CN208900074U - It is a kind of for controlling the auxiliary device in cementing plug face - Google Patents

It is a kind of for controlling the auxiliary device in cementing plug face Download PDF

Info

Publication number
CN208900074U
CN208900074U CN201821629969.5U CN201821629969U CN208900074U CN 208900074 U CN208900074 U CN 208900074U CN 201821629969 U CN201821629969 U CN 201821629969U CN 208900074 U CN208900074 U CN 208900074U
Authority
CN
China
Prior art keywords
drilling rod
connector
seperated
section
rubber plug
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821629969.5U
Other languages
Chinese (zh)
Inventor
刘德平
巫道富
付华才
任茜
钟睿
伍建勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chuandong Drilling Co of CNPC Chuanqing Drilling Engineering Co Ltd
Original Assignee
Chuandong Drilling Co of CNPC Chuanqing Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chuandong Drilling Co of CNPC Chuanqing Drilling Engineering Co Ltd filed Critical Chuandong Drilling Co of CNPC Chuanqing Drilling Engineering Co Ltd
Priority to CN201821629969.5U priority Critical patent/CN208900074U/en
Application granted granted Critical
Publication of CN208900074U publication Critical patent/CN208900074U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model uses a kind of for controlling the auxiliary device in cementing plug face, further includes that the bruising connector of drilling rod lower end and the seperated rubber plug being preset in cementing head is arranged in including the cementing head that drilling rod and drilling rod upper end are arranged;Outer power drive fission rubber plug enters in drilling rod out of cementing head to be moved axially downwards along drilling rod to bruising connector, seperated rubber plug is clamped section by bruising connector and is intercepted, the seperated rubber plug of interception separates fission with ontology, and isolated ontology is intercepted by multiple anti-drop rods.Change the discharge pressure of slush pump by way of bruising, it can intuitively be obtained by the pressure-detecting device being arranged on slush pump, the cement slurry in drilling rod has all been replaced into tubing string to judge to enter the displacement fluid in drilling rod, more traditional mode that conveying replacement liquid measure is determined by way of calculating drilling rod volume is more accurate, facilitates engineer operation.

Description

It is a kind of for controlling the auxiliary device in cementing plug face
Technical field
The utility model relates to drillng operation technical fields, and in particular to a kind of auxiliary dress for controlling cementing plug face It sets.
Background technique
During oil gas drilling, either drillng operation or completion practice are frequently necessary to carry out cementing plug operation, Cementing plug operation is mainly used for backfilling a certain well section or abandoned well, solves the problems, such as blind hole during drilling well, provides ground for open hole test Anchor etc..
Before cementing plug operation, needs first to form tubing string in underground, be at this time drilling fluid and mud entirely in tubing string, pass through It calculates cement slurry dosage and carries out cementing plug operation;Drilling tool or oil pipe are designed into bottom depth down toward cement plug from ground, successively It is preceding when liquid enters in tubing string from drilling tool or oil pipe every liquid, cement slurry, displacement fluid before being added in drilling tool or oil pipe, due to pipe Be completely filled with material before the liquid before addition in column, thus it is preceding every liquid into figure tubing string when, it is preceding will to be located at pipe every liquid It is excessive that the material of column top position squeezes out tubing string, while preceding can also be divided material original in tubing string and cement slurry every liquid Every, avoid the pollution of cement slurry, the cement slurry of design flow be added, by displacement fluid by drilling tool or oil pipe cement slurry all push up For in inlet pipe column, inside and outside tubing string 1 is then slightly kept to arrive the Negative Pressure Difference of 2MPa, then rises and be drilled into 30~50m of design plug face or more, Flush cycle, Hou Ning.
During aforesaid operations, the amount that displacement fluid is added is estimated by calculating the internal volume of drilling tool or oil pipe Judgement, pull out of hole after replacing cement slurry to drilling tool or oil pipe bottom according to the displacement fluid that calculation amount pours into certain volume, due to The reasons such as inaccurate and measurement instrument of the occupancy volumes such as water supply pipeline, measuring tank cause measurement error in displacement process, are easy to lead Causing displacement fluid to be added, excessive or addition is very few, and making cement plug plug face is more than to estimate position (overdisplacing) or cannot reach to estimate position It sets and (replaces not in place), cause cementing plug to fail, be also easy to cause the engineering accidents such as bit freezing when serious.
Utility model content
For the deficiency in the presence of the prior art, the utility model provides a kind of for controlling the auxiliary of cementing plug face Device is helped, solving the result that drilling rod cavity volume uses calculation to obtain in the prior art, there is a problem with large errors.
To achieve the above object, the utility model uses the following technical solution: one kind is for controlling cementing plug face Auxiliary device including the cementing head with multiple interfaces that drilling rod and drilling rod upper end are arranged further include setting in drilling rod lower end Bruising connector and the seperated rubber plug that is preset in cementing head;
The fission rubber plug includes the column fission being arranged in cylindric ontology and ontology, and the ontology lower end is equipped with Angle, the ontology have been peripherally installed with multiple spaced locating plates, the locating plate sidewall slope setting and its inclined direction It is identical as chamfering inclined direction;
The bruising connector be in cavity structure, the cavity structure include the connection seal section for being connected to setting from top to bottom, Supporting section, clamping section, anticreep section, the connection seal section are in inverted conical mesa-shaped, and connect seal section end diameter and be greater than brill Bar outer diameter, the supporting section is straight, and supporting section diameter, between drilling rod internal diameter and outer diameter, the clamping section is presented greatly Under small shrink mouth shape, and be clamped section end diameter and be less than seperated rubber plug body diameter and be greater than seperated diameter, the anticreep section is in straight tube The anti-drop rod of multiple interconnections is equipped in shape and anticreep section;
Outer power drive fission rubber plug enters in drilling rod out of cementing head to be moved axially downwards along drilling rod to bruising connector, point Body rubber plug is clamped section by bruising connector and is intercepted, and the seperated rubber plug of interception separates fission with ontology, Isolated ontology is intercepted by multiple anti-drop rods.
The utilization principle of the utility model: firstly, cementing head, drilling rod, bruising connector can form fluid channel;
It is specific to use: first preceding will to pass through slush pump conveying every liquid (slush pump has flow detection table and pressure detecting table) Mode from an interface of cementing head be sent into drilling rod in, into drilling rod in front of entered back into tubing string every liquid by bruising connector; Before having infused after liquid, then the cement slurry for calculating volume is sent into drilling rod by another connector on cementing head and enters tubing string It is interior;After cement slurry has been infused, the interface of cementing head is replaced again, enables to be preset in the seperated rubber plug in cementing head and enters with displacement fluid Drilling rod is simultaneously moved downward in bruising connector, and the seperated rubber plug into bruising connector can be blocked by bruising connector clamping section It cuts, fluid channel blocks at this time, and inner pressure inside pipe increases (obtaining by the pressure detecting table of slush pump), continues conveying and replaces Liquid, then the pressure in drilling rod continues to increase, until the fission of seperated rubber plug is separated with ontology, isolated fission is blocked by anti-drop rod It cuts, reopens fluid channel, pressure is fallen after rise, and it is unimpeded to restore pipe inner flow passage;Then it pulls out of hole, waits after stopping slush pump feeding It is solidifying.
Compared with the prior art, the utility model has the following beneficial effects:
1, change the discharge pressure of slush pump, it can be by the pressure detecting that is arranged on slush pump Device intuitively obtains, so that judging that the displacement fluid entered in drilling rod all replaces the cement slurry in drilling rod enters tubing string Interior, more traditional mode that conveying replacement liquid measure is determined by way of calculating drilling rod volume is more accurate, facilitates engineer operation.
2, the utility model setting bruising connector can after reuse, due to seperated rubber plug be replaced by displacement fluid into Enter in bruising connector, bruising connector and drilling rod can be separated to the seperated rubber plug of taking-up, then by bruising connector and bore after trip-out Bar assembling carries out next cementing plug operation, has the effect of economical and energy saving.
3, the bruising connector of the utility model setting does not have to carry out structure change, processes more while may be reused It is convenient.
4, the fission of the seperated rubber plug of the utility model setting its active area when carrying out stress is small, and pressure is big, needs Slightly increasing drilling rod pressure can be such that fission separates with ontology, and the pushing tow liquid being added in drilling rod is avoided excessively to increase to cement slurry Replace error.
5, the anti-drop rod of the utility model setting can intercept isolated fission, avoid seperated enter in tubing string to pipe Cement slurry intermittent pollution in column.
Detailed description of the invention
Structural schematic diagram when Fig. 1 is the operation of the utility model cementing plug;
Fig. 2 is the utility model cementing head and drilling rod fit structure simplified schematic diagram;
Fig. 3 is the utility model bruising connector and drilling rod fit structure simplified schematic diagram;
Fig. 4 is the structure schematic diagram under another state of Fig. 3;
Fig. 5 is line A-A cross-sectional view in Fig. 3;
Fig. 6 is the utility model bruising joint structure simplified schematic diagram;
Fig. 7 is the utility model fission rubber plug structure schematic diagram.
In figure, cementing head 1, interface 11, catching sheet 12, cover board 13, connector 14, geological stratification 2, drilling rod 3, bruising connector 4, Connect seal section 41, supporting section 42, clamping section 43, anticreep section 44, anti-drop rod 441, seperated rubber plug 5, ontology 51, locating plate 511, It is chamfering 512, fission 52, pin 53, displacement fluid 6, tubing string 7, drilling fluid 8, preceding every liquid 9, cement slurry 10.
Specific embodiment
The utility model is described further with reference to the accompanying drawing.
It is described in the utility model a kind of for controlling the auxiliary device in cementing plug face as shown in FIG. 1 to FIG. 7, including Drilling rod 3 and the cementing head 1 with multiple interfaces 11 of 3 upper end of drilling rod setting, further include the bruising connector that 3 lower end of drilling rod is arranged in 4 with the seperated rubber plug 5 that is preset in cementing head 1;3 sections of drilling rod/section that wherein drilling rod 3 is spliced by multiple head and the tail is formed, adjacent brill Connection can be detained between 3 sections of bar/section by drilling rod 3, and (button of drilling rod 3 is common between this field connection two 3 sections of adjacent drill pipes/section Technological means), then cementing head 1 is mounted in the upper end between the top 3 sections of installation site drilling rod/section, and bruising connector 4 is It is mounted on and most descends lower end between 3 sections of drilling rod/section of installation site.
Since seperated rubber plug 5 needs to be preset in cementing head 1, for convenience of the installation of seperated rubber plug 5, the utility model setting Relatively existing 1 structure of cementing head of cementing head 1 improve to some extent, specifically, the cementing head 1 include connector 14 and and connector The 14 multiple interfaces 11 communicated, connector 14 are in cavity structure, and connector 14 is vertically arranged when use, and 14 upper end of connector is equipped with The cover board 13 of removable setting, 14 lower end of connector are communicated with drill bit, and for convenience of the installation of seperated rubber plug 5, the utility model is in institute It states 14 inner wall of connector and is equipped with the cyclic annular catching sheet 12 for being used to support seperated rubber plug 5, and be located on catching sheet 12 in connector 14 Fang Yuyi interface 11 communicates.12 internal diameter of catching sheet is less than 5 locating plate of seperated rubber plug, 511 maximum outside diameter, as shown in Fig. 2, before perfusion When liquid 9 and cement slurry 10, it can be imported by the interface 11 of 12 lower section of catching sheet in Fig. 2, when displacement fluid 6 is added, from Fig. 2 The interface 11 of middle uppermost position imports displacement fluid 6, since 12 internal diameter of catching sheet is slightly less than seperated 5 locating plate of rubber plug, 511 maximum Outer diameter, displacement fluid 6 will squeeze seperated rubber plug 5 when being full of 12 upper space of catching sheet, a setting occurs for rubber plug locating plate 511 Become, enable to move up into drilling rod 3 under seperated rubber plug 5, while for convenience of the installation of seperated rubber plug 5, connector 14 and cover board 13 can The releasable connection in a manner of through flanged joint.
As shown in fig. 7, cementing head 1, drilling rod 3, bruising connector 4 are formed fluid channel and are blocked up for convenience of seperated rubber plug 5 The seperated rubber plug 5 of plug and conducting, the utility model setting is seperated including the column being arranged in cylindric ontology 51 and ontology 51 52, described seperated 52 are connect with ontology 51 by more pins 53, while guaranteeing that fission 52 is effectively connect with ontology 51, It can be separated in the case where pressurization.For convenience of sliding of the seperated rubber plug 5 in drilling rod 3, avoid making due to 3 inner wall out-of-flatness of drilling rod Seperated rubber plug 5 shifts or just stuck in drilling rod 3 by the foreign matter in drilling rod 3 not entering into bruising connector 4 in drilling rod 3 Interior, 51 one end of the ontology of the utility model setting is equipped with chamfering 512, and the ontology 51 has been peripherally installed with multiple interval settings Locating plate 511,511 sidewall slope of locating plate setting and 511 sidewall slope direction of locating plate and 512 inclined direction of chamfering It is identical;511 outer diameter of locating plate is arranged to be slightly less than 3 internal diameter of drilling rod, not will do it offset, energy in guaranteeing rubber plug folding process State as shown in figure 1 enters in bruising connector 4, at the same be also avoided that seperated rubber plug 5 along drilling rod 3 glide during encounter drilling rod The foreign matter of 3 inner walls can be directly blocked in drilling rod 3, because deformation occurs can cross 3 inner wall foreign matter of drilling rod by locating plate 511 It is moved up under position is smooth in impacting seat connector.
As shown in fig. 6, the bruising connector 4 is in cavity structure, the cavity structure includes connection setting from top to bottom Seal section 41, supporting section 42, clamping section 43, anticreep section 44 are connected, the connection seal section 41 is in inverted conical mesa-shaped, and is connected 41 end diameter of seal section is greater than 3 outer diameter of drilling rod, and the supporting section 42 is straight, and 42 diameter of supporting section is located in drilling rod 3 Between diameter and outer diameter, the clamping section 43 is in up big and down small shrink mouth shape, and is clamped 43 end diameter of section and is less than seperated rubber plug 5 51 diameter of body is greater than seperated 52 diameters, the anticreep section 44 is straight and anticreep section 44 in be equipped with the anticreeps of multiple interconnections Bar 441;Outer power drive fission rubber plug 5 enters in drilling rod 3 out of cementing head 1 to be moved axially downwards along drilling rod 3 to bruising connector 4 Interior, seperated rubber plug 5 is clamped section 43 by bruising connector 4 and is intercepted, and the seperated rubber plug 5 of interception makes fission 52 under outer power drive It is separated with ontology 51, isolated ontology 51 is intercepted by multiple anti-drop rods 441.The connection seal section 41 of the setting of bruising connector 4, branch Support section 42 can effectively be fixed drilling rod 3, at the same can be greater than by connection seal section 41 3 outer radial position of drilling rod to drilling rod 3 and Bruising connector 4 is effectively sealed;The clamping section 43 that bruising connector 4 is arranged can effectively intercept seperated rubber plug 5, facilitate this Body 51 with seperated 52 separation;The more anti-drop rods 441 that the anticreep section 44 that bruising connector 4 is arranged is arranged can be by the fission 52 of separation It is effectively intercepted, fission 52 is avoided to enter in cement slurry 10, since seperated 52 diameters differ more with 44 diameter of anticreep section, be So that anti-drop rod 441 is effectively intercepted fission 52, more anti-drop rods 441 are arranged to " rice " shape as shown in the figure.
It is ° by connection 41 tilt angle of seal section simultaneously for effective sealing of the connection seal section 41 to drilling rod 3 is effectively ensured ~°, to enable effectively to read while will not be added excessive displacement fluid 6 in transformation in drilling rod 3, section 43, chamfering will be clamped 512 tilt angles are °~°, and clamping section 43,512 tilt angle of chamfering is excessive or too small prevents pressure from seperated rubber plug 5 It is effectively converged, it is desirable to separate fission 52 with ontology 51,6 amount of displacement fluid of pressurization is opposite will be excessive, same to influence note The result of cement plug operation.
Specific practical principle: it before carrying out cementing plug operation, needs first to form tubing string 7 under geological stratification 2, at this time tubing string It is drilling fluid 8 entirely in 7, carries out cementing plug operation by calculating 10 dosage of cement slurry;Before lower drilling rod 3, according to as shown in the figure Mounting means drilling rod 3 and cementing head 1 and bruising connector 4 are connected and fixed, seperated rubber plug 5 is preset in cementing head 1 at this time;So By drilling rod 3, bottom depth, then cementing plug operation is arranged in cement plug in tubing string 7 afterwards.
First will it is preceding every liquid 9 by way of slush pump conveying (slush pump has flow detection table and pressure detecting table) from water The interface 11 of mud head 1 is sent into drilling rod 3, into drilling rod 3 in front of entered back into tubing string 7 every liquid 9 by bruising connector 4;It has infused It is preceding that the cement slurry 10 for calculating volume is sent into drilling rod 3 into tubing string 7 after liquid 9, then through another connector on cementing head 1 It is interior;After 10 note of cement slurry is complete, the interface 11 of cementing head 1 is replaced again, enables the seperated rubber plug 5 being preset in cementing head 1 with top Enter drilling rod 3 for liquid 6 and be moved downward in bruising connector 4, the seperated rubber plug 5 into bruising connector 4 can pass through bruising connector 4 Clamping section 43 is intercepted, and fluid channel blocks at this time, and pressure rise (passes through the pressure detecting table of slush pump in drilling rod 3 at this time Obtain), continue to convey displacement fluid 6, then the pressure in drilling rod 3 continues to increase, until the fission 52 of seperated rubber plug 5 divides with ontology 51 From the fission 52 of separation is intercepted by anti-drop rod 441, reopens fluid channel, and pressure is fallen after rise, and it is smooth to restore pipe inner flow passage It is logical;Then it pulls out of hole after stopping slush pump feeding, Hou Ning.
Finally, it is stated that above embodiments are merely intended for describing the technical solutions of the present application, but not for limiting the present application, although ginseng The utility model is described in detail according to preferred embodiment, those skilled in the art should understand that, it can be to this The technical solution of utility model is modified or replaced equivalently, without departing from the objective and model of technical solutions of the utility model It encloses, should all cover in the scope of the claims of the utility model.

Claims (4)

1. a kind of for controlling the auxiliary device in cementing plug face, including drilling rod and drilling rod upper end be arranged with multiple interfaces Cementing head, it is characterised in that: further include that the bruising connector of drilling rod lower end and the seperated rubber plug being preset in cementing head are set;
The fission rubber plug includes the column fission being arranged in cylindric ontology and ontology, and the ontology lower end is equipped with chamfering, The ontology has been peripherally installed with multiple spaced locating plates, the locating plate sidewall slope setting and its inclined direction and has fallen Angle lapping tilted direction is identical;
The bruising connector is in cavity structure, and the cavity structure includes the connection seal section for being connected to setting from top to bottom, support Section, clamping section, anticreep section, the connection seal section are in inverted conical mesa-shaped, and connect seal section end diameter and be greater than outside drilling rod Diameter, the supporting section is straight, and supporting section diameter, between drilling rod internal diameter and outer diameter, the clamping section is in up big and down small Shrink mouth shape, and be clamped section end diameter and be less than seperated rubber plug body diameter and be greater than seperated diameter, the anticreep section it is straight and The anti-drop rod of multiple interconnections is equipped in anticreep section;
Outer power drive fission rubber plug enters in drilling rod out of cementing head to be moved axially downwards along drilling rod to bruising connector, seperated glue Plug is clamped section by bruising connector and is intercepted, and the seperated rubber plug of interception separates fission with ontology, separates Ontology intercepted by multiple anti-drop rods.
2. according to claim 1 a kind of for controlling the auxiliary device in cementing plug face, it is characterised in that: the cement Head includes the connector of cavity structure, and the connector is communicated with multiple interfaces, and the connector upper end is equipped with removable setting Cover board, connector lower end are communicated with drill bit, and the connector inner wall is equipped with the cyclic annular catching sheet for being used to support seperated rubber plug, and even It is located above catching sheet in connector and is communicated with an interface.
3. according to claim 2 a kind of for controlling the auxiliary device in cementing plug face, it is characterised in that: the fission It is connect with ontology by more pins.
4. according to claim 3 a kind of for controlling the auxiliary device in cementing plug face, it is characterised in that: the connection Seal section tilt angle is 75 °~80 °, and the clamping section, chamfering tilt angle are 45 °~50 °.
CN201821629969.5U 2018-09-30 2018-09-30 It is a kind of for controlling the auxiliary device in cementing plug face Expired - Fee Related CN208900074U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821629969.5U CN208900074U (en) 2018-09-30 2018-09-30 It is a kind of for controlling the auxiliary device in cementing plug face

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821629969.5U CN208900074U (en) 2018-09-30 2018-09-30 It is a kind of for controlling the auxiliary device in cementing plug face

Publications (1)

Publication Number Publication Date
CN208900074U true CN208900074U (en) 2019-05-24

Family

ID=66574909

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821629969.5U Expired - Fee Related CN208900074U (en) 2018-09-30 2018-09-30 It is a kind of for controlling the auxiliary device in cementing plug face

Country Status (1)

Country Link
CN (1) CN208900074U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110924927A (en) * 2019-11-15 2020-03-27 长江大学 Method, device and equipment for downlink real-time positioning of well cementation rubber plug and storage medium
CN112814612A (en) * 2019-11-18 2021-05-18 中国石油天然气股份有限公司 Sealing layer plugging method for oil well
CN115217441A (en) * 2022-07-27 2022-10-21 中海石油(中国)有限公司湛江分公司 Ball-throwing device for cement injection plug and cement injection plug process thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110924927A (en) * 2019-11-15 2020-03-27 长江大学 Method, device and equipment for downlink real-time positioning of well cementation rubber plug and storage medium
CN110924927B (en) * 2019-11-15 2023-06-27 长江大学 Method, device, equipment and storage medium for positioning well cementation rubber plug downwards in real time
CN112814612A (en) * 2019-11-18 2021-05-18 中国石油天然气股份有限公司 Sealing layer plugging method for oil well
CN115217441A (en) * 2022-07-27 2022-10-21 中海石油(中国)有限公司湛江分公司 Ball-throwing device for cement injection plug and cement injection plug process thereof

Similar Documents

Publication Publication Date Title
CN208900074U (en) It is a kind of for controlling the auxiliary device in cementing plug face
CN109403894B (en) Early overflow and leakage monitoring system for well drilling
CN110887645A (en) Device and method for testing temporary plugging ball seat seal of hole in shale gas horizontal well pipe
CN103277092A (en) Horizontal well multistage fracturing variable mass multiphase flow simulation experiment device
CN104101390B (en) Flow measuring device for measuring sewage in non-full pipe
CN201627575U (en) Oil well air-lock-preventing oil pumping pipe column
CN103924948A (en) Vortex flow state simulation visual test device
CN203257349U (en) Ocean module drill rig slurry backflow device
CN205532590U (en) Novel two return circuit bi -polar shutoff systems of leaking hunting
CN208900077U (en) A kind of landing nipple for the control of cementing plug operation plug face
CN210217716U (en) Coal bed gas pressure measuring device
CN109915099A (en) High pressure water circuit control device and water pressure supporing system
CN203145914U (en) Automatic high-pressure sand discharging device
CN206592093U (en) Change wellhead connector in oil field four
CN209014064U (en) A kind of flue gas measurement Special wear-resistant block-resistant type pitot tube flowmeter
CN204514911U (en) A kind of sludge specific resistance measurement mechanism
CN203961951U (en) Oil extraction metering device
CN112129360A (en) Device and method for measuring gas extraction pipeline flow
CN201433789Y (en) Ascending hole coal-bed gas pressure detection water pressure eliminator
CN207066936U (en) A kind of portable parallel core simulation of infiltration device
CN203241291U (en) Dredging device of muddy water splitting test measuring pipe
CN205368258U (en) Unsteady harvesting device of crude oil secondary settlement jar intermediate level transition zone
CN210460633U (en) Novel single well measurement calibration of coal bed gas device
CN214091796U (en) Grouting and pipe fixing device between two-stage casing walls of mine hydrological hole
CN209992349U (en) Device for detecting permeability of sand-free concrete well pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190524