CN208896436U - A kind of plastic cement products moment quickly cooling and moment speed heat equipment - Google Patents

A kind of plastic cement products moment quickly cooling and moment speed heat equipment Download PDF

Info

Publication number
CN208896436U
CN208896436U CN201821659551.9U CN201821659551U CN208896436U CN 208896436 U CN208896436 U CN 208896436U CN 201821659551 U CN201821659551 U CN 201821659551U CN 208896436 U CN208896436 U CN 208896436U
Authority
CN
China
Prior art keywords
level
fixedly installed
cooling
pipe
solenoid valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821659551.9U
Other languages
Chinese (zh)
Inventor
万杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Xinglijia Plastic Technology Co Ltd
Huizhou Xinglijia Technology Co Ltd
Original Assignee
Shenzhen Xinglijia Plastic Technology Co Ltd
Huizhou Xinglijia Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Xinglijia Plastic Technology Co Ltd, Huizhou Xinglijia Technology Co Ltd filed Critical Shenzhen Xinglijia Plastic Technology Co Ltd
Priority to CN201821659551.9U priority Critical patent/CN208896436U/en
Application granted granted Critical
Publication of CN208896436U publication Critical patent/CN208896436U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Moulds For Moulding Plastics Or The Like (AREA)

Abstract

The utility model discloses a kind of plastic cement products moment quickly coolings and moment speed heat equipment, including casing and valve station, the centre of the casing internal is fixedly installed with partition, the upper surface of the partition is fixedly installed with support base, the left side of the heater box is successively seamless from top to bottom to be fixedly connected with return pipe, water inlet pipe and outlet pipe, Pyatyi solenoid valve is fixedly installed on the water inlet pipe, the internal reservation at the valve station has guide groove, the right of the switch is successively fixedly installed with level-one+heat button and level-one cooling button, the lower section of the level-one+heat button is successively fixedly installed with second level+heat button and second level cooling button from left to right, the front of the casing offers thermovent.The plastic cement products moment quickly cooling and moment speed heat equipment, can make in a short time mold be warming up to 180 degrees Celsius, then mold is made to cool to 40 degrees Celsius of room temperature, molding cycle greatly improves, to reach the stabilization of quality, while also substantially increasing production efficiency.

Description

A kind of plastic cement products moment quickly cooling and moment speed heat equipment
Technical field
The utility model relates to plastic cement products production equipment technology, specially a kind of plastic cement products moment quickly cooling and wink Between speed heat equipment.
Background technique
Injection molding machine is that plastic cement products produce a kind of indispensable equipment, it is by thermoplastic or thermosetting plastics benefit The main molding equipment of plastic products of various shapes is made of mould for plastics.It is divided into vertical, horizontal, all electric.Injection molding Function heating of plastic applies high pressure to molten plastic, it is made to project and be full of mold cavity.
Carrying out molding main component to plastic cement in injection molding machine is mold, in the product process of production bloom and glue position thickness In, mold temperature control equipment is difficult to that mold is made to be reduced to 40 degrees Celsius of room temperature by 180 degrees Celsius in a short time, while also difficult So that mold is warming up to 180 degrees Celsius by 40 degrees Celsius of room temperature, molding cycle is longer, reduces the efficiency of production.
Utility model content
It is above-mentioned to solve the purpose of this utility model is to provide a kind of plastic cement products moment quickly cooling and moment speed heat equipment It is proposed in background technique in the product process of production bloom and glue position thickness, mold temperature control equipment is difficult to make in a short time Mold is reduced to 40 degrees Celsius of room temperature by 180 degrees Celsius, while it is Celsius to be also difficult to make mold by 40 degrees Celsius of room temperature to be warming up to 180 The problem of degree, molding cycle is longer, reduces the efficiency of production.
To achieve the above object, the utility model provides the following technical solutions: a kind of plastic cement products moment quickly cooling and moment Speed heat equipment, including casing and valve station, the centre of the casing internal are fixedly installed with partition, and the upper surface of the partition is fixed Support base is installed, the upper surface of the support base is fixedly installed with heater box, increasing is fixedly installed on the right side of the heater box Having heaters is fixedly mounted in press pump, the inside of the heater box, and successively seamless fixation connects from top to bottom in the left side of the heater box It is connected to return pipe, water inlet pipe and outlet pipe, turns left on the outlet pipe from the right side and is successively fixedly installed with level-one water pump and level-one electricity Magnet valve is fixedly installed with Pyatyi solenoid valve on the water inlet pipe, and detachable connection that the right end of the water inlet pipe is seamless has external Water pipe is equipped with two-stage electromagnetic valve on the return pipe, and the bottom end of the casing internal is fixedly installed with support base, the support The upper surface of seat is fixedly installed with cooling water tank, and the right side inside the cooling water tank and heater box is fixedly installed with temperature biography Sensor, the inside of the cooling water tank are fixedly installed with condenser, and the left side of the cooling water tank is also successively seamless from top to bottom It is fixedly connected with return pipe, water inlet pipe and outlet pipe, turns left on the outlet pipe on the left of the cooling water tank from the right side and successively fixes peace Equipped with second level water pump and three-level solenoid valve, level Four solenoid valve is fixedly installed on the return pipe on the left of the cooling water tank, it is described Also Pyatyi solenoid valve is fixedly installed on water inlet pipe on the left of cooling water tank, the lower end on the left of the casing is fixedly installed with power supply Line, for the valve erect-position in the left location of casing, the internal reservation at the valve station has guide groove, the fixed peace in the left at the valve station Equipped with mold, the inside of the mold offers water-flowing trough, is connected with each other between the guide groove and water-flowing trough by connecting tube, The centre of the casing right side is fixedly installed with PID control system, is fixedly installed with out below the PID control system It closes, the right of the switch is successively fixedly installed with level-one+heat button and level-one cooling button, the level-one+heat button Lower section is successively fixedly installed with second level+heat button and second level cooling button from left to right, and the front of the casing offers heat dissipation Mouthful.
Preferably, the height of the heater box is less than the half of chassis height, and the shape phase of cooling water tank and heater box Together.
Preferably, the heater box and cooling water tank are made by stainless steel material, and heater box and cooling water tank lower end Four angles in face and the upper surface of support base mutually coincide.
Preferably, the return pipe, water inlet pipe and outlet pipe are same model stainless steel waterpipe, and return pipe, water inlet pipe The inside of heater box and cooling water tank is extended to the right end of outlet pipe.
Preferably, the guide groove is connected with each other inside valve station, and guide groove is connected to return pipe and outlet pipe.
Preferably, the PID control system and booster pump, temperature sensor, heater, level-one water pump, level-one solenoid valve, Two-stage electromagnetic valve, condenser, second level water pump, three-level solenoid valve, level Four solenoid valve, switch, level-one+heat button, level-one cooling are pressed Button, second level+heat button and Pyatyi solenoid valve are electrically connected.
Compared with prior art, the utility model has the beneficial effects that the plastic cement products moment quickly cooling is set with moment speed heat It is standby, it is heated up using heater to the water inside heater box, the water to heat up reaches 180 degrees Celsius, then in level-one water pump Drive under pass through solenoid valve, outlet pipe and guide groove and be flowed into the water-flowing trough of mould inside, be rapidly heated to mold, Water in mold passes through guide groove, return pipe and solenoid valve again and is flowed into inside heater box, is recycled, using condenser to cold But the water in water tank cools down, and the water to cool down passes through three-level solenoid valve, outlet pipe and guiding under the drive of second level water pump Slot is flowed into the water-flowing trough in mold, carries out fast cooling to mold, the water in mold passes through guide groove, level Four solenoid valve again It is flowed into inside cooling water tank with return pipe, is recycled, so that mold is warming up to 180 degrees Celsius in a short time, then make mold 40 degrees Celsius of room temperature are cooled to, molding cycle greatly improves, to reach the stabilization of quality, while also substantially increasing production effect Rate.
Detailed description of the invention
Fig. 1 is the utility model schematic diagram of internal structure;
Fig. 2 is the utility model positive structure diagram;
Fig. 3 is the utility model side structure schematic view;
Fig. 4 is the utility model heating procedure schematic diagram;
Fig. 5 is the utility model cooling flow diagram.
In figure: 1, casing;2, partition;3, support base;4, heater box;5, booster pump;6, temperature sensor;7, heater; 8, return pipe;9, water inlet pipe;10, outlet pipe;11, level-one water pump;12, level-one solenoid valve;13, external water pipe;14, two-stage electromagnetic Valve;15, cooling water tank;16, condenser;17, second level water pump;18, three-level solenoid valve;19, level Four solenoid valve;20, power supply line; 21, valve station;22, guide groove;23, connecting tube;24, mold;25, water-flowing trough;26, PID control system;27, it switchs;28, level-one + heat button;29, level-one cooling button;30, second level+heat button;31, second level cooling button;32, thermovent;33, Pyatyi electricity Magnet valve.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-5 is please referred to, the utility model provides a kind of technical solution: a kind of plastic cement products moment quickly cooling and moment speed heat Equipment, including casing 1, partition 2, support base 3, heater box 4, booster pump 5, temperature sensor 6, heater 7, return pipe 8, water inlet Pipe 9, outlet pipe 10, level-one water pump 11, level-one solenoid valve 12, external water pipe 13, two-stage electromagnetic valve 14, cooling water tank 15, condensation Device 16, second level water pump 17, three-level solenoid valve 18, level Four solenoid valve 19, power supply line 20, valve station 21, guide groove 22, connecting tube 23, Mold 24, water-flowing trough 25, PID control system 26, switch 27, level-one+heat button 28, level-one cooling button 29, second level heating are pressed Button 30, second level cooling button 31, thermovent 32 and Pyatyi solenoid valve 33, the centre inside casing 1 are fixedly installed with partition 2, every The upper surface of plate 2 is fixedly installed with support base 3, and the upper surface of support base 3 is fixedly installed with heater box 4, and the right side of heater box 4 is solid Dingan County is equipped with booster pump 5, the model HAA31-2.5 air boost pump of booster pump 5, and the inside of heater box 4, which is fixedly installed with, to be added Hot device 7, the left side of heater box 4 is successively seamless from top to bottom to be fixedly connected with return pipe 8, water inlet pipe 9 and outlet pipe 10, outlet pipe It turns left on 10 from the right side and is successively fixedly installed with level-one water pump 11 and level-one solenoid valve 12, Pyatyi electricity is fixedly installed on water inlet pipe 9 Magnet valve 33, detachable connection that the right end of water inlet pipe 9 is seamless have external water pipe 13, two-stage electromagnetic valve 14 are equipped on return pipe 8, Bottom end inside casing 1 is fixedly installed with support base 3, and the upper surface of support base 3 is fixedly installed with cooling water tank 15, cooling water tank 15 and heater box 4 inside right side be fixedly installed with temperature sensor 6, the model DHT11 of temperature sensor 6, cooling water The inside of case 15 is fixedly installed with condenser 16, and the left side of cooling water tank 15 is also successively seamless from top to bottom to be fixedly connected with return water Pipe 8, water inlet pipe 9 and outlet pipe 10 turn left on the outlet pipe 10 in the left side of cooling water tank 15 from the right side and are successively fixedly installed with second level water Pump 17 and three-level solenoid valve 18, the model IS6550160 of level-one water pump 11 and second level water pump 17,15 left side of cooling water tank are returned It is fixedly installed with level Four solenoid valve 19 on water pipe 8, is also fixedly installed with Pyatyi solenoid valve on the water inlet pipe 9 in 15 left side of cooling water tank 33, level-one solenoid valve 12, two-stage electromagnetic valve 14, three-level solenoid valve 18, the model of level Four solenoid valve 19 and Pyatyi solenoid valve 33 are equal Lower end for flange stainless steel piston electromagnetic valve LD71,1 left side of casing is fixedly installed with power supply line 20, and valve station 21 is located at casing 1 Left location, the internal reservation at valve station 21 has a guide groove 22, and the left at valve station 21 is fixedly installed with mold 24, mold 24 it is interior Portion offers water-flowing trough 25, is connected with each other between guide groove 22 and water-flowing trough 25 by connecting tube 23, the centre of 1 right side of casing It is fixedly installed with PID control system 26, the lower section of PID control system 26 is fixedly installed with switch 27, and the right of switch 27 is successively It is fixedly installed with level-one+heat button 28 and level-one cooling button 29, the lower section of level-one+heat button 28 is successively fixed from left to right Second level+heat button 30 and second level cooling button 31 are installed, the front of casing 1 offers thermovent 32.
Further, the height of heater box 4 is less than the half of 1 height of casing, and the shape of heater box 4 and cooling water tank 15 It is identical, the inside of casing 1 is vertically mounted on convenient for heater box 4 and cooling water tank 15.
Further, heater box 4 and cooling water tank 15 are made by stainless steel material, and heater box 4 and cooling water tank 15 Four angles of lower end surface and the upper surface of support base 3 mutually coincide, and by the way that support base 3 is arranged, make heater box 4 and cooling water tank 15 Installation it is more stable and firm, while stainless steel material can prevent from getting rusty, and high temperature resistant and low temperature.
Further, return pipe 8, water inlet pipe 9 and outlet pipe 10 be same model stainless steel waterpipe, and return pipe 8, water inlet The right end of pipe 9 and outlet pipe 10 extends to the inside of heater box 4 and cooling water tank 15, convenient for replacing to water pipe, while just It is logical in water flow, achieve the purpose that cooling and cooling.
Further, guide groove 22 is connected with each other inside valve station 21, and guide groove 22 and return pipe 8 and outlet pipe 10 are equal Connection is reached inside water-flowing trough 25 by outlet pipe 10 and guide groove 22 convenient for water, mold 24 is cooled down and heated up, then is led to It crosses return pipe 8 to return to inside heater box 4 and cooling water tank 15, be recycled.
Further, PID control system 26 and booster pump 5, temperature sensor 6, heater 7, level-one water pump 11, level-one electricity Magnet valve 12, two-stage electromagnetic valve 14, condenser 16, second level water pump 17, three-level solenoid valve 18, level Four solenoid valve 19, switch 27, level-one + heat button 28, level-one cooling button 29, second level+heat button 30, second level cooling button 31 and Pyatyi solenoid valve 33 electrically connect It connects, equipment is controlled convenient for PID control system 26, operates normally equipment.
Power supply line 20: being connected to external power supply first by working principle, and water inlet pipe 9 is then connected external water source, is pressed 27 starting device of switch, PID control system 26 control Pyatyi solenoid valve 33 and open, and water source is made to enter heater box 4 and cooling water Inside case 15, it is then shut off Pyatyi solenoid valve 33, then heater 7 is started to work, the water inside heater box 4 is heated, Temperature sensor 6 detects the water temperature inside heater box 4 simultaneously, and the data detected are then transferred to PID control system System 26 controls the water temperature height inside heater box 4 by level-one+heat button 28 and level-one cooling button 29, then level-one water Pump 11 and level-one solenoid valve 12 are started to work, and the water inside heater box 4 passes through outlet pipe 10, one under the drive of level-one water pump 11 Grade solenoid valve 12 and guide groove 22, flow ultimately into the water-flowing trough 25 inside mold 24, heat up to mold 24, water-flowing trough Water inside 25 passes through guide groove 22, level-one solenoid valve 12 and return pipe 8 again and is flowed into inside heater box 4, while booster pump 5 drops Air pressure inside low heater box 4, enables the water temperature inside heater box 4 to reach 180 degrees Celsius, quickly rises to mold 24 Temperature, three-level solenoid valve 18, level Four solenoid valve 19 and Pyatyi solenoid valve 33 are in close state while heating, then to mold 24 carry out fast cooling, and condenser 16 cools down to the water inside cooling water tank 15, make water temperature not less than 0 degree Celsius, then Start second level water pump 17, open simultaneously three-level solenoid valve 18, then the water in cooling water tank 15 under the drive of second level water pump 17, Outlet pipe 10, three-level solenoid valve 18 and guide groove 22 are passed sequentially through, is flowed ultimately into the water-flowing trough 25 inside mold 24, to mould Tool 24 carries out fast coolings, the water inside water-flowing trough 25 pass through again guide groove 22, level Four solenoid valve 19 and return pipe 8 be flowed into it is cold But inside water tank 15, cooling is completed, level-one solenoid valve 12, two-stage electromagnetic valve 14 and Pyatyi solenoid valve 33 are in while cooling Closed state.
Finally it should be noted that the above content is only to illustrate the technical solution of the utility model, rather than it is practical to this The limitation of novel protected range, those skilled in the art to the technical solution of the utility model carry out it is simple modification or Person's equivalent replacement, all without departing from the spirit and scope of technical solutions of the utility model.

Claims (6)

1. a kind of plastic cement products moment quickly cooling and moment speed heat equipment, including casing (1) and valve station (21), it is characterised in that: institute The internal centre of casing (1) to be stated to be fixedly installed with partition (2), the upper surface of the partition (2) is fixedly installed with support base (3), The upper surface of the support base (3) is fixedly installed with heater box (4), is fixedly installed with booster pump on the right side of the heater box (4) (5), the heater box (4) inside be fixedly mounted having heaters (7), the left side of the heater box (4) from top to bottom successively without Seam is fixedly connected with return pipe (8), water inlet pipe (9) and outlet pipe (10), turns left on the outlet pipe (10) from the right side and successively fixes Level-one water pump (11) and level-one solenoid valve (12) are installed, are fixedly installed with Pyatyi solenoid valve (33), institute on the water inlet pipe (9) The seamless detachable connection of right end for stating water inlet pipe (9) has external water pipe (13), is equipped with two-stage electromagnetic on the return pipe (8) Valve (14), the internal bottom end of the casing (1) are fixedly installed with support base (3), and the upper surface of the support base (3) is fixedly mounted Have cooling water tank (15), the right side of the cooling water tank (15) and heater box (4) inside is fixedly installed with temperature sensor (6), the inside of the cooling water tank (15) is fixedly installed with condenser (16), and the left side of the cooling water tank (15) is from top to bottom Also successively seamless to be fixedly connected with return pipe (8), water inlet pipe (9) and outlet pipe (10), going out on the left of the cooling water tank (15) It turns left on water pipe (10) from the right side and is successively fixedly installed with second level water pump (17) and three-level solenoid valve (18), the cooling water tank (15) It is fixedly installed with level Four solenoid valve (19) on the return pipe (8) in left side, on the water inlet pipe (9) on the left of the cooling water tank (15) It is fixedly installed with Pyatyi solenoid valve (33), the lower end on the left of the casing (1) is fixedly installed with power supply line (20), the valve station (21) it is located at the left location of casing (1), the internal reservation of the valve station (21) has guide groove (22), a left side for the valve station (21) Side is fixedly installed with mold (24), and the inside of the mold (24) offers water-flowing trough (25), the guide groove (22) and water flowing It is connected with each other between slot (25) by connecting tube (23), the centre of casing (1) right side is fixedly installed with PID control system (26), it is fixedly installed with switch (27) below the PID control system (26), the right of the switch (27) is successively fixed to pacify Equipped with level-one+heat button (28) and level-one cooling button (29), the lower section of the level-one+heat button (28) is from left to right successively It is fixedly installed with second level+heat button (30) and second level cooling button (31), the front of the casing (1) offers thermovent (32).
2. a kind of plastic cement products moment quickly cooling according to claim 1 and moment speed heat equipment, it is characterised in that: described to add The height of hot tank (4) is less than the half of casing (1) height, and cooling water tank (15) is identical with the shape of heater box (4).
3. a kind of plastic cement products moment quickly cooling according to claim 1 and moment speed heat equipment, it is characterised in that: described to add Hot tank (4) and cooling water tank (15) are made by stainless steel material, and four of heater box (4) and cooling water tank (15) lower end surface The upper surface of angle and support base (3) mutually coincide.
4. a kind of plastic cement products moment quickly cooling according to claim 1 and moment speed heat equipment, it is characterised in that: described time Water pipe (8), water inlet pipe (9) and outlet pipe (10) be same model stainless steel waterpipe, and return pipe (8), water inlet pipe (9) and water outlet The right end of pipe (10) extends to the inside of heater box (4) and cooling water tank (15).
5. a kind of plastic cement products moment quickly cooling according to claim 1 and moment speed heat equipment, it is characterised in that: described to lead It is connected with each other inside valve station (21) to slot (22), and guide groove (22) is connected to return pipe (8) and outlet pipe (10).
6. a kind of plastic cement products moment quickly cooling according to claim 1 and moment speed heat equipment, it is characterised in that: described PID control system (26) and booster pump (5), temperature sensor (6), heater (7), level-one water pump (11), level-one solenoid valve (12), two-stage electromagnetic valve (14), condenser (16), second level water pump (17), three-level solenoid valve (18), level Four solenoid valve (19), open Close (27), level-one+heat button (28), level-one cooling button (29), second level+heat button (30), second level cooling button (31) and Pyatyi solenoid valve (33) is electrically connected.
CN201821659551.9U 2018-10-13 2018-10-13 A kind of plastic cement products moment quickly cooling and moment speed heat equipment Active CN208896436U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821659551.9U CN208896436U (en) 2018-10-13 2018-10-13 A kind of plastic cement products moment quickly cooling and moment speed heat equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821659551.9U CN208896436U (en) 2018-10-13 2018-10-13 A kind of plastic cement products moment quickly cooling and moment speed heat equipment

Publications (1)

Publication Number Publication Date
CN208896436U true CN208896436U (en) 2019-05-24

Family

ID=66575453

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821659551.9U Active CN208896436U (en) 2018-10-13 2018-10-13 A kind of plastic cement products moment quickly cooling and moment speed heat equipment

Country Status (1)

Country Link
CN (1) CN208896436U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113977892A (en) * 2021-10-30 2022-01-28 浙江吉尚汽车部件有限公司 Auxiliary shaping method and auxiliary shaping device for injection molding

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113977892A (en) * 2021-10-30 2022-01-28 浙江吉尚汽车部件有限公司 Auxiliary shaping method and auxiliary shaping device for injection molding

Similar Documents

Publication Publication Date Title
CN108327206A (en) A kind of equipment for injection molding
CN208896436U (en) A kind of plastic cement products moment quickly cooling and moment speed heat equipment
CN205661009U (en) Area heating and cooling function's plastics milk bottle injection molding machine
CN106915050B (en) A kind of waste heat recycling device for vertical injection molding machine
CN208745282U (en) A kind of plastic shell processing mold with recirculated water cooling structure
CN103112137B (en) A kind of electrical heating rapid thermal circulation injection mould
CN112428544A (en) Plastic injection mold convenient for cooling and demolding
CN107457963A (en) A kind of injection mold of conveniently regulating and controlling temperature
CN214562249U (en) Heating device of plastic mould
CN109130096A (en) A kind of energy conservation injection mold
CN205818353U (en) The TOP-TIP of mould and mould
CN208529657U (en) The cooling device of injection mold on a kind of injection moulding machine
CN204687244U (en) There is the mould of homogeneous heating
CN211416242U (en) Blowing machine that radiating effect is good
CN209335997U (en) A kind of exchange injection mold
CN209426044U (en) A kind of bottle base processing multilayer hot runner mould
CN103831934A (en) Quick cooling temperature control injection molding mold
CN207273737U (en) Based on the anti-deformation injection mold of air purifier fan
CN208180134U (en) A kind of rapid forming mold based on hot swapping
CN208375823U (en) A kind of injection mold production radiator convenient for heat recovery
CN220464654U (en) Injection mold production heating mechanism
CN215969954U (en) Circulating cooling device for injection molding of mold
CN206913640U (en) A kind of plastic-injection mold base
CN208558223U (en) A kind of injection mold with cooling structure
CN221249759U (en) Injection molding machine with melting cavity

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant