CN208899855U - A kind of crawler type climbing cementing mold - Google Patents

A kind of crawler type climbing cementing mold Download PDF

Info

Publication number
CN208899855U
CN208899855U CN201821203295.2U CN201821203295U CN208899855U CN 208899855 U CN208899855 U CN 208899855U CN 201821203295 U CN201821203295 U CN 201821203295U CN 208899855 U CN208899855 U CN 208899855U
Authority
CN
China
Prior art keywords
cementing
climbing
shoe
mold
crawler
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821203295.2U
Other languages
Chinese (zh)
Inventor
陈春来
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fire Trade Private Ltd Co
Original Assignee
Fire Trade Private Ltd Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fire Trade Private Ltd Co filed Critical Fire Trade Private Ltd Co
Priority to CN201821203295.2U priority Critical patent/CN208899855U/en
Application granted granted Critical
Publication of CN208899855U publication Critical patent/CN208899855U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a kind of crawler types to climb cementing mold, the upper and lower side of constant distance axis is separately installed with quad wheel and lower quad wheel, crawler belt is equipped between upper quad wheel and lower quad wheel, crawler belt is hingedly formed by multiple shoe, and the driving mechanism for driving upper quad wheel rotation is equipped on constant distance axis;When casting concrete column, four crawler type climbing cementing molds surround concrete column chamber, multiple parallel connecting rods are connected between the crawler belt of corresponding two crawler types climbing cementing mold from top to bottom, the shoe that the both ends of connecting rod pass through fastener and two crawler type climbing cementing molds respectively is mutually fixed.The utility model reduces mold and quantity of labor when building concrete column, thus greatly reduces production cost;Meanwhile the crawler type climbing cementing mold of the utility model is to rise no crimping vertically on concrete column, without that can climb after waiting concrete columns to complete solidification, which raises the construction speeds of concrete column.

Description

A kind of crawler type climbing cementing mold
Technical field
The utility model relates to Architectural Equipment technical fields more particularly to a kind of crawler type to climb cementing mold.
Background technique
Casting concrete building trade in, the prior art build one setting concrete post (inside having reinforcing bar) or When concrete walls (inside having reinforcing bar), using fixed concrete mold, it is poured concrete in a mold, is torn open after waiting concrete settings Lower concrete mold carries out building and building for the next position;A large amount of mold and labourer must be used involved in the above method, Ratio to make cost of labor account for cost of construction is very high.
Utility model content
Aiming at the shortcomings existing in the above problems, the utility model provides a kind of crawler type climbing cementing mold.
To achieve the above object, the utility model provides a kind of crawler type climbing cementing mold, comprising: constant distance axis;
The upper end of the constant distance axis is equipped with rotatable upper quad wheel and the drive for driving the upper quad wheel rotation Motivation structure, the lower end of the constant distance axis are equipped with rotatably lower quad wheel;It is equipped between the upper quad wheel and lower quad wheel Crawler belt, the crawler belt are hingedly formed by multiple shoe, the length of the length and width of the shoe and the upper quad wheel or lower quad wheel It is wide consistent;
When casting concrete column, four crawler types climbing cementing molds surround concrete column chamber, and corresponding two It is connected with multiple parallel connecting rods from top to bottom between the crawler belt of crawler type climbing cementing mold, described connecting rod one end is logical Cross fastener and a crawler type climbing cementing mold shoe mutually fix, the connecting rod other end by fastener with it is another The shoe of crawler type climbing cementing mold is mutually fixed.
The driving mechanism is chain drive mechanism, the chain drive machine as a further improvement of the utility model, Structure includes big sprocket wheel, minor sprocket and chain;
The big sprocket wheel is mounted on the upper quad wheel, and the minor sprocket is mounted on the middle part of the constant distance axis, described The chain is equipped between big sprocket wheel and minor sprocket.
As a further improvement of the utility model, when the crawler belt quantity of crawler belt is 2n, four crawler type climbing water fillings N-1 shoe of mud mould tool constitutes the four sides of the concrete column chamber, corresponding two crawler types climbing cementing mold N-1 connecting rod is correspondingly provided between n-1 shoe, described connecting rod one end is filled the water by the first nut and crawler type climbing The shoe of mud mould tool is mutually fixed, and the connecting rod other end climbs the shoe of cementing mold by the first nut and another crawler type Piece is mutually fixed.
All connecting rods are horizontally disposed as a further improvement of the utility model, and the connecting rod is welded and fixed On the reinforcing bar or reinforcing bar built in concrete column.
The driving mechanism is pneumatic drive mechanism, the pneumatic driving motivation as a further improvement of the utility model, Structure includes 90 ° of turntables of one-way pneumatic, cylinder, climbing hand and track;
90 ° of turntables of the one-way pneumatic are mounted on the upper quad wheel, and the cylinder and track are vertically arranged, described The bottom of cylinder and track is installed on the bracket, is equipped on the top extension bar of the cylinder for hooking the shoe Hinged place climbing climbing hand, the track be equipped with for accommodates simultaneously the second nut of clamping cavity, second nut It is screwed onto the both ends of the connecting rod.
As a further improvement of the utility model, when the crawler belt quantity of crawler belt is 2n, four crawler type climbing water fillings N-1 shoe of mud mould tool constitutes the four sides of the concrete column chamber, corresponding two crawler types climbing cementing mold N-1 connecting rod is correspondingly provided between n-1 shoe, described connecting rod one end is climbed by the second nut and track with a crawler type The shoe for climbing cementing mold is mutually fixed, and the connecting rod other end is infused by the second nut and track and the climbing of another crawler type The shoe of cement mold is mutually fixed.
All connecting rods are horizontally disposed as a further improvement of the utility model, and the connecting rod is welded and fixed On the reinforcing bar or reinforcing bar built in concrete column.
The climbing is equipped with the elastic slice for pressing climbing hand to lean on wall on hand as a further improvement of the utility model,.
It is equipped in the cavity of the track for compressing second nut as a further improvement of the utility model, Track fastener.
The two sides of the track are respectively provided with a cylinder as a further improvement of the utility model,.
Compared with prior art, the utility model has the following beneficial effects:
When the utility model is used, four crawler types climbing cementing molds surround concrete column chamber, and corresponding two Multiple parallel connecting rods are connected by fastener between the crawler belt of crawler type climbing cementing mold, are infused into concrete column chamber Concrete unclamps the fastener of lower end, effect of four crawler type climbing cementing molds in driving mechanism after concrete setting Under climbed upwards close to the concrete solidified, the fastener of upper end is sequentially connected during climbing and is guaranteed corresponding Two crawler types climbing cementing mold at least connecting rod in the cement of solidification, the crawler type climbed up Climbing cementing mold forms concrete column chamber again, infuses concrete into concrete column chamber, so constantly repeats to climb and pour Building concrete can be completed the construction of concrete column;The utility model reduces mold and labourer's number when building concrete column Amount, thus greatly reduces production cost;Meanwhile the crawler type climbing cementing mold of the utility model is on concrete column Rise no crimping vertically, can be climbed after completing solidification without equal concrete columns, which raises the construction speeds of concrete column.
Detailed description of the invention
Fig. 1 is the structure chart that crawler type disclosed in a kind of embodiment of the utility model climbs cementing mold;
Fig. 2 is the exploded view of Fig. 1;
Fig. 3 is the exploded view of connecting rod and the first nut in Fig. 1;
Fig. 4 is the cross-sectional view of connecting rod and the first nut in Fig. 1;
Fig. 5 is the work flow diagram of Fig. 1;
Fig. 6 is the structure chart that crawler type disclosed in the utility model another kind embodiment climbs cementing mold;
Fig. 7 is the exploded view of Fig. 6;
Fig. 8 is the exploded view of connecting rod and the second nut in Fig. 6;
Fig. 9 is the cross-sectional view of connecting rod and the second nut in Fig. 6;
Figure 10 is the fiting relation figure of Fig. 6 middle orbit and connecting rod, the second nut;
Figure 11 is the structure chart of cylinder and climbing hand in Fig. 6;
Figure 12 is the work flow diagram of Fig. 6;
Figure 13 is the structure chart that odd number crawler type disclosed in a kind of embodiment of the utility model climbs cementing mold.
In figure:
1, constant distance axis;2, upper quad wheel;3, lower quad wheel;4, crawler belt;5, shoe;6, hinge;7, connecting rod;8, big chain Wheel;9, minor sprocket;10, chain;11, the first nut;12,90 ° of correct position pointers;13,90 ° of turntables of one-way pneumatic;14, gas Cylinder;15, hand is climbed;16, track;17, bracket;18, the second nut;19, cavity;20, elastic slice;21, track fastener;22, bullet Spring;23, concrete column.
Specific embodiment
It is practical new below in conjunction with this to keep the objectives, technical solutions, and advantages of the embodiments of the present invention clearer Attached drawing in type embodiment, the technical scheme in the utility model embodiment is clearly and completely described, it is clear that is retouched The embodiment stated is a part of the embodiment of the utility model, instead of all the embodiments.Based on the reality in the utility model Apply example, those of ordinary skill in the art's every other embodiment obtained without making creative work, all Belong to the range of the utility model protection.
The utility model is further described in detail with reference to the accompanying drawing:
The utility model provides a kind of crawler type climbing cementing mold, comprising: constant distance axis;
The upper end of constant distance axis is equipped with rotatable upper quad wheel and the driving mechanism for driving upper quad wheel rotation, drives There are many driving mechanisms of dynamic upper quad wheel movement, and specific driving structure the utility model only lists following chains and drives Motivation structure and pneumatic drive mechanism;The lower end of constant distance axis is equipped with rotatably lower quad wheel;Upper quad wheel and lower quad wheel it Between be equipped with crawler belt, crawler belt is hingedly formed by multiple shoe, and the length and width of shoe are consistent with the length and width of upper quad wheel or lower quad wheel; The width of pillar is as the length of mould, but long hair is slightly shorter than mould, and such length, which can be pressed on width, leaks cement not.Osmanthus is first infused to height The height of a wall mold or more is crossed, the mold for just infusing wall or wall shape column not so wall can bump against pillar mold.
When casting concrete column, four crawler types climbing cementing molds surround concrete column chamber, and corresponding two It is connected with multiple parallel connecting rods from top to bottom between the crawler belt of crawler type climbing cementing mold, connecting rod one end passes through tight The shoe of firmware and crawler type climbing cementing mold is mutually fixed, and the connecting rod other end is climbed by fastener and another crawler type The shoe for climbing cementing mold is mutually fixed.
When the utility model is used, four crawler types climbing cementing molds surround concrete column chamber, and corresponding two Multiple parallel connecting rods are connected by fastener between the crawler belt of crawler type climbing cementing mold, are infused into concrete column chamber Concrete unclamps the fastener of lower end, effect of four crawler type climbing cementing molds in driving mechanism after concrete setting Under climbed upwards close to the concrete solidified, the fastener of upper end is sequentially connected during climbing and is guaranteed corresponding Two crawler types climbing cementing mold at least connecting rod in the cement of solidification, the crawler type climbed up Climbing cementing mold forms concrete column chamber again, infuses concrete into concrete column chamber, so constantly repeats to climb and pour Building concrete can be completed the construction of concrete column;The utility model reduces mold and labourer's number when building concrete column Amount, thus greatly reduces production cost;Meanwhile the crawler type climbing cementing mold of the utility model is on concrete column Rise no crimping vertically, can be climbed after completing solidification without equal concrete columns, which raises the construction speeds of concrete column.
The utility model is further described in detail with reference to the accompanying drawing:
Embodiment 1:
As shown in Figs 1-4, the utility model provides a kind of crawler type climbing cementing mold, comprising: constant distance axis 1, upper four Square wheel 2, lower quad wheel 3, crawler belt 4, connecting rod 7, chain drive mechanism, the first nut 11 and 90 ° correct position pointer 12;Its In:
The constant distance axis 1 of the utility model is H-type structure as shown in Figure 1, 2, and the upper end of constant distance axis 1 is equipped with rotatably Upper quad wheel 2, the lower end of constant distance axis 1 are equipped with rotatably lower quad wheel 3, pass through shoe between upper quad wheel 2 and lower quad wheel 3 Band 4 connects, and upper quad wheel 2 drives lower quad wheel 3 to rotate by crawler belt 4;Crawler belt 4 is hinged by hinge 6 by multiple shoe 5 At the structure and size of upper quad wheel 2 or lower quad wheel 3 are consistent, the length of the length and width of shoe 5 and upper quad wheel 2 or lower quad wheel 3 Wide consistent, a shoe 5 of crawler belt 4 can be laid with or be detached from vertical plane by quad wheel 2 or every 90 ° of the rotation of lower quad wheel 3 in guarantee; 5 mating connection bar of shoe is equipped with the through-hole for installing the first nut.
Chain drive mechanism for driving upper quad wheel rotation is installed, chain drives on the constant distance axis 1 of the utility model Motivation structure includes big sprocket wheel 8, minor sprocket 9 and chain 10;Big sprocket wheel 8 is mounted on quad wheel 2, and the rotation of big sprocket wheel 8 can drive The rotation of dynamic upper quad wheel 2, minor sprocket 9 are mounted on the middle part of constant distance axis 1, chain 10 are equipped between big sprocket wheel 8 and minor sprocket 9. When driving upper quad wheel 2, minor sprocket 9 or the output shaft using electric wrench rotation minor sprocket 9, minor sprocket 9 can be rotated manually Big sprocket wheel 8 is driven to rotate by chain 10, the rotation of big sprocket wheel 8 can drive the rotation of quad wheel 2, to realize that crawler type is climbed Climb the climbing of cementing mold.
When casting concrete column 23, four crawler type climbing cementing molds surround concrete column chamber, for the ease of exhibition Show that the utility model illustrates only two or so opposite crawler type climbing cementing molds in Fig. 1, it is opposite that front and back is omitted Crawler type climb cementing mold;Connect from top to bottom between the crawler belt 4 of corresponding two crawler types climbing cementing mold Multiple parallel connecting rods 7 are connected to, 7 one end of connecting rod climbs 5 phase of shoe of cementing mold by fastener with a crawler type Fixed, 7 other end of connecting rod is fixed by 5 phase of shoe that fastener climbs cementing mold with another crawler type.It is specific: such as Fig. 1, shown in 2, when the crawler belt quantity of crawler belt is 2n (12 shown in FIG. 1, n=6), four crawler types climb cementing molds N-1 (as shown in Figure 1 5) shoe constitute the four sides of concrete column chamber, corresponding two crawler types climb cementing N-1 (as shown in Figure 1 5) connecting rods 7 are correspondingly provided between n-1 (as shown in Figure 1 5) shoe 5 of mold;Such as figure 3, shown in 4, each 7 one end of connecting rod is fixed by 5 phase of shoe that the first nut 11 climbs cementing mold with a crawler type, even 7 other end of extension bar is fixed by 5 phase of shoe that the first nut 11 climbs cementing mold with another crawler type, all connecting rods 7 Horizontally disposed, connecting rod 7 is weldingly fixed on the reinforcing bar or reinforcing bar built in concrete column.
Further, it can also be equipped with 90 ° of correct position pointers 12 on the constant distance axis 1 of the utility model, be used to indicate four directions The correct position of 2 90 ° of overturning of wheel.
The design principle of the utility model are as follows:
1, as the principle of crawler type climbing is climbed to a higher point with animal or people, caterpillar mould can just be made by having had to 2 points of interactions Tool climbs up and over wall more than concrete column, and bet concrete is formed by coagulation provincialism crossing concrete post jamb, after condensation It climbs up again, so constantly repeats to climb and infuse concrete, just complete the part that building is erect.
2, all good front and back hinge of going here and there is exactly crawler belt to its length and width of the shoe of crawler belt per a piece of, crawler belt easily to automate with Double safety, will will at least fasten 1 or more the company in the concrete of oneself solidification at any time and connect Defend 7, connect Defend 7 when connecting Oneself is being set in cement secondly holding referred to as climbing point (other end is to another counterpoise).
3, opposite must have the mold with weight, while balancing and being climbed together as balance, and another effect is that all front and backs fence up and make Cement, which has been infused, not to be leaked out, and after mixing up reinforcing bar/bone position and straight degree, the both ends in the connecting rod on reinforcing bar/bone are welded in oneself, Often upper a piece of/lattice are often climbed in crawler belt, just have a hole to be directed at connecting rod.If no-reinforcing-bar or reinforcing bar, can after being fastenedly connected bar, Position and straight degree with prior art mode transfer;It, can be with now after connecting two moulds if having reinforcing bar or reinforcing bar, but connecting rod of not burn-oning There is technology first to mix up mode transfer position and directly degree again after reinforcing bar/bone position and straight degree.
If what 4, lower concreter made dispositions is good, it should can cement of note in the morning, by the minimum a piece of shoe of model Band;If standard allows, it is repeated once again before putting work, because being to erect to rise no crimping, the upper pressure only less weighed.
5, seam can be pressed between two moulds with thin object piece, or directly be pressed ornaments, be allowed to water-tight mud, cement not sticking to mould It can oiling.
6, fastener can also be used for fastening scaffold or other purposes, if after not having to or using, it is mended in the hole solved on wall.
As shown in figure 5, the specifically used method of the utility model are as follows:
First nut at bottom connecting rod both ends in 5 S1, solution connecting rods;
S2, rotation minor sprocket, for minor sprocket by chain-driving bull gear drive, gear wheel drives upper quad wheel to rotate 90 ° To 90 ° of correct position pointers of alignment;At this point, the shoe of upper four directions wheel drive crawler belt is flipped up a lattice, the shoe as the top Piece;The shoe of time lower end is as the lowermost shoe in S2 in S1;
S3, the first nut for tying up the top connecting rod, make connecting rod be fixed as one with shoe;
Close and then surface is shaken at S4, lower cement to about eighty per cant to scrape;
S5, anti-sticking object of cementing.
Embodiment 2:
As illustrated in figs. 6-11, the utility model provides a kind of crawler type climbing cementing mold, comprising: constant distance axis 1, upper four Square wheel 2, lower quad wheel 3, crawler belt 4, connecting rod 7, pneumatic drive mechanism and the second nut 18;Wherein:
The constant distance axis 1 of the utility model is H-type structure as shown in Figure 1, 2, and the upper end of constant distance axis 1 is equipped with rotatably Upper quad wheel 2, the lower end of constant distance axis 1 are equipped with rotatably lower quad wheel 3, pass through shoe between upper quad wheel 2 and lower quad wheel 3 Band 4 connects, and upper quad wheel 2 drives lower quad wheel 3 to rotate by crawler belt 4;Crawler belt 4 is hinged by hinge 6 by multiple shoe 5 At the structure and size of upper quad wheel 2 or lower quad wheel 3 are consistent, the length of the length and width of shoe 5 and upper quad wheel 2 or lower quad wheel 3 Wide consistent, a shoe 5 of crawler belt 4 can be laid with or be detached from vertical plane by quad wheel 2 or every 90 ° of the rotation of lower quad wheel 3 in guarantee, 5 mating connection bar of shoe is equipped with the through-hole for installing the second nut.
Pneumatic drive mechanism for driving upper quad wheel rotation, pneumatic driving are installed on the constant distance axis 1 of the utility model Motivation structure includes 90 ° of turntables of one-way pneumatic, 13, two cylinders 14, climbing hand 15 and track 16, and 90 ° of turntables of one-way pneumatic are existing Standard component structure;Wherein, 90 ° of turntables 13 of one-way pneumatic are mounted on quad wheel 2, for driving upper quad wheel to rotate 90 °, from And the shoe of crawler belt is made to climb a lattice;Cylinder 14 and track 16 are vertically arranged and two cylinders 14 set up separately the two of track 16 The bottom of side, cylinder 14 and track 16 is mounted on bracket 17, is equipped on the top extension bar of cylinder 14 for hooking shoe Hinged place climbing climbing hand 15, track 16 be equipped with for accommodates simultaneously the second nut of clamping 18 cavity 19, the second nut 18 are screwed onto the both ends of connecting rod 7.All connecting rods 7 are horizontally disposed, and connecting rod 7 is weldingly fixed on the reinforcing bar built in concrete column Or on reinforcing bar, climbing hand 15 is equipped with the elastic slice 20 for pressing climbing hand to lean on wall, as shown in figure 11;It is set in the cavity 19 of track 16 There is the track fastener 21 for compressing the second nut 18, the inside of track fastener 21 is equipped with spring, as shown in Figure 10.
When casting concrete column 23, four crawler type climbing cementing molds surround concrete column chamber, for the ease of exhibition Show that the utility model illustrates only two or so opposite crawler type climbing cementing molds in Fig. 6, it is opposite that front and back is omitted Crawler type climb cementing mold;Connect from top to bottom between the crawler belt 4 of corresponding two crawler types climbing cementing mold Multiple parallel connecting rods 7 are connected to, 7 one end of connecting rod climbs 5 phase of shoe of cementing mold by fastener with a crawler type Fixed, 7 other end of connecting rod is fixed by 5 phase of shoe that fastener climbs cementing mold with another crawler type.It is specific: such as Fig. 6, shown in 7, when the crawler belt quantity of crawler belt is 2n (12 shown in fig. 6, n=6), four crawler types climb cementing molds N-1 (5 as shown in FIG. 6) shoe constitute the four sides of concrete column chamber, corresponding two crawler types climb cementing N-1 (5 as shown in FIG. 6) connecting rods 7 are correspondingly provided between n-1 (5 as shown in FIG. 6) shoe 5 of mold;Such as figure 8, shown in 9, each 7 one end of connecting rod climbs the shoe 5 of cementing mold by the second nut 18 and track 16 and a crawler type Mutually fixed, 7 other end of connecting rod climbs 5 phase of shoe of cementing mold by the second nut 18 and track 16 with another crawler type Fixed, all connecting rods 7 are horizontally disposed, and connecting rod 7 is weldingly fixed on the reinforcing bar or reinforcing bar built in concrete column.
The design principle of the utility model are as follows:
1, as the principle of crawler type climbing is climbed to a higher point with animal or people, caterpillar mould can just be made by having had to 2 points of interactions Tool climbs up and over wall more than concrete column, and bet concrete is formed by coagulation provincialism crossing concrete post jamb, after condensation It climbs up again, so constantly repeats to climb and infuse concrete, just complete the part that building is erect.
2, all good front and back hinge of going here and there is exactly crawler belt to its length and width of the shoe of crawler belt per a piece of, crawler belt easily to automate with Double safety, will will at least fasten 1 or more the company in the concrete of oneself solidification at any time and connect Defend 7, connect Defend 7 when connecting Oneself is being set in cement secondly holding referred to as climbing point (other end is to another counterpoise).
3, opposite must have the mold with weight, while balancing and being climbed together as balance, and another effect is that all front and backs fence up and make Cement, which has been infused, not to be leaked out, and after mixing up reinforcing bar/bone position and straight degree, the both ends in the connecting rod on reinforcing bar/bone are welded in oneself, Often upper a piece of/lattice are often climbed in crawler belt, just have a hole to be directed at connecting rod.If no-reinforcing-bar or reinforcing bar, can after being fastenedly connected bar, Position and straight degree with prior art mode transfer;It, can be with now after connecting two moulds if having reinforcing bar or reinforcing bar, but connecting rod of not burn-oning There is technology first to mix up mode transfer position and directly degree again after reinforcing bar/bone position and straight degree.
If what 4, lower concreter made dispositions is good, it should can cement of note in the morning, by the minimum a piece of shoe of model Band;If standard allows, it is repeated once again before putting work, because being to erect to rise no crimping, the upper pressure only less weighed.
5, seam can be pressed between two moulds with thin object piece, or directly be pressed ornaments, be allowed to water-tight mud, cement not sticking to mould It can oiling.
6, fastener can also be used for fastening scaffold or other purposes, if after not having to or using, it is mended in the hole solved on wall.
As shown in figure 12, the utility model is before crawler type climbing cementing mold climbing, the reinforcing bar or steel of concrete column Connecting rod 7 is welded on bone, the both ends of connecting rod 7 have been bolted with the second nut 18, second nut 18 of all 7 one end of connecting rod In vertical linear, the correspondence of track 16 is stuck in the groove of the second nut 18 by when installation crawler type climbing cementing mold, such as Fig. 9, shown in 10;The specifically used method of the utility model are as follows:
S1, cylinder 14 stretch out, and climbing hand 15 rises the hinged place for catching a lattice;
S2, cylinder 14 retract, since the bracket 17 that the grip of climbing hand 15 will drive cylinder bottom rises a lattice, thus band Dynamic rail road 16 rises a lattice (height of shoe is known as a lattice);Track 16 is consolidated while the second nut 18 for unlocking bottom end Determine second nut 18 of the top;
S3, the top connecting rod both ends the second nut fastened by the track fastener 21 of track after, one-way pneumatic 90 ° of turntables 13 rotate 90 °;
S4, lower cement;
S5, shake are close;
S6, flat surface is scraped;
S7, anti-sticking object of cementing.
Multiple crawler type climbing cementing molds can be used also to build wall, principle and building concrete in the utility model The principle of column is consistent.
It is that shoe quantity is even numbers and climbs cementing mold using the crawler type of quad wheel shown in above-mentioned, except this it Outside, the crawler type climbing cementing mold of single shoe number as shown in fig. 13 that also can be used in the utility model, omits quad wheel; Crawler belt is driven to climb using cylinder;Its principle is consistent with the principle that even numbers crawler belt is climbed, therefore does not do at this to its result and explain in detail It states.
The above is only the preferred embodiments of the utility model, are not intended to limit the utility model, for this field Technical staff for, various modifications and changes may be made to the present invention.Within the spirit and principle of the utility model, Any modification, equivalent replacement, improvement and so on should be included within the scope of protection of this utility model.

Claims (10)

1. a kind of crawler type climbs cementing mold characterized by comprising constant distance axis;
The upper end of the constant distance axis is equipped with rotatable upper quad wheel and the driving machine for driving the upper quad wheel rotation Structure, the lower end of the constant distance axis are equipped with rotatably lower quad wheel;Crawler belt is equipped between the upper quad wheel and lower quad wheel, The crawler belt is hingedly formed by multiple shoe, the length and width one of the length and width of the shoe and the upper quad wheel or lower quad wheel It causes;
When casting concrete column, four crawler type climbing cementing molds surround concrete column chamber, corresponding two crawler belts It is connected with multiple parallel connecting rods from top to bottom between the crawler belt of formula climbing cementing mold, described connecting rod one end passes through tight The shoe of firmware and crawler type climbing cementing mold is mutually fixed, and the connecting rod other end passes through fastener and another crawler belt The shoe of formula climbing cementing mold is mutually fixed.
2. crawler type as described in claim 1 climbs cementing mold, which is characterized in that the driving mechanism is chain drive Mechanism, the chain drive mechanism include big sprocket wheel, minor sprocket and chain;
The big sprocket wheel is mounted on the upper quad wheel, and the minor sprocket is mounted on the middle part of the constant distance axis, the big chain The chain is equipped between wheel and minor sprocket.
3. crawler type as claimed in claim 2 climbs cementing mold, which is characterized in that when the crawler belt quantity of crawler belt is 2n When, n-1 shoe of four crawler type climbing cementing molds constitutes the four sides of the concrete column chamber, corresponding two shoes It is correspondingly provided with n-1 connecting rod between n-1 shoe of belt climbing cementing mold, described connecting rod one end passes through the first spiral shell The shoe of cap and crawler type climbing cementing mold is mutually fixed, and the connecting rod other end passes through the first nut and another crawler belt The shoe of formula climbing cementing mold is mutually fixed.
4. crawler type as claimed in claim 3 climbs cementing mold, which is characterized in that all connecting rod levels are set It sets, the connecting rod is weldingly fixed on the reinforcing bar or reinforcing bar built in concrete column.
5. crawler type as described in claim 1 climbs cementing mold, which is characterized in that the driving mechanism is pneumatic actuation Mechanism, the pneumatic drive mechanism include 90 ° of turntables of one-way pneumatic, cylinder, climbing hand and track;
90 ° of turntables of the one-way pneumatic are mounted on the upper quad wheel, and the cylinder and track are vertically arranged, the cylinder It is rack-mount with the bottom of track, the hinged place for hooking the shoe is installed on the top extension bar of the cylinder The climbing hand of climbing, the track are equipped with the cavity for accommodating simultaneously the second nut of clamping, and second nut is screwed onto institute State the both ends of connecting rod.
6. crawler type as claimed in claim 5 climbs cementing mold, which is characterized in that when the crawler belt quantity of crawler belt is 2n When, n-1 shoe of four crawler type climbing cementing molds constitutes the four sides of the concrete column chamber, corresponding two shoes It is correspondingly provided with n-1 connecting rod between n-1 shoe of belt climbing cementing mold, described connecting rod one end passes through the second spiral shell The shoe of cap and track and crawler type climbing cementing mold is mutually fixed, and the connecting rod other end passes through the second nut and rail The shoe in road and another crawler type climbing cementing mold is mutually fixed.
7. crawler type as claimed in claim 6 climbs cementing mold, which is characterized in that all connecting rod levels are set It sets, the connecting rod is weldingly fixed on the reinforcing bar or reinforcing bar built in concrete column.
8. crawler type as claimed in claim 5 climbs cementing mold, which is characterized in that the climbing is equipped with for pressing on hand Climb the elastic slice that hand leans on wall.
9. crawler type as claimed in claim 5 climbs cementing mold, which is characterized in that be equipped with and use in the cavity of the track In the track fastener for compressing second nut.
10. crawler type as claimed in claim 5 climbs cementing mold, which is characterized in that the two sides of the track are respectively provided with One cylinder.
CN201821203295.2U 2018-07-27 2018-07-27 A kind of crawler type climbing cementing mold Expired - Fee Related CN208899855U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821203295.2U CN208899855U (en) 2018-07-27 2018-07-27 A kind of crawler type climbing cementing mold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821203295.2U CN208899855U (en) 2018-07-27 2018-07-27 A kind of crawler type climbing cementing mold

Publications (1)

Publication Number Publication Date
CN208899855U true CN208899855U (en) 2019-05-24

Family

ID=66568219

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821203295.2U Expired - Fee Related CN208899855U (en) 2018-07-27 2018-07-27 A kind of crawler type climbing cementing mold

Country Status (1)

Country Link
CN (1) CN208899855U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108678367A (en) * 2018-07-27 2018-10-19 消防贸易私营有限公司 A kind of crawler type climbing cementing mold

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108678367A (en) * 2018-07-27 2018-10-19 消防贸易私营有限公司 A kind of crawler type climbing cementing mold

Similar Documents

Publication Publication Date Title
CN208899855U (en) A kind of crawler type climbing cementing mold
CN207392708U (en) A kind of Fast Installation scaffold for building
CN107617363A (en) A kind of method for improving coating stirring efficiency
CN210947655U (en) Intelligent combined mounting frame for building
CN208887880U (en) A kind of cement board vibratory equipment
CN209260518U (en) A kind of highway maintenance equipment
CN114397432A (en) Concrete structure surface crack detection device
DE3412509A1 (en) Process for producing swimming pools using permanent shutterings
CN108678367A (en) A kind of crawler type climbing cementing mold
CN206903213U (en) A kind of pillar structure for being easy to filling concrete and adjustable height
CN108951429A (en) The method of frame and hollow pier pier construction built in hollow pier pier shaft
CN208533893U (en) A kind of concrete prefabricated stairs
CN107684865A (en) Construction material agitating device with elevating function
CN215593702U (en) Supporting template for constructing upper-span bridge anti-collision guardrail
CN110331846A (en) Concreting workbench is built in a kind of room
CN208777183U (en) Frame and constructing device built in hollow pier pier shaft
CN104032960B (en) A kind of suspension type concreting chute device
CN209635721U (en) A kind of clear-water concrete GRC plate lifting balancing device
CN208514702U (en) It is a kind of first to open prefabricated box -beam stretch-drawing beam
CN208949829U (en) A kind of truss-like cantilever form
CN206838146U (en) A kind of novel laboratory workbench
CN108381754B (en) Cement preparation mixing machine for building
CN207538506U (en) The independent supporting rack of efficient construction of precast floorslab
CN206769340U (en) A kind of easy-to-dismount construction platform
CN213654325U (en) Glue injection device for reinforcing building structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190524