CN208860673U - A kind of transparent native experimental rig of simulation tunnel excavation face unstability - Google Patents

A kind of transparent native experimental rig of simulation tunnel excavation face unstability Download PDF

Info

Publication number
CN208860673U
CN208860673U CN201821358514.4U CN201821358514U CN208860673U CN 208860673 U CN208860673 U CN 208860673U CN 201821358514 U CN201821358514 U CN 201821358514U CN 208860673 U CN208860673 U CN 208860673U
Authority
CN
China
Prior art keywords
model casing
pipeline
model
transparent
face
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821358514.4U
Other languages
Chinese (zh)
Inventor
雷华阳
翟塞北
刘敏
胡垚
刘英男
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin University
Original Assignee
Tianjin University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin University filed Critical Tianjin University
Priority to CN201821358514.4U priority Critical patent/CN208860673U/en
Application granted granted Critical
Publication of CN208860673U publication Critical patent/CN208860673U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model relates to a kind of transparent native experimental rigs of simulation tunnel excavation face unstability, including the transparent mould molding box for accommodating transparent soil and for the pipeline in tunnel in construction simulation, pipeline one end is protruded into model casing, one end is stretched out outside model casing, it is characterized in that, keeping closed and relaxation by rubber membrane in the side of pipeline protruded into model casing;Pressure gauge is configured on pipeline, and the hose by being provided with air-stopping valve is connected with air compressor;In the cross laser device of model casing being fixedly arranged above for generating horizontal and vertical laser section;It is fixed with camera on model casing periphery, the image of camera shooting is admitted to computer.The utility model can be used to the generating process of dynamic analog excavation face unstable failure, and research influences to excavate the factors of face stability.

Description

A kind of transparent native experimental rig of simulation tunnel excavation face unstability
Technical field
The utility model relates to a kind of transparent native experimental rigs of simulation tunnel excavation face unstability, open suitable for research shield The temporal and spatial evolution that soil deformation destroys in the Instability of digging face.
Background technique
The history that shield machine comes out existing more than 190 years so far, starts from Britain, is developed in Japan, Germany.Due to shield method Excavation causes ground settlement small, and driving speed is fast, and tunnel Forming Quality is preferable, and mechanization degree is high, low cost, has very high Nowadays Technological Economy superiority has become most common method in underground tunnel project construction.Since shield tunneling is one three The dynamic process promoted is tieed up, in the tunneling process of shield machine, tunnel circumferential direction land movement can be by applying section of jurisdiction lining in time Block is controlled, but the tunneling direction in tunnel, no matter which kind of construction method is used, and guarantees the supporting that excavation face is stable and applies The control of power is all difficult to fully equivalent in original crustal stress, and excavation face supporting power increases or reduces, can all cause around The soil body occurs corresponding displacement or even major accident occurs, therefore indispensable for the research for excavating face stability.
Model test is because be convenient for Control experiment parameter and preferable economy, in the research of tunnel excavation face stability It is widely applied.The existing tunnel excavation face Stability Model experimental evidence likelihood ratio determines the design size and mould of model casing Displacement meter observing earth body surface is arranged on soil body surface layer in type soil, the Instability in excavation simulation face by way of displacement on cutting face The soil deformation rule in face buries the soil pressure changing rule in soil pressure cell observation Instability in inside soil body, thus Obtain the changing rule of excavation face unstable failure.
Although existing model test apparatus can be derived that before excavation face unstability and after unstability soil body table situation of change, There are still more serious disadvantages:
(1) be not inconsistent with actual condition: the principal element for influencing excavation face stability is the size of supporting power, and supporting power is insufficient Lead to excavation face unstability.And existing model test is using the process of displacement on cutting face simulation shield tunneling face unstable failure, test Process major influence factors are the sizes of displacement rather than the change of supporting power, thus routine test not fully meets practical work Condition is also unable to get the relationship of supporting power this major influence factors and soil body internal deformation.
(2) measurement limitation is larger: can only observe the changing rule that soil body surface settles in excavation face Instability, nothing The deformation rule of method observation inside soil body.
(3) test data is distorted: being measured using exploration type measuring tool, the property that can change the test soil body has been sent out Raw to change, there are various uncertainties for test result.
In recent years, the application with the development and digital image processing techniques of transparent soil model in geotechnical engineering, makes The research that deformation must be carefully seen to inside soil body is possibly realized, and model test soil layer is used as using transparent soil, at digital picture Reason technology, laser speckle technique, by excavation simulation face supporting power change procedure to during shield-tunneling construction around the digging face Jian it is native Body deformation failure is observed, and obtains the temporal and spatial evolution of excavation face unstable failure overall process soil deformation destruction.
Utility model content
The purpose of the utility model is to provide a kind of experimental rigs of simulation tunnel excavation face unstability based on transparent soil, can With the generating process of dynamic analog excavation face unstable failure, research influences to excavate the factors of face stability, applies for shield method Work provides theoretical direction.Technical solution is as follows:
A kind of transparent native experimental rig of simulation tunnel excavation face unstability, including the transparent mould molding box for accommodating transparent soil With the pipeline for being used to tunnel in construction simulation, pipeline one end is protruded into model casing, and one end is stretched out outside model casing, which is characterized in that Closed and relaxation is kept by rubber membrane in the side of pipeline protruded into model casing;Pressure gauge is configured on pipeline, and by setting The hose for being equipped with air-stopping valve is connected with air compressor;In being fixedly arranged above for generating horizontal and vertical laser for model casing The cross laser device of section;It is fixed with camera on model casing periphery, the image of camera shooting is admitted to computer.
Preferably, the pipeline is pvc pipe.There are two the cameras, and one is located at the top of model casing, another Positioned at the side of model casing.
The utility model has significant scientific research value and practical value, can carry out shield tunneling for construction and R&D institution Face unstable failure law study opens up new approach.Compared with existing Shield Tunneling face stability experimental rig, this reality Have the advantages that the following aspects with novel:
(1) generating process of the process simulation excavation face unstability reduced by simulation supporting power is adopted with conventional model test It is compared with displacement method excavation simulation face destabilizing deflection curves, can more really simulate actual condition.
(2) mistake of excavation face unstability is led to by the supporting power deficiency in the Instability of excavation simulation face that reduces step by step of air pressure Journey obtains the relationship of supporting power and soil deformation, provides for the variation of research supporting power and the changing rule and its relevance of the soil body With reference to.
(3) deformation field that can non-contact, continuously measure excavation face unstability overall process inside soil body, is not destroying the soil body The temporal and spatial evolution of the excavation face unstable failure overall process soil body is obtained under conditions of property.
(4) test influence factor is controllable.Compared to field test, can simulate supporting power, buried depth ratio, soil mass property etc. because Influence of the element to face stability is excavated.Various experimental conditions can be controlled, research purpose is reached according to the difference of research variable.
Detailed description of the invention
Fig. 1 is the front view of entire experimental rig;
Fig. 2 is the side view of entire experimental rig;
Fig. 3 is the top view of main experimental device.
Experimental rig includes model assay systems and Image Acquisition, processing system.Figure label explanation: 1. model casings; 2.PVC pipe;3. rubber membrane;4. pressure gauge;5. hose;6. air compressor;7. air-stopping valve;8. vent valve;9. bracket;10. Cross laser device;11.CCD camera;12.CCD camera;13. data line;14. four-way connection;15. transparent soil;16. computer.
Specific embodiment
The utility model is illustrated with embodiment with reference to the accompanying drawing.
As shown in Figure 1-3, the novel test device of the simulation tunnel excavation face unstable failure deformation of the utility model, utilizes Pressure balance principle in physics by adjusting air pressure size dynamic analog excavation face unstable failure deformation in pvc pipe and is stablized The influence of property.The utility model includes:
Transparent mould molding box 1 with a thickness of 15mm, carries out tunnel having a size of 40*30*50cm (long * wide * high) in model casing Excavate test;
Pvc pipe 2, length 70cm, outer diameter 50mm, the tunnel with a thickness of 2mm, in construction simulation.2 one end of pvc pipe is protruded into Hose and pneumatic shuttle are connected in 15cm in model casing, one end;
Rubber membrane 3, be fixed on protrude into model casing pvc pipe side keep it is closed and relaxation (loose purpose is to prevent rubber Glue film itself interferes the Free Transform of the soil body);
Pressure gauge 4, configuration measure intraductal atmospheric pressure on pvc pipe;
Vent valve 8 configures and stretches out the side of model casing in pvc pipe;
Hose 5 connects for connecting tunnel model and air compressor;
Four-way connection 14 connects pvc pipe, pressure gauge, hose, vent valve;
Air compressor 6, connection hose inject air pressure to pvc pipe;
Bracket 9 is used to suspension cross laser;
Cross laser device 10, the top for being suspended on model casing generate horizontal and vertical laser section;
CCD camera 11,21, two.The laser tangent plane picture of horizontal, the vertical both direction of the transparent soil of sync pulse jamming;
Data line 13, the image that transmission CCD camera is shot to computer;
Computer 16 is post-processed after receiving the image of CCD camera shooting using PIV software.
The application method of the utility model device, including the following steps:
(1) according to getting out testing equipment and equipment shown in Fig. 1.Suitable transparent soil is configured, simulation test soil sample is used for. Check whether laser light source, CCD camera, pressurizing device can work normally, examination pressurization checks the air-tightness of pvc pipe.
(2) transparent soil is placed in model casing gradually to bury to specified altitude assignment, slowly fills air pressure in pvc pipe at the same time To soil body static pressure, rubber membrane external and internal pressure is identical when the embedded completion of transparent soil, stands a period of time, excavation face is at this time Initial stable state.
(3) cross laser device is opened, slowly enhancing laser intensity is enough to brightness, laser angle is reasonably adjusted, in model The longitudinal direction at a vertical box bottom is respectively formed in case in front of pvc pipe rubber membrane at half of diametral distance and along pvc pipe section direction With the laser section of lateral stable and uniform.Test preferably carries out in dark space during carrying out, the irradiation area of laser Brighter, the effect for shooting imaging is also more preferable.
(4) CCD camera is opened, the position and height for adjusting camera make plane where its camera lens be parallel to model casing appearance Face, adjustment viewing field of camera acquire image after can covering entire excavation face unstability face, and it is soft to be transferred to computer PIV by data line Part carries out image procossing, forms inside soil body 3 D deformation field, is soil stabilization state before excavation face unstability.
(5) it opens air valve and reduces air pressure step by step, the variation of supporting power leads to excavation face unstability in the Instability of excavation simulation face The process of destruction stands after the completion of the unloading of every level-one and uses imaging system after transparent soil deformation is substantially stabilized for a period of time Data acquisition is carried out, the corresponding soil body 3 D deformation of supporting power at different levels field is obtained.
The utility model can be used to supporting power in the unstability overall process of excavation simulation face and change caused inside soil body three-dimensional Deformation rule.
This method is simple and easy, and by rationally designing, it is broken can to analyze soil deformation in the unstability overall process of tunnel excavation face Bad temporal and spatial evolution, and influence of the change of supporting power size to excavation face Instability can be analyzed, with Practical Project It is more close.

Claims (3)

1. a kind of transparent native experimental rig of simulation tunnel excavation face unstability, including for accommodating transparent soil transparent mould molding box with For the pipeline in tunnel in construction simulation, pipeline one end is protruded into model casing, and one end is stretched out outside model casing, which is characterized in that The side of pipeline protruded into model casing keeps closed and relaxation by rubber membrane;Pressure gauge is configured on pipeline, and passes through setting There is the hose of air-stopping valve to be connected with air compressor;It is cut in being fixedly arranged above for model casing for generating horizontal and vertical laser The cross laser device in face;It is fixed with camera on model casing periphery, the image of camera shooting is admitted to computer.
2. experimental rig according to claim 1, which is characterized in that the pipeline is pvc pipe.
3. experimental rig according to claim 1, which is characterized in that there are two the cameras, and one is located at model casing Top, another is located at the side of model casing.
CN201821358514.4U 2018-08-22 2018-08-22 A kind of transparent native experimental rig of simulation tunnel excavation face unstability Expired - Fee Related CN208860673U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821358514.4U CN208860673U (en) 2018-08-22 2018-08-22 A kind of transparent native experimental rig of simulation tunnel excavation face unstability

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821358514.4U CN208860673U (en) 2018-08-22 2018-08-22 A kind of transparent native experimental rig of simulation tunnel excavation face unstability

Publications (1)

Publication Number Publication Date
CN208860673U true CN208860673U (en) 2019-05-14

Family

ID=66415304

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821358514.4U Expired - Fee Related CN208860673U (en) 2018-08-22 2018-08-22 A kind of transparent native experimental rig of simulation tunnel excavation face unstability

Country Status (1)

Country Link
CN (1) CN208860673U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109060534A (en) * 2018-08-22 2018-12-21 天津大学 A kind of transparent native experimental rig of simulation tunnel excavation face unstability

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109060534A (en) * 2018-08-22 2018-12-21 天津大学 A kind of transparent native experimental rig of simulation tunnel excavation face unstability

Similar Documents

Publication Publication Date Title
CN109060534A (en) A kind of transparent native experimental rig of simulation tunnel excavation face unstability
Firpo et al. Use of digital terrestrial photogrammetry in rocky slope stability analysis by distinct elements numerical methods
US20220228486A1 (en) Hypergravity model test device and method for simulating progressive failure of shield tunnel face
CN105716960B (en) Excavation of foundation pit model test apparatus under complicated groundwater environment
CN104807563B (en) Stress test device in a non-contact manner and method based on drilling microscopic digital shooting
White et al. An image-based deformation measurement system for the geotechnical centrifuge
CN111122337B (en) Segment soil pressure model test device and method considering shield tail wall post-grouting influence
Zhou Tunnelling-induced ground displacements in sand
CN105021418A (en) Shield excavation face model suitable for soil engineeringcentrifugal model test and simulation method
CN106567416A (en) Model test device of excavating tunnel in transparent soil foundation and test method
CN208860673U (en) A kind of transparent native experimental rig of simulation tunnel excavation face unstability
Zou et al. A proposed method for estimating in-situ stress direction using panoramic stereo-pair imaging and stressed borehole geometric shapes
CN116046572A (en) Multifunctional subway tunnel stress analysis method containing hidden defects
Askarinejad et al. A novel technique to monitor subsurface movements of landslides
CN110455171A (en) A kind of moveable measurement analog simulation roadway surrounding rock wall surface deformation monitoring method
Benton et al. Photogrammetry in underground mining ground control—Lucky Friday mine case study
CN113358653A (en) Transparent soil model test device and method for simulating stratum settlement caused by coal seam mining
CN108343095A (en) The experimental rig and method of static pressure pile-sinking in the simulation saturation soil body
CN104180766A (en) Frozen soil interface layer deformation measuring system and measuring method thereof
CN208366993U (en) The experimental rig that simulation shield tunneling face unstability influences pipeline architecture
CN108692891A (en) A kind of pipe leakage simulation test device and test method
CN104315989B (en) Method for measuring deformation of rock area
Le The effect of forepole reinforcement on tunnelling-induced movements in clay
CN203720055U (en) Titration apparatus for testing stress of tunnel rock
CN218624232U (en) Pipe curtain undercut test device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190514

CF01 Termination of patent right due to non-payment of annual fee