- CN208858153U CN208858153U CN201821554892.XU CN201821554892U CN208858153U CN 208858153 U CN208858153 U CN 208858153U CN 201821554892 U CN201821554892 U CN 201821554892U CN 208858153 U CN208858153 U CN 208858153U
- Authority
- CN
- China
- Prior art keywords
- vertical shaft
- shaft gantry
- hole
- cast
- place concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model discloses a kind of vertical shaft gantries to wear cast-in-place concrete floor one-time-shaped mould, including bottom plate, vertically the coaming plate that is fixedly mounted on the bottom plate and the cover board that the coaming plate top is set, the center of the bottom plate offers vertical shaft gantry across hole, the vertical shaft gantry passes through the outer dimension in hole and the outer dimension of vertical shaft gantry matches, and the buckling parts to match with the coaming plate inner surface is provided on the cover board.The utility model can not only one-pass molding vertical shaft gantry hole to be provided, and coaming plate can be as the sealing platform of vertical shaft gantry hole to be provided, bottom plate can be as the fire-proof board of vertical shaft gantry hole to be provided, it can be realized batch production processing, batch machining is at low cost, and in-site installation is simple and convenient, and it is not high to site operation environmental requirement, saving of work and time is installed.
Description
Technical field
The utility model belongs to technical field of building construction, and in particular to a kind of vertical shaft gantry wears cast-in-place concrete floor one
The mold of secondary molding.
Background technique
In traditional vertical shaft gantry hole to be provided construction technology, casting concrete forms cast-in-place concrete floor at the scene
When, by way of being laid with plank sheathing, it is reserved that the vertical shaft gantry passed through for vertical shaft gantry is reserved in cast-in-place concrete floor
Hole, then vertical shaft gantry is threaded through in vertical shaft gantry hole to be provided and then secondary pouring molding sealing platform, and be laid with fire-proof plate,
Smear fire-proof mud;In the actual construction process, it has the following deficiencies: 1, need stopping for secondary pouring molding vertical shaft gantry hole to be provided
Water platform is easy to pollute lower layer's vertical shaft gantry;2, the gap between vertical shaft gantry and the metope of concrete walls is smaller, operation
Space is limited, in the sealing platform of second pouring molding vertical shaft gantry hole to be provided, can occur honeycomb fiber crops because leakiness is vibrated
The phenomenon that face, has seriously affected the impression quality of concrete construction;3, it needs to install additional in the lower face of cast-in-place concrete floor anti-
Ashes after a fire plate increases workload, and causes the waste on material;In order to solve disadvantages described above, it should propose a kind of vertical shaft gantry
Wear the mold of cast-in-place concrete floor one-pass molding.
Utility model content
The technical problem to be solved by the utility model is in view of the deficiency of the prior art, provide vertical shaft gantry
Cast-in-place concrete floor one-time-shaped mould is worn, simple structure and reasonable design can not only form vertical shaft gantry hole to be provided,
And coaming plate can as the sealing platform of vertical shaft gantry hole to be provided, bottom plate can as the fire-proof board of vertical shaft gantry hole to be provided,
Can be realized batch production processing, batch machining is at low cost, and in-site installation is simple and convenient, and it is not high to site operation environmental requirement,
Saving of work and time is installed.
In order to solve the above technical problems, the technical solution adopted in the utility model is: a kind of vertical shaft gantry wears cast-in-place coagulation
Tulou plate one-time-shaped mould, it is characterised in that: the coaming plate and setting being fixedly mounted on the bottom plate including bottom plate, vertically exist
The cover board on the coaming plate top, the center of the bottom plate offer vertical shaft gantry across hole, and the vertical shaft gantry passes through hole
Outer dimension and the outer dimension of vertical shaft gantry match, be provided on the cover board and match with the coaming plate inner surface
Buckling parts.
Above-mentioned vertical shaft gantry wears cast-in-place concrete floor one-time-shaped mould, it is characterised in that: the vertical shaft gantry is worn
Via hole is rectangular opening, and the coaming plate is the first side plate laid in parallel by two and two the second side plate splicing groups laid in parallel
At rectangle coaming plate, the top of the rectangle coaming plate is higher than cast-in-place concrete floor upper face 50mm~80mm.
Above-mentioned vertical shaft gantry wears cast-in-place concrete floor one-time-shaped mould, it is characterised in that: first side plate with
Gusset is provided between bottom plate and between the second side plate and bottom plate.
Above-mentioned vertical shaft gantry wears cast-in-place concrete floor one-time-shaped mould, it is characterised in that: the buckling parts is by more
A block is collectively formed.
Compared with the prior art, the utility model has the following advantages:
1, the utility model can not only form vertical shaft gantry hole to be provided, and the coaming plate can be used as the vertical shaft bridge
The sealing platform of frame hole to be provided, therefore, after casting concrete forms cast-in-place concrete floor and vertical shaft gantry hole to be provided at the scene,
The sealing platform for not needing to carry out vertical shaft gantry hole to be provided described in secondary pouring molding, reduces working procedure, avoids secondary dirt
Dye, moreover, improving the system of sealing platform height and size when sealing platform of the coaming plate as the vertical shaft gantry hole to be provided
One property, error are small.
2, the utility model can not only one-pass molding vertical shaft gantry hole to be provided, and bottom plate can be used as the vertical shaft bridge
The fire-proof board of frame hole to be provided, therefore, at the scene casting concrete molding cast-in-place concrete floor and vertical shaft gantry hole to be provided it
Afterwards, it does not need to be laid with fire-proof board in cast-in-place concrete floor lower face, is conducive to finished product protection, there is significant economy and ring
Border benefit eliminates fire-proof board and cast-in-place concrete building when fire-proof board of the bottom plate as the vertical shaft gantry hole to be provided
Faulting of slab ends between plate lower face improves the impression quality in ed crack of cast-in-place concrete slab face, and will not be to already installed
Vertical shaft gantry causes secondary pollution, and using effect is good.
3, the utility model can be realized batch production processing, and batch machining is at low cost, and in-site installation is simple and convenient, to existing
Field construction environment is of less demanding, installs saving of work and time;After cast-in-place concrete floor and vertical shaft gantry hole to be provided molding,
It does not need to remove entire vertical shaft gantry hole to be provided molding die, reduces the labor intensity of operator, improve construction efficiency,
Cost of labor has been saved, has not been limited by vertical shaft gantry hole to be provided size and construction environment, special-less process and technical requirements, has been fitted
Molding for the vertical shaft gantry hole to be provided of cast-in-place concrete floor in all construction.
4, the utility model simple structure and reasonable design, construction process is simple, easy to promote and utilize.
In conclusion the utility model simple structure and reasonable design, can not only form vertical shaft gantry hole to be provided, and
Coaming plate can be as the fire-proof board of vertical shaft gantry hole to be provided as the sealing platform of vertical shaft gantry hole to be provided, bottom plate, can
Realize batch production processing, batch machining is at low cost, and in-site installation is simple and convenient, installation not high to site operation environmental requirement
Saving of work and time.
Below by drawings and examples, the utility model is further described in detail.
Detailed description of the invention
Fig. 1 is that the utility model removes the structural schematic diagram after cover board.
Fig. 2 is the structural schematic diagram of the utility model cover board.
Fig. 3 is the use state diagram of the utility model.
Fig. 4 is the structural schematic diagram that the utility model vertical shaft gantry wears cast-in-place concrete floor.
Description of symbols:
1-bottom plate;1-1-vertical shaft gantry passes through hole;The first side plate of 2-1-;
The second side plate of 2-2-;3-cover boards;3-1-block;
4-gussets;5-vertical shaft gantries;6-plank sheathings;
7-cast-in-place concrete floors;8-fireprotection layers;9-screws.
Specific embodiment
As depicted in figs. 1 and 2, the utility model include bottom plate 1, the coaming plate being fixedly mounted on the bottom plate 1 vertically and
The cover board 3 on the coaming plate top is set, and the center of the bottom plate 1 offers vertical shaft gantry across hole 1-1, the vertical shaft
Gantry matches across the outer dimension of hole 1-1 and the outer dimension of vertical shaft gantry 5, is provided on the cover board 3 and encloses with described
The buckling parts that plate inner surface matches.
In the present embodiment, it is fixedly mounted on coaming plate on the bottom plate 1 by setting bottom plate 1 and vertically, it can not only be at
Type vertical shaft gantry hole to be provided, and coaming plate can be used as described as the sealing platform of the vertical shaft gantry hole to be provided, bottom plate 1
The fire-proof board of vertical shaft gantry hole to be provided, therefore, casting concrete molding cast-in-place concrete floor 7 and vertical shaft gantry are pre- at the scene
After box out, does not need to carry out the sealing platform of vertical shaft gantry hole to be provided described in secondary pouring molding, reduce working procedure, avoid
Secondary pollution, moreover, when sealing platform of the coaming plate as the vertical shaft gantry hole to be provided, improve sealing platform height and
The uniformity of size, error are small;After casting concrete forms cast-in-place concrete floor 7 and vertical shaft gantry hole to be provided at the scene,
It does not need to be laid with fire-proof board in 7 lower face of cast-in-place concrete floor, is conducive to finished product protection, there is significant economy and environment
Benefit eliminates fire-proof board and cast-in-place concrete floor when fire-proof board of the bottom plate 1 as the vertical shaft gantry hole to be provided
Faulting of slab ends between 7 plate faces improves the impression quality of 7 plate face of cast-in-place concrete floor, and will not be to already installed perpendicular
Well gantry 5 causes secondary pollution, and using effect is good.
In the present embodiment, by the setting cover board 3 on the coaming plate top, casting concrete forms cast-in-place coagulation at the scene
When Tulou plate 7, it can prevent concrete from entering in the coaming plate.
In the present embodiment, it is rectangular opening that the vertical shaft gantry, which passes through hole 1-1, the coaming plate be by two lay in parallel the
The rectangle coaming plate of side plate 2-1 and two the second side plate 2-2 splicing compositions laid in parallel, the top of the rectangle coaming plate is higher than
7 upper face 50mm~80mm of cast-in-place concrete floor.
In the present embodiment, since the cross section of vertical shaft gantry 5 is rectangle, it is rectangle that vertical shaft gantry, which passes through hole 1-1,
Hole, for the ease of installation, the gap between the inner surface of the rectangular opening and the outer surface of vertical shaft gantry 5 is 1mm~2mm.
In the present embodiment, the top of the rectangle coaming plate is higher than the mesh of 7 upper face 50mm~80mm of cast-in-place concrete floor
Be: the rectangle coaming plate can be as the sealing platform of the vertical shaft gantry hole to be provided, according to the design requirement of sealing platform, institute
The top for stating rectangle coaming plate should be higher than 7 upper face 50mm~80mm of cast-in-place concrete floor, can just play the role of sealing platform.
In the present embodiment, it is all provided between the first side plate 2-1 and bottom plate 1 and between the second side plate 2-2 and bottom plate 1
It is equipped with gusset 4.
In the present embodiment, by being respectively provided between the first side plate 2-1 and bottom plate 1 and between the second side plate 2-2 and bottom plate 1
Gusset 4 can be improved the rigidity of vertical shaft gantry hole to be provided molding die, and vertical shaft gantry hole to be provided molding die is made to be not likely to produce change
Shape ensure that the planarization between 7 lower face of bottom plate 1 and cast-in-place concrete floor.
In the present embodiment, the bottom plate 1, the first side plate 2-1, the second side plate 2-2 and gusset 4 are all made of steel plate production, steel
Plate with a thickness of 3mm~5mm, in work progress, be hardly damaged, be unlikely to deform, using effect is good.
In the present embodiment, the buckling parts is collectively formed by multiple block 3-1.
In the present embodiment, cover board 3 and multiple block 3-1 are all made of plank production, plank with a thickness of 5mm~8mm.
As shown in Figure 3 and Figure 4, in actual use, first when forming cast-in-place concrete floor 7 and vertical shaft gantry hole to be provided
First, it is required according to design drawing, it is pre-buried for positioning the positioning plate of vertical shaft gantry hole to be provided position on the ground, and described fixed
Positioning reference holes are marked by the way of scribing line on the plate of position and examine the position of datum hole;Secondly, it is laid with plank sheathing 6, according to
The position of the positioning reference holes and inspection datum hole that mark on the positioning plate, determines the vertical shaft on the plank sheathing 6
The installation site of gantry hole to be provided molding die, and the vertical shaft gantry hole to be provided molding die is fixedly mounted on the wooden model
On plate 6;Then, poured in place concrete forms cast-in-place concrete floor 7, after the solidification of cast-in-place concrete floor 7, removes wooden model
Plate 6 and cover board 3, sealing platform of the coaming plate as the vertical shaft gantry hole to be provided, the bottom plate 1 are pre- as the vertical shaft gantry
The fire-proof board of box out;Then, the vertical shaft gantry 5 is lifted, the vertical shaft gantry 5 is made to pass through the vertical shaft gantry hole to be provided,
Later, cable is laid in vertical shaft gantry;Finally, two surfaces up and down of the bottom plate 1 on each layer cast-in-place concrete floor 7 apply
Smear fireproof coating, then, after the fireproof coating parches, the coaming plate on each layer cast-in-place concrete floor 7 with it is described
Fire proofing material is filled between vertical shaft gantry 5, later, is smeared fire-proof mud on the surface of the fire proofing material, is formed fireprotection layer 8.
As shown in figure 3, in the present embodiment, bottom plate 1 is fixedly mounted on plank sheathing 6 by screw 9, when practical operation, by
In bottom plate 1 using being made with a thickness of the steel plate of 3mm, for the ease of utilizing screw 9 by bottom plate 1 and plank sheathing at the construction field (site)
6 are fixed together, it is only necessary to pierce in plank sheathing 6 half of screw 9, recycle hammer that screw 9 is tapped bending, make
The other half of screw 9 is pressed on bottom plate 1.
Compared with prior art, this vertical shaft gantry hole to be provided molding die can be realized batch production processing, batch machining
It is at low cost, and in-site installation is simple and convenient, it is not high to site operation environmental requirement, saving of work and time is installed;In cast-in-place concrete building
After plate 7 and vertical shaft gantry hole to be provided molding, does not need to remove entire vertical shaft gantry hole to be provided molding die, reduce behaviour
The labor intensity for making personnel, improves construction efficiency, has saved cost of labor, not by vertical shaft gantry hole to be provided size and construction ring
The limitation in border, special-less process and technical requirements, the vertical shaft gantry of cast-in-place concrete floor is pre- suitable for all construction
The molding of box out.
The above is only the preferred embodiment of the utility model, not imposes any restrictions to the utility model, all
According to any simple modification to the above embodiments of the utility model technical spirit, change and equivalent structural changes, still
Belong in the protection scope of technical solutions of the utility model.
Claims (4)
1. a kind of vertical shaft gantry wears cast-in-place concrete floor one-time-shaped mould, it is characterised in that: including bottom plate (1), vertical solid
The cover board (3) Dingan County the coaming plate on the bottom plate (1) and the coaming plate top is set, the centre bit of the bottom plate (1)
It sets and offers vertical shaft gantry across hole (1-1), the vertical shaft gantry passes through outer dimension and vertical shaft gantry (5) of hole (1-1)
Outer dimension matches, and is provided with the buckling parts to match with the coaming plate inner surface on the cover board (3).
2. vertical shaft gantry described in accordance with the claim 1 wears cast-in-place concrete floor one-time-shaped mould, it is characterised in that: described
It is rectangular opening that vertical shaft gantry, which passes through hole (1-1), and the coaming plate is that the first side plate (2-1) for being laid in parallel by two is parallel with two
The rectangle coaming plate for the second side plate (2-2) the splicing composition laid, the top of the rectangle coaming plate are higher than cast-in-place concrete floor (7)
Upper face 50mm~80mm.
3. vertical shaft gantry wears cast-in-place concrete floor one-time-shaped mould according to claim 2, it is characterised in that: described
It is provided with gusset (4) between first side plate (2-1) and bottom plate (1) and between the second side plate (2-2) and bottom plate (1).
4. vertical shaft gantry described in accordance with the claim 1 wears cast-in-place concrete floor one-time-shaped mould, it is characterised in that: described
Buckling parts is collectively formed by multiple blocks (3-1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821554892.XU CN208858153U (en) | 2018-09-22 | 2018-09-22 | Vertical shaft gantry wears cast-in-place concrete floor one-time-shaped mould |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821554892.XU CN208858153U (en) | 2018-09-22 | 2018-09-22 | Vertical shaft gantry wears cast-in-place concrete floor one-time-shaped mould |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208858153U true CN208858153U (en) | 2019-05-14 |
Family
ID=66419048
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821554892.XU Active CN208858153U (en) | 2018-09-22 | 2018-09-22 | Vertical shaft gantry wears cast-in-place concrete floor one-time-shaped mould |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208858153U (en) |
-
2018
- 2018-09-22 CN CN201821554892.XU patent/CN208858153U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110273539A (en) | A kind of combination set shaped steel formwork and its modeling method | |
CN109252662B (en) | One-step forming construction method for vertical shaft bridge frame through cast-in-place concrete floor | |
CN110722666A (en) | Splicing type prefabricated composite floor slab forming die and splicing method thereof | |
CN110978229A (en) | Method for prefabricating composite floor slab by splicing type mold | |
CN204510650U (en) | A kind of precast splice type stringer type stairway | |
CN105155836B (en) | Aluminum alloy mould plate for building and its using method | |
CN208858153U (en) | Vertical shaft gantry wears cast-in-place concrete floor one-time-shaped mould | |
CN114704080A (en) | Aluminum template and PC (polycarbonate) component combined mold hanging system and construction method | |
CN201713970U (en) | Structural system with light multi-ribbed plates and light multi-ribbed floor systems | |
CN202969967U (en) | Temporary protecting device for once formed floor reserved hole | |
CN102912978A (en) | One-step forming temporary protection device for floor reserved hole and construction method | |
CN109826117B (en) | Electric slip form pull-rod-free integral through culvert wall body pouring formwork trolley | |
CN112609971A (en) | Combined stair template | |
CN209633304U (en) | A kind of knockdown grass-planting brick shaper component | |
CN208068520U (en) | A kind of septic tank mold | |
CN204024043U (en) | A kind of for concrete pitched roof mounting structure | |
CN208629658U (en) | Precast stair particular manufacturing craft | |
CN201843084U (en) | Single-box multi-room box girder template | |
CN213829507U (en) | Hollow nut block vertical casting mold | |
CN210395121U (en) | Steel platform combines portable thick liquid board decking construction frock of ending of broach board formula | |
CN108222349A (en) | A kind of light steel of half assembled-foam concrete composite floor and its construction method | |
CN102873751B (en) | Method for manufacturing exhaust passage | |
CN201187146Y (en) | Novel plastics-steel building formwork | |
CN208280604U (en) | A kind of monoblock type aluminum alloy pattern plate connector | |
CN211849863U (en) | Template device with adjustable town road inspection shaft well neck all steel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |