CN208870070U - A kind of seif-citing rate formula generation power foundation of wind power ring group plinth hardened system - Google Patents

A kind of seif-citing rate formula generation power foundation of wind power ring group plinth hardened system Download PDF

Info

Publication number
CN208870070U
CN208870070U CN201821396965.7U CN201821396965U CN208870070U CN 208870070 U CN208870070 U CN 208870070U CN 201821396965 U CN201821396965 U CN 201821396965U CN 208870070 U CN208870070 U CN 208870070U
Authority
CN
China
Prior art keywords
foundation
seif
stiffener
pasting board
billet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201821396965.7U
Other languages
Chinese (zh)
Inventor
何敏娟
何桂荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Architecture Design and Research Institute of Tongji University Group Co Ltd
Original Assignee
Architecture Design and Research Institute of Tongji University Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Architecture Design and Research Institute of Tongji University Group Co Ltd filed Critical Architecture Design and Research Institute of Tongji University Group Co Ltd
Priority to CN201821396965.7U priority Critical patent/CN208870070U/en
Application granted granted Critical
Publication of CN208870070U publication Critical patent/CN208870070U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Wind Motors (AREA)

Abstract

The utility model relates to a kind of seif-citing rate formula generation power foundation of wind power ring group plinth hardened systems, the system comprises the blower fan tower barrels being connected and foundation ring basis, foundation ring basis includes the foundation ring in concrete stub and lower end Transducers Embedded in Concrete stub, the bracing means applied for realizing precompression is provided with outside the foundation ring, the bracing means includes steel pasting board and billet, the steel pasting board is attached at foundation ring lateral surface, and it is fixed by permanent cable wire hoop, the billet is fixed on concrete column pier top face, and the setting on the outside of foundation ring, stiffener is provided on the steel pasting board, it is provided on billet and the matched lower stiffener of upper stiffener, upper stiffener is connected with lower stiffener by high-strength bolt.Compared with prior art, the utility model can use tower lower part and directly voluntarily pressurize to its periphery concrete, fundamentally solve the problems, such as that foundation ring basis generates cracking because of fatigue, force path is simply clear by setting bracing means.

Description

A kind of seif-citing rate formula generation power foundation of wind power ring group plinth hardened system
Technical field
The utility model belongs to generation power foundation of wind power reinforcement technique field, sends out more particularly, to a kind of seif-citing rate formula wind-force Electric tower foundation ring group plinth hardened system.
Background technique
Embedment tower formula blower foundation is limited by depth of foundation and bottom plate top mat, and buried section is caused to be embedded to base Plinth is excessively shallow, and the bending resistance that tower lateral force provides is than relatively limited, and embedment tower surrounding concrete is in chronic fatigue effect of vibration It is lower to occur broken, and in powdered, meet rainwater and become paste, be lost outward under fan vibration, thus upper and lower in embedment tower Form annular slot.
Previous general method for strengthening is to fill in gap with high-strength grout, this not can solve asking for concrete fragmentation Topic, in addition might as well basis be completed at the beginning of, be easy go wrong repeatedly.
Previous external prestressed strengthening method (ZL201510183824.1) is in addition to filling gap with high-strength grout, also In basal perimeter Prestressing anchor pole, sole plate is anchored into, then in basic top surface six roots of sensation girder steel cross-distribution, to tower week Side concrete applies precompression, and then pouring concrete covers girder steel, and this method can apply pressure to tower periphery concrete, Be conducive to the durability of this part concrete, but apply that precompression force path is too long, and Structural Engineering amount is larger, reinforce cost compared with It is high.
Summary of the invention
The purpose of this utility model is exactly to provide a kind of seif-citing rate formula to overcome the problems of the above-mentioned prior art Generation power foundation of wind power ring group plinth hardened system.
The purpose of this utility model can be achieved through the following technical solutions:
A kind of seif-citing rate formula generation power foundation of wind power ring group plinth hardened system, including the blower fan tower barrel and foundation ring being connected Basis, foundation ring basis include the foundation ring in concrete stub and lower end Transducers Embedded in Concrete stub, are arranged outside the foundation ring There is the bracing means applied for realizing precompression, which includes steel pasting board and billet, and the steel pasting board is attached at Foundation ring lateral surface, and fixed by permanent cable wire hoop, the billet is fixed on concrete column pier top face, and around foundation ring Outside setting, is provided with stiffener on the steel pasting board, be provided on the billet with upper stiffener it is matched under put more energy into Plate, the upper stiffener and lower stiffener are connected by high-strength bolt.
Further, the foundation ring is equipped with steel pasting board side and is coated with epoxide-resin glue.
Further, the steel pasting board and billet are equipped with multiple, and quantity is identical.
Further, the upper stiffener and lower stiffener are equipped with for the bolt hole across the high-strength bolt, and should Bolt hole is slotted hole.
Further, setting is correspondingly arranged two on the billet there are two upper stiffener on each steel pasting board Lower stiffener.
Further, the bracing means further includes the reinforcing bar for wrapping up the steel pasting board and billet.
Further, concrete ring beam is additionally provided with outside the reinforcing bar.
Further, the upper face in the foundation ring Transducers Embedded in Concrete stub is coated with chlorinated rubber paint.
Further, the upper stiffener is equipped with construction square hole.
Compared with prior art, the utility model has the following beneficial effects:
1, the utility model hardened system is reasonable in design, and firm stable is easy to implement, can effectively solve basic ring group The problem of fatigue damage of plinth realizes and directly voluntarily pressurizes to periphery concrete using tower lower part that reinforcing approach is more direct, section About reinforce expense.
2, the strong operability that the utility model is reinforced, on the basis of restoring original structure and destroying concrete most to stress Greatly, most complicated tower outer periphery top concrete applies precompression, so that it is in compression in the operating condition, will not occur Fatigue rupture.In addition, prestressing force makes the multidirectional compression of concrete, intensity is improved.
3, in the utility model, upper stiffener is fixed on steel pasting board, and steel pasting board is fixed on tower drum outer wall again, so to mixed Solidifying soil pressure applies drawing to tower.Tower intensity is larger herein, and under limiting condition tower intensity in principle not by prestressing force shadow It rings, therefore safety.
4, in the utility model, tower periphery concrete is anchored by tower tension itself, and is used after hydraulic cylinder pressurization High-strength bolt fixes upper stiffener and lower stiffener to keep precompression.Under blower working condition, tower periphery nearby mixed Solidifying soil is in pressured state, can keep the durability and integrality of concrete, reach reinforcing purpose.
5, the project amount of the utility model hardened system is small, and low cost is easy for construction, can fundamentally solve basic ring group Plinth leads to the problem of cracking because of fatigue effect.
Detailed description of the invention
Fig. 1 is planar structure schematic diagram provided by the utility model;
Fig. 2 is the A-A sectional view of Fig. 1;
Fig. 3 is the detail drawing 1. located in Fig. 2;
Fig. 4 is the B-B sectional view of Fig. 3;
Fig. 5 is the C-C sectional view of Fig. 4;
Fig. 6 is that steel pasting board clamps schematic diagram in work progress;
Wherein: 1 is blower fan tower barrel;2 be basic ring;3 be concrete stub;4 be basic bottom plate;5 be chlorinated rubber paint;6 For high-strength grout;7 be steel pasting board;8 be billet;9 be upper stiffener;10 be lower stiffener;11 be epoxide-resin glue;12 are Permanent cable wire hoop;13 be high-strength bolt;14 be reinforcing bar;15 be concrete ring beam;16 be tool-type cable wire hoop;17 be spring pressure Plate;18 jack girder steel for tool-type;19 be hydraulic cylinder.
Specific embodiment
The utility model is described in detail in the following with reference to the drawings and specific embodiments.The present embodiment is with the utility model Implemented premised on technical solution, the detailed implementation method and specific operation process are given, but the guarantor of the utility model Shield range is not limited to the following embodiments.
As shown in Figure 1-3, the present embodiment provides a kind of seif-citing rate formula generation power foundation of wind power ring group plinth hardened systems, including Blower fan tower barrel 1 and the foundation ring basis being connected, foundation ring basis includes concrete stub 3 and lower end Transducers Embedded in Concrete stub 3 Interior foundation ring 2, foundation ring 2 are provided with the bracing means applied for realizing precompression outside, which includes steel pasting board 7 With billet 8, steel pasting board 7 is attached at 2 lateral surface of foundation ring, and billet 8 is fixed on 3 top surface of concrete stub, and around basis It is arranged on the outside of ring 2, stiffener 9 is provided on steel pasting board 7, is provided on billet 8 and the matched lower stiffener of upper stiffener 9 10, upper stiffener 9 and lower stiffener 10 are connected by high-strength bolt 13.
Steel pasting board 7 passes through the permanent cable wire hoop 12 installed up and down and is fixed on foundation ring 2, and is tightened with flower basket bolt, makes Steel pasting board 7 is firmly bonded with 2 outer wall of foundation ring.
Foundation ring 2 is equipped with 7 side of steel pasting board and is coated with epoxide-resin glue 11.On in 2 Transducers Embedded in Concrete stub 3 of foundation ring Portion surface is coated with chlorinated rubber paint 5.The range for coating chlorinated rubber paint 5 can be within the scope of basic top surface down 800mm.
Steel pasting board 7 and billet 8 are equipped with multiple, and quantity is identical, and quantity can be 4 multiple, each steel pasting board 7 and steel pad Plate 8 is evenly arranged.Upper stiffener 9 and lower stiffener 10 are equipped with for the bolt hole across high-strength bolt 13, and the bolt hole is Slotted hole.
In the present embodiment, on each steel pasting board 7 setting there are two upper stiffener 9, be correspondingly arranged on billet 8 under two plus Strength plate 10.The square hole that convenient card sets tool-type jacking girder steel 18 can be equipped on upper stiffener 9.
In certain embodiments, bracing means further includes the reinforcing bar 14 for wrapping up steel pasting board 7 and billet 8.
In certain embodiments, concrete ring beam 15 is additionally provided with outside reinforcing bar 14.
Seif-citing rate formula generation power foundation of wind power ring group plinth reinforcement means based on above-mentioned hardened system, comprising the following steps:
A, gap and hole in concrete, 800mm range brush below the basic top surface in 2 outside of foundation ring are cleared up with " water knife " Chlorinated rubber paint 5, and pressurizeed and filled with high-strength grout 6, form intensity;
B, steel pasting board 7 and billet 8 are made by field measurement and design requirement, upper stiffener 9, steel is welded on steel pasting board 7 Lower stiffener 10 is welded on backing plate 8;
C, twice tool-type cable wire hoop 16, tool-type cable wire hoop is arranged in 2 outside steel pasting board of foundation ring, 7 bonded areas above and below Multiple spring bearer plates 17 are connected on 16;
D, 2 outside brush epoxide-resin glue 11 of foundation ring pastes steel pasting board 7, and spring pressure is pulled after adjusting in 7 position of steel pasting board Plate 17 pushes down steel pasting board 7, as shown in Figure 6;
E, after the consolidation of epoxide-resin glue 11, taking off tool formula cable wire hoop 16 installs permanent cable wire hoop 12, and with gaily decorated basket spiral shell Bolt tightening;
F, circumferential direction is evenly arranged billet 8, and billet 8 and steel pasting board 7 correspond, lower stiffener 10 and upper stiffener 9 Bolt hole alignment;
G, insertion tool-type jacks girder steel 18 in upper 9 square hole of stiffener, as shown in fig. 4-5;
H, tool-type jacks 18 span centre arranged beneath hydraulic cylinder 19 of girder steel, and hydraulic cylinder top holds out against tool-type jacking steel 18 lower edge of beam, lower part are seated on billet 8, and hydraulic cylinder 19 pressurizes, and consider that loss of prestress is turned round when reaching pressure criteria Moments method tightens high-strength bolt 13;
I, 19 pressure of hydraulic cylinder is zeroed, and removes hydraulic cylinder 19 and tool-type jacks girder steel 18;
J, it pressurizes one by one to every piece of billet 8 in order, and fixed with high-strength bolt 13;
K, after the completion of all billets 8 pressurize, above billet 8 and the 7 exterior annular range assembling reinforcement 14 of steel pasting board, Formwork supporting plate, casting concrete, maintenance, demoulding form concrete ring beam 15, realize anti-corrosion protection.
The preferred embodiments of the present invention have been described in detail above.It should be appreciated that the ordinary skill people of this field Member according to the present utility model can conceive without creative work makes many modifications and variations.Therefore, all this technology necks Technical staff passes through logic analysis, reasoning or limited reality according to the design of the utility model on the basis of existing technology in domain Available technical solution is tested, it all should be within the scope of protection determined by the claims.

Claims (9)

1. a kind of seif-citing rate formula generation power foundation of wind power ring group plinth hardened system, including the blower fan tower barrel (1) being connected and basis Ring group plinth, foundation ring basis include the foundation ring (2) in concrete stub (3) and lower end Transducers Embedded in Concrete stub (3), feature It is,
The bracing means applied for realizing precompression is provided with outside the foundation ring (2), which includes steel pasting board (7) With billet (8), the steel pasting board (7) is attached at foundation ring (2) lateral surface, and fixed by permanent cable wire hoop (12), described Billet (8) is fixed on concrete stub (3) top surface, and the setting on the outside of foundation ring (2), is arranged on the steel pasting board (7) Have upper stiffener (9), be provided on the billet (8) with the matched lower stiffener (10) of upper stiffener (9), it is described on put more energy into Plate (9) and lower stiffener (10) are connected by high-strength bolt (13).
2. seif-citing rate formula generation power foundation of wind power ring group plinth hardened system according to claim 1, which is characterized in that described Foundation ring (2) is equipped with steel pasting board (7) side and is coated with epoxide-resin glue (11).
3. seif-citing rate formula generation power foundation of wind power ring group plinth hardened system according to claim 1, which is characterized in that described Steel pasting board (7) and billet (8) are equipped with multiple, and quantity is identical.
4. seif-citing rate formula generation power foundation of wind power ring group plinth hardened system according to claim 1, which is characterized in that described Upper stiffener (9) and lower stiffener (10) are equipped with for the bolt hole across the high-strength bolt (13), and the bolt hole is length Circular hole.
5. seif-citing rate formula generation power foundation of wind power ring group plinth hardened system according to claim 3, which is characterized in that each On the steel pasting board (7) there are two settings upper stiffener (9), two lower stiffeners (10) are correspondingly arranged on the billet (8).
6. seif-citing rate formula generation power foundation of wind power ring group plinth hardened system according to claim 1, which is characterized in that described Bracing means further includes the reinforcing bar (14) for wrapping up the steel pasting board (7) and billet (8).
7. seif-citing rate formula generation power foundation of wind power ring group plinth hardened system according to claim 6, which is characterized in that described Concrete ring beam (15) are additionally provided with outside reinforcing bar (14).
8. seif-citing rate formula generation power foundation of wind power ring group plinth hardened system according to claim 1, which is characterized in that described Upper face in foundation ring (2) Transducers Embedded in Concrete stub (3) is coated with chlorinated rubber paint (5).
9. seif-citing rate formula generation power foundation of wind power ring group plinth hardened system according to claim 1, which is characterized in that described Upper stiffener (9) is equipped with construction square hole.
CN201821396965.7U 2018-08-28 2018-08-28 A kind of seif-citing rate formula generation power foundation of wind power ring group plinth hardened system Withdrawn - After Issue CN208870070U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821396965.7U CN208870070U (en) 2018-08-28 2018-08-28 A kind of seif-citing rate formula generation power foundation of wind power ring group plinth hardened system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821396965.7U CN208870070U (en) 2018-08-28 2018-08-28 A kind of seif-citing rate formula generation power foundation of wind power ring group plinth hardened system

Publications (1)

Publication Number Publication Date
CN208870070U true CN208870070U (en) 2019-05-17

Family

ID=66465884

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821396965.7U Withdrawn - After Issue CN208870070U (en) 2018-08-28 2018-08-28 A kind of seif-citing rate formula generation power foundation of wind power ring group plinth hardened system

Country Status (1)

Country Link
CN (1) CN208870070U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108755740A (en) * 2018-08-28 2018-11-06 同济大学建筑设计研究院(集团)有限公司 A kind of seif-citing rate formula generation power foundation of wind power ring group plinth hardened system and reinforcement means
CN113026796A (en) * 2021-03-17 2021-06-25 上海久坚加固科技股份有限公司 Foundation reinforcing structure and method for foundation of wind power generation tower

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108755740A (en) * 2018-08-28 2018-11-06 同济大学建筑设计研究院(集团)有限公司 A kind of seif-citing rate formula generation power foundation of wind power ring group plinth hardened system and reinforcement means
CN108755740B (en) * 2018-08-28 2023-08-04 同济大学建筑设计研究院(集团)有限公司 Self-stress type wind power generation tower foundation ring foundation reinforcing system and reinforcing method
CN113026796A (en) * 2021-03-17 2021-06-25 上海久坚加固科技股份有限公司 Foundation reinforcing structure and method for foundation of wind power generation tower
CN113026796B (en) * 2021-03-17 2023-12-15 上海久坚加固科技股份有限公司 Wind power generation tower foundation ring foundation reinforcing structure and method

Similar Documents

Publication Publication Date Title
CN104790424B (en) The hardened system on generation power foundation of wind power ring basis and reinforcement means thereof
CN106245670B (en) Exposed steel column base construction method
CN208870070U (en) A kind of seif-citing rate formula generation power foundation of wind power ring group plinth hardened system
CN102505636A (en) Construction method of No.0 block of continuous rigid frame bridge of double-thin-wall pier
CN108411769A (en) A kind of assembled device of prefabricated pier shaft and prefabricated bent cap
CN108755740A (en) A kind of seif-citing rate formula generation power foundation of wind power ring group plinth hardened system and reinforcement means
CN113550348A (en) Land large-plate foundation anchor rod reinforcing structure, construction method and fan foundation structure
CN205742249U (en) A kind of prestressed concrete back cover cushion cap template
CN208415284U (en) A kind of transmission line of electricity assembled girder system cushion cap small precast pile foundation
CN112195957B (en) Reinforced connecting structure of fan tower and foundation and construction method
CN108755394A (en) A kind of method of presstressed reinforcing steel reinforcement bridge abnormity pier stud
CN106592622A (en) Annular concrete based wind-driven generator foundation structure with vertical prestress
CN208219689U (en) Prefabricated components concrete tower fan foundation structure
CN105862871A (en) Prestressing anchor body assembly type frame hoop slope protection device and construction method
CN109322490A (en) A kind of material distributing machine and steel platform connection structure of climbing
CN212077645U (en) Pre-buried ground tackle device
CN210712562U (en) Tower crane system for construction of cast-in-situ tower column of cable-stayed bridge
CN201265214Y (en) Steel plate anchorage block used for external pre-stress reinforcement structure
CN108756202A (en) A kind of recyclable building builder's jack fixing device and application method
CN204728356U (en) The hardened system of generation power foundation of wind power cyclic group plinth
CN2149419Y (en) Steel bar structure for reinforced convrete pile
CN209369359U (en) A kind of material distributing machine and steel platform connection structure of climbing
CN208430522U (en) The blower foundation of steel truss structure
CN107806252B (en) Upper pier structure for seismic isolation and reinforcement of existing building and construction method thereof
CN208121551U (en) A kind of assembled device of prefabricated pier shaft and prefabricated bent cap

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20190517

Effective date of abandoning: 20230804

AV01 Patent right actively abandoned

Granted publication date: 20190517

Effective date of abandoning: 20230804