CN208831896U - A kind of water conservancy construction tube support arrangement - Google Patents

A kind of water conservancy construction tube support arrangement Download PDF

Info

Publication number
CN208831896U
CN208831896U CN201821415406.6U CN201821415406U CN208831896U CN 208831896 U CN208831896 U CN 208831896U CN 201821415406 U CN201821415406 U CN 201821415406U CN 208831896 U CN208831896 U CN 208831896U
Authority
CN
China
Prior art keywords
connects
fixing sleeve
supporting device
adjusting supporting
arc pallet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821415406.6U
Other languages
Chinese (zh)
Inventor
周建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201821415406.6U priority Critical patent/CN208831896U/en
Application granted granted Critical
Publication of CN208831896U publication Critical patent/CN208831896U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

A kind of water conservancy construction tube support arrangement.Its composition of this product includes: pipeline, arc pallet, pipeline is placed on arc pallet, weld 2 horizontal circle sets being parallel to each other in one end of arc pallet, rotating bar is inserted between 2 horizontal circle sets, rotating bar connects curved cover plate, arc pallet connects lower fastening plates, curved cover plate connects upper platen, lower fastening plates are provided with the fastener hole communicated with upper platen, fastener hole connects bolt, arc pallet is separately connected left front adjusting supporting device, left back adjusting supporting device, adjusting supporting device before the right side, adjusting supporting device behind the right side, preceding slot and rear slot are provided at the top of curved cover plate, magnetic sheet before preceding slot connects, preceding magnetic sheet, which is attracted, connects preceding iron plate, magnetic sheet after slot connection afterwards, magnetic sheet is attracted iron plate after connection afterwards, transparent horizontal testing tube is inserted between preceding iron plate and rear iron plate, transparent horizontal testing tube is provided with colored liquid.The utility model is used to support water conservancy construction pipeline.

Description

A kind of water conservancy construction tube support arrangement
Technical field:
The utility model relates to a kind of water conservancy construction tube support arrangements.
Background technique:
It needing to be supported when carrying out water conservancy construction pipeline and being laid with, existing support device can not carry out trace regulation, It cannot achieve when certain a part of injustice needs to adjust, be merely able to carry out cushioning, it is very inconvenient during cushioning, sometimes It can also can not add, pipeline can not be made to be completely in equilibrium state.
Summary of the invention:
The purpose of the utility model is to provide one kind to be able to carry out trace regulation, it is ensured that the stabilization of pipeline support makes pipeline Horizontality it is good, do not influence liquid flowing a kind of water conservancy construction tube support arrangement.
Above-mentioned purpose is realized by following technical scheme:
A kind of water conservancy construction tube support arrangement, composition includes: pipeline, arc pallet, on the arc pallet The pipeline is placed, 2 horizontal circle sets being parallel to each other, horizontal circle set described in 2 are welded in one end of the arc pallet Between be inserted into rotating bar, the rotating bar connects curved cover plate, and the arc pallet connects lower fastening plates, the arc covers Plate connects upper platen, and the lower fastening plates are provided with the fastener hole communicated with the upper platen, and the fastener hole connects Connecting bolt, the arc pallet adjust support dress before being separately connected left front adjusting supporting device, left back adjusting supporting device, the right side It sets, adjusting supporting device behind the right side, preceding slot and rear slot is provided at the top of the curved cover plate, before the preceding slot connection Magnetic sheet, the preceding magnetic sheet, which is attracted, connects preceding iron plate, magnetic sheet after the rear slot connection, after the rear magnetic sheet is attracted connection Iron plate, is inserted into transparent horizontal testing tube between the preceding iron plate and the rear iron plate, in the transparent horizontal testing tube Equipped with colored liquid.
A kind of water conservancy construction tube support arrangement, the left front adjusting supporting device, the left back tune Adjusting supporting device includes pedestal behind adjusting supporting device, the right side before section support device, the right side, the pedestal Connect lower support column, the lower support column connects left-hand thread column, and the left-hand thread column connects positive/negative thread set, it is described just Left-hand thread set connection plus thread column, the plus thread column connect upper support column, and the upper support column is respectively welded at described Arc pallet it is left front, left back, right before, it is right after position, the positive/negative thread set connection adjusts ring.
A kind of water conservancy construction tube support arrangement, the lower support column include left front support column, left back branch Dagger, right anterior branch dagger, right rear support strut, the left front support column connect left front opening fixing sleeve, the left back support Column connects left back opening fixing sleeve, and the right anterior branch dagger connects right open front fixing sleeve, the right rear support strut connection Right after-opening fixing sleeve is connected between the left front opening fixing sleeve and the right open front fixing sleeve by front shoe It connects, is connected between the left back opening fixing sleeve and the right after-opening fixing sleeve by rear fixed plate, described is left front Opening fixing sleeve, the right open front fixing sleeve, the left back opening fixing sleeve, the right after-opening fixing sleeve are opened Mouth end two sides are all connected with vertical clamping plate, and vertical clamping plate described in 2 is provided with the through-hole communicated, and the through-hole connection bolt carries out It is fixed.
The utility model has the advantages that
1. the pipeline of the utility model can be adjusted by left-hand thread column, positive/negative thread set, plus thread column to horizontality, Enable pipeline always in horizontality, it is ensured that the liquid flowing in pipeline is not obstructed, and using effect is good.
The arc pallet and curved cover plate of the utility model are capable of fixing pipeline, stabilization, the safety for being supported pipeline, Make pipeline using safe, effect is good.
Magnetic sheet carries out assembling preceding iron plate and rear iron after the utility model is attracted preceding magnetic sheet by preceding iron plate, rear iron plate is attracted Plate, it is convenient when assembling, assembling speed is fast, also facilitate when removing, when use is very flexible, and preceding iron plate and rear iron plate can be good at Fixed transparent horizontal testing tube provides necessary guarantee to test pipeline.
The opening fixing sleeve of the utility model, fixed plate can further fix left front support column and right anterior branch dagger, a left side Rear support strut and right rear support strut make adjusting supporting device, the right side before left front adjusting supporting device, left back adjusting supporting device, the right side Adjusting supporting device support is more safe and stable afterwards.
Detailed description of the invention:
Attached drawing 1 is the structural schematic diagram of this product.
Attached drawing 2 is the rearview of attached drawing 1.
Attached drawing 3 is the left view of attached drawing 1.
Specific embodiment:
Below in conjunction with the attached drawing of the utility model, the technical scheme in the embodiment of the utility model is carried out clear, complete Site preparation description.
Embodiment 1:
A kind of water conservancy construction tube support arrangement, composition includes: pipeline 1, arc pallet 2, the arc pallet Horizontal circle set described in 2 horizontal 3,2, circle set to be parallel to each other is welded in pipeline described in upper placement, one end of the arc pallet Between be inserted into rotating bar 4, the described rotating bar connection curved cover plate 34, the arc pallet connects lower fastening plates 5, The curved cover plate connects upper platen 6, and the lower fastening plates are provided with the fastener hole 7 communicated with the upper platen, The fastener hole connects bolt 8, and the arc pallet is separately connected left front adjusting supporting device, left back adjusting support dress Adjusting supporting device before setting, being right, it is right after adjusting supporting device, be provided with preceding slot 9 and rear slot at the top of the curved cover plate 10, magnetic sheet 11 before the preceding slot connects, the preceding magnetic sheet, which is attracted, connects preceding iron plate 12, magnetic after the rear slot connection Plate 13, the rear magnetic sheet are attracted iron plate 14 after connection, are inserted into transparent level between the preceding iron plate and the rear iron plate Testing tube 15, the transparent horizontal testing tube are provided with colored liquid.
Adjusting supporting device before the left front adjusting supporting device, the left back adjusting supporting device, the right side, Adjusting supporting device includes pedestal 16 behind the right side, and the pedestal connects lower support column, the lower support column connection Left-hand thread column 17, the left-hand thread column connection positive/negative thread set 18, the positive/negative thread set connection plus thread column 19 are described Plus thread column connect upper support column 20, the upper support column is respectively welded at the left front, left back, right of the arc pallet Before, it is right after position, the positive/negative thread set connection adjusts ring 21.
The lower support column includes left front support column 22, left back support column 23, right anterior branch dagger 24, right rear support strut 25, the left front support column connects left front opening fixing sleeve 26, and the left back support column connects left back opening fixing sleeve 27, The right anterior branch dagger connects right open front fixing sleeve 28, and the right rear support strut connects right after-opening fixing sleeve 29, institute It is connected between the left front opening fixing sleeve and the right open front fixing sleeve stated by front shoe 30, the left back opening It is connected between fixing sleeve and the right after-opening fixing sleeve by rear fixed plate 31, it is the left front opening fixing sleeve, described Right open front fixing sleeve, the left back opening fixing sleeve, the right after-opening fixing sleeve open end two sides be all connected with Vertical clamping plate described in vertical clamping plate 32,2 is provided with the through-hole 33 communicated, and the through-hole connection bolt is fixed.
Working principle:
Pipeline is placed on arc pallet, curved cover plate is covered on pipeline, blending bolt is fixed, by preceding iron plate and Iron plate group is loaded onto afterwards, and transparent horizontal testing tube is caught between preceding iron plate and rear iron plate, is shown according to transparent horizontal testing tube State, the distance between adjustment left-hand thread column, positive/negative thread set, plus thread column, until transparent horizontal testing tube is in horizontal Until state, opened after finally assembling left front opening fixing sleeve, right open front fixing sleeve, front shoe and left back opening fixing sleeve, the right side Mouth fixing sleeve, rear fixed plate, are fixing left front opening fixing sleeve, right open front fixing sleeve, left back opening fixing sleeve, the right side with bolt The opening of after-opening fixing sleeve.

Claims (3)

1. a kind of water conservancy construction tube support arrangement, composition includes: pipeline, arc pallet, it is characterized in that: the arc The pipeline is placed on shape supporting plate, 2 horizontal circle sets being parallel to each other are welded in one end of the arc pallet, described in 2 Rotating bar is inserted between horizontal circle set, the rotating bar connects curved cover plate, and the arc pallet connects lower fastening plates, described Curved cover plate connect upper platen, the lower fastening plates are provided with the fastener hole communicated with the upper platen, described Fastener hole connects bolt, and the arc pallet is adjusted before being separately connected left front adjusting supporting device, left back adjusting supporting device, the right side Save support device, it is right after adjusting supporting device, be provided with preceding slot and rear slot at the top of the curved cover plate, it is described preceding to insert Magnetic sheet before slot connects, the preceding magnetic sheet, which is attracted, connects preceding iron plate, and magnetic sheet after the rear slot connection, the rear magnetic sheet is inhaled Iron plate after connecting is closed, transparent horizontal testing tube, the transparent level are inserted between the preceding iron plate and the rear iron plate Testing tube is provided with colored liquid.
2. a kind of water conservancy construction tube support arrangement according to claim 1, it is characterized in that: the left front adjusting Adjusting supporting device behind adjusting supporting device, the right side before support device, the left back adjusting supporting device, the right side It include pedestal, the pedestal connects lower support column, and the lower support column connects left-hand thread column, and the left-hand thread column connects Positive/negative thread set, the positive/negative thread set connection plus thread column are connect, the plus thread column connects upper support column, and described is upper Support column be respectively welded at the arc pallet it is left front, left back, right before, it is right after position, the positive/negative thread, which covers, to be connected Connect adjusting ring.
3. a kind of water conservancy construction tube support arrangement according to claim 2, it is characterized in that: the lower support column Including left front support column, left back support column, right anterior branch dagger, right rear support strut, the left front support column connects left front opening Fixing sleeve, the left back support column connect left back opening fixing sleeve, and the right anterior branch dagger connects right open front fixing sleeve, The right rear support strut connects right after-opening fixing sleeve, the left front opening fixing sleeve and the right open front fixing sleeve Between connected by front shoe, it is fixed after passing through between the left back opening fixing sleeve and the right after-opening fixing sleeve Plate connection, it is the left front opening fixing sleeve, the right open front fixing sleeve, the left back opening fixing sleeve, described The open end two sides of right after-opening fixing sleeve are all connected with vertical clamping plate, and vertical clamping plate described in 2 is provided with the through-hole communicated, described Through-hole connection bolt be fixed.
CN201821415406.6U 2018-08-31 2018-08-31 A kind of water conservancy construction tube support arrangement Expired - Fee Related CN208831896U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821415406.6U CN208831896U (en) 2018-08-31 2018-08-31 A kind of water conservancy construction tube support arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821415406.6U CN208831896U (en) 2018-08-31 2018-08-31 A kind of water conservancy construction tube support arrangement

Publications (1)

Publication Number Publication Date
CN208831896U true CN208831896U (en) 2019-05-07

Family

ID=66311325

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821415406.6U Expired - Fee Related CN208831896U (en) 2018-08-31 2018-08-31 A kind of water conservancy construction tube support arrangement

Country Status (1)

Country Link
CN (1) CN208831896U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110695589A (en) * 2019-10-08 2020-01-17 曹红霞 Welding operation table for electric welder and using method
CN110848463A (en) * 2019-11-19 2020-02-28 霍栋 Sewer line fixing device with not hard up prompt facility
CN112196588A (en) * 2020-10-17 2021-01-08 黑龙江农垦建工路桥有限公司 Tunnel construction grouting device convenient to clean and construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110695589A (en) * 2019-10-08 2020-01-17 曹红霞 Welding operation table for electric welder and using method
CN110848463A (en) * 2019-11-19 2020-02-28 霍栋 Sewer line fixing device with not hard up prompt facility
CN112196588A (en) * 2020-10-17 2021-01-08 黑龙江农垦建工路桥有限公司 Tunnel construction grouting device convenient to clean and construction method
CN112196588B (en) * 2020-10-17 2022-05-31 黑龙江农垦建工路桥有限公司 Tunnel construction grouting device convenient to clean and construction method

Similar Documents

Publication Publication Date Title
CN208831896U (en) A kind of water conservancy construction tube support arrangement
CN206090984U (en) Anchor curtain is tied to free reassembling type combination pendant and back of body
CN206852678U (en) Novel mouse tail vein injection fixing device
CN206867655U (en) A kind of sports tournament terminal line apparatus
CN207221971U (en) A kind of fixing device for being used to clamp experiment smelting furnace
CN206715121U (en) Novel balance trainer
CN206428976U (en) Construction roof beam structure fixing device
CN204023168U (en) A kind of Sewing machines is folded position fixture adjustable bracket device
CN207504802U (en) Solar energy mounting bracket
CN205034561U (en) Novel steam turbine transportation is fixed device
CN209498102U (en) Forestry nursery stock transplantation device
CN207681825U (en) Cabinet fillet cover welder
CN207414673U (en) A kind of solar photovoltaic bracket welds positioning tool
CN205934436U (en) Dyeing machine dyestuff equipartition device
CN208845817U (en) A kind of hydraulic engineering pipeline valve door fastening device
CN207149363U (en) A kind of electric pole transformer carrier member device
CN206365605U (en) Back of the body rack of the fast demountable into chaise longue
CN206658440U (en) Mountain region covering device of seeder
CN205893665U (en) Dull and stereotyped edge spreader in infrared spy limit
CN205434880U (en) Basketball stand
CN209489231U (en) Novel forest conservation forest seedling growth device
CN209834353U (en) Water tank support frame of high strength resistance to compression
CN209148016U (en) Leaf area instrument renovates supporting and regulating device
CN209659938U (en) A kind of corn drill plants case attachment device
CN208447965U (en) A kind of wheelchair rear wheel installation site adjustable structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190507

Termination date: 20200831