CN206583030U - A kind of full thermal purification VMC - Google Patents

A kind of full thermal purification VMC Download PDF

Info

Publication number
CN206583030U
CN206583030U CN201720103632.XU CN201720103632U CN206583030U CN 206583030 U CN206583030 U CN 206583030U CN 201720103632 U CN201720103632 U CN 201720103632U CN 206583030 U CN206583030 U CN 206583030U
Authority
CN
China
Prior art keywords
section
air
heat
blower fan
waste
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720103632.XU
Other languages
Chinese (zh)
Inventor
何鲁敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Westinghouse Electric Co Ltd
Original Assignee
Beijing Westinghouse Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Westinghouse Electric Co Ltd filed Critical Beijing Westinghouse Electric Co Ltd
Priority to CN201720103632.XU priority Critical patent/CN206583030U/en
Application granted granted Critical
Publication of CN206583030U publication Critical patent/CN206583030U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/56Heat recovery units

Landscapes

  • Air Conditioning Control Device (AREA)

Abstract

The utility model provides a kind of full thermal purification VMC, including new blower fan, the fresh air channel between fresh inlet and fresh air outlet, including initial effect filtering section, heat-recovery section, humidity regulation section, interior condensation segment, external cold heat section and HEPA fillter sections successively;Waste air passage between waste air import and waste air outlet, including exhaustion section, heat-recovery section and condensed exterior section successively;Waste air passage is provided with sensor, the heat energy produced by detection human body;Fresh air channel and waste air passage share a heat-recovery section, reclaim cold from waste air passage, fresh air channel is freezed;Condensate water recovery device, one end is connected to the condensed water delivery port of the humidity regulation section, other end connection condensed exterior section.Using fresh air as carrier, cold is reclaimed from the waste air of discharge, the cold reclaimed is loaded on into fresh air, so that energy-efficient.The condensed water of humidity regulation section is reclaimed, the cooling as condensed exterior section, there is provided working environment preferably for the surface temperature of reduction condensed exterior section.

Description

A kind of full thermal purification VMC
Technical field
The utility model is related to a kind of full thermal purification VMC.
Background technology
With economic development and growth in the living standard, application of the new wind devices in industry and civil buildings is increasingly Generally.How to realize that green, environmentally friendly, the efficient new wind devices of synthesis are the focuses studied at present.
Utility model content
The application provides a kind of full thermal purification VMC, including new blower fan, and the new blower fan includes:
Fresh air channel between fresh inlet and fresh air outlet, including set gradually:Initial effect filtering section, heat-recovery section, Humidity regulation section, interior condensation segment, external cold heat section and HEPA fillter sections, for indoor injection fresh air;
Waste air passage between waste air import and waste air outlet, including set gradually:Exhaustion section, heat-recovery section and outer Condensation segment, for the waste air in absorption chamber;
The waste air passage is provided with sensor, for detecting the heat energy produced by human body;
Fresh air channel and the waste air passage shares a heat-recovery section, and the heat-recovery section is according to produced by the human body Heat energy, reclaim cold from waste air passage, fresh air channel freezed;
Condensate water recovery device, one end is connected to the condensed water delivery port of the humidity regulation section, and other end connection is outer cold Solidifying section is set, and in the pipeline of the condensate water recovery device, is provided with spray, moisturizing and atomising device.
By upper, by the detection for return air, judge whether to have only as " damp and hot " situation produced by people, with fresh air For carrier, cold is reclaimed from the waste air of discharge, the cold reclaimed is loaded on into fresh air, so that energy-efficient.In addition, returning The condensed water of humidity regulation section is received, the cooling of condensed exterior section is used as, on the one hand avoids the waste of cryogenic condensation water, it is another Aspect can reduce the surface temperature of condensed exterior section, and working environment preferably is provided for it.
Optionally, the bottom of the condensed exterior section is additionally provided with a condensed water cistern.
By upper, by setting cistern, the drippage of the water of the non-evaporating completely in surface of condensed exterior section is on the one hand avoided, separately On the one hand it can be soaked by the water of recovery for condensed exterior section, so that the further surface temperature of reduction condensed exterior section.
Optionally, the sensor at least includes one below:CO2Sensor, humidity sensor, temperature sensor, PM2.5 sensors and air flow sensor.
By upper, realize and be acquired for " damp and hot " situation produced by indoor people, and by for CO in return air2 With PM2.5 detection, it can obtain whether interior needs the degree of purification of resh air requirement and room air.
Optionally, in the waste air passage, in addition to one towards condensed exterior section blower fan;
The blower fan and a monolithic mechatronics;
The single-chip microcomputer is also electrically connected with the sensor, heat-recovery section and control valve.
By upper, when resh air requirement demand is smaller, with the reduction of fresh air.It is corresponding, return air amount in waste air passage also phase The reduction answered.When the air quantity of condensed exterior section reduces, easily produce condenser pressure rise and cause the shutdown of its self-protection Situation.Based on this, basic air quantity is provided by the outside condensation segment of blower fan, the working environment of condensed exterior section is met.So that in difference In the state of fresh air, condensed exterior Duan Junke normal works.
Optionally, the fresh inlet of the new blower fan is arranged at outdoor, absorbs outdoor fresh air;
The fresh air air inlet of the fresh air outlet connection sensible heat air conditioner of the new blower fan;
Interior is led in the fresh air outlet of the sensible heat air conditioner;
The waste air entrance of the sensible heat air conditioner is arranged at waste air in interior, absorption chamber;
The waste air entrance of the new blower fan of waste air outlet connection of the sensible heat air conditioner;
Outdoor is led in the waste air outlet of the new blower fan.
Optionally, the fresh inlet of the new blower fan is arranged at outdoor, absorbs outdoor fresh air;
Interior is led in the fresh air outlet of the new blower fan;
The waste air entrance of the new blower fan is arranged at waste air in interior, absorption chamber;
Outdoor is led in the waste air outlet of the new blower fan.
By upper, new blower fan both by pipeline can be connected the full thermal purification VMC of composition with sensible heat air conditioner, can also Individually to indoor offer fresh air, and for the recovery of waste air.So as to which using fresh air as carrier, being extracted from air draft can be to fresh air Handled, it is not only energy-efficient and can " instantaneity " fresh pure air is provided, it is often more important that:The equipment fully undertakes The load of people.
Brief description of the drawings
Fig. 1 is the principle schematic of full thermal purification VMC;
Fig. 2 is the principle schematic of new blower fan first embodiment;
Fig. 3 is the control principle schematic diagram of double-condenser;
Fig. 4 is the principle schematic that external condenser cools;
Fig. 5 is that full thermal purification VMC is applied to arenas, the principle schematic of Conference Hall scene;
Fig. 6 is the principle schematic that full thermal purification VMC is applied to office building scene;
Fig. 7 is that full thermal purification VMC is applied to rear kitchen, the principle schematic of dining room scene.
Embodiment
Describe the full thermal purification VMC that the utility model is provided in detail below in conjunction with the accompanying drawings, as shown in figure 1, including The new blower fan and sensible heat air conditioner being connected with each other.Wherein, the fresh inlet of new blower fan leads to outdoor, by outdoor acquisition fresh air, newly The fresh air outlet of blower fan is connected to the fresh air air inlet of sensible heat air conditioner.The fresh air air outlet of sensible heat air conditioner leads to interior, carries Waste air in cooling/heat, the waste air return air inlet recovery room of sensible heat air conditioner, the waste air air outlet of sensible heat air conditioner is divided into two Road, is exported to the waste air import of new blower fan all the way, and another road is exported to the fresh air air inlet of sensible heat air conditioner.The dirt of new blower fan Wind outlet is arranged to outdoor by waste air.
Existing air conditioner load can be divided into two classes, including people's type load and (building) species load.
Wherein, people's type load is the load produced by human survival, such as new wind load, human-body radiating (full heat).It is this kind of Load is given birth to because of people, and nobody is just without this type load, and its size is relevant with number and human survival quality, and (air quality will Ask higher, load is bigger).In general, aggregation is built, and such as classroom, meeting room, dining room, arenas, people's type load accounting is very It is high.People's type load has following feature:The load of people contains whole humidity loads, for example human breathing and produced by perspiring Moisture.And the load of people is " instantaneity ", people is then having, people walk then without.
(building) species load is " building enclosure load ", belongs to the load produced because of building heat transfer or using equipment, with Human survival is unrelated, and the size and building heat preservation and purposes of this type load are closely related.Species load has following features:Thing Load does not include humidity load, and with certain time-delay characteristic, due to the hot gap of wall, outdoor heat (sun, temperature) is passed to Interior is usually required after 4~12 Small Time Lags, and such as lag time is the load of the building of 8 hours, and the highest temperature is 14:00 Occur, due to time-delay characteristics, thermic load peak appears in 22:00, and now outside air temperature has escaped the high temperature period.
The effective ways of reduction species load are reinforcement building heat preservation and use energy-conserving device.The measure of this respect and will Ask and embodied in relevant specification of country, effect is realized very well, by taking Beijing as an example:Heat transfer across wall load is from previous generation Record last average about 80~120W/m2, it is reduced to 50~70W/m2, some energy saving buildings are even up to 20~30W/m2
Corresponding with species load, people's type load requires the reasons such as raising due to Indoor Air Pollution with outdoor Air Pollution, life quality, It is increasingly becoming the principal contradiction of air conditioner load;With 30m per capita3Exemplified by/h fresh airs, in the Yangtze river basin and areas to the south, outdoor is pressed 35 DEG C, relative humidity 70%, interior presses 25 DEG C, and relative humidity 55%, species load (load containing building enclosure) is smaller, the mankind Accounting of the load in air conditioner load is relatively large.Now, being made an effort in species load has lost more than gain, and reduces building energy consumption Emphasis need to people's type load processing on have in mind, can get twice the result with half the effort.
Based on above-mentioned theory, the application separately handles the load to people and the load to thing, and people is handled by new blower fan Load, new blower fan is using fresh air as carrier, extracting energy (cold/heat/moisture content) to return air/air draft, so as to pass through heat Wet process makes the indoor air underwriter's type load in full of feeding.Further, it can be supplied in real time newly by cleaning equipment Fresh, pure air.After above-mentioned processing so that the load of sensible heat air conditioner only processed material, it can be greatly reduced in theory The energy consumption of existing sensible heat air conditioner.
It is illustrated in figure 2 the principle schematic of the new blower fan first embodiment of the application, including fresh inlet and fresh air outlet Between fresh air channel, and waste air import and waste air outlet between waste air passage.Fresh air channel and the waste air passage is total to A heat-recovery section is used, so that fresh air channel absorbs the energy of waste air passage.
Adjusted specifically, being disposed with fresh inlet 11, initial effect filtering section 12, heat-recovery section 13, humidity in fresh air channel Section 14, interior condensation segment 15, external cold heat section 16, HEPA fillter sections 17 and fresh air outlet 18.
Waste air import 21, exhaustion section 22, heat-recovery section 13, condensed exterior section 23 and waste air are disposed with waste air passage Outlet 24.
Initial effect filtering section 12 includes air-valve, roughing efficiency air filter, air-makeup system and heating system.By controlling opening for air-valve The intake of the i.e. controllable fresh air channel of degree.Roughing efficiency air filter is arranged at fresh inlet 11, for entering to the fresh air sucked Row by-pass filtration.Air-makeup system is used to produce basic air quantity, when the air quantity change of condensed exterior section 23, in condensed exterior section 23 The system that condenser carries out air quantity regulation because causing the shutdown situation of its self-protection pressure rise.Heating system is used for Prevent outdoor temperature is too low to produce unnecessary blocking to heat-recovery section 13 under severe cold condition in the winter time.
Heat-recovery section 13 is used to absorb in energy, first embodiment from waste air passage, uses and turns in the heat-recovery section 13 Heat reclamation device is taken turns, runner is as accumulation of heat core body, the semicircle accumulation of heat core that the fresh air in fresh air channel passes through full-thermal type runner Waste air in body, waste air passage inversely passes through another semicircle accumulation of heat core body of runner simultaneously.During winter, waste air is by heat and water Divide and be released to accumulation of heat core body, the reduction of waste air temperature, the temperature rise of core body.When cold fresh air touches the accumulation of heat core body of heat, It is same as the presence of temperature difference, core body rejects heat to fresh air, new air temperature rise.When cooling in summer is run, processing procedure phase Instead.
Humidity regulation section 14, is realized by evaporator, is turned on and off based on indoor epidemic disaster requirement described hereinafter Compressor, so that the humidity to fresh air is adjusted.
Interior condensation segment 15 and condensed exterior described hereinafter section 23 are identical, are realized by condenser.
External cold heat section 16, using external cold/heat source, to indoor load beyond require when, aid in the tune into trip temperature It is whole.
HEPA fillter sections 17, for carrying out purified treatment to fresh air.In the present embodiment, the HEPA fillter sections 17 are by putting down The zeolite layer of row arrangement, active carbon layer, fine sand layer, Electrostatic Absorption filter layer, optical hydrogen ion purifying layer, HEPA filter layer and negative The filter chamber of ion generation layer composition.The HEPA filter layer is interwoven by very tiny organic fiber, and particulate is caught Catch ability stronger, aperture is small, adsorption capacity is big, purification efficiency is high, and possess water imbibition, purified for 0.3 micron of particle Rate is 99.97%.
The exhaustion section 22 includes air-returning device and sensor group.The air-returning device is used for waste air by waste air Import 21 sucks waste air passage.The sensor group includes CO2Sensor device, humidity sensor, temperature sensor, PM2.5 inspections Survey device and air flow sensor.Because indoor people can produce moisture and CO2, therefore be that can detect that room by sensor group Humiture load caused by interior people.
When judging the load of people, its main distinguishing rule is CO2The data that sensor is detected.Prestore different people The corresponding CO produced of number2Data, and with the CO2Damp and hot load corresponding to data.When there is a people interior, it breathes institute The CO of generation2For M, corresponding, its human body distributes heat for N, and human body distributes moisture for O.The different numbers of correspondence, above-mentioned CO2、 The data such as heat and moisture are proportional corresponding with number.
Because the height of environment temperature can produce certain influence, when environment temperature is high, human-body radiating for human-body radiating More, when environment temperature is low, human-body radiating is smaller, i.e. N=N ' * A%, and N ' is environment temperature in formula, and A% is environment temperature pair In the influence coefficient of human-body radiating.Based on above-mentioned situation, influence of the environment temperature for human-body radiating can be accurately calculated, Chip microcontroller described hereinafter can be used by calculating below, be comprised the following steps:
Step 1, calculating human-body radiating temperature.
According to CO2The CO that sensor is detected2Data, the CO with reference to produced by one2With the corresponding relation of human-body radiating, The human-body radiating total amount of current indoor can be calculated, that is, calculates human-body radiating temperature.
Step 2, calculating indoor environment temperature.
By the temperature that temperature sensor is detected includes indoor environment temperature and human-body radiating temperature, therefore, by temperature The temperature that sensor is detected subtracts the environment temperature that the human-body radiating temperature that step 1 calculated is current indoor.
The influence of step 3, calculating current indoor environment temperature for human-body radiating temperature.
According to N=N ' * A%, influence coefficient of the environment temperature for human-body radiating temperature can be calculated.
Compressor is additionally provided with the exhaustion section 22, as shown in figure 3, adjusting the evaporator, swollen of section 14 with foregoing moisture Together, the refrigerant for constituting new blower fan is followed the condenser of swollen valve (routine techniques), the condenser of interior condensation segment 15 and condensed exterior section 23 Endless tube road.The compressor is controlled by a single-chip microcomputer, and the single-chip microcomputer receives the influence system of the human-body radiating temperature Number, and according to the working condition of data control compressor, it is possible to achieve handled for temperature and humidity in fresh air, one Aspect can be by the accurate influence for eliminating environment temperature for human-body radiating, so as to improve comfort level;On the other hand one can be entered The energy consumption of step reduction sensible heat air conditioner.Further, the lifting of adaptability can also be carried out to the working frequency of compressor, 10%~20% is for example lifted, it is possible thereby to which eliminating the heat for practicing midwifery raw by the human world carries out heat, the electricity such as lamp or computer Heat produced by device.
In addition, the single-chip microcomputer can be electrically connected also with the air-valve in fresh air channel, runner heat reclamation device, so that foundation CO caused by indoor people2Data volume adjusts valve area.
The condenser of condenser and the condensed exterior section 23 of the interior condensation segment 15 is connected in parallel, in the cold of interior condensation segment 15 In pipeline where condenser, condenser control valve is provided with.By controlling opening and closing and the aperture of condenser control valve, it can control Whether refrigerant flows through the condenser of interior condensation segment 15, and realizes the control for the specific flow of refrigerant.When refrigerant flow through it is interior cold During the condenser of solidifying section 15, it is possible to achieve for the heating and dehumidification of fresh air.Such a situation is up to standard for air-conditioning humidity regulation But the relatively low situation of temperature, the lifting for temperature is realized by the condenser of interior condensation segment 15.
Further, as shown in figure 4, also including an evaporator condensation apparatus for recovering, the device one end is connected to evaporation The condensed water delivery port of device, the condenser that the other end is connected to condensed exterior section 23 is set, and is connected by water lines.In the water In pipeline, picotan, water replanishing device, spray and atomising device are additionally provided with, so as to ensure that condensed water is exported to spray and mist Disguise the delivery port put.Sprayed, with realizing it is cooled towards the condenser of condensed exterior section 23 by delivery port. Further, a condensed water cistern (not shown) is additionally provided with the condenser bottom of outer condensation segment 23, thus works as condensed water When spraying excessive, condensed water can be received by condensed water cistern.On the one hand avoid condensing water waste, on the other hand, cistern In condensed water can realize further cooling to it by soaking the condenser of condensed exterior section 23.
In the exhaustion section 22, the blower fan towards condensed exterior 23 condensers of section is additionally provided with, foregoing air-makeup system is used as End, for the outside condenser of condensation segment 23 carry out wind-cooling heat dissipating.The interior of demand due to to(for) fresh air has difference, When resh air requirement demand is smaller, with the reduction of fresh air.Corresponding, the return air amount in waste air passage also reduces accordingly.When outer When the air quantity of the condenser of condensation segment 23 reduces, just easily produce condenser pressure rise and cause the shutdown shape of its self-protection Condition.Based on this, basic air quantity is provided by the outside condenser of condensation segment 23 of basic air-makeup system set in initial effect filtering section, Meet the working environment of condensed exterior 23 condensers of section.So that in the state of different fresh airs, condensed exterior 23 condensers of section can be just Often work.Specifically, the air-makeup system at least includes blower fan and connected chip microcontroller, the single-chip microcomputer is according to sensing The return air situation that air flow sensor is detected in device group realizes the control for rotation speed of fan.
The application also provides second embodiment, and second embodiment and first embodiment differ only in heat-recovery section 13 Implementation.Heat-recovery section 13 in second embodiment is realized using heat pipe-type heat reclamation device.First and second embodiment Difference is:The advantage of runner heat reclamation device is that heat exchange efficiency is higher, but shortcoming is that isolation effect is poor, main to use In places such as market, theater or families.The advantage of heat pipe-type heat reclamation device is that isolation effect is good, but shortcoming is to change The thermal efficiency is relatively low, is mainly used in hospital, can be prevented effectively from air cross infection.
Preferred embodiment of the present utility model is the foregoing is only, not to limit the utility model, for example, is schemed 5 be that personnel are more intensive the characteristics of showing arenas, Conference Hall scene, this scene, and distribution is more concentrated, and is thus caused new Wind demand is big, and new wind load and personnel's load are all very big.Based on this, the fresh air outlet of new blower fan can be introduced directly into personnel Compact district, so that fresh air is directly provided, and waste air import is directly by indoor carry out waste air suction.Thus, new blower fan and sensible heat Air conditioner substantially has no the connection on pipeline, and new blower fan is merely responsible for " damp and hot " part, compared with traditional approach, energy-conservation 30%, and And can be used in conditioning in Transition Season as air-conditioning, shorten cooling, heating time about one month every year.Also, fresh air direct-furnish seating area, Freshness, cleanliness factor are ensure that, and wind-warm syndrome is suitable, greatly improves comfort level.
Fig. 6 show office building scene, is that Per capita area is larger the characteristics of this scene, new wind load and personnel's load compared with Small, sensible heat load is mainly heat transfer load, and fan coil and water system are used air conditioning terminal more.Such building is close due to personnel Degree is low, has a very wide distribution, required resh air requirement and humidity load are smaller.Cold water temperature is reduced for less humidity load, causes cold The thermal efficiency is reduced, extremely unreasonable, is that scheme shown in this Fig. 6 supplies fresh air (can be by minimum fresh air requirmente) using the layering of new blower fan, Whole humidity loads are undertaken, while air-conditioning supplies water and sensible heat load is only born in end, 50% are can save energy.
The characteristics of Fig. 7 show dining room, dining room scene, this scene is that internal contamination is very big (burning, oil smoke, peculiar smell), because The resh air requirement that this needs is very big, causes new wind load too high, smaller shared by sensible heat load by contrast (to account for total load , therefore total energy consumption is very high 30%).In this case, the waste air of interior is directly extracted in the waste air import of new blower fan, by complete-hot fresh air Machine adds sensible heat air conditioner to undertake the hot humidity load of dining area, can improve supply water temperature, energy-conservation more than 40%.
New blower fan can be both connected with sensible heat air conditioner by pipeline it can be seen from the illustrated embodiment of Fig. 5~7 constitutes Full thermal purification VMC, can also be individually to indoor offer fresh air, and for the recovery of waste air.So as to using fresh air as load Body, being extracted from air draft can be handled fresh air, it is not only energy-efficient and can " instantaneity " fresh pure air is provided, more It is important that:The equipment fully assume responsibility for the load of people.
It is all within spirit of the present utility model and principle in a word, any modification, equivalent substitution and improvements made etc., It should be included within protection domain of the present utility model.

Claims (6)

1. a kind of full thermal purification VMC, it is characterised in that including new blower fan, the new blower fan includes:
Fresh air channel between fresh inlet and fresh air outlet, including set gradually:Initial effect filtering section, heat-recovery section, humidity Section, interior condensation segment, external cold heat section and HEPA fillter sections are adjusted, for indoor injection fresh air;
Waste air passage between waste air import and waste air outlet, including set gradually:Exhaustion section, heat-recovery section and condensed exterior Section, for the waste air in absorption chamber;
The waste air passage is provided with sensor, for detecting the heat energy produced by human body;
Fresh air channel and the waste air passage shares the heat-recovery section, and the heat-recovery section is according to the warm produced by the human body Can, cold is reclaimed from waste air passage, fresh air channel is freezed;
Condensate water recovery device, one end is connected to the condensed water delivery port of the humidity regulation section, other end connection condensed exterior section Set, in the pipeline of the condensate water recovery device, be provided with spray, moisturizing and atomising device.
2. system according to claim 1, it is characterised in that the bottom of the condensed exterior section is additionally provided with a condensed water retaining Pond.
3. system according to claim 1, it is characterised in that the sensor at least includes one below:CO2Sensor, Humidity sensor, temperature sensor, PM2.5 sensors and air flow sensor.
4. system according to claim 1, it is characterised in that in the waste air passage, in addition to one towards condensed exterior The blower fan of section;
The blower fan and a monolithic mechatronics;
The single-chip microcomputer is also electrically connected with the sensor, heat-recovery section and control valve.
5. system according to claim 1, it is characterised in that
The fresh inlet of the new blower fan is arranged at outdoor, absorbs outdoor fresh air;
Interior is led in the fresh air outlet of the new blower fan;
The waste air entrance of the new blower fan is arranged at waste air in interior, absorption chamber;
Outdoor is led in the waste air outlet of the new blower fan.
6. system according to claim 1, it is characterised in that also including the sensible heat air conditioner being connected with the new blower fan,
The fresh inlet of the new blower fan is arranged at outdoor, absorbs outdoor fresh air;
The fresh air air inlet of the fresh air outlet connection sensible heat air conditioner of the new blower fan;
Interior is led in the fresh air outlet of the sensible heat air conditioner;
The waste air entrance of the sensible heat air conditioner is arranged at waste air in interior, absorption chamber;
The waste air entrance of the waste air outlet connection new blower fan of the sensible heat air conditioner;
Outdoor is led in the waste air outlet of the new blower fan.
CN201720103632.XU 2017-01-23 2017-01-23 A kind of full thermal purification VMC Expired - Fee Related CN206583030U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720103632.XU CN206583030U (en) 2017-01-23 2017-01-23 A kind of full thermal purification VMC

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720103632.XU CN206583030U (en) 2017-01-23 2017-01-23 A kind of full thermal purification VMC

Publications (1)

Publication Number Publication Date
CN206583030U true CN206583030U (en) 2017-10-24

Family

ID=60110978

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720103632.XU Expired - Fee Related CN206583030U (en) 2017-01-23 2017-01-23 A kind of full thermal purification VMC

Country Status (1)

Country Link
CN (1) CN206583030U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106839241A (en) * 2017-01-23 2017-06-13 北京威斯汀豪斯科技有限公司 A kind of full thermal purification VMC
CN109595734A (en) * 2018-12-10 2019-04-09 广东美的制冷设备有限公司 Control method, device and the fresh air system of fresh air system
CN112902325A (en) * 2021-03-03 2021-06-04 赵岐华 Air heat and humidity treatment method and unit for primary return air conditioning system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106839241A (en) * 2017-01-23 2017-06-13 北京威斯汀豪斯科技有限公司 A kind of full thermal purification VMC
CN109595734A (en) * 2018-12-10 2019-04-09 广东美的制冷设备有限公司 Control method, device and the fresh air system of fresh air system
CN112902325A (en) * 2021-03-03 2021-06-04 赵岐华 Air heat and humidity treatment method and unit for primary return air conditioning system

Similar Documents

Publication Publication Date Title
CN107143945B (en) Combined control of temperature and CO2Multi-air-duct constant-humidity fresh air machine and working method thereof
CN103900181B (en) A kind of family formula Fresh air handling units
CN103644600B (en) Intelligent purifying and bacteriostatic air processing unit
CN206583030U (en) A kind of full thermal purification VMC
CN107246664A (en) A kind of full heat removes haze fresh air all-in-one
CN203642338U (en) Double-cold-source combination type fresh air handling unit
CN206583029U (en) A kind of full thermal purification VMC
CN106642332A (en) Floor type direct blowing fresh air ventilator
CN106705224A (en) Multi-level heat recovery combined air processor and air processing method thereof
CN206669982U (en) A kind of device for recycling condensed water for Fresh air handling units
CN102840638A (en) Building micro-ventilation system for improving indoor air quality and humidity environment
CN106642426A (en) Purification fresh air unit with dehumidifying and energy recycling functions and dehumidifying and purifying method of purification fresh air unit
CN106091342A (en) A kind of air quality processes unit and control method thereof
CN207570068U (en) A kind of embedded indoor ventilation system
CN106885308A (en) A kind of heat-pump-type heat recovery fresh air purifies dehumidifying integrated machine
CN206583031U (en) A kind of full thermal purification VMC
CN208139479U (en) A kind of heat pump fresh air system with energy recovery function
CN207350664U (en) One kind humidification filtering integral Fresh air handling units
CN205991562U (en) A kind of combined air processing group
CN205980035U (en) Double runner air conditioning unit with high -efficient dehumidification, energy -conservation
CN207763134U (en) Air conditioning system with fresh air haze removal and self-cleaning functions and independent temperature and humidity control function
CN207721687U (en) A kind of water dispenser with air cleaning unit
CN107896466B (en) Data center is with actively the same as the cooling cold supply system of the evaporation passively combined
CN206669890U (en) A kind of heat-pump-type heat recovery fresh air purifies dehumidifying integrated machine
CN107883479A (en) Air conditioning system with fresh air haze removal and self-cleaning functions and independent temperature and humidity control function

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171024

Termination date: 20200123

CF01 Termination of patent right due to non-payment of annual fee