- CN208883247U CN208883247U CN201821401144.8U CN201821401144U CN208883247U CN 208883247 U CN208883247 U CN 208883247U CN 201821401144 U CN201821401144 U CN 201821401144U CN 208883247 U CN208883247 U CN 208883247U
- Authority
- CN
- China
- Prior art keywords
- steel construction
- shelter bridge
- metope
- main body
- connector
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
The elevator steel construction shelter bridge device that relative position is convenient, structural stability is high is adjusted the utility model discloses a kind of, bracket is adjusted including shelter bridge main body, metope side adjustment bracket and steel construction side, the shelter bridge main body adjusts bracket by the metope side and metope is connected, and the shelter bridge main body adjusts bracket by the metope side close to the metope side and adjusts along the vertical direction and the relative position of metope;The shelter bridge main body adjusts bracket by the steel construction side and elevator shaft steel construction is connected, and the shelter bridge main body adjusts bracket by the steel construction side close to elevator shaft steel construction side and adjusts along the vertical direction and the relative position of elevator shaft steel construction.The shelter bridge device of the utility model is fixed in a manner of docking with metope and elevator shaft steel construction, the two sides of shelter bridge main body are respectively arranged with metope side adjustment bracket and steel construction side adjustment bracket simultaneously, and the fine tuning of relative altitude is realized in a manner of slotted hole, to realize the adjustment of relative position.
Description
Technical field
The utility model relates to elevator construction technologies, and in particular to a kind of elevator steel construction shelter bridge device.
Background technique
With the development in continuous improvement of people's living standards and city, more and more skyscrapers appear in people
Live, in order to facilitate on user downstairs, general skyscraper can all set up an at least elevator;And it constructs in elevator
In, especially elevator shaft applies man-hour requirement and temporarily builds shelter bridge for construction personnel's construction, and the shelter bridge is generally with operation platform
Form is temporarily built between elevator shaft steel construction and metope.
In the prior art, one block of steel plate has only been laid with as shelter bridge between metope and elevator shaft steel construction, or
It is some position that shelter bridge plate is directly anchored to elevator shaft steel construction using steel, the mode built generallyd use is all
Overlap joint is primarily due to the lap-joint of metope lap-joint and hoistway steel construction not necessarily on a horizontal line, therefore, after overlap joint
Shelter bridge has certain gradient, in addition, this in the prior art build mode also and can not quickly adjust the height of shelter bridge, institute
With existing shelter bridge structure is unable to satisfy construction requirement, can extend construction period and there are some potential safety problemss.
Utility model content
The elevator steel construction corridor that relative position is convenient, structural stability is high is adjusted the purpose of the utility model is to provide a kind of
Biodge device.
To achieve the goals above, the utility model provides the following technical solutions:
A kind of elevator steel construction shelter bridge device disclosed by the utility model, the shelter bridge device are installed on elevator shaft steel construction
Between metope, the shelter bridge device includes:
Shelter bridge main body;
Metope side adjusts bracket, and the shelter bridge main body adjusts bracket by the metope side and metope is connected, and the corridor
Bridge main body is adjusted along the vertical direction close to the metope side by metope side adjustment bracket and the relative position of metope, and
It is fastened by the first fastener;
Steel construction side adjusts bracket, and the shelter bridge main body adjusts bracket and elevator shaft steel construction by the steel construction side
It is connected, and the shelter bridge main body adjusts bracket along vertical side by the steel construction side close to elevator shaft steel construction side
It is fastened to the relative position of adjustment and elevator shaft steel construction, and by the second fastener.
Further, the shelter bridge main body adjusts bracket by the metope side close to metope side and docks admittedly with metope
It is fixed;The shelter bridge main body adjusts bracket and elevator shaft steel construction by the steel construction side close to elevator shaft steel construction side
Docking is fixed.
Further, the shelter bridge main body includes the board body part in quadrangle plank frame and is formed in the plate body
Portion two sides and the support portion extended vertically downwards.
Further, the quantity of the metope side adjustment bracket is two, and two metope side adjustment brackets are symmetrically solid
Due to the shelter bridge main body close to metope side;
The metope side adjustment bracket includes the first connector being connected with metope, and the front side of first connector is connected
There is the first fixed body extended forward, the board body part of the shelter bridge main body is overlapped on first fixed body;
Multiple first connector connecting holes are offered on first connector, are offered on first fixed body multiple
First fixed body mounting hole;
The first connector connecting hole and the first fixed body mounting hole are slotted hole.
Further, the quantity of the steel construction side adjustment bracket is two, and two steel construction sides adjust bracket pair
Title is fixed on the shelter bridge main body close to elevator shaft steel construction side;
The steel construction side adjustment bracket includes the second connector being connected with elevator shaft steel construction, second connection
The second fixed body to extend back is fixed on rear side of body, the rear side of second connector also has and second connector
The third connector vertical with the second fixed body;
The support portion of the shelter bridge main body is supported on second fixed body and the support portion is connect with the third
Consideration is leaned on;
The lower end of the support portion has the fixing body extended towards board body part center;
Multiple second connector connecting holes are offered on second connector, are offered on second fixed body multiple
Second fixed body mounting hole offers multiple third connector connecting holes on the third connector;
The second connector connecting hole, the second fixed body mounting hole, third connector connecting hole are slotted hole.
Further, first fastener is setscrew, and second fastener is bolt.
In the above-mentioned technical solutions, a kind of elevator steel construction shelter bridge device provided by the utility model has beneficial below
Effect:
1, the shelter bridge device of the utility model is fixed in a manner of docking with metope and elevator shaft steel construction, while shelter bridge
The two sides of main body are respectively arranged with metope side adjustment bracket and steel construction side adjustment bracket, and are realized relatively in a manner of slotted hole
The fine tuning of height, to guarantee the levelness of shelter bridge main body and the height relative to elevator steel construction;
2, each connecting hole of shelter bridge device of the utility model and mounting hole is compact has preferred to use slotted hole, it is ensured that using
The stress brought by Different Ground settles can be released between hoistway with steel structure and metope in the process, to the maximum extent
Guarantee to pretend the safety in elevator.
Detailed description of the invention
In order to illustrate the technical solutions in the embodiments of the present application or in the prior art more clearly, below will be to institute in embodiment
Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only to record in the utility model
Some embodiments be also possible to obtain other drawings based on these drawings for those of ordinary skill in the art.
Structural representation when Fig. 1 is a kind of elevator steel construction shelter bridge device Construction State provided by the embodiment of the utility model
Figure;
Fig. 2 is a kind of structural schematic diagram of elevator steel construction shelter bridge device provided by the embodiment of the utility model;
Fig. 3 is that a kind of metope side of elevator steel construction shelter bridge device provided by the embodiment of the utility model adjusts the knot of bracket
Structure schematic diagram;
Fig. 4 is that a kind of steel construction side of elevator steel construction shelter bridge device provided by the embodiment of the utility model adjusts bracket
Structural schematic diagram.
Description of symbols:
1, elevator shaft steel construction;2, metope;3, shelter bridge main body;4, metope side adjusts bracket;5, steel construction side adjustment branch
Frame;
301, board body part;302, support portion;
401, the first connector;402, the first fixed body;
40101, the first connector connecting hole;40201, the first fixed body mounting hole;
501, the second connector;502, third connector;503, the second fixed body;
50101, the second connector connecting hole;50201, third connector connecting hole;50301, the second fixed body mounting hole.
Specific embodiment
In order to make those skilled in the art more fully understand the technical solution of the utility model, below in conjunction with attached drawing pair
The utility model is further detailed.
As shown in Figure 1 to Figure 2, a kind of elevator steel construction shelter bridge device provided by the embodiment of the utility model, shelter bridge dress
It sets and is installed between elevator shaft steel construction 1 and metope 2, shelter bridge device includes:
Shelter bridge main body 3;
Metope side adjusts bracket 4, and shelter bridge main body 3 adjusts bracket 4 by metope side and metope 2 is connected, and shelter bridge main body 3 is leaned on
Nearly 2 side of metope is adjusted along the vertical direction by metope side adjustment bracket 4 and the relative position of metope 2, and passes through the first fastening
Part fastening;
Steel construction side adjusts bracket 5, and shelter bridge main body 3 adjusts bracket 5 by steel construction side and elevator shaft steel construction 1 is solid
Even, and shelter bridge main body 3 adjusts bracket 5 by steel construction side close to 1 side of elevator shaft steel construction and adjusts along the vertical direction and electricity
The relative position of stair shaft road steel construction 1, and fastened by the second fastener.
Preferably, shelter bridge main body 3 adjusts bracket 4 by metope side close to 2 side of metope in the present embodiment and metope 2 is right
Connect fixation;Shelter bridge main body 3 adjusts bracket 5 and elevator shaft steel construction 1 by steel construction side close to 1 side of elevator shaft steel construction
Docking is fixed.
Specifically, present embodiment discloses a kind of shelter bridge device for facilitating overlap joint, highly-safe elevator to use when constructing,
It mainly includes the shelter bridge main body 3 in platform-like and the metope side adjustment bracket 4 and steel for being installed on 3 two sides of shelter bridge main body
Structure side adjusts bracket 5;Wherein, shelter bridge main body 3 can be with micro- while realizing that installation is fixed by metope side adjustment bracket 4
Adjust the relative altitude position with metope 2;In addition, shelter bridge main body 3, which adjusts bracket 5 by steel construction side, is realizing the same of installation fixation
When can also finely tune relative altitude position with elevator shaft steel construction 1.Therefore, the shelter bridge device and elevator of the utility model
Road steel construction 1 and metope 2 install fixed may not need with the mode docked and consider that the structure of two sides realizes height adjustment, meanwhile,
Bracket with certain fine adjustment function can be eliminated centainly in use again due to stress caused by surface subsidence, improve
Safety.
Preferably, shelter bridge main body 3 includes the board body part 301 in quadrangle plank frame and is formed in the present embodiment
301 two sides of board body part and the support portion 302 extended vertically downwards.
It participates in shown in Fig. 3, wherein the quantity of above-mentioned metope side adjustment bracket 4 is two, and two metope sides adjust bracket
4 are symmetrically fixed on shelter bridge main body 3 close to 2 side of metope;Specifically, metope side adjustment bracket 4 includes first to be connected with metope 2
Connector 401, the front side of the first connector 401 are fixed with the first fixed body 402 extended forward, the board body part of shelter bridge main body 3
301 are overlapped on the first fixed body 402;Offer multiple first connector connecting holes 40101 on first connector 401, first
Multiple first fixed body mounting holes 40201 are offered on fixed body 402;First connector connecting hole 40101 and the first fixed body
Mounting hole 40201 is slotted hole.
Shown in Figure 4, the quantity of above-mentioned steel construction side adjustment bracket 5 is two, and two steel construction sides adjust bracket 5
Shelter bridge main body 3 is symmetrically fixed on close to 1 side of elevator shaft steel construction;Specifically, steel construction side adjustment bracket 5 includes and elevator
The second connected connector 501 of hoistway steel construction 1, the rear side of the second connector 501 are fixed with the second fixed body to extend back
503, also there is the rear side of the second connector 501 third vertical with the second connector 501 and the second fixed body 503 to connect
Body 502;The support portion 302 of shelter bridge main body 3 is supported on the second fixed body 503 and support portion 302 and third connector 502 paste
It leans on;The lower end of support portion 302 has the fixing body extended towards 301 center of board body part;It is offered on second connector 501 multiple
Second connector connecting hole 50101 offers multiple second fixed body mounting holes 50301, third connection on second fixed body 503
Multiple third connector connecting holes 50201 are offered on body 502;Second connector connecting hole 50101, the second fixed body mounting hole
50301, third connector connecting hole 50201 is slotted hole.
Above-described embodiment specifically describes the structure and difference of metope side adjustment bracket 4 and steel construction side adjustment bracket 5
In the connection structure of metope 2 and elevator shaft steel construction 1.The present embodiment considers that the structural stability of shelter bridge main body 3 is asked first
Topic, so shelter bridge main body 3 and metope side adjustment bracket 4 and steel construction side adjustment bracket 5 all use overlapped mounting means,
Slotted hole is opened up at above-mentioned each link position, slotted hole can be realized fine tuning to a certain extent, improve device
Applicability.
Preferably, the first above-mentioned fastener is setscrew, and the second fastener is bolt.
The specific mounting means of shelter bridge device of the utility model are as follows:
After elevator shaft steel construction 1 completes, steel construction side adjustment bracket 5 is fixed on elevator shaft using bolt
On steel construction 1, and adjustment height is required to arrive suitable position according to live practice of construction;Then, using setscrew by metope
Side adjustment bracket 4 is fixed at the respective heights of metope 2, and the height and position at this is adjusted according to the installation situation of the other side;
Finally, shelter bridge main body 3 is fixed on two brackets, entire work progress, the shelter bridge apparatus structure of the program are completed
Stability is high, and it is convenient to construct, and effect is substantially better than shelter bridge in the prior art.
In the above-mentioned technical solutions, a kind of elevator steel construction shelter bridge device provided by the utility model has beneficial below
Effect:
The shelter bridge device of the utility model is fixed in a manner of docking with metope 2 and elevator shaft steel construction 1, while shelter bridge
The two sides of main body 3 are respectively arranged with metope side adjustment bracket 4 and steel construction side adjustment bracket 5, and are realized in a manner of slotted hole
The fine tuning of relative altitude, to guarantee the levelness of shelter bridge main body 3 and the height relative to elevator shaft steel construction 1;
Each connecting hole of shelter bridge device of the utility model and mounting hole is compact has preferred to use slotted hole, it is ensured that using
The stress brought by Different Ground settles can be released between elevator shaft steel construction 1 and metope 2 in journey, maximum limit
Degree ground guarantees to pretend the safety in elevator.
It is above that certain exemplary embodiments of the utility model are only described by way of explanation, undoubtedly, for
Those skilled in the art can be with a variety of different without departing from the spirit and scope of the utility model
Mode is modified described embodiment.Therefore, above-mentioned attached drawing and description are regarded as illustrative in nature, and should not be construed as
Limitation to the utility model claims protection scope.
Claims (6)
1. a kind of elevator steel construction shelter bridge device, the shelter bridge device are installed between elevator shaft steel construction (1) and metope (2),
It is characterized in that, the shelter bridge device includes:
Shelter bridge main body (3);
Metope side adjusts bracket (4), and the shelter bridge main body (3) is connected by metope side adjustment bracket (4) and metope (2),
And the shelter bridge main body (3) close to the metope (2) side by the metope side adjustment bracket (4) along the vertical direction adjustment with
The relative position of metope (2), and fastened by the first fastener;
Steel construction side adjusts bracket (5), and the shelter bridge main body (3) passes through steel construction side adjustment bracket (5) and elevator shaft
Steel construction (1) is connected, and the shelter bridge main body (3) passes through the steel construction side close to elevator shaft steel construction (1) side
Adjustment bracket (5) adjusts the relative position with elevator shaft steel construction (1) along the vertical direction, and is fastened by the second fastener.
2. a kind of elevator steel construction shelter bridge device according to claim 1, which is characterized in that the shelter bridge main body (3) is leaned on
Nearly metope side fixation is docked with metope (2) by metope side adjustment bracket (4);The shelter bridge main body (3) is close to elevator
Hoistway steel construction (1) side fixation is docked with elevator shaft steel construction (1) by steel construction side adjustment bracket (5).
3. a kind of elevator steel construction shelter bridge device according to claim 1, which is characterized in that shelter bridge main body (3) packet
It includes the board body part (301) in quadrangle plank frame and is formed in the board body part (301) two sides and vertically downwards
The support portion (302) of extension.
4. a kind of elevator steel construction shelter bridge device according to claim 3, which is characterized in that the metope side adjusts bracket
(4) quantity is two, and two metope side adjustment bracket (4) are symmetrically fixed on the shelter bridge main body (3) close to metope (2)
Side;
Metope side adjustment bracket (4) includes the first connector (401) being connected with metope (2), first connector
(401) the first fixed body (402) extended forward is fixed on front side of, the board body part (301) of the shelter bridge main body (3) is overlapped in
On first fixed body (402);
Multiple first connector connecting holes (40101), first fixed body are offered on first connector (401)
(402) multiple first fixed body mounting holes (40201) are offered on;
The first connector connecting hole (40101) and the first fixed body mounting hole (40201) are slotted hole.
5. a kind of elevator steel construction shelter bridge device according to claim 3, which is characterized in that the steel construction side adjustment branch
The quantity of frame (5) is two, and two steel construction side adjustment bracket (5) are symmetrically fixed on the shelter bridge main body (3) close to electricity
Stair shaft road steel construction (1) side;
Steel construction side adjustment bracket (5) includes the second connector (501) being connected with elevator shaft steel construction (1), described
The second fixed body (503) to extend back is fixed on rear side of second connector (501), after second connector (501)
Side also has the third connector (502) vertical with second connector (501) and the second fixed body (503);
The support portion (302) of the shelter bridge main body (3) is supported on second fixed body (503) and the support portion (302)
It reclines with the third connector (502);
The lower end of the support portion (302) has the fixing body extended towards board body part (301) center;
Multiple second connector connecting holes (50101), second fixed body are offered on second connector (501)
(503) multiple second fixed body mounting holes (50301) are offered on, offer multiple thirds on the third connector (502)
Connector connecting hole (50201);
The second connector connecting hole (50101), the second fixed body mounting hole (50301), third connector connecting hole
It (50201) is slotted hole.
6. a kind of elevator steel construction shelter bridge device according to claim 1, which is characterized in that first fastener is swollen
Swollen screw, second fastener are bolt.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821401144.8U CN208883247U (en) | 2018-08-28 | 2018-08-28 | A kind of elevator steel construction shelter bridge device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821401144.8U CN208883247U (en) | 2018-08-28 | 2018-08-28 | A kind of elevator steel construction shelter bridge device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208883247U true CN208883247U (en) | 2019-05-21 |
Family
ID=66510240
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821401144.8U Active CN208883247U (en) | 2018-08-28 | 2018-08-28 | A kind of elevator steel construction shelter bridge device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208883247U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110422721A (en) * | 2019-07-16 | 2019-11-08 | 山东博尔特电梯有限公司 | A kind of steel structure lift shaft sedimentation protection structure |
-
2018
- 2018-08-28 CN CN201821401144.8U patent/CN208883247U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110422721A (en) * | 2019-07-16 | 2019-11-08 | 山东博尔特电梯有限公司 | A kind of steel structure lift shaft sedimentation protection structure |
CN110422721B (en) * | 2019-07-16 | 2023-03-31 | 山东博尔特电梯有限公司 | Steel construction elevator well subsides protection architecture |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208883247U (en) | A kind of elevator steel construction shelter bridge device | |
CN206873723U (en) | A kind of novel curtain wall keel device | |
CN214302811U (en) | Self-adaptive all-steel attached lifting scaffold in micro-tilt building | |
CN108915250A (en) | A kind of cantilever form | |
CN207728298U (en) | A kind of maintenance of roofing uses stainless steel retractable cat ladder | |
CN208830712U (en) | A kind of cantilever form | |
CN206158176U (en) | Foldable concrete form support frame | |
CN210239225U (en) | Interim steel construction stair that building engineering used | |
CN105133918B (en) | Car roof traveling tent | |
CN216380629U (en) | Self-lifting type silencing dust-settling unloading platform | |
CN106121253A (en) | Installation component adjustable auxiliary installation device and method | |
CN108678362A (en) | A kind of fixed setting method of construction elevator and wall | |
CN208294053U (en) | Attachment type raise scaffold protecting screen structure | |
CN205472115U (en) | Good elevator guide rail support of stability | |
CN208648493U (en) | A kind of no scaffold installation elevator operation platform device | |
CN207094559U (en) | A kind of bright dress switchover frame of flat lamp | |
CN106948594B (en) | Suspension ladder used and production, application method when civil engineering work building | |
CN208933832U (en) | Shear connector | |
CN207846225U (en) | Erection crane and thereafter anchor device | |
CN211779962U (en) | Electronic display ware altitude mixture control support | |
CN207581132U (en) | A kind of oblique hanging lifting tables platform of photovoltaic sun | |
CN208136699U (en) | Pin-connected panel pedestrian overpass | |
CN201687147U (en) | Glass handrail | |
CN205499268U (en) | Offal is gone on board and is passed a bridge | |
CN209369304U (en) | A kind of climbing frame panel turnover component |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |