CN208831156U - A kind of cable wind rope anchoring device for locating of fans installation - Google Patents

A kind of cable wind rope anchoring device for locating of fans installation Download PDF

Info

Publication number
CN208831156U
CN208831156U CN201821475109.0U CN201821475109U CN208831156U CN 208831156 U CN208831156 U CN 208831156U CN 201821475109 U CN201821475109 U CN 201821475109U CN 208831156 U CN208831156 U CN 208831156U
Authority
CN
China
Prior art keywords
steel plate
cable wind
wind rope
locating
anchoring device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821475109.0U
Other languages
Chinese (zh)
Inventor
张守锐
郝好峰
张伟
孙超
翟兆礼
安利华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SEPCO Electric Power Construction Co Ltd
Original Assignee
SEPCO Electric Power Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SEPCO Electric Power Construction Co Ltd filed Critical SEPCO Electric Power Construction Co Ltd
Priority to CN201821475109.0U priority Critical patent/CN208831156U/en
Application granted granted Critical
Publication of CN208831156U publication Critical patent/CN208831156U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/728Onshore wind turbines

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

A kind of cable wind rope anchoring device for locating of fans installation, includes support frame;Support frame as described above has included the steel plate for supporting fixed function, and steel plate includes in the bottom steel plate being laterally arranged and being installed on side steel plate vertically arranged at left and right sides of the steel plate of bottom;Reinforcing rib is fixed between the rear and front end of side steel plate, the bottom of reinforcing rib is fixed on the steel plate of bottom;The middle part of the side steel plate is equipped with reinforcing ring, is equipped with swivel mount between reinforcing ring, stop tab is inlaid between swivel mount and reinforcing ring.The present apparatus can the stress to cable wind rope accurately adjusted and controlled, so that tower is in best stress, guarantee that subsequent construction makes smooth advances.120 degree of anchor interval is uniformly distributed.Anchor swivel mount is free to rotate, is influenced by landform, the gradient smaller.Cable wind rope stress is controllable, adjustable, and stress is good.The present apparatus is influenced smaller by landform, the gradient, and cable wind rope stress is simple, reliable.It is wider that the present apparatus adapts to boundary of works area.

Description

A kind of cable wind rope anchoring device for locating of fans installation
Technical field
The utility model relates to blower construction field, especially a kind of cable wind rope for locating of fans installation anchors dress It sets.
Background technique
Distant view energy 120m tower is after having lifted the 5th section of tower, by oneself height and high-altitude air speed influence, tower vibration Dynamic amplitude is larger, and to ensure that safety and the tower of equipment are gone on smoothly with what cabin abutting joint worked, integrating prevents from vibrating Validity and field conduct convenient and efficient property, generally use cable wind rope as optimal embodiment, pass through the cable being tightened up Wind rope limits the amplitude (generally using 3 cable wind ropes, 120 ° of adjacent angle) of tower, in order to keep the tension of cable wind rope, It needs to anchor cable wind rope.
Since blower construction place is complicated, site operation platform is not of uniform size, in order to guarantee that cable wind rope can sufficiently inhibit Tower is vibrated in radial direction, and the angle of tower and cable wind rope is no less than 30 °, and usually construction is advisable with 45 °.Usual blower cable Wind rope anchoring construction is by pounding bar reinforcement into underground certain depth as anchor point, and this method is unable to accurately control three The state of tension of cable wind rope guarantees that the resultant radial force that tower is subject to is zero.Once cable wind rope anchoring after, it is subsequent be finely adjusted it is tired Difficult and dynamics is not easily controlled, and during distant view energy 120m tower cable wind rope anchoring construction, develops a kind of novel guy Restrict anchor, structure is simple, it is easy to operate, can the stress to cable wind rope accurately adjusted and controlled, make tower Cylinder is in best stress, guarantees that subsequent construction makes smooth advances.
Utility model content
The technical problem underlying of solution: a kind of cable wind rope anchoring device for locating of fans installation, structure is simple, behaviour Make it is convenient, can the stress to cable wind rope accurately adjusted and controlled, so that tower is in best stress, after guarantee Continuous construction makes smooth advances.
The technical scheme adopted by the utility model to solve the technical problem is as follows: a kind of guy for locating of fans installation Rope anchor, includes support frame;Support frame as described above has included the steel plate for supporting fixed function, and steel plate includes setting in lateral The bottom steel plate set and it is installed on side steel plate vertically arranged at left and right sides of the steel plate of bottom;It is fixed between the rear and front end of side steel plate There is reinforcing rib, the bottom of reinforcing rib is fixed on the steel plate of bottom;The middle part of the side steel plate is equipped with reinforcing ring, is equipped between reinforcing ring Swivel mount is inlaid with stop tab between swivel mount and reinforcing ring.
The utility model compared to the prior art, the advantage is that:
(1) present apparatus structure is simple, fixed, easy to connect, and easy to manufacture, manufacturing cost is low.Anchor structure Simply, it is convenient to mount and dismount.Backstop chip architecture is simple, rotates, will not fall off with axis.
(2) present apparatus can the stress to cable wind rope accurately adjusted and controlled, so that tower is in best stress shape State guarantees that subsequent construction makes smooth advances.
(3) 120 degree of anchor interval, be uniformly distributed.Anchor swivel mount is free to rotate, by landform, gradient shadow Sound is smaller.Cable wind rope stress is controllable, adjustable, and stress is good.The present apparatus is influenced smaller, cable wind rope stress by landform, the gradient Simply, reliably.It is wider that the present apparatus adapts to boundary of works area.
The additional aspect and advantage of the utility model will be set forth in part in the description, partially will be from following description In become obvious, or recognized by the practice of the utility model.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor Under, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is the utility model cable wind rope anchoring device composition schematic diagram;
Fig. 2 is the utility model support frame composition schematic diagram;
Fig. 3 is the utility model swivel mount composition schematic diagram;
Fig. 4 is the utility model stop tab schematic diagram.
Specific embodiment
Exemplary embodiments of the present disclosure are described in more detail below with reference to accompanying drawings.Although showing the disclosure in attached drawing Exemplary embodiment, it being understood, however, that may be realized in various forms the disclosure without should be by embodiments set forth here It is limited.On the contrary, these embodiments are provided to facilitate a more thoroughly understanding of the present invention, and can be by the scope of the present disclosure It is fully disclosed to those skilled in the art.
In the description of the present invention, it should be understood that term " longitudinal direction ", " transverse direction ", "upper", "lower", " preceding ", The orientation or positional relationship of the instructions such as " rear ", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside" be based on Orientation or positional relationship shown in the drawings is merely for convenience of description the utility model, rather than the dress of indication or suggestion meaning It sets or element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as to the utility model Limitation.
A kind of cable wind rope anchoring device for locating of fans installation, includes support frame 4;Support frame as described above 4 includes The steel plate 7 of support fixed function is played, steel plate 7 includes in the bottom steel plate 72 being laterally arranged and being installed on bottom steel plate 72 or so two The vertically arranged side steel plate 71 in side;Reinforcing rib 6 is fixed between the rear and front end of side steel plate 71, the bottom of reinforcing rib 6 is fixed on On bottom steel plate 72;The middle part of the side steel plate 71 is equipped with reinforcing ring 8, and swivel mount 2, swivel mount 2 and reinforcement are equipped between reinforcing ring 8 Stop tab 3 is inlaid between ring 8.
The swivel mount 2 includes lateral steel pipe and vertical steel pipe, and lateral steel pipe and vertical steel pipe are welded into T-shaped steel Pipe 10;The both ends of lateral steel pipe are equipped with the stop tab card slot 11 for inlaying stop tab 3;Vertical steel pipe is in hollow form, tail portion weldering It is connected to hex nut 9, threaded engagement is equipped with ball handle 1 in hex nut 9, and ball handle 1 connects cable wind rope.
Optimization, the outside of the bottom steel plate 72 is additionally provided with four reinforcing rings 8, and reinforcing ring 8 is equipped with anchor bolt 5, passes through four Root anchor bolt 5 fixes support frame 4 on the ground, and slope can also construct, and it is wider to adapt to boundary of works area.
Optimization, the whole stop tab 3 is in " Jiong " character form structure, and bottom spacing is equal to the outer diameter of lateral steel pipe, backstop Chip architecture is simple, rotates, will not fall off with axis.
Optimization, the whole reinforcing rib 6 is in "U" shaped structure, and top spacing is greater than the outer diameter of vertical steel pipe.
The principle of cable wind rope anchoring device for locating of fans installation: cable wind rope anchoring device is mainly by connection cable wind rope Ball handle, swivel mount, stop tab, support frame, anchor bolt composition, are fixed on the ground support frame by four anchor bolts, slope Also it can construct, the axial freedom of swivel mount is then limited by the stop tab of two sides, swivel mount is made only to retain rotary freedom. After cable wind rope is connected to ball handle and fastens, rotating ballhead handle by bolt precession and exits and reaches tension, loosens guy The purpose of rope, at the same also can control cable wind rope stress size and state, since swivel mount can rotate freely, cable wind rope by Power is in good condition, is influenced by ground surface or terrain smaller.
The specific implementation method of cable wind rope anchoring device for locating of fans installation are as follows:
1) before the lifting of top section tower, be prepared in advance 3 cable wind ropes, and rope length guarantees 200m length.It is advised simultaneously on ground The specific location of three anchor points is marked, anchor points are selected cannot influence subsequent lifting construction as principle, by cable Wind rope is distributed in 120 ° and ties up on the flange of tower top with reference to anchor points, it is reliable to guarantee connection, while rope is in tower What be can be convenient remove.
2) 3 anchors are anchored on the ground respectively by anchor bolt, while rotation is blocked by the stop tab of two sides Frame, will be in ball handle precession swivel mount.Swivel mount is made of two steel-pipe weldings, is welded with ball handle joint steel pipe end One hex nut forms bolt connection pair with ball handle.
3) top section tower bolt is all pre- next, and master hangs decoupling device, by cable wind rope by being fastened on bulb hand after manually tensing On handle, then by the way that reinforcing bar is inserted into ball handle, rotating ballhead handle achievees the purpose that tense cable wind rope, when cable wind rope tenses Simultaneously operating is needed, bolt should be consistent into silk number, guarantees three cable wind rope uniform forces.
4) cabin is lifted by crane, two positioning pins are installed below cabin, are docked in cabin with tower, positioning and guiding pin has passed through When tower drum flange hole, cabin and tower also use one section of gap, ball handle is screwed out into swivel mount, removes tower cable wind rope.It completes Cabin is docked with tower, and the method is equally applicable to the abutting joint of wind wheel and cabin.
Although the various embodiments described above are described, once a person skilled in the art knows basic wounds The property made concept, then additional changes and modifications can be made to these embodiments, so the foregoing is merely the realities of the utility model Example is applied, the scope of patent protection of the utility model is not intended to limit, it is all to utilize the utility model specification and accompanying drawing content Made equivalent structure or equivalent flow shift, is applied directly or indirectly in other relevant technical fields, and similarly includes Within the scope of patent protection of the utility model.

Claims (5)

1. a kind of cable wind rope anchoring device for locating of fans installation, includes support frame (4);It is characterized in that, the branch Support (4) has included the steel plate (7) for supporting fixed function, and steel plate (7) includes in bottom steel plate (72), the Yi Jian being laterally arranged Loaded on side steel plate (71) vertically arranged at left and right sides of bottom steel plate (72);Reinforcement is fixed between the rear and front end of side steel plate (71) Muscle (6), the bottom of reinforcing rib (6) are fixed on bottom steel plate (72);The middle part of the side steel plate (71) is equipped with reinforcing ring (8), adds Swivel mount (2) are equipped between Qiang Huan (8), stop tab (3) are inlaid between swivel mount (2) and reinforcing ring (8).
2. the cable wind rope anchoring device according to claim 1 for locating of fans installation, which is characterized in that the rotation Frame (2) includes lateral steel pipe and vertical steel pipe, and lateral steel pipe and vertical steel pipe are welded into T-shaped steel pipe (10);Lateral steel The both ends of pipe are equipped with the stop tab card slot (11) for inlaying stop tab (3);Vertical steel pipe is in hollow form, and tail portion is welded with hexagonal Nut (9), threaded engagement is equipped with ball handle (1) in hex nut (9), and ball handle (1) connects cable wind rope.
3. the cable wind rope anchoring device according to claim 1 for locating of fans installation, which is characterized in that the bottom steel Four reinforcing rings (8) are additionally provided on the outside of plate (72), reinforcing ring (8) is equipped with anchor bolt (5).
4. the cable wind rope anchoring device according to claim 2 for locating of fans installation, which is characterized in that the backstop Piece (3) is integrally in " Jiong " character form structure, and bottom spacing is equal to the outer diameter of lateral steel pipe.
5. the cable wind rope anchoring device according to claim 1 for locating of fans installation, which is characterized in that the reinforcement Muscle (6) is integrally in "U" shaped structure, and top spacing is greater than the outer diameter of vertical steel pipe.
CN201821475109.0U 2018-09-10 2018-09-10 A kind of cable wind rope anchoring device for locating of fans installation Active CN208831156U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821475109.0U CN208831156U (en) 2018-09-10 2018-09-10 A kind of cable wind rope anchoring device for locating of fans installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821475109.0U CN208831156U (en) 2018-09-10 2018-09-10 A kind of cable wind rope anchoring device for locating of fans installation

Publications (1)

Publication Number Publication Date
CN208831156U true CN208831156U (en) 2019-05-07

Family

ID=66312684

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821475109.0U Active CN208831156U (en) 2018-09-10 2018-09-10 A kind of cable wind rope anchoring device for locating of fans installation

Country Status (1)

Country Link
CN (1) CN208831156U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112664032A (en) * 2019-10-16 2021-04-16 北京金风科创风电设备有限公司 Stay cable anchoring device, stay cable type tower and wind generating set

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112664032A (en) * 2019-10-16 2021-04-16 北京金风科创风电设备有限公司 Stay cable anchoring device, stay cable type tower and wind generating set

Similar Documents

Publication Publication Date Title
CN101418542B (en) Cable system construction method of spatial self-anchored rope-suspension bridge
CN104532843B (en) A kind of steel column location straightening method of stand column pile
CN104695752B (en) Rapid rush-repair Tower System and its erection method
CN105780995B (en) A kind of curved space tube truss structure and its installation method
CN110374008A (en) A method of the erection of cable-stayed bridge steel truss is carried out in marine environment
CN208831156U (en) A kind of cable wind rope anchoring device for locating of fans installation
CN109339458A (en) A kind of multi-functional trolley of Cast-in-situ Beam steel reinforcement cage binding installation
CN106703835A (en) Welding-free quick assembly supporting structure with grid steel frames for tunnel primary supporting construction
CN108221694A (en) The method for installing long-span arch bridge tie-rod
CN105401527B (en) Construction method for anchoring catwalk and catwalk anchoring device
CN107675624A (en) The general telescopic sustaining wall of assembly of disk button cat ladder
CN107816209B (en) The large-scale Roof Truss construction technology of installation is lifted across outer two sides
CN105905815A (en) Work method of seating-type self-balance holding pole
CN206768628U (en) A kind of bridge rotating hauling rope positioner
CN205474862U (en) Wet seam template operation platform of portable case roof beam
CN208456648U (en) A kind of soft-rock tunnel full length fastening supporting construction
CN209308433U (en) A kind of multi-functional trolley of Cast-in-situ Beam steel reinforcement cage binding installation
CN215419516U (en) Pipeline protection structure
CN206346755U (en) A kind of grid steel frame for tunnel just branch construction exempts to weld quick assembling supporting construction
CN101942835B (en) Heavy-load composite function anchoring device for scaffold
CN206173966U (en) Stake end reinforcing apparatus
CN206070552U (en) The detachable rope net contact support of deep water drilling platform
CN208966123U (en) A kind of big section lattice steel tube holding pole formal dress lifting device
CN208686521U (en) A kind of pylon steel strand wires wire installation
CN103072903B (en) Method for mounting high-rise pylon by using self-stable double-rocker elevating device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant