CN108678362A - A kind of fixed setting method of construction elevator and wall - Google Patents

A kind of fixed setting method of construction elevator and wall Download PDF

Info

Publication number
CN108678362A
CN108678362A CN201810846668.6A CN201810846668A CN108678362A CN 108678362 A CN108678362 A CN 108678362A CN 201810846668 A CN201810846668 A CN 201810846668A CN 108678362 A CN108678362 A CN 108678362A
Authority
CN
China
Prior art keywords
frame
attachment
wall
construction elevator
connection frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810846668.6A
Other languages
Chinese (zh)
Other versions
CN108678362B (en
Inventor
刘鸿伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Metallurgical Construction Engineering Group Co Ltd
Original Assignee
China Metallurgical Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Metallurgical Construction Engineering Group Co Ltd filed Critical China Metallurgical Construction Engineering Group Co Ltd
Priority to CN201810846668.6A priority Critical patent/CN108678362B/en
Publication of CN108678362A publication Critical patent/CN108678362A/en
Application granted granted Critical
Publication of CN108678362B publication Critical patent/CN108678362B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/046Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The invention discloses the fixed setting methods of a kind of construction elevator and wall, which is characterized in that includes the following steps:Spacing according to the wall-attached frame being connected on construction elevator standard knot apart from wall, it obtains the attachment of lower structure such as and converts framework, the attachment conversion framework includes whole rectangular attachment connection frame, and spacing of the width for adhering to connection frame with wall-attached frame apart from wall is consistent;There are multiple attachment points being correspondingly arranged with the wall-attached frame on the side in attachment connection width of frame direction;When installation, attachment connection frame is horizontally arranged on wall, makes the attachment point on attachment connection frame towards construction elevator side, wall-attached frame is mounted on the attachment point of attachment connection frame, completes the fixation of construction elevator and wall.The present invention is convenient with constructing operation, and connective stability is good, the advantages that capable of ensureing normal mounting and the use of construction elevator.

Description

A kind of fixed setting method of construction elevator and wall
Technical field
The present invention relates to technical field of building construction, in particular to a kind of fixed installation side of construction elevator and wall Method.
Background technology
In high-building construction, mainly using construction elevator conveying construction personnel, equipment or material, with other elevators Structure is compared, and construction elevator is mostly installed on the outside of the stair of skyscraper, without separately setting computer room or hoistway, stable structure, safety Reliably.In general, using standard wall-attached frame as the connection parts between construction elevator guide rail bracket and building, standard wall-attached frame position Between construction elevator guide rail bracket and building.
But due to the modern design of building, it is retracted at the part floor of building, construction elevator guide rail bracket and the portion The distance between floor building is divided to be more than the distance between other parts floor building, the length of standard wall-attached frame is not It is enough, it can not be fixed on building.
Invention content
In view of the above shortcomings of the prior art, the technical problem to be solved by the present invention is to:How a kind of construction behaviour is provided Facilitate, connective stability is good, and the construction elevator and the fixed of wall that can ensure the normal mounting of construction elevator and use are pacified Dress method.
In order to solve the above-mentioned technical problem, present invention employs the following technical solutions:
A kind of fixed setting method of construction elevator and wall, which is characterized in that include the following steps:It is electric according to construction is connected to Spacing of the wall-attached frame apart from wall on terraced standard knot obtains the attachment of lower structure such as and converts framework, and framework is converted in the attachment Frame is connected including whole rectangular attachment, it is consistent that the attachment connects spacing of the width of frame with wall-attached frame apart from wall;Institute Stating has multiple attachment points being correspondingly arranged with the wall-attached frame on the side in attachment connection width of frame direction;It, will be attached when installation It connection frame to be horizontally arranged on wall, makes the attachment point on attachment connection frame towards construction elevator side, wall-attached frame is mounted on On the attachment point of attachment connection frame, the fixation of construction elevator and wall is completed.
Further, the attachment conversion framework further includes the wall for being inclined at attachment the connection frame and building Between reinforcing diagonal brace, it is described reinforce diagonal brace be symmetrically disposed in it is described attachment connection frame length direction both sides.
Further, the main frame of the wall-attached frame to include whole be in isosceles trapezoidal structure, shorter bottom on the main frame The both ends on side be respectively vertically arranged there are one be used for connection construction elevator standard section standard knot connecting pole;It is longer on the main frame The both ends on bottom edge are used to connect the attachment connecting pole that the attachment connects frame there are one being respectively vertically arranged;The attachment connecting pole End has vertically disposed connecting plate, has attachment bolt hole on the connecting plate;Have at the attachment point of the attachment connection frame The attachment bolt hole being correspondingly arranged with the attachment bolt hole;The wall-attached frame is by passing through on the connecting plate and attachment connection frame Bolt be fixedly connected on attachment connection frame.
Further, the brace being obliquely installed, the both ends of the brace are also associated between two attachment connecting poles It is connected to the end of two attachment connecting poles.
Further, also have between the both sides in attachment connection width of frame direction and be obliquely installed bracing piece, it is described to add Strong bar is symmetrically provided with two along attachment connection frame length direction.
Further, the attachment connection frame includes multiple rectangle frames for being sequentially connected setting in the width direction, the square Link bolt hole of the both sides in shape width of frame direction also with horizontal vertical perforation setting, the link bolt hole is along the rectangle The length direction equidistant placement of frame has multiple, and the two neighboring rectangle frame passes through the connection bolt in adjacent side The bolt in hole is fixedly connected;The width of the attachment connection frame is the integral multiple of the rectangle width of frame.
Further, the both sides of the rectangle frame length direction also have the strengthening stud hole for vertically penetrating through setting, institute State strengthening stud hole have along the width direction equidistant placement of the rectangle frame it is multiple;The attachment conversion framework further includes along described The width direction of attachment connection frame, and vertically arranged reinforcing frame;The whole isosceles trapezoid knot with a narrow upper and lower width of the reinforcing frame Structure has multiple bolts hole corresponding with the strengthening stud hole on the upper side edge of the reinforcing frame, and is bolted on The lower section of the two neighboring rectangle frame;The upper end for reinforcing diagonal brace is bolted on the lower side of the reinforcing frame On.
Further, attachment connection frame is welded using channel steel, and the open side of the channel steel is towards the attachment The middle part of frame is connected, and two neighboring channel steel is using 45 degree of angle bevel edge welding.
Further, the inside of the attachment connection frame also has the reinforcement pad being correspondingly arranged with the attachment bolt hole Piece has bolt hole corresponding with the attachment connecting hole on the reinforcement gasket.
Further, the reinforcing diagonal brace includes hound, and the both ends of the hound are each, and hinged there are one connecting seat, institutes Stating tool on the bottom plate of connecting seat, there are two the connecting holes for being symmetrically disposed in hinged shaft both sides;The lower side of the reinforcing frame has more The bolt hole of a vertically communicated setting, the distance of the two neighboring bolt hole are consistent at a distance from two connecting holes.
In conclusion the present invention is convenient with constructing operation, connective stability is good, can ensure the normal peace of construction elevator The advantages that dress and use.
Description of the drawings
Fig. 1 is a kind of structural schematic diagram of the attachment connection structure of construction elevator and wall.
Fig. 2 is the structural schematic diagram of attachment conversion framework in Fig. 1.
Fig. 3 is the structural schematic diagram of wall-attached frame in Fig. 1.
Fig. 4 is another structural schematic diagram of attachment conversion framework.
Specific implementation mode
With reference to embodiment, the present invention is described in further detail.
When specific implementation:As shown in FIG. 1 to 3, the attachment connection structure of a kind of construction elevator and wall, including be connected to Framework 2 is converted in wall-attached frame 1 on construction elevator standard knot, and the attachment being fixedly mounted on building, and structure is converted in the attachment Frame 2 includes that horizontally disposed and whole rectangular attachment connects frame 21, the side installation of attachment connection 21 width direction of frame There are multiple attachment points being correspondingly arranged with the wall-attached frame 1 on the wall of building, and on the opposite other side, it is described attached Wall stand 1 is on the attachment point that one end of construction elevator is connected to the attachment connection frame 21.
Using the above structure, by installing attachment connection frame on wall, it can make up and be applied caused by due to floor is retracted Excessive distance between work elevator and the part floor building, facilitates wall-attached frame to fix.Attachment connection frame setting is rectangular Frame structure can not only ensure that attachment connection frame can be bonded wall installation, but also can provide stable mounting surface for wall-attached frame, It is easily installed construction.
When implementation, the attachment conversion framework 2 further includes the wall for being inclined at attachment the connection frame 21 and building Reinforcing diagonal brace 22 between body, two for reinforcing diagonal brace 22 and being symmetrically disposed in attachment connection 21 length direction of frame Side.
In this way, the intensity of attachment connection frame can be improved by fixed diagonal brace, the stabilization of integral installation connection structure is improved Property.
When implementation, the wall-attached frame 1 includes whole be in isosceles trapezoidal structure main frame 11, it is shorter on the main frame 11 The both ends on bottom edge be respectively vertically arranged there are one be used for connection construction elevator standard section standard knot connecting pole 12;The main frame 11 On longer bottom edge both ends be respectively vertically arranged there are one for connect it is described attachment connection frame 21 attachment connecting pole 13;It is described attached The end for connecting pole 13 has vertically disposed connecting plate 14, has attachment bolt hole on the connecting plate 14;The attachment connection There is the attachment bolt hole being correspondingly arranged with the attachment bolt hole at the attachment point of frame 21;The wall-attached frame 1 is by passing through The bolt on connecting plate 14 and attachment connection frame 21 is stated to be fixedly connected on the attachment connection frame 21.
When implementation, the brace being obliquely installed, the both ends of the brace are also associated between two attachment connecting poles 13 It is connected to the end of two attachment connecting poles 13.
Adhere to after connecting pole is mounted on attachment connection frame and forms rectangular frame structure, by the brace being obliquely installed, It is in two triangle rock-steady structures that rectangular frame structure can be separated, and is conducive to the stability for improving connection.
When implementation, also has between the both sides of attachment connection 21 width direction of frame and be obliquely installed bracing piece 23, it is described Bracing piece 23 is symmetrically provided with two along attachment connection 21 length direction of frame.
When implementation, the both sides of attachment connection 21 width direction of frame also penetrate through the connection bolt of setting with horizontal vertical Hole, the link bolt hole have multiple along the length direction equidistant placement of the attachment connection frame 21;Framework 2 is converted in the attachment Frame 21 is connected including multiple attachments for being sequentially connected setting in the width direction, and the two neighboring attachment connection frame 21 is logical The bolt for the link bolt hole crossed in adjacent side is fixedly connected.
In this way, the quantity of connection frame can be adhered to by increasing, the spacing between wall and wall-attached frame is made up, can be made attached Building of different shapes use can be suitable for by conversion framework, and the scope of application is wider.
When it is implemented, structure as shown in Figure 4 can also be used, the both sides of attachment connection 21 length direction of frame are also With the strengthening stud hole for vertically penetrating through setting, the strengthening stud hole is equidistant along the width direction of the attachment connection frame 21 It is disposed with multiple;The attachment conversion framework 2 further includes the width direction along the attachment connection frame 21, and it is vertically arranged plus Strong frame 3;The whole isosceles trapezoidal structure with a narrow upper and lower width of the reinforcing frame 3, have on the upper side edge of the reinforcing frame 3 it is multiple with The corresponding bolt hole in the strengthening stud hole, and it is bolted on the lower section of the two neighboring attachment conversion framework 2;Institute The upper end for stating reinforcing diagonal brace 22 is bolted on the lower side of the reinforcing frame 3.
Using the above structure, by be connected to it is two neighboring attachment connection frame below reinforcing frame, can enhance two it is attached The installation strength between connection frame.
When implementation, attachment connection frame 21 is welded using channel steel, and the open side of the channel steel is towards the attachment The middle part of frame 21 is connected, and two neighboring channel steel is using 45 degree of angle bevel edge welding.
In this way, the integral strength of attachment connection frame can be enhanced.
When implementation, the inside of the attachment connection frame 21 also has the reinforcement pad being correspondingly arranged with the attachment bolt hole Piece has bolt hole corresponding with the attachment connecting hole on the reinforcement gasket.
When implementation, the reinforcing diagonal brace 22 includes hound, and the both ends of the hound are each, and hinged there are one connecting seat, institutes Stating tool on the bottom plate of connecting seat, there are two the connecting holes for being symmetrically disposed in hinged shaft both sides;The lower side of the reinforcing frame 3 has The bolt hole of multiple vertically communicated settings, the distance of the two neighboring bolt hole are consistent at a distance from two connecting holes.
Both ends due to reinforcing diagonal brace are hinged with connecting seat so that reinforce the hound of diagonal brace in different diagonal brace angles Under, it can ensure the lower side or metope of the bottom plate fitting reinforcing frame of connecting seat.And it is arranged in the lower side of reinforcing frame more A bolt hole can need the link position of adjustable rooting diagonal brace so that installation is more flexible according to installation.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not limitation, all essences in the present invention with the present invention All any modification, equivalent and improvement etc., should all be included in the protection scope of the present invention made by within refreshing and principle.

Claims (10)

1. the fixed setting method of a kind of construction elevator and wall, which is characterized in that include the following steps:It constructs according to being connected to Spacing of the wall-attached frame apart from wall on elevator standard section obtains the attachment of lower structure such as and converts framework, and structure is converted in the attachment Frame includes whole rectangular attachment connection frame, and it is consistent that the attachment connects spacing of the width of frame with wall-attached frame apart from wall; There are multiple attachment points being correspondingly arranged with the wall-attached frame on the side in attachment connection width of frame direction;It, will when installation Attachment connection frame is horizontally arranged on wall, makes the attachment point on attachment connection frame towards construction elevator side, wall-attached frame is installed On the attachment point of attachment connection frame, the fixation of construction elevator and wall is completed.
2. the fixed setting method of construction elevator as described in claim 1 and wall, which is characterized in that structure is converted in the attachment Frame further includes the reinforcing diagonal brace being inclined between the attachment connection frame and the wall of building, and the reinforcing diagonal brace is symmetrical Ground is arranged in the both sides of the attachment connection frame length direction.
3. the fixed setting method of construction elevator as claimed in claim 2 and wall, which is characterized in that the wall-attached frame includes Whole is in the main frame of isosceles trapezoidal structure, and the both ends on shorter bottom edge are respectively vertically arranged that there are one for connecting on the main frame The standard knot connecting pole of construction elevator standard knot;The both ends on longer bottom edge are respectively vertically arranged that there are one for connecting on the main frame Connect the attachment connecting pole of the attachment connection frame;The end of the attachment connecting pole has vertically disposed connecting plate, the connecting plate It is upper that there is attachment bolt hole;There is the attachment spiral shell being correspondingly arranged with the attachment bolt hole at the attachment point of the attachment connection frame Keyhole;The wall-attached frame(1)It is fixedly connected on the attachment connection by the bolt on the connecting plate and attachment connection frame On frame.
4. the fixed setting method of construction elevator as claimed in claim 3 and wall, which is characterized in that two attachments connect It connects and is also associated with the brace being obliquely installed between column, the both ends of the brace are connected to the ends of two attachment connecting poles Portion.
5. the fixed setting method of construction elevator as described in claim 1 and wall, which is characterized in that the attachment connects frame Also have between the both sides of width direction and be obliquely installed bracing piece, the bracing piece is symmetrical along attachment connection frame length direction There are two ground settings.
6. the fixed setting method of construction elevator as claimed in claim 2 and wall, which is characterized in that the attachment connects frame Including multiple rectangle frames for being sequentially connected setting in the width direction, the both sides of the rectangle frame width direction also have horizontal vertical Penetrate through setting link bolt hole, the link bolt hole have along the length direction equidistant placement of the rectangle frame it is multiple, it is adjacent Two rectangle frames are fixedly connected by the bolt of the link bolt hole in adjacent side;The attachment connects frame Width be the rectangle width of frame integral multiple.
7. the fixed setting method of construction elevator as claimed in claim 6 and wall, which is characterized in that the rectangle frame length The both sides in direction also have the strengthening stud hole for vertically penetrating through setting, and the strengthening stud hole is along the width side of the rectangle frame Have to equidistant placement multiple;The attachment conversion framework further includes the width direction along the attachment connection frame, and vertically arranged Reinforcing frame;The reinforcing frame whole isosceles trapezoidal structure with a narrow upper and lower width has on the upper side edge of the reinforcing frame multiple Bolt hole corresponding with the strengthening stud hole, and it is bolted on the lower section of the two neighboring rectangle frame;It is described to add Gu the upper end of diagonal brace is bolted on the lower side of the reinforcing frame.
8. the fixed setting method of construction elevator as claimed in claim 2 and wall, which is characterized in that the attachment connects frame It is welded using channel steel, the open side of the channel steel is towards the middle part of the attachment connection frame, and two neighboring channel steel uses 45 degree of angle bevel edge welding.
9. the fixed setting method of construction elevator as claimed in claim 8 and wall, which is characterized in that the attachment connects frame Inside also have with the reinforcement gasket that is correspondingly arranged of attachment bolt hole, have on the reinforcements gasket and attachment company Connect the corresponding bolt hole in hole.
10. the fixed setting method of construction elevator as claimed in claim 7 and wall, which is characterized in that the reinforcing diagonal brace Including hound, the both ends of the hound are each hinged there are one connecting seat, and there are two symmetrical for tool on the bottom plate of the connecting seat The connecting hole in hinged shaft both sides is arranged in ground;The lower side of the reinforcing frame has the bolt hole of multiple vertically communicated settings, adjacent The distance of two bolts hole is consistent at a distance from two connecting holes.
CN201810846668.6A 2018-07-27 2018-07-27 Fixed installation method for construction elevator and wall Active CN108678362B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810846668.6A CN108678362B (en) 2018-07-27 2018-07-27 Fixed installation method for construction elevator and wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810846668.6A CN108678362B (en) 2018-07-27 2018-07-27 Fixed installation method for construction elevator and wall

Publications (2)

Publication Number Publication Date
CN108678362A true CN108678362A (en) 2018-10-19
CN108678362B CN108678362B (en) 2021-03-16

Family

ID=63815931

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810846668.6A Active CN108678362B (en) 2018-07-27 2018-07-27 Fixed installation method for construction elevator and wall

Country Status (1)

Country Link
CN (1) CN108678362B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115199085A (en) * 2022-08-19 2022-10-18 中国十九冶集团有限公司 Square column pier structure attached to crawling ladder and construction method of square column pier structure
CN115263021A (en) * 2022-08-22 2022-11-01 中国十九冶集团有限公司 Ladder stand structure for cylindrical pier construction and construction method for pouring cylindrical pier

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014114097A (en) * 2012-12-07 2014-06-26 Ohbayashi Corp Deposit treatment equipment
CN203938397U (en) * 2014-06-10 2014-11-12 金华市东山机械厂 A kind of compound type wall-attaching equipment
CN205397790U (en) * 2016-03-31 2016-07-27 海南庞源建筑机械租赁有限公司 A subassembly that is used for construction elevator to attach wall pull rod overlength
CN106144832A (en) * 2016-08-31 2016-11-23 中建四局第六建筑工程有限公司 A kind of special extended type wall-attached frame and preparation method thereof
CN205709351U (en) * 2016-06-24 2016-11-23 山西省工程机械厂 Building hoist remote installing type attachment device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014114097A (en) * 2012-12-07 2014-06-26 Ohbayashi Corp Deposit treatment equipment
CN203938397U (en) * 2014-06-10 2014-11-12 金华市东山机械厂 A kind of compound type wall-attaching equipment
CN205397790U (en) * 2016-03-31 2016-07-27 海南庞源建筑机械租赁有限公司 A subassembly that is used for construction elevator to attach wall pull rod overlength
CN205709351U (en) * 2016-06-24 2016-11-23 山西省工程机械厂 Building hoist remote installing type attachment device
CN106144832A (en) * 2016-08-31 2016-11-23 中建四局第六建筑工程有限公司 A kind of special extended type wall-attached frame and preparation method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115199085A (en) * 2022-08-19 2022-10-18 中国十九冶集团有限公司 Square column pier structure attached to crawling ladder and construction method of square column pier structure
CN115263021A (en) * 2022-08-22 2022-11-01 中国十九冶集团有限公司 Ladder stand structure for cylindrical pier construction and construction method for pouring cylindrical pier

Also Published As

Publication number Publication date
CN108678362B (en) 2021-03-16

Similar Documents

Publication Publication Date Title
CN108678362A (en) A kind of fixed setting method of construction elevator and wall
WO2017020541A1 (en) Guide rail mechanism fixed on building
CN202146601U (en) Swing
CN201486120U (en) Detachable steel column connecting construction operation platform
CN210767927U (en) Safety protection platform of attached lifting operation
CN105804416B (en) The attachment structure of prefabrication tower crane
CN208531974U (en) A kind of attachment connection structure of construction elevator and wall
CN218149656U (en) Operating platform in lighting well
CN215167897U (en) Net piece fixed knot of frame is climbed in lightweight constructs
CN109577624A (en) Frame-shear structure scaffold system and construction method
CN205591575U (en) Overhanging type protective shed structure
CN205590122U (en) Construction elevator wall attaching device
CN211920714U (en) Support system of pull-up and pull-down type external hanging self-climbing tower crane
CN203308109U (en) External carrying net device
CN208327124U (en) A kind of lifting stair suspender
CN210914885U (en) Retaining wall rod fixing device of construction elevator
CN206051211U (en) A kind of special extended type wall-attached frame
CN217652297U (en) Scaffold upper scaffold board and guide rail connecting structure
CN205935712U (en) Simple and easy jack bracket
CN217602024U (en) High-altitude overhanging type steel support frame
CN205575425U (en) High strength tower crane attachment structure
CN217175622U (en) Protection integration elevartor shaft operation platform
CN211114943U (en) A high outer wall protector of security for construction
CN214885646U (en) Material platform drawknot connecting piece
CN211524011U (en) Safety operation cage externally hung on boundary beam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant