CN208899907U - A kind of regularization secondary structure constructional column reinforcement system being used in turn - Google Patents
A kind of regularization secondary structure constructional column reinforcement system being used in turn Download PDFInfo
- Publication number
- CN208899907U CN208899907U CN201821627258.4U CN201821627258U CN208899907U CN 208899907 U CN208899907 U CN 208899907U CN 201821627258 U CN201821627258 U CN 201821627258U CN 208899907 U CN208899907 U CN 208899907U
- Authority
- CN
- China
- Prior art keywords
- nut
- main joist
- screw arbor
- wall
- main
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses the regularization secondary structure constructional column reinforcement systems that one kind can be used in turn, including the first main joist, first main joist is located at the back side of wall, further include: two the second main joists, two second main joists are separately positioned at two inner corner trims of the wall, two third main joists, two third main joists are separately positioned at two inner corner trims of the wall, first Screw arbor with nut at both-ends, it is threaded through the side of first main joist, second Screw arbor with nut at both-ends, it is threaded through the other side of first main joist, first steel plate, it is set in the outside of first Screw arbor with nut at both-ends and the second Screw arbor with nut at both-ends, third Screw arbor with nut at both-ends, the third Screw arbor with nut at both-ends is interspersed between two first square steel tubes, and the both ends of the third Screw arbor with nut at both-ends extend through third main joist.The utility model makes the present apparatus have the characteristics that be easily installed and good fixing effect by the way that a series of structure is arranged.
Description
Technical field
The utility model relates to building engineering equipment technical field, specially a kind of secondary knot of regularization that can be used in turn
Structure constructional column reinforcement system.
Background technique
Architectural engineering, refer to by construction to all kinds of building constructions and its affiliated facility and route matched with its, pipeline,
The installation activity of equipment is formed by engineering entity, wherein " building construction ", which refers to, top cover, beam column, wall, basis and can
Inner space is formed, meets people's production, lives, learns, the engineering that public activity needs.
In construction, secondary structure constructional column generally uses plank sheathing reinforcement system, and demoulding is completed in concreting
Be frequently found the poor problem of mould, spillage, joint part impression quality that rises afterwards, and using the plank sheathing reinforcement system number of turnover compared with
Low, template and the wooden a tree, used in making timber for boats are easily-deformable.To solve this problem, the utility model uses regularization reinforcement system, after processing at one time
It can be used in turn and field-hardened is easy, improve construction efficiency.
Utility model content
The purpose of this utility model is to provide the regularization secondary structure constructional column reinforcement system that can be used in turn of one kind,
To solve the problems mentioned in the above background technology.
To achieve the above object, the utility model provides the following technical solutions: the regularization that one kind can be used in turn is secondary
Structure constructional column reinforcement system, including the first main joist, first main joist are located at the back side of wall, further includes:
Two the second main joists, two second main joists are separately positioned at two inner corner trims of the wall;
Two third main joists, two third main joists are separately positioned at two inner corner trims of the wall, and position
The side of second main joist and the third main joist at same inner corner trim is welded to each other, and described be welded to each other
Two main joists and the third main joist are at a ° angle;
First Screw arbor with nut at both-ends is threaded through the side of first main joist, and one end of first Screw arbor with nut at both-ends is successively
Through first main joist, the wall and second main joist;
Second Screw arbor with nut at both-ends is threaded through the other side of first main joist, and one end of the second Screw arbor with nut at both-ends is successively passed through
Wear first main joist, the wall and second main joist;
First steel plate is set in the outside of first Screw arbor with nut at both-ends and the second Screw arbor with nut at both-ends, and first steel plate position
Between first main joist and the wall;
Four floors of putting more energy into are fixedly mounted between first steel plate and the first main joist;
Two the second steel plates are respectively arranged in second main joist close to the side of the wall;
Two third steel plates are respectively arranged in the third main joist close to the side of the wall;
Two the first square steel tubes wear the both ends with first Screw arbor with nut at both-ends and second Screw arbor with nut at both-ends respectively, and
It is separately positioned at two inner corner trims of wall;
Third Screw arbor with nut at both-ends is interspersed with the third Screw arbor with nut at both-ends, and the third between two first square steel tubes
The both ends of Screw arbor with nut at both-ends extend through third main joist.
Preferably, the both ends of first Screw arbor with nut at both-ends, second Screw arbor with nut at both-ends and the third Screw arbor with nut at both-ends are all provided with
It is equipped with nut and rubber pad, rotates nut described in first Screw arbor with nut at both-ends both ends and when the valve rubber moves toward one another, it can be with
Cooperate first Screw arbor with nut at both-ends to clamp first main joist and second main joist, similarly, rotates described second pair
When nut described in screw rod both ends and the valve rubber being drawn to move toward one another, second Screw arbor with nut at both-ends can be cooperated main by described first
Keel and second main joist clamp, and rotate nut described in third Screw arbor with nut at both-ends both ends and the valve rubber moves toward one another
When, the third Screw arbor with nut at both-ends can be cooperated to clamp the third main joist and second main joist.
Preferably, the phase of second main joist and second steel plate, the third main joist and the third steel plate
Opposite passes through the second square steel tube and is fixedly connected.
Preferably, the back side of two first square steel tubes and two third main joists be located at opposite to each other it is same vertical
On line, and it is located in same horizontal line with second main joist far from the side of the wall.
Preferably, the floor of putting more energy into is located at first main joist and the first steel plate opposite face, and at symmetrical point
Cloth.
Preferably, the third Screw arbor with nut at both-ends is located at the rear of first Screw arbor with nut at both-ends and second Screw arbor with nut at both-ends.
Compared with prior art, the utility model has the beneficial effects that the utility model is scientific and reasonable for structure, use is safe
It is convenient, by the setting of the first steel plate, the second steel plate and third steel plate, so that overall structure has fixed effect well for wall
Fruit, by being fixedly connected for the first steel plate, the second steel plate and third steel plate and wall, convenient for pouring for wall, when to prevent pouring
The outflow of concrete and the expansion of mold cause to deform, by the first Screw arbor with nut at both-ends, the second Screw arbor with nut at both-ends, third Screw arbor with nut at both-ends,
The setting of first main joist, the second main joist, third main joist, convenient for the reinforcing to wall, by the upper nut of pulling force screw rod
It rotates to opposite direction, is clamped main joist to wall by the rotatable engagement pulling force screw rod of nut, be convenient for overall structure
Installation be conducive to being used in turn for later period so that overall structure installs more convenient.
Detailed description of the invention
Fig. 1 is the apparatus structure schematic diagram of the utility model;
Fig. 2 is the structural schematic diagram of reinforcement system at the L wall of the utility model;
Fig. 3 is the structural schematic diagram of reinforcement system at a word wall of the utility model;
Fig. 4 is the side view of Fig. 1 structure.
In figure: 1, the first main joist;2, it puts more energy into floor;3, the second main joist;4, square steel tube;5, third main joist;6, spiral shell
It is female;7, the first Screw arbor with nut at both-ends;8, the second Screw arbor with nut at both-ends;9, third Screw arbor with nut at both-ends;10, the first steel plate;11, the second steel plate;12,
Three steel plates;13, wall;14, the first square steel tube;15, the second square steel tube.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Referring to Fig. 1, the present embodiment one provides a kind of technical solution when wall is T-type: what one kind can be used in turn determines
Type secondary structure constructional column reinforcement system technical solution, including the first main joist 1, the first main joist 1 are located at the back of wall 13
Face, further includes:
Two the second main joists 3, two the second main joists 3 are separately positioned at two inner corner trims of wall 13;
Two third main joists 5, two third main joists 5 are separately positioned at two inner corner trims of wall 13, and are located at same
The side of the second main joist 3 and third main joist 5 at one inner corner trim is welded to each other, and the second main joist 3 being welded to each other and
The angle in 90 ° of three main joist 5;
First Screw arbor with nut at both-ends 7 is threaded through the side of the first main joist 1, and one end of the first Screw arbor with nut at both-ends 7 sequentially passes through
One main joist 1, wall 13 and the second main joist 3;
Second Screw arbor with nut at both-ends 8 is threaded through the other side of the first main joist 1, and one end of the second Screw arbor with nut at both-ends 8 sequentially passes through
First main joist 1, wall 13 and the second main joist 3;
First steel plate 10 is set in the outside of the first Screw arbor with nut at both-ends 7 and the second Screw arbor with nut at both-ends 8, and the first steel plate 10 is located at
Between first main joist 1 and wall 13;
Four floors 2 of putting more energy into, are fixedly mounted between the first steel plate 10 and the first main joist 1;
Two the second steel plates 11 are respectively arranged in the second main joist 3 close to the side of wall 13;
Two third steel plates 12 are respectively arranged in third main joist 5 close to the side of wall 13;
Two the first square steel tubes 14 wear the both ends with the first Screw arbor with nut at both-ends 7 and the second Screw arbor with nut at both-ends 8 respectively, and respectively
It is arranged at two inner corner trims of wall 13;
Third Screw arbor with nut at both-ends 9 is interspersed with third Screw arbor with nut at both-ends 9, and third Screw arbor with nut at both-ends 9 between two the first square steel tubes 14
Both ends extend through third main joist 5.
Preferably, the both ends of the first Screw arbor with nut at both-ends 7, the second Screw arbor with nut at both-ends 8 and third Screw arbor with nut at both-ends 9 are provided with nut 6,
When rotating 7 liang of end nuts 6 of the first Screw arbor with nut at both-ends and moving toward one another, the first Screw arbor with nut at both-ends 7 can be cooperated the first main joist 1 and second
Main joist 3 clamps, and similarly, when rotation 8 liang of end nuts 6 of the second Screw arbor with nut at both-ends move toward one another, can cooperate the second Screw arbor with nut at both-ends 8 will
First main joist 1 and the second main joist 3 clamp, and when rotation 9 liang of end nuts 6 of third Screw arbor with nut at both-ends move toward one another, can cooperate the
Three Screw arbor with nut at both-ends 9 clamp two pieces of third main joists 5.
Preferably, the second main joist 3 passes through with the second steel plate 11, third main joist 5 and the opposite face of third steel plate 12
Second square steel tube 15 is fixedly connected.
Preferably, the back side of two the first square steel tubes 14 and two third main joists 5 are located on same vertical line opposite to each other,
And it is located in same horizontal line with the second main joist 3 far from the side of wall 14.
Preferably, floor 2 of putting more energy into is located at 11 opposite face of the first main joist 1 and the first steel plate, and is symmetrically distributed.
Preferably, third Screw arbor with nut at both-ends 9 is located at the rear of the first Screw arbor with nut at both-ends 7 and the second Screw arbor with nut at both-ends 8.
Referring to Fig. 2, the present embodiment two provides a kind of technical solution when wall is L-type: by two piece of first steel plate 10
One end welding, l-shaped are mounted at the external corner of wall, and the surface of two piece of first steel plate 10 passes through three difference of floor 2 of putting more energy into
Two first main joists 1 are welded with, one end of two piece of second steel plate 11 is fixedly welded respectively at one end of the first square steel tube 14,
First square steel tube 14 is placed at inner corner trim, the side on two pieces of 11 surface of the second steel plate passes through the second square steel tube 15 and installs respectively
There are the second main joist 3 and a third main joist 5, the contact surface of the second main joist 3 and third main joist 5 is welded to each other fixation, and its
In the side of first main joist 1 be equipped with the first Screw arbor with nut at both-ends 7, and the other end of the first Screw arbor with nut at both-ends 7 is worn through wall
Saturating third main joist 5, the side of another first main joist 1 is equipped with the second Screw arbor with nut at both-ends 8, and, the second Screw arbor with nut at both-ends 8 it is another
One end penetrates the second main joist 3 through wall, by the nut 6 on the first Screw arbor with nut at both-ends 7 of rotation, by the first main joist 1 and the
Three main joists 5 step up wall 1 and make that L-type wall is fixed, and spillage at the external corner of L-type wall is avoided,
So that overall structure is easy to disassemble.
Referring to Fig. 3, the present embodiment three provides a kind of technical solution: the two sides of wall 13 are equal when wall is "-" type
First steel plate 10 is installed, the side of two piece of first steel plate 10 passes through four floors 2 of putting more energy into and is welded with the first main joist 1, and two
The middle position of the first main joist of root 1 is equipped with the first Screw arbor with nut at both-ends 7 through wall 13, by rotating nuts 6, by two pieces the
One main joist 1 steps up wall 13, occur rising in the casting process of surface film, spillage the phenomenon that, facilitate device to use, dismantle
It is convenient.
Working principle: user rotates the screw rod 6 at Screw arbor with nut at both-ends both ends round about, then will be inside main joist
Screw arbor with nut at both-ends extraction, the main joist of two sides on wall 13 is taken out from wall, and by putting more energy into, floor will fixed 13 upper steel plate of wall
It removes, so that overall structure has disassembly well, is used in turn convenient for integrally-built, integrally-built use has also been enlarged
Range, device make template is fixed more to consolidate, avoid casting concrete and rise mould, spillage, joint part impression quality occur
Poor problem.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (6)
1. the regularization secondary structure constructional column reinforcement system that one kind can be used in turn, including the first main joist (1), described first
Main joist (1) is located at the back side of wall (13), which is characterized in that further include:
Two the second main joists (3), two second main joists (3) are separately positioned on two inner corner trims of the wall (13)
Place;
Two third main joists (5), two third main joists (5) are separately positioned on two inner corner trims of the wall (13)
Place, and the side for being located at second main joist (3) and the third main joist (5) at same inner corner trim is welded to each other, and phase
Second main joist (3) mutually welded and the third main joist (5) angle in 90 °;
First Screw arbor with nut at both-ends (7) is threaded through the side of first main joist (1), and one end of first Screw arbor with nut at both-ends (7)
Sequentially pass through first main joist (1), the wall (13) and second main joist (3);
Second Screw arbor with nut at both-ends (8), is threaded through the other side of first main joist (1), and one end of the second Screw arbor with nut at both-ends (8) according to
It is secondary to run through first main joist (1), the wall (13) and second main joist (3);
First steel plate (10) is set in the outside of first Screw arbor with nut at both-ends (7) and the second Screw arbor with nut at both-ends (8), and described first
Steel plate (10) is between first main joist (1) and the wall (13);
Four floors of putting more energy into (2) are fixedly mounted between first steel plate (10) and the first main joist (1);
Two the second steel plates (11) are respectively arranged with the side in second main joist (3) close to the wall (13);
Two third steel plates (12) are respectively arranged with the side in the third main joist (5) close to the wall (13);
Two the first square steel tubes (14) wear two with first Screw arbor with nut at both-ends (7) and second Screw arbor with nut at both-ends (8) respectively
End, and be separately positioned at two inner corner trims of wall (13);
Third Screw arbor with nut at both-ends (9) is interspersed with the third Screw arbor with nut at both-ends (9), and institute between two first square steel tubes (14)
The both ends for stating third Screw arbor with nut at both-ends (9) extend through third main joist (5).
2. the regularization secondary structure constructional column reinforcement system that one kind according to claim 1 can be used in turn, feature
Be: the both ends of first Screw arbor with nut at both-ends (7), second Screw arbor with nut at both-ends (8) and the third Screw arbor with nut at both-ends (9) are respectively provided with
Have nut (6), when nut (6) described in rotation the first Screw arbor with nut at both-ends (7) both ends moves toward one another, described first pair can be cooperated
It draws screw rod (7) to clamp first main joist (1) and second main joist (3), similarly, rotates second Screw arbor with nut at both-ends
(8) when nut described in both ends (6) moves toward one another, second Screw arbor with nut at both-ends (8) can be cooperated first main joist (1) and
Second main joist (3) clamps, when rotating nut (6) described in third Screw arbor with nut at both-ends (9) both ends and moving toward one another, Ke Yipei
The third Screw arbor with nut at both-ends (9) is closed to clamp two pieces of third main joists (5).
3. the regularization secondary structure constructional column reinforcement system that one kind according to claim 1 can be used in turn, feature
It is: second main joist (3) and second steel plate (11), the third main joist (5) and the third steel plate (12)
Opposite face pass through the second square steel tube (15) and be fixedly connected.
4. the regularization secondary structure constructional column reinforcement system that one kind according to claim 1 or 3 can be used in turn, special
Sign is: being located at opposite to each other for the back side of two first square steel tubes (14) and two third main joists (5) is same vertical
On line, and it is located in same horizontal line with second main joist (3) far from the side of the wall (13).
5. the regularization secondary structure constructional column reinforcement system that one kind according to claim 1 can be used in turn, feature
Be: the floor of putting more energy into (2) is located at first main joist (1) and first steel plate (10) opposite face, and at symmetrical point
Cloth.
6. the regularization secondary structure constructional column reinforcement system that one kind according to claim 1 or 2 can be used in turn, special
Sign is: the third Screw arbor with nut at both-ends (9) is located at the rear of first Screw arbor with nut at both-ends (7) and second Screw arbor with nut at both-ends (8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821627258.4U CN208899907U (en) | 2018-10-08 | 2018-10-08 | A kind of regularization secondary structure constructional column reinforcement system being used in turn |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821627258.4U CN208899907U (en) | 2018-10-08 | 2018-10-08 | A kind of regularization secondary structure constructional column reinforcement system being used in turn |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208899907U true CN208899907U (en) | 2019-05-24 |
Family
ID=66575002
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821627258.4U Active CN208899907U (en) | 2018-10-08 | 2018-10-08 | A kind of regularization secondary structure constructional column reinforcement system being used in turn |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208899907U (en) |
-
2018
- 2018-10-08 CN CN201821627258.4U patent/CN208899907U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104631512B (en) | Hang modulus method after-pouring band beam-slab construction method | |
CN204703498U (en) | Wall of High-building deformation joint template construction structure | |
CN105735625B (en) | A kind of side form support system for floor construction | |
CN206545386U (en) | Sheet metal forming formwork drops in a kind of toilet | |
CN203834926U (en) | Formwork erecting structure for bare concrete basement exterior wall | |
CN210239135U (en) | Reinforced concrete location centre gripping template | |
CN204920210U (en) | Dysmorphism spar template reinforced structure | |
CN208899907U (en) | A kind of regularization secondary structure constructional column reinforcement system being used in turn | |
CN204781960U (en) | High -rise building shear force wall movement joint department template is propped up and is established and reinforcement system | |
CN209469000U (en) | Truss and truss aluminium alloy tunnel form for aluminum alloy mould plate | |
CN203403669U (en) | Horizontally-structural formwork system | |
CN202731296U (en) | Deformation joint prefabricated formwork and installation structure thereof | |
CN109235709B (en) | Full cast-in-place outer wall structure of building | |
CN201972395U (en) | Steel-frame double-layer-net building template | |
CN215907403U (en) | Fine adjustment tool for supporting large steel formwork | |
CN204703499U (en) | Wall of High-building deformation joint template | |
CN205012645U (en) | Be used for figurate(d) formwork support composite set of special -shaped curved surface structure | |
CN204960324U (en) | Suspension type floor formwork support device | |
CN114182616A (en) | Box girder template for road and bridge building | |
CN103510703A (en) | Method for constructing concrete arch columns with variable cross-sections | |
CN204040457U (en) | Wooden frame plastic formwork system | |
CN202220438U (en) | Diving platform steel formwork support system | |
CN205822778U (en) | A kind of huge post of stiffness is without screw aluminum alloy formwork system | |
CN211037338U (en) | Reinforcing apparatus of movement joint | |
CN218264935U (en) | Reinforced structure of shear force wall concrete floor template |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |