site air cleaning cooling device, including cabinet, cabinet bottom end are respectively fixed with strut on quadrangle.The utility model construction site air cleaning cooling device, air can be endlessly sent into office, lobby or storehouse after cooling and purification, and the air cleaning cooling system is arranged in outdoor, effectively reduces the influence generated due to noise to staff.In summary; the utility model input cost is low, using effect is good; not only effectively air can be cooled down by the four casees intracorporal water; simultaneously; fine particle dust in air can also be kept here; and when first motor drives umbrella leaf that coiled pipe is blowed, further cool down to the air in coiled pipe, to provide suitable temperature environment for the office of staff, lobby on construction site.Be easy to implement, at the same the good air cleaning cooling system simple structure and reasonable design of using effect and input cost it is low.

Description

A kind of construction site air cleaning cooling device
Technical field
The utility model relates to the realm of building construction, and in particular to a kind of construction site air cleaning cooling dress It sets.
Background technique
In building construction process, scene generates a large amount of dust, pernicious gas, while summer temperature height, in recent years haze day It is beneficial rampant, it enables operating environment especially severe, the work and rest of construction site staff has been seriously affected, due to being chronically at The environment of air pollution and noise pollution, staff's health is there is many disease risks, such as respiratory inflammation, chronic Bronchitis, bronchial asthma, coronary heart disease, hypertension, even cancer etc..Previous influence of the building trade to this respect does not weigh Depending on construction site work rest environment is all very simple and crude.Careful with national policy, green energy conservation is advocated, and employee protects self The raising of consciousness is protected, industry begins to take control measures to this.Meanwhile the activity of the mankind continues to cause global warming, so that ground The increasingly extramalization of ball weather, work rest environment in construction site is all very simple and crude in addition, and the direct shadow of the physical condition of staff Construction speed and construction quality, even construction safety are rung, therefore the office of staff, lobby on construction site are mentioned It is particularly important for suitable temperature environment.But mostly or pass through the air purifier and sky bought in the market at present Transfer to improve, this side has the following problems: cannot for interior continually input fresh air, due on building site air pollution more than Cell environment it is serious, only by the air purifier and air-conditioning bought in the market can not effective solution indoor air circulation it is net Change, repetitive cycling air bacterium easy to breed and anoxic, so needing frequent ventilation;Power consumption is higher, is unfavorable for energy conservation Environmental protection;Air cleaner is disposed within, and noise is larger.
Utility model content
To solve the above problems, the utility model provides a kind of construction site air cleaning cooling dress It sets.
The utility model is achieved through the following technical solutions:
A kind of construction site air cleaning cooling device, including cabinet, it is solid respectively on the quadrangle of the cabinet bottom end Surely there is strut, riser is fixed in the cabinet, cabinet is divided into two the first independent sealed cabinets and by the riser Two cabinets are fixed with transverse slat in first cabinet, and the first cabinet is divided into two independent sealed third casees by the transverse slat Body and the 4th cabinet, bottom end is fixed with booster fan in the third cabinet, and the booster fan air inlet is fixed with blast pipe, The blast pipe other end is pierced by wall box, several filter screens, the blast pipe and case are fixed in the blast pipe Body sidewall contact position is sealedly and fixedly connected, and the booster fan air outlet is fixed with discharge pipe, is fixed in the discharge pipe Check valve, the discharge pipe bottom end, which penetrates transverse slat, which protrudes into fixed-link in the 4th cabinet, has air to refine disk, the air refinement Bottom end is arranged in the 4th cabinet in disk, and the booster fan side is equipped with escape pipe, and the escape pipe is fixedly connected with transverse slat And setting is communicated with the 4th cabinet, the box top is fixed with filler pipe, and the filler pipe bottom end penetrates box top wall and cross Plate top surface is fixedly connected, and the filler pipe is connected with the 4th cabinet, and the filler pipe top surface is threaded with lid, described Cabinet bottom end is fixed with drainpipe, and the drainpipe is connected with the 4th cabinet, and the drainpipe bottom end is threaded with One lid, fixed baffle on the 4th wall box, the baffle other end are fixed with support plate, and the support plate side is solid Surely there is first motor, the first umbrella leaf is fixed on the output end of the first motor, the first umbrella leaf side is equipped with several Heat sink, the heat sink are fixedly connected with the 4th wall box, several coiled pipes, institute are staggeredly equipped in second cabinet It states coiled pipe one end to be fixedly connected with riser and communicate setting with third box house, the coiled pipe other end is pierced by case Body sidewall, the coiled pipe are sealedly and fixedly connected with riser contact position, are fixed with cover on the wall box, the cover with Second cabinet is connected, several air inlet holes are fixed on the faceshield side wall, are fixed with motor on the cover inner wall, It is fixed with umbrella leaf on the motor output end, is fixed with several exhaust vents on second wall box.
Preferably, the cabinet is used to be welded and fixed and be connect with strut.
Preferably, the motor, first motor and booster fan pass through conducting wire respectively and extraneous power supply is electrically connected.
Compared with prior art, the beneficial effects of the utility model are: the utility model construction site air Air can be endlessly sent into office, lobby or storehouse by purifying and cooling device after cooling and purification, and The air cleaning cooling system is arranged in outdoor, effectively reduces the influence generated due to noise to staff.To sum up institute It states, the utility model input cost is low, using effect is good, not only can effectively be carried out air by the four casees intracorporal water Cooling, it is also possible to keep fine particle dust in air here, and when first motor drives umbrella leaf that coiled pipe is blowed When, further cool down to the air in coiled pipe, to be mentioned for the office of staff, lobby on construction site For suitable temperature environment.It is easy to implement, while the good air cleaning cooling system simple structure and reasonable design of using effect and throwing Enter at low cost.
Detailed description of the invention
Fig. 1 is the schematic diagram of structure described in the utility model;
Fig. 2 is the side view of structure chart 1 described in the utility model.
In figure: cabinet 1, the first cabinet 1-1, the second cabinet 1-2, third cabinet 1-3, the 4th cabinet 1-4, riser 2, transverse slat 3, booster fan 4, blast pipe 5, discharge pipe 6, air refine disk 7, escape pipe 8, check valve 9, filler pipe 10, lid 11, first Lid 11-1, drainpipe 12, filter screen 13, coiled pipe 14, cover 15, air inlet hole 16, motor 17, first motor 17-1, umbrella leaf 18, the first umbrella leaf 18-1, exhaust vent 19, baffle 20, support plate 21, heat sink 22, strut 23.
Specific embodiment
The utility model is described in further detail with specific embodiment with reference to the accompanying drawing:
As shown in Figure 1 and Figure 2, a kind of construction site air cleaning cooling device, including cabinet 1, the cabinet 1 It is respectively fixed with strut 23 on the quadrangle of bottom end, riser 2 is fixed in the cabinet 1, cabinet 1 is divided into two by the riser 2 Transverse slat 3 is fixed in independent sealed the first cabinet 1-1 and the second cabinet 1-2, the first cabinet 1-1, the transverse slat 3 is One cabinet 1-1 is divided into two independent sealed third cabinet 1-3 and the 4th cabinet 1-4, and bottom end is solid in the third cabinet 1-3 Surely there is booster fan 4,4 air inlet of booster fan is fixed with blast pipe 5, and 5 other end of blast pipe is pierced by 1 side of cabinet Wall, is fixed with several filter screens 13 in the blast pipe 5, the blast pipe 5 with the sealing of 1 side wall contact position of cabinet is fixed connects It connects, 4 air outlet of booster fan is fixed with discharge pipe 6, and check valve 9, the discharge pipe 6 are fixed in the discharge pipe 6 Bottom end, which penetrates transverse slat 3, which protrudes into fixed-link in the 4th cabinet 1-4, has air to refine disk 7, and the air refinement disk 7 is arranged the 4th Bottom end in cabinet 1-4,4 side of booster fan are equipped with escape pipe 8, and the escape pipe 8 is fixedly connected with transverse slat 3 and with the Four cabinet 1-4 communicate setting, and 1 top surface of cabinet is fixed with filler pipe 10,10 bottom end of filler pipe penetrate 1 roof of cabinet with 3 top surface of transverse slat is fixedly connected, and the filler pipe 10 is connected with the 4th cabinet 1-4, and 10 top surface of filler pipe is threadedly coupled There is lid 11,1 bottom end of cabinet is fixed with drainpipe 12, and the drainpipe 12 is connected with the 4th cabinet 1-4, the row 12 bottom end of water pipe is threaded with the first lid 11-1, and fixed baffle 20 on the 4th cabinet 1-4 side wall, the baffle 20 is separately One end is fixed with support plate 21, and 21 side of support plate is fixed with first motor 17-1, the output of the first motor 17-1 Be fixed with the first umbrella leaf 18-1 on end, the first umbrella side leaf 18-1 is equipped with several heat sinks 22, the heat sink 22 with 4th cabinet 1-4 side wall is fixedly connected, several coiled pipes 14, the coiled pipe 14 are staggeredly equipped in the second cabinet 1-2 One end be fixedly connected with riser 2 and with setting is communicated inside third cabinet 1-3,14 other end of coiled pipe is pierced by cabinet 1 side wall, the coiled pipe 14 are sealedly and fixedly connected with 2 contact position of riser, are fixed with cover 15 on 1 side wall of cabinet, described Cover 15 is connected with the second cabinet 1-2, several air inlet holes 16, the cover 15 are fixed on 15 side wall of cover It is fixed with motor 17 on inner wall, umbrella leaf 18 is fixed on 17 output end of motor, fixation is set on the second cabinet 1-2 side wall There are several exhaust vents 19.
The cabinet 1 is used to be welded and fixed and be connect with strut 23.
The motor 17, first motor 17-1 and booster fan 4 are electrically connected by conducting wire and extraneous power supply respectively.
Working principle: the utility model construction site in use, is led to first with air cleaning cooling device It crosses strut 23 and is placed to designated place originally practical, unscrew lid 11, three points are added in the 4th cabinet 1-4 by filler pipe 10 Two water, then connected in the exposed one end of coiled pipe 14 and lead to air pipeline indoor or towards workplace.Carry out with Motor 17, first motor 17-1 and booster fan 4 are respectively started after upper work, booster fan 4 extracts the external world by blast pipe 5 Air is discharged in the 4th cabinet 1-4 by discharge pipe 6, because the filter screen 13 being arranged in blast pipe 5, can effectively filter Fall the bulky grain dust in outside air, because 6 bottom end of discharge pipe is provided with air refinement disk 7, and the 4th cabinet 1-4 is built-in Have water, thus could be passed through after precipitating of the air air that refines of refinement disk 7 by water in the 4th cabinet 1-4 escape pipe 8 into Entering into third cabinet 1-3, air refinement disk 7 effectively strengthens air by the process of the precipitating of water in the 4th cabinet 1-4, this Sample air not only realizes the effect of purification air in the 4th cabinet 1-4, meanwhile, also achieve the purpose that air cooling-down. And due to the setting of heat sink 22, the first umbrella leaf 18-1 dries to heat sink 22 by first motor 17-1, thus effectively To the water cooling in the 4th cabinet 1-4, the case where coolant-temperature gage rises in the 4th cabinet 1-4 is effectively prevented.Work as third When passing through coiled pipe 14 in cabinet 1-3, umbrella leaf 18 dries to coiled pipe 14 under the drive of motor 17, further right in this way Air in coiled pipe 14 cools down, to provide suitable temperature for the office of staff, lobby on construction site Spend environment.
The basic principles and main features and advantage of the utility model have been shown and described above.The technical staff of the industry It should be appreciated that the present utility model is not limited to the above embodiments, the above embodiments and description only describe this The principle of utility model, on the premise of not departing from the spirit and scope of the utility model, the utility model also has various change And improvement, these various changes and improvements fall within the scope of the claimed invention.The utility model requires protection scope It is defined by the appending claims and its equivalent thereof.

Claims (3)

1. a kind of construction site air cleaning cooling device, it is characterised in that;Including cabinet (1), cabinet (1) bottom End is respectively fixed with strut (23) on quadrangle, is fixed with riser (2) in the cabinet (1), and the riser (2) is cabinet (1) point Two independent sealed the first cabinets (1-1) and the second cabinet (1-2) are cut into, are fixed with transverse slat in first cabinet (1-1) (3), the first cabinet (1-1) is divided into two independent sealed third cabinets (1-3) and the 4th cabinet (1- by the transverse slat (3) 4), the interior bottom end of the third cabinet (1-3) is fixed with booster fan (4), and booster fan (4) air inlet is fixed with blast pipe (5), blast pipe (5) other end is pierced by cabinet (1) side wall, is fixed with several filter screens in the blast pipe (5) (13), the blast pipe (5) is sealedly and fixedly connected with cabinet (1) side wall contact position, and booster fan (4) air outlet is fixed with Discharge pipe (6) is fixed with check valve (9) in the discharge pipe (6), and discharge pipe (6) bottom end penetrates transverse slat (3) and protrudes into the Four cabinets (1-4) interior fixed-link has air to refine disk (7), and air refinement disk (7) is arranged at the 4th interior bottom cabinet (1-4) At end, booster fan (4) side is equipped with escape pipe (8), and the escape pipe (8) is fixedly connected with transverse slat (3) and with the 4th Cabinet (1-4) communicates setting, and cabinet (1) top surface is fixed with filler pipe (10), and filler pipe (10) bottom end penetrates cabinet (1) roof is fixedly connected with transverse slat (3) top surface, and the filler pipe (10) is connected with the 4th cabinet (1-4), the filler pipe (10) top surface is threaded with lid (11), and cabinet (1) bottom end is fixed with drainpipe (12), the drainpipe (12) and the Four cabinets (1-4) are connected, and drainpipe (12) bottom end is threaded with the first lid (11-1), the 4th cabinet Fixed baffle (20) on (1-4) side wall, baffle (20) other end are fixed with support plate (21), support plate (21) side It is fixed with first motor (17-1), is fixed with the first umbrella leaf (18-1) on the output end of the first motor (17-1), described The one umbrella leaf side (18-1) is equipped with several heat sinks (22), the heat sink (22) and the fixed company of the 4th cabinet (1-4) side wall It connects, several coiled pipes (14) is staggeredly equipped in second cabinet (1-2), described coiled pipe (14) one end and riser (2) are solid Fixed connection simultaneously communicates setting with third cabinet (1-3) inside, and coiled pipe (14) other end is pierced by cabinet (1) side wall, The coiled pipe (14) is sealedly and fixedly connected with riser (2) contact position, is fixed with cover (15), institute on cabinet (1) side wall It states cover (15) to be connected with the second cabinet (1-2), is fixed with several air inlet holes (16) on cover (15) side wall, It is fixed with motor (17), is fixed with umbrella leaf (18) on motor (17) output end, described second on cover (15) inner wall Several exhaust vents (19) are fixed on cabinet (1-2) side wall.
2. a kind of construction site air cleaning cooling device according to claim 1, it is characterised in that: the case Body (1) is used to be welded and fixed and be connect with strut (23).
3. a kind of construction site air cleaning cooling device according to claim 1, it is characterised in that: the electricity Machine (17), first motor (17-1) and booster fan (4) are electrically connected by conducting wire and extraneous power supply respectively.
CN201821817407.3U 2018-11-06 2018-11-06 A kind of construction site air cleaning cooling device Active CN208907670U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821817407.3U CN208907670U (en) 2018-11-06 2018-11-06 A kind of construction site air cleaning cooling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821817407.3U CN208907670U (en) 2018-11-06 2018-11-06 A kind of construction site air cleaning cooling device

Publications (1)

Publication Number Publication Date
CN208907670U true CN208907670U (en) 2019-05-28

Family

ID=66614688

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821817407.3U Active CN208907670U (en) 2018-11-06 2018-11-06 A kind of construction site air cleaning cooling device

Country Status (1)

Country Link
CN (1) CN208907670U (en)

Similar Documents

Publication Publication Date Title
CN106123193B (en) A kind of PM2.5And CO2The Intelligent fresh air ventilator and fresh air processing method of joint control
CN202709325U (en) Intelligent air cleaner
CN203323274U (en) Large-small environment evaporative cooling, mechanical cooling and mixed ventilation composite air conditioning system
CN204513613U (en) Fresh air purifier and this indoor air purification circulatory system
CN205104802U (en) Dustproof protection against electric shock electric power cabinet
CN106642332A (en) Floor type direct blowing fresh air ventilator
CN207221563U (en) A kind of waste gas circulation processing unit
CN209565913U (en) Workbench is used in a kind of polishing of alloy product
CN205777692U (en) The bus stop shelter billboard of adsorbable particulate matter based on solar energy
CN208907670U (en) A kind of construction site air cleaning cooling device
CN206583030U (en) A kind of full thermal purification VMC
CN105605703A (en) Novel super PM2.5 treatment draught fan and using method
CN104006447B (en) The active energy-saving air conditioning system for removing radon gas
CN206693433U (en) A kind of environmental protection energy-saving type phase transformation building external structure
CN206234903U (en) A kind of intelligent house temperature control system
WO2022062046A1 (en) Smart ventilation system
CN204830322U (en) Intelligent indoor new trend air inlet system
CN206786949U (en) A kind of Novel anti-mist haze window
CN203797791U (en) Fresh air fan
CN206583031U (en) A kind of full thermal purification VMC
CN206488364U (en) A kind of new blower fan of console mode direct sending wind
CN204648572U (en) A kind of Novel clean supersonic humidifier system
CN207688339U (en) Wall-mounted new wind turbine
CN206600886U (en) One kind removes the new blower fan of haze
CN205579802U (en) Super PM2. 5 handles new fan

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant