CN208907103U - A kind of u-gas gasifier to start working furnace drying device - Google Patents

A kind of u-gas gasifier to start working furnace drying device Download PDF

Info

Publication number
CN208907103U
CN208907103U CN201821395219.6U CN201821395219U CN208907103U CN 208907103 U CN208907103 U CN 208907103U CN 201821395219 U CN201821395219 U CN 201821395219U CN 208907103 U CN208907103 U CN 208907103U
Authority
CN
China
Prior art keywords
valve
gas
burning
pipeline
burning torch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821395219.6U
Other languages
Chinese (zh)
Inventor
钟汉贤
李永波
段少栋
郑立林
刘明忠
乔丽娟
李平
曾悦省
梅仙召
李润生
王亚培
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yima Coal Industry Zongneng New Energy Co Ltd
Original Assignee
Yima Coal Industry Zongneng New Energy Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yima Coal Industry Zongneng New Energy Co Ltd filed Critical Yima Coal Industry Zongneng New Energy Co Ltd
Priority to CN201821395219.6U priority Critical patent/CN208907103U/en
Application granted granted Critical
Publication of CN208907103U publication Critical patent/CN208907103U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Combustion Of Fluid Fuel (AREA)

Abstract

The utility model discloses a kind of u-gas gasifier to start working furnace drying devices, including burner body, and the igniter being sent into together in gasification furnace body on burner body and with burner body and flame monitoring apparatus is arranged in.The utility model on original device by carrying out structural transformation, by being transformed to the burner tube road that goes into operation, combustion-supporting air hose, control valve, wind deflector and connection metal hose, shorten the overall operation period of U-GAS gasification installation, guarantee is provided for the orderly function of entire process, increases the core competitiveness of enterprise.

Description

A kind of u-gas gasifier to start working furnace drying device
Technical field
It goes into operation baking equipment field the utility model relates to u-gas gasification installation, specially a kind of u-gas gasification furnace is driven The device to heat up during baker.
Background technique
With the development of society, especially scientific and technical progress, is greatly facilitated the rapid development of social productive forces, people While constantly enjoying social progress bring plentiful material life, new leather constantly also is being carried out to society Newly.
Coal gasifier is also known as gas generator (gas producer).The capital equipment of coal gasification.According to the property of coal and There are many gasification furnace patterns for requirement to coal gas product.It is divided into the forms such as fixed bed (moving bed), ebullated bed and air flow bed.
After u-gas gasification furnace driving initial stage establishes bed, due to the burning torch pressure-bearing < used during gasification furnace baker 0.1MPa, it is 1.0MPa that gasification furnace, which operates normally pressure, therefore burning torch needs to be extracted after establishing bed;Gasification furnace is drawn guns When, gasification furnace establishes bed 10KPa or so, and 650 DEG C of temperature of charge or so in gasification furnace, gasification furnace pressure is 10KPa or so, needs Gasification furnace is taken out to draw guns after negative pressure;Gasification furnace is drawn guns to take out and be born using 0.5MPa steam, needs to maintain pressure during drawing guns; There are pressure oscillations in gasification furnace, and high-temperature material is sprayed to outside gasification furnace during gasification furnace is drawn guns, and personnel is caused to scald;Gasification Furnace process duration of drawing guns is long, need to carry out 3 hours, waste of resource, extends the time of driving.
Therefore, existing u-gas gasifier to start working furnace drying device is improved, is a good problem to study.
Summary of the invention
In order to overcome the deficiencies in the prior art described above, utility model device structure is simple, easy for operation, and energy After so that u-gas gasification installation is avoided baker furnace drying device need to extract and caused by equipment personnel's accident u-gas gasification Furnace goes into operation furnace drying device.
Purpose of the utility model is realized as follows:
A kind of u-gas gasifier to start working furnace drying device, including burner body, and be arranged on burner body simultaneously same Burner body is sent into igniter and flame monitoring apparatus in gasification furnace body together;
The burning main body includes burning pipeline, and is arranged and is fixed on the air distribution plate of burning pipeline front end;Institute The combustion tube line back end connection igniter stated, and igniter junction is provided with gun body connecting flange, gun body connection method The furnace body connecting valve of connection gasification furnace body is provided on orchid;
The igniter includes the firing gun body that one end is connect with burning pipeline, and the firing gun body other end passes through pipeline Connect flame detecting device, gas source device and igniting gun apparatus;
It is arranged in the gun body of the firing gun body by being provided with the combustion air piping connection wind regime of combustion air connection valve; The pipe with spare purging interface valve, between spare purging interface valve and combustion-supporting air pipe line is provided on the combustion-supporting air pipe line Road is provided with the first air pipe line purge gass hand-operated valve and the second air pipe line purge gass hand-operated valve;
The gas source device connects firing gun body by the fuel gas pipeline of setting fuel gas inlet valve;The combustion gas The second hand-operated valve of fuel gas inlet first manual valve and fuel gas inlet is provided on pipeline;
The gas piping for being provided with small flow gas interface valve is communicated on the fuel gas pipeline simultaneously;
The igniting gun apparatus includes the burning torch burning line connecting with firing gun body, is led on burning torch burning line Cross burning torch fuel gas inlet connection fuel gas source, and connect with firing gun body, and be provided with the first burning torch import hand-operated valve with The burning torch inlet ductwork of second burning torch import hand-operated valve;Burning torch import is provided at the burning torch inlet ductwork f Flange;
Flame detecting device includes fire inspection bashertron, the fire inspection bashertron connecting flange being fixed at fire inspection blow valve port, institute The fire inspection blow valve port stated is helicitic texture, by being provided with the first fire inspection bashertron hand-operated valve and the second fire inspection bashertron hand-operated valve It is connect with firing gun body;
Flame-observing hole flange is provided on the firing gun body.
Positive beneficial effect: the utility model on original device by carrying out structural transformation, by the burning that goes into operation Device pipeline, combustion-supporting air hose, control valve, wind deflector and connection metal hose are transformed, and shorten the whole of U-GAS gasification installation The running body period provides guarantee for the orderly function of entire process, increases the core competitiveness of enterprise, while overcoming gas There are pressure oscillations in gasification furnace, and high-temperature material is sprayed to outside gasification furnace during change furnace is drawn guns, the deficiency for causing personnel to scald.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is sectional view along A-A in Fig. 1;
Fig. 3 is B-B direction cross-sectional view in Fig. 1;
In figure are as follows: the second air pipe line purge gass hand-operated valve 1, fire inspection bashertron connecting flange 2, burning torch suction flange 3, Gun body connecting flange 4, flame-observing hole flange 5, the second hand-operated valve 6, firelock fuel gas inlet 7, fuel gas inlet first manual valve 8, first Air pipe line purge gass hand-operated valve 9, burning pipeline 10, air distribution plate 11, firing gun body 12, burning torch burning line 13, second point Firelock import hand-operated valve 14, first burning torch import hand-operated valve the 15, first fire inspection bashertron hand-operated valve 16 and the second fire inspection signal Instrument hand-operated valve 17.
Specific embodiment
With reference to the accompanying drawing, the utility model is described further:
As shown in Figure 1, a kind of u-gas gasifier to start working furnace drying device, including burner body, and be arranged in burner The igniter and flame monitoring apparatus being sent into together in main body and with burner body in gasification furnace body;
The burning main body includes burning pipeline 10, and is arranged and is fixed on the air distribution plate of burning 10 front end of pipeline 11;10 rear end of burning pipeline connects igniter, and igniter junction is provided with gun body connecting flange 4, rifle The furnace body connecting valve e of connection gasification furnace body is provided on body connecting flange 4;
The igniter includes the firing gun body 12 that one end is connect with burning pipeline 10, and 12 other end of firing gun body is logical Cross piping connection flame detecting device, gas source device and igniting gun apparatus;
It is set in the gun body of the firing gun body 12 by being provided with the combustion air piping connection wind regime of combustion air connection valve d It sets;Be provided on the combustion-supporting air pipe line with spare purging interface valve g, spare purging interface valve g and combustion-supporting air pipe line it Between pipeline on be provided with the first air pipe line purge gass hand-operated valve 9 and the second air pipe line purge gass hand-operated valve 1;
The gas source device connects firing gun body 12 by the fuel gas pipeline of setting fuel gas inlet valve b;Described Fuel gas inlet first manual valve 8 and the second hand-operated valve of fuel gas inlet 6 are provided on fuel gas pipeline;
The gas piping for being provided with small flow gas interface valve a is communicated on the fuel gas pipeline simultaneously;
As shown in figure 3, the igniting gun apparatus includes the burning torch burning line 13 connecting with firing gun body 12, igniting Fuel gas source is connected by burning torch fuel gas inlet 7 on rifle burning line 13, and is connect with firing gun body 12, and be provided with first The burning torch inlet ductwork f of burning torch import hand-operated valve 15 and the second burning torch import hand-operated valve 14;The burning torch import Burning torch suction flange 3 is provided at pipeline f;
Flame detecting device includes fire inspection bashertron, the fire inspection bashertron connecting flange 2 being fixed at fire inspection blow valve port c, The fire inspection blow valve port c is helicitic texture, by being provided with the first fire inspection bashertron hand-operated valve 16 and the second fire inspection bashertron Hand-operated valve 17 is connect with firing gun body 12;
Flame-observing hole flange 5 is provided on the firing gun body 12.
Go into operation heating of the utility model using town gas as fuel, for gasification furnace.The novel burner that goes into operation is direct With gasification furnace body flanged joint.For burner in horizontally disposed, every set burner is furnished with flame monitoring and igniter.Igniting dress It sets and flame monitoring apparatus is mounted on burner body part, gasification furnace is integrally packed into together with burner, in gasification furnace body On not separately aperture.The covering device can control the operation of the burner that goes into operation of gasification furnace, all system configurations (including scene control Cabinet processed) to consider the feasibility and convenience of execute-in-place.Need valve, instrument for being arranged on stokehold etc. then individually to set really It is vertical: such as burner pipeline, burning air pipe line stokehold stop valve;
Specific construction technique are as follows:
1. being required according to invention, maintenance and renovation scheme and technique, design improvement drawing is worked out, and do Strength co-mputation, handled And provide a series of proofs and the formalities such as pressure vessel transformation, maintenance, prison inspection.
2, buner system is made of close phase section two burners, pipeline, control valve, safety systems etc..It goes into operation Burner is mainly used for the temperature inside gasification furnace rising to a maximum of about of 900 DEG C by room temperature.It is arranged two on each gasification furnace to open Work burner.Burner go into operation using town gas as fuel, burner is used for the heating that goes into operation of gasification furnace, and burner is direct It is connect with gasification furnace.
3, burner is in horizontally disposed, and every set burner is configured with integral flame monitoring and high energy ignition unit.High energy Igniter and flame monitoring apparatus are mounted on burner body part, and gasification furnace is integrally packed into together with burner, are gasifying Not separately aperture on furnace body.The burner that goes into operation of three gasification furnaces is controlled using a set of combustion air and town gas instrument System.The set system can control the operation of the burner that goes into operation of gasification furnace, and all system configurations (including field control cabinet) are real Existing execute-in-place and teletransmission operation.Valve, instrument for being arranged on stokehold etc. are then individually set up: such as burner pipeline, burning wind Stop valve etc. of the pipeline in stokehold.
Major alterations content is as follows:
Two combustion systems, including two burners, burning pipeline, air pipe line stainless steel stop valve, 8 words are transformed in every blind roaster Blind plate, stainless steel check-valves and connection metal hose etc..In addition more by original air pipe line, burning pipeline flowmeter and regulating valve It changes.Remaining pipeline and control system utilize existing equipment.Burner pipe rupture valve should all use stainless steel material, pressure etc. Grade 4.0MPa;For the stop valve for the wind that burns, the three core shift butterfly valves using Shanghai automatic control logical greatly are specified, the operating temperature of valve is not Lower than 400 DEG C.
Stainless steel check (non-return) valve is respectively provided with after fuel gas pipeline stop valve, the operating temperature of pressure rating 4.0MPa, valve is not low In 400 DEG C.In stop valve upstream, set gradually 8 word blind plates and scene leak detection pressure gauge.Air pipe line stokehold sets the manual ball of stainless steel Valve and spectactle blind.
2.1 important technological parameters
Illustrate:
2.1.1 correspond to minimum thermic load (i.e. about 350,000kcal/h) for 80 DEG C;800 DEG C of normal requirement flue-gas temperature, In busy hour, it is desirable that there is the ability by flue-gas temperature stability contorting at 900 DEG C.
2.1.2 continuous operation during operating duty is driven.
2.1.3 material characteristic
Driving operating condition
Name of material: coke, steam, coal, slag
Bed density: 640 ~ 1200kg/m3
Fire box temperature when burner deactivates: 800 DEG C
Furnace pressure when burner deactivates: 1.0MPaG
Proper Design temperature: 300 DEG C
Proper Design pressure: 1.2MPaG
Environmental pressure: normal pressure
Fuel: operating condition of normally driving
Dimethyl ether temperature room temperature
Gas: temperature room temperature
2.1.4 public work
Power supply: 380V/3P/50Hz
The specification of plant air: 25 DEG C of temperature
0.5 MPaG of pressure
The specification of purging nitrogen: 25 DEG C of temperature
0.60 MPaG of pressure
Water source: process water, 0.2~0.4 MPa(g of pressure)
2.1.5 igniting
Every burner is equipped with igniter, altar lamp and fire inspection control system.Pass through the finger on operation ignition control case Show button to complete automatic ignition on the spot.It also lights a fire in a manner of using manual firing simultaneously.If automatic ignition fails, point Fiery control cabinet can then signal to fuel fast cut valve on the spot, and issue alarm, the rapid fuel shutoff valve of fast cut valve, to guarantee to light a fire The safety of process.
2.1.6 adjusting furnace temperature
Furnace temperature realizes quantitative air-fuel by adjusting the regulating valve on the fuel control valve and air header on burning line Than adjusting, meet the control requirement of gasifier temperature.Fuel and combustion air main pipe are equipped with regulating valve and flowmeter, operational process It is middle to give signal to DCS, it is realized and is controlled by DCS, have the function that automatic ratio adjusting of burning.

Claims (7)

1. a kind of u-gas gasifier to start working furnace drying device, it is characterised in that: including burner body, and be arranged in burner The igniter and flame monitoring apparatus being sent into together in main body and with burner body in gasification furnace body;The burner Main body includes burning pipeline (10), and is arranged and is fixed on the air distribution plate (11) of burning pipeline (10) front end;The combustion It burns pipeline (10) rear end and connects igniter, and igniter junction is provided with gun body connecting flange (4), gun body connection method The furnace body connecting valve (e) of connection gasification furnace body is provided on blue (4);The igniter includes one end and burning pipeline (10) firing gun body (12) connected, firing gun body (12) other end are filled by piping connection flame detecting device, gas source It sets and lights a fire gun apparatus.
2. a kind of u-gas gasifier to start working furnace drying device according to claim 1, it is characterised in that: the burning torch It is arranged in the gun body of body (12) by being provided with the combustion air piping connection wind regime of combustion air connection valve (d);The combustion air It is provided on pipeline with spare purging interface valve (g), is set on the pipeline between spare purging interface valve (g) and combustion-supporting air pipe line It is equipped with the first air pipe line purge gass hand-operated valve (9) and the second air pipe line purge gass hand-operated valve (1).
3. a kind of u-gas gasifier to start working furnace drying device according to claim 1, it is characterised in that: the combustion gas gas Source device connects firing gun body (12) by the fuel gas pipeline of setting fuel gas inlet valve (b);It is provided on the fuel gas pipeline Fuel gas inlet first manual valve (8) and the second hand-operated valve of fuel gas inlet (6).
4. a kind of u-gas gasifier to start working furnace drying device according to claim 3, it is characterised in that: the fuel gas conduit Road is communicated with the gas piping for being provided with small flow gas interface valve (a) simultaneously.
5. a kind of u-gas gasifier to start working furnace drying device according to claim 1, it is characterised in that: the burning torch Device includes the burning torch burning line (13) connecting with firing gun body (12), and burning torch burning line passes through burning torch on (13) Fuel gas inlet (7) connects fuel gas source, and connect with firing gun body (12), and be provided with the first burning torch import hand-operated valve (15) With the burning torch inlet ductwork (f) of the second burning torch import hand-operated valve (14);Burning torch inlet ductwork (f) place is provided with Burning torch suction flange (3).
6. a kind of u-gas gasifier to start working furnace drying device according to claim 1, it is characterised in that: flame detecting device Bashertron is examined including fire, is fixed on fire inspection bashertron connecting flange (2) at fire inspection place blow valve port (c), the fire inspection blow valve port (c) be helicitic texture, by be provided with first fire inspection bashertron hand-operated valve (16) and second fire inspection bashertron hand-operated valve (17) and Firing gun body (12) connection.
7. a kind of u-gas gasifier to start working furnace drying device according to claim 6, it is characterised in that: the burning torch Flame-observing hole flange (5) are provided on body (12).
CN201821395219.6U 2018-08-28 2018-08-28 A kind of u-gas gasifier to start working furnace drying device Expired - Fee Related CN208907103U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821395219.6U CN208907103U (en) 2018-08-28 2018-08-28 A kind of u-gas gasifier to start working furnace drying device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821395219.6U CN208907103U (en) 2018-08-28 2018-08-28 A kind of u-gas gasifier to start working furnace drying device

Publications (1)

Publication Number Publication Date
CN208907103U true CN208907103U (en) 2019-05-28

Family

ID=66613244

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821395219.6U Expired - Fee Related CN208907103U (en) 2018-08-28 2018-08-28 A kind of u-gas gasifier to start working furnace drying device

Country Status (1)

Country Link
CN (1) CN208907103U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110617710A (en) * 2019-10-09 2019-12-27 安徽楚江科技新材料股份有限公司 Furnace drying method of walking beam furnace

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110617710A (en) * 2019-10-09 2019-12-27 安徽楚江科技新材料股份有限公司 Furnace drying method of walking beam furnace

Similar Documents

Publication Publication Date Title
CN106322368B (en) A kind of super low NO and its combustion method
CN102261664B (en) Novel blast furnace gas diffusion and automatic ignition system
CN102353041A (en) Efficient and energy saving ground flare gas system
CN104791811B (en) A kind of flare system
CN106247353A (en) A kind of blast furnace gas diffusing ignition system
CN202131322U (en) Novel diffusing and automatic ignition system for blast furnace gas
CN208907103U (en) A kind of u-gas gasifier to start working furnace drying device
CN203927952U (en) A kind of blast furnace gas diffusing automatic ignition companion burns device
CN103486580A (en) Tiny-oil ignition oxygenation combustion energy conservation system
CN105219900B (en) A kind of blast furnace gas diffusing method and automatic control system
CN202203935U (en) Adjustable ground torch gas system
CN204476360U (en) A kind of individual well sledge dress heated by natural gas throttling arrangement
CN207778024U (en) A kind of Natural Gas transfer pipeline of double-hearth lime kiln
CN206768042U (en) A kind of biomass gasifying furnace
CN107228356B (en) Automatic stable combustion system for opposite-flushing boiler
CN1400422A (en) Method for controlling torch altar lamp which burns day and night
CN202709178U (en) Natural gas ignition system of pulverized coal flame furnace
CN202849503U (en) Field assembly welding annular welding joint heat treatment device of large chemical equipment
CN211344795U (en) Liquid ethane pipeline valve chamber relief system
CN204853491U (en) Three air supply safety combustors
CN207599694U (en) A kind of low NOx steady burning burners in boiler
CN211176798U (en) Flame-retardant burner
CN202393197U (en) Premixing combustion system for vertical melting furnace
CN207259462U (en) A kind of simple furnace drying device of LNG methanators
CN206556010U (en) A kind of Ou Ye producer gas burners of high-efficiency environment friendly

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190528

Termination date: 20200828

CF01 Termination of patent right due to non-payment of annual fee