doughnut
hoist cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821026005.1U
Other languages
Chinese (zh)
Inventor
陈庆军
梁竣杰
蔡健
叶嘉彬
左志亮
杨春
黄冠文
吴宏伟
杨轶涵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
South China University of Technology SCUT
Original Assignee
South China University of Technology SCUT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by South China University of Technology SCUT filed Critical South China University of Technology SCUT
Priority to CN201821026005.1U priority Critical patent/CN208857834U/en
Application granted granted Critical
Publication of CN208857834U publication Critical patent/CN208857834U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of high pile foundation casing reinforcement devices, including hoist cable, for casing to be squeezed into the fixed pulley to the bottom surface on the pile pressing device of ground set depth and the floor for being set to high pile foundation support, hoist cable one end is traction end, the other end is used for and casing connection, is set around on fixed pulley in the middle part of hoist cable.The process that the utility model can remove cofferdam construction from transports prefabricated casing to scene, can be installed, not only be greatly improved construction efficiency, be also greatly reduced difficulty of construction and cost.

Description

A kind of high pile foundation casing reinforcement device
Technical field
The utility model relates to building field, in particular to a kind of high pile foundation casing reinforcement device.
Background technique
With the continuous propulsion of scientific and technological Xinghai County's strategy, the construction of harbour, water conservancy projects is increasingly paid attention to, especially code The sustainable use of head building, becomes research hotspot.High pile foundation compares gravity type code as one of harbour primary structure form Head and sheet-pile wharf have smaller horizontal bearing capacity and horizontal rigidity, in wave force, horizontal seismic force, ship impact force effect The lower possible biggish horizontal distortion of generation, needs to reinforce the high pile foundation being damaged using effective method.
In Practical Project, for harbour after by the multiple lateral impact of ship, damage concentration is in underwater area in the bottom of stake. According to traditional reinforcement means, such as concrete section method, carbon cloth reinforced method are increased, need cofferdam construction, reinforced and make The difficulty of industry is big, at high cost, therefore, is badly in need of more convenient reinforcement means of constructing.
Utility model content
For the technical problems in the prior art, the purpose of this utility model is: providing a kind of high pile foundation casing Bracing means.
The purpose of this utility model is achieved through the following technical solutions: a kind of high pile foundation casing reinforcement device, including is hung Rope, the bottom surface for casing being squeezed into the pile pressing device of ground set depth and being set to the floor that high pile foundation supports Fixed pulley, hoist cable one end is traction end, and the other end is used for and casing connection, is set around on fixed pulley in the middle part of hoist cable.
Preferably, described sleeve pipe includes more than two doughnut-shaped steel plates, and each doughnut-shaped steel plate is set on the outside of high pile foundation simultaneously Each two adjacent doughnut-shaped steel plates are fixedly connected with the casing for being formed and being enclosed on the outside of high pile foundation.
Preferably, described sleeve pipe is multiple, stacked along high pile foundation extending direction respectively, each casing stowed position phase It is fixedly connected.
Preferably, what the two doughnut-shaped steel plates opening of neighbouring two casing was fixedly connected is staggeredly located to open up and sets.
Preferably, the fixed pulley and hoist cable are four and are arranged in a one-to-one correspondence, and four fixed pulleys surround high pile foundation Arrangement, two neighboring fixed pulley intersect in 90 ° to the line of high pile foundation.
The utility model compared with the existing technology have following advantages and effects
1, the utility model can remove the process of cofferdam construction from, and prefabricated casing is transported to scene, can be pacified Dress, is not only greatly improved construction efficiency, is also greatly reduced difficulty of construction and cost.
2, the casing of the utility model can be used as a part of ruggedized construction, and construction is completed not needing to remove, eliminates and take If the process of template.
3, the casing of the utility model can squeeze into rock stratum, until it is contour with high pile foundation, to the consolidation effect of high pile foundation Significantly, and it is applied widely.
Detailed description of the invention
Fig. 1 is the flow diagram of high pile foundation casing reinforcement construction method;
Fig. 2 is that the fixed pulley of the utility model is set to the structural schematic diagram of floor bottom surface;
Fig. 3 is the bottom view of Fig. 2;
Fig. 4 is the structural schematic diagram that the casing of the utility model is surrounded on outside high pile foundation;
Fig. 5 is the schematic diagram of the utility model lifting first layer casing;
Fig. 6 is the schematic diagram of the utility model lifting second layer casing;
Fig. 7 is that the pile pressing device of the utility model pushes the schematic diagram of casing;
Fig. 8 is the schematic diagram after the completion of high pile foundation casing reinforcement construction.
Specific embodiment
The present invention will be further described in detail with reference to the embodiments and the accompanying drawings, but the implementation of the utility model Mode is without being limited thereto.
Fig. 1 is the flow diagram of high pile foundation casing reinforcement construction method.A kind of high pile foundation casing reinforcement construction method, It include: to be arranged casing outside high pile foundation;Casing is squeezed into ground set depth;It is inserted between casing and high pile foundation mixed Solidifying soil or other reinforcement materials.Casing can be squeezed by jack to ground set depth, specifically, using harbour as embodiment It being illustrated, jack is fixed on the bottom surface on the floor of high pile foundation support, the mandril alignment sleeve of jack pushes, from And casing is squeezed into specified rock stratum.
Preferably, if inserting concrete after extracting ponding out there are when ponding between casing and high pile foundation.
Preferably, it is doughnut-shaped steel plate by two in " C " shape from high pile foundation that casing, which is sheathed on the method outside high pile foundation, Two sides buckle into and the opening of two doughnut-shaped steel plates are fixedly connected with the casing for being formed and being enclosed on the outside of high pile foundation.
Preferably, described sleeve pipe is multiple, stacked along high pile foundation extending direction respectively, each casing stowed position phase It is fixedly connected, specifically, can be fixedly connected with the position that upper layer and lower layer casing is in contact by welding.
Preferably, it is staggeredly located what two doughnut-shaped steel plates of adjacent two casing opening was fixedly connected to open up and sets.
A kind of high pile foundation casing reinforcement device, including hoist cable 1, for squeezing into casing to the piling of ground set depth Device 2 and the fixed pulley 5 being set on the bottom surface on the floor 4 that high pile foundation 3 supports, 1 one end of hoist cable is traction end 6, another End is used for and casing connection, is set around on fixed pulley 5 in the middle part of hoist cable 1.Jack etc. can be used in pile pressing device 2, and casing is steel bushing Pipe, casing can be prefabricated in the factory.
As shown in fig. 7, being illustrated using harbour as embodiment, jack is fixed to the floor 4 that high pile foundation 3 supports Bottom surface on, the mandril alignment sleeve of jack pushes, to squeezing into casing to specified rock stratum, and is pushing casing process In, loosen hoist cable 1 and is squeezed into casing to specified rock stratum with cooperating.
As shown in Figure 2 or Figure 3, it is preferred that the fixed pulley 5 and hoist cable 1 are four and are arranged in a one-to-one correspondence, and four fixed Pulley 5 arranges that the angle α that two neighboring fixed pulley 5 intersects to the line of high pile foundation 3 is in 90 ° around high pile foundation 3.
Fig. 4 is that the casing of the utility model is surrounded on the structural schematic diagram outside high pile foundation.Preferably, described sleeve pipe includes More than two doughnut-shaped steel plates 7, each doughnut-shaped steel plate 7 are set to high 3 outside of pile foundation and fix each two adjacent doughnut-shaped steel plates 7 Connect the casing to be formed and be enclosed in high 3 outside of pile foundation.Such as: casing include two be in " C " shape doughnut-shaped steel plate 7, two The opening of doughnut-shaped steel plate 7 buckles into respectively from high 3 two sides of pile foundation and is fixedly connected with the opening of two doughnut-shaped steel plates 7 and formed It is enclosed in the casing in high 3 outside of pile foundation.
As shown in Fig. 7 or Fig. 8, it is preferred that described sleeve pipe be it is multiple, it is stacked along high 3 extending direction of pile foundation respectively, Each casing stowed position is mutually fixedly connected, specifically, can be fixedly connected with the position that upper layer and lower layer casing is in contact by welding Get up.
As shown in Fig. 7 or Fig. 8, it is preferred that two doughnut-shaped steel plates 7 opening of adjacent two casing was fixedly connected is staggeredly located out Setting.
As shown in figure 5, when each doughnut-shaped steel plate 7 of the casing of lifting first layer, two opposite hoist cables 1 are annular with two respectively Steel plate 7 is mutually fixedly connected with (docking location is in the middle part of 7 lateral surface of doughnut-shaped steel plate) one by one;Two traction ends 6 are drawn respectively by two Doughnut-shaped steel plate 7 hangs supreme 3 outside of pile foundation, and two doughnut-shaped steel plates 7 opening is snapped into high pile foundation 3, each doughnut-shaped steel plate 7 In 3 outside of high pile foundation, two can surround completely high pile foundation 3 semi-surrounding, in practice of construction, also can be set two with On doughnut-shaped steel plate 7, each doughnut-shaped steel plate 7 is surrounded on 3 outside of high pile foundation;Two adjacent doughnut-shaped steel plates 7 are welded, thousand Jin top pushes casing, squeezes into casing to the rock stratum of set depth, as shown in fig. 6, being distinguished using in addition two opposite hoist cables 1 Two doughnut-shaped steel plates 7 for lifting the casing of the second layer are repeated the installation for completing the casing of the second layer by the above process;Then, As shown in figure 8, repeating the installation process of first sleeve and second layer casing until casing is arranged to setting height, wherein in phase Adjacent two layers of the casing place of stacking is welded, so that the casing of adjacent two layers is fixedly connected.Two are used alternatingly among the above It is convenient to make 7 seam of doughnut-shaped steel plate of adjacent two layers to be staggered in the hoist cable 1 being oppositely arranged, being staggered 7 seam of doughnut-shaped steel plate can Quality is improved to avoid using concentration.
After the setting for completing casing, if mixed there are being inserted when ponding, after ponding is extracted out between casing and high pile foundation Solidifying soil, completes construction.
Above-described embodiment is the preferable embodiment of the utility model, but the embodiments of the present invention is not by above-mentioned The limitation of embodiment, it is made under other any spiritual essence and principles without departing from the utility model to change, modify, replacing In generation, simplifies combination, should be equivalent substitute mode, is included within the protection scope of the utility model.

Claims (5)

1. a kind of high pile foundation casing reinforcement device, which is characterized in that set deeply including hoist cable, for squeezing into casing to ground The pile pressing device of degree and the fixed pulley being set on the bottom surface on the floor that high pile foundation supports, hoist cable one end are traction end, separately One end is used for and casing connection, is set around on fixed pulley in the middle part of hoist cable.
2. high pile foundation casing reinforcement device according to claim 1, which is characterized in that described sleeve pipe includes two or more Doughnut-shaped steel plate, each doughnut-shaped steel plate is set on the outside of high pile foundation and is fixedly connected with each two adjacent doughnut-shaped steel plates and formed The casing being enclosed on the outside of high pile foundation.
3. high pile foundation casing reinforcement device according to claim 1 or 2, which is characterized in that described sleeve pipe be it is multiple, point Not stacked along high pile foundation extending direction, each casing stowed position is mutually fixedly connected.
4. high pile foundation casing reinforcement device according to claim 3, which is characterized in that two rings of neighbouring two casing What shape steel plate opening was fixedly connected is staggeredly located to open up and sets.
5. high pile foundation casing reinforcement device according to claim 1, which is characterized in that the fixed pulley and hoist cable are It four and is arranged in a one-to-one correspondence, four fixed pulleys are arranged around high pile foundation, line of the two neighboring fixed pulley to high pile foundation Intersect in 90 °.
CN201821026005.1U 2018-06-29 2018-06-29 A kind of high pile foundation casing reinforcement device Active CN208857834U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821026005.1U CN208857834U (en) 2018-06-29 2018-06-29 A kind of high pile foundation casing reinforcement device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821026005.1U CN208857834U (en) 2018-06-29 2018-06-29 A kind of high pile foundation casing reinforcement device

Publications (1)

Publication Number Publication Date
CN208857834U true CN208857834U (en) 2019-05-14

Family

ID=66412173

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821026005.1U Active CN208857834U (en) 2018-06-29 2018-06-29 A kind of high pile foundation casing reinforcement device

Country Status (1)

Country Link
CN (1) CN208857834U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108894262A (en) * 2018-06-29 2018-11-27 华南理工大学 A kind of high pile foundation steel sleeve reinforced construction method and device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108894262A (en) * 2018-06-29 2018-11-27 华南理工大学 A kind of high pile foundation steel sleeve reinforced construction method and device

Similar Documents

Publication Publication Date Title
CN208857834U (en) A kind of high pile foundation casing reinforcement device
CN212052708U (en) Novel underground continuous wall joint box
CN109706950A (en) The construction method of diaphram wall in a kind of tunnel
CN112195962A (en) Offshore electric platform pile-sleeve foundation structure with anti-sinking box structure
CN102261519B (en) Method for assisting sliding, floating and down-ditching of pipeline by air bags
CN113718820A (en) Offshore wind power steel pipe pile combined reinforcing device and reinforcing method
CN101962946A (en) Method for arranging hoisting points and floating-supported conduit frame with skirt pile sleeves
CN103243725A (en) Offshore foundation pit cofferdam construction technology
CN112813969A (en) Steel pipe pile foundation and construction method thereof
CN111188336B (en) Method for piling and feeding PHC piles in backfilled and dug foundation area
CN217974546U (en) Underwater dredging movable multifunctional operation platform
CN108894262A (en) A kind of high pile foundation steel sleeve reinforced construction method and device
RU2122071C1 (en) Process of formation of sheet piling of foundation pit in marsh and gear for its implementation
CN108411934B (en) Floating tubular pile, dam retaining structure and construction method thereof
CN214994007U (en) Bridge steel protects a section of thick bamboo and steel reinforcement cage and is connected locating rack
CN214272066U (en) High water content soft soil precipitation excavation integral sewer pipeline
CN210315400U (en) Deep and steep pit wading slope reinforcing structure
CN203947481U (en) Combined type Section-steel Piles lagging supporting and protection structure
CN109440778B (en) Active bidirectional inclined row pile foundation pit supporting method
CN206986897U (en) A kind of tethered sliding formula toe slab grouting system
CN205501988U (en) Stake of binocular shape hasp
CN2589514Y (en) Vertical load-supporting pile having buoyancy pontoon for pile foundation wharf
CN109853651A (en) A kind of mill tailings library waterpower takes sand method
CN112376607B (en) Anti-floating construction method and anti-floating structure for river-crossing pipeline
CN113373941B (en) Sheet pile foundation pit support structure and waterproof construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant