CN208830352U - A kind of comprehensive pipe gallery structure - Google Patents

A kind of comprehensive pipe gallery structure Download PDF

Info

Publication number
CN208830352U
CN208830352U CN201821416108.9U CN201821416108U CN208830352U CN 208830352 U CN208830352 U CN 208830352U CN 201821416108 U CN201821416108 U CN 201821416108U CN 208830352 U CN208830352 U CN 208830352U
Authority
CN
China
Prior art keywords
piping lane
plastics piping
support
plastics
support plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821416108.9U
Other languages
Chinese (zh)
Inventor
张泽
孔德信
刘伟
张继刚
张景元
尤明旗
汤崚云
张平
陈涛
钱伟兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Haining Yada Plastic Pipeline System Co Ltd
Original Assignee
Haining Yada Plastic Pipeline System Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Haining Yada Plastic Pipeline System Co Ltd filed Critical Haining Yada Plastic Pipeline System Co Ltd
Priority to CN201821416108.9U priority Critical patent/CN208830352U/en
Application granted granted Critical
Publication of CN208830352U publication Critical patent/CN208830352U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rigid Pipes And Flexible Pipes (AREA)

Abstract

The utility model provides a kind of comprehensive pipe gallery structure, it includes plastics piping lane, it is characterized in that, the plastics piping lane is cylindrical and is laterally arranged, the toroidal frame of several supporting plastic piping lanes is equipped in plastics piping lane along its length direction, the first support plate walked for people is equipped in plastics piping lane, feed pipe and return pipe are fixed in first support plate, horizontally disposed support frame is equipped with below first support plate, sewage pipe and rain pipe are fixed on support frame, the toroidal frame two sides are welded with the support rod that several layers are horizontally disposed with and are used to support the communications cable and electric power cable.The plastics piping lane junction good airproof performance of the Pipe rack, the good corrosion resistance of plastics piping lane do not absorb water, and low temperature resistivity is good, and plastics piping lane is flexible good, and anti-settlement of foundation is excellent, and plastic material impermeability is good, recoverable, and performance is high and practical.

Description

A kind of comprehensive pipe gallery structure
Technical field
The utility model belongs to urban operating mechanism technical field, more particularly, to a kind of comprehensive pipe gallery structure.
Background technique
Pipe gallery builds a tunnel space in Urban Underground, by electric power, communication, combustion gas, heat supply, plumbing etc. Various utilities pipelines are integrated in one, be equipped with special access hole, hoisting port and monitoring system, implement unified planning, Uniting, Unified construction and management are the important infrastructure and " lifeline " for ensureing city operations.Pipe gallery is one and benefits the nation and the people Engineering, have create new industry, pull it is economical, rationally using urban underground space, benefit future generations the characteristics of.
In the prior art, there are two types of piping lane assembly method: concrete cast-in-situ and concrete prefabricated;
(1) concrete cast-in-situ: this kind of mode sealing joint is poor, and due to settlement of foundation, leak risk is larger at expansion joint, Poor corrosion resistance is easily corroded by acid, chloride ion etc., and frost resistance is poor, and concrete porous structure generates gap after enduring cold, and reduces material Expect intensity and bearing capacity, rigid piping lane, anti-settlement of foundation is poor, impervious poor, the easy to leak of concrete porous structure, and needs It excavates, cast in situs, speed of application is slow, cast in situs long construction period, highly energy-consuming trade, and the feature of environmental protection is poor.
(2) concrete prefabricated: the every section module of sealing joint difference is no more than 2 meters, and interface is more, junction and expansion joint leak Risk is larger, poor corrosion resistance, is easily corroded by acid, chloride ion etc., and concrete porous structure generates gap after enduring cold, and reduces The strength of materials and bearing capacity, rigid piping lane, anti-settlement of foundation is poor, concrete porous structure, impervious poor, easy to leak, construction Mode can be excavated, can push pipe, assembled, interface is more, and the set-up time is long, highly energy-consuming trade, and the feature of environmental protection is poor.
Utility model content
The purpose of the utility model is to provide a kind of comprehensive pipe gallery structure, the plastics piping lane junction of the Pipe rack is sealed Property good, the good corrosion resistance of plastics piping lane, do not absorb water, low temperature resistivity is good, and plastics piping lanes is flexible good, and anti-settlement of foundation is excellent Good, plastic material impermeability is good, recoverable, and performance is high and practical.
The technical solution of the utility model is: a kind of comprehensive pipe gallery structure, it includes plastics piping lane, which is characterized in that institute The plastics piping lane stated is cylindrical and is laterally arranged, and is equipped with several supporting plastic piping lanes along its length direction in plastics piping lane Toroidal frame, the first support plate walked for people is equipped in plastics piping lane, is fixed with feed pipe and return pipe in the first support plate, It is equipped with horizontally disposed support frame below first support plate, is fixed with sewage pipe and rain pipe, the toroidal frame on support frame Two sides are welded with the support rod that several layers are horizontally disposed with and are used to support the communications cable and electric power cable.
Firstly, being powered on molten composite welding by squeezing out when the plastics piping lane connects, bonding strength is higher than strength of parent, sealing Property is good, and feed pipe, return pipe, sewage pipe, rain pipe, the communications cable and electric power cable are all arranged in plastics piping lane, facilitate work People's installation and maintenance.
Further, first support plate and support frame both ends are welded on toroidal frame, the first support plate and branch Support post is connected between support.
Further, the plastics piping lane inner top is fixed with several superfine powder fire extinguishers.
Further, the plastics piping lane inner top is further fixed on fire main.
Further, the plastics piping lane inner wall is coated with nano fire-retardant coating.Nano fire-retardant coating with a thickness of 0.15- 0.2mm, 1300 DEG C of heatproof high temperature 90 minutes or more, which does not burn, does not smolder, and the tolerance time for coping with common fire is longer.
Further, headlamp is additionally provided at the top of the plastic tube.
The advantages of this comprehensive pipe gallery structure, has:
1. the plastics piping lane junction good airproof performance of the Pipe rack, the good corrosion resistance of plastics piping lane do not absorb water, resist low Warm nature is good, and plastics piping lanes is flexible good, and anti-settlement of foundation is excellent, and plastic material impermeability is good, recoverable, performance it is high and It is practical.
2. comprehensive pipe gallery structure mounting means are as follows: excavate, assembled, ground is not necessarily to hard based process.
Detailed description of the invention
Fig. 1 is comprehensive pipe gallery structure schematic diagram.
In figure: 1, toroidal frame;2, superfine powder fire extinguisher;3, fire main;4, support rod;5, electric power cable;6, return water Pipe;7, support post;8, sewage pipe;9, support frame;10, rain pipe;11, the first support plate;12, feed pipe;13, plastic tube Corridor;14, the communications cable;15, headlamp.
Specific embodiment
As shown in Figure 1, the technical solution of the utility model is a kind of comprehensive pipe gallery structure, it includes plastics piping lane 13, It is characterized in that, the plastics piping lane 13 is cylindrical and is laterally arranged, if being equipped in plastics piping lane 13 along its length direction The toroidal frame 1 of dry supporting plastic piping lane 13, plastics piping lane 13 is interior to be equipped with the first support plate 11 walked for people, the first support plate It is fixed with feed pipe 12 and return pipe 6 on 11, horizontally disposed support frame 9 is equipped with below the first support plate 11, is consolidated on support frame 9 Surely there are sewage pipe 8 and rain pipe 10,1 two sides of toroidal frame are welded with several layers and are horizontally disposed with and are used to support communication The support rod 4 of cable 14 and electric power cable 5.
First support plate 11 and 9 both ends of support frame is welded on toroidal frame 1, the first support plate 11 and support frame Support post 7 is connected between 9.
13 inner top of plastics piping lane is fixed with several superfine powder fire extinguishers 2.
13 inner top of plastics piping lane is further fixed on fire main 3.
13 inner wall of plastics piping lane is coated with nano fire-retardant coating.Nano fire-retardant coating with a thickness of 0.15-0.2mm, 1300 DEG C of heatproof high temperature 90 minutes or more, which does not burn, does not smolder, and the tolerance time for coping with common fire is longer.
Headlamp 15 is additionally provided at the top of the plastic tube.
The 13 junction good airproof performance of plastics piping lane of the Pipe rack, the good corrosion resistance of plastics piping lane 13 do not absorb water, and resist Low temperature properties are good, and plastics piping lane 13 is flexible good, and anti-settlement of foundation is excellent, and plastic material impermeability is good, recoverable, performance It is high and practical.
Comprehensive pipe gallery structure mounting means are as follows: excavate, assembled, ground is not necessarily to hard based process.
Firstly, being powered on molten composite welding by squeezing out when the plastics piping lane 13 connects, bonding strength is higher than strength of parent, close Envelope property is good, and feed pipe 12, return pipe 6, sewage pipe 8, rain pipe 10, the communications cable 14 and electric power cable 5 are all arranged in plastic tube In corridor 13, facilitate worker's installation and maintenance.
Fire-fighting system, ventilating system, power supply system, illumination can also be installed additional in the plastics piping lane 13 of the comprehensive pipe gallery structure System, lightning protection earthing system, automatic fire alarm system, video monitoring and security system, evacuation escape system, pernicious gas and Environmental monitoring system, electric power monitoring system, drainage system, mark system, make the comprehensive pipe gallery structure have multiple functions.

Claims (6)

1. a kind of comprehensive pipe gallery structure, it includes plastics piping lane, which is characterized in that the plastics piping lane is cylindrical and lateral Setting, the interior toroidal frame that several supporting plastic piping lanes are equipped with along its length direction of plastics piping lane, interior be equipped with of plastics piping lane supply First support plate of people's walking is fixed with feed pipe and return pipe in the first support plate, sets below the first support plate equipped with level The support frame set, sewage pipe and rain pipe are fixed on support frame, and the toroidal frame two sides are welded with several layers level It is arranged and is used to support the support rod of the communications cable and electric power cable.
2. a kind of comprehensive pipe gallery structure according to claim 1, it is characterised in that: first support plate and support frame Both ends are welded on toroidal frame, are connected with support post between the first support plate and support frame.
3. a kind of comprehensive pipe gallery structure according to claim 1, it is characterised in that: the plastics piping lane inner top is fixed There are several superfine powder fire extinguishers.
4. a kind of comprehensive pipe gallery structure according to claim 1, it is characterised in that: the plastics piping lane inner top is also solid Surely there is fire main.
5. a kind of comprehensive pipe gallery structure according to claim 1, it is characterised in that: the plastics piping lane inner wall, which is coated with, to be received Rice fireproof coating.
6. a kind of comprehensive pipe gallery structure according to claim 1, it is characterised in that: be additionally provided with photograph at the top of the plastic tube Bright lamp.
CN201821416108.9U 2018-08-30 2018-08-30 A kind of comprehensive pipe gallery structure Active CN208830352U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821416108.9U CN208830352U (en) 2018-08-30 2018-08-30 A kind of comprehensive pipe gallery structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821416108.9U CN208830352U (en) 2018-08-30 2018-08-30 A kind of comprehensive pipe gallery structure

Publications (1)

Publication Number Publication Date
CN208830352U true CN208830352U (en) 2019-05-07

Family

ID=66311373

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821416108.9U Active CN208830352U (en) 2018-08-30 2018-08-30 A kind of comprehensive pipe gallery structure

Country Status (1)

Country Link
CN (1) CN208830352U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109056799A (en) * 2018-08-30 2018-12-21 海宁亚大塑料管道系统有限公司 A kind of comprehensive pipe gallery structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109056799A (en) * 2018-08-30 2018-12-21 海宁亚大塑料管道系统有限公司 A kind of comprehensive pipe gallery structure

Similar Documents

Publication Publication Date Title
CN202969415U (en) Multifunctional assembled comprehensive pipe gallery
CN104746531B (en) A kind of stainless steel composite pipe gallery
RU132461U1 (en) COMMUNICATION COLLECTOR MODULE, MAIN TUNNEL AND INPUT CAMERA MODULE
CN207033199U (en) A kind of detachable waterproof window frame
CN105064400A (en) Urban comprehensive pipe rack of steel corrugated plate structure
CN205716040U (en) A kind of assembled corrugated steel composite steel-concrete piping lane
CN208830352U (en) A kind of comprehensive pipe gallery structure
CN106885093A (en) A kind of two-way plugging device of pipeline with strong sealing and its application method
CN109056799A (en) A kind of comprehensive pipe gallery structure
CN109137965A (en) A kind of pipe gallery
CN110295624A (en) Crossroad underground pedestrian walk and pipe gallery build structure and its construction method jointly
CN206267314U (en) It is embedded with the house that the modularization wall of distributed pipeline builds
CN112031331A (en) Energy-saving green lighting construction by utilizing natural light guide pipe in construction process
CN205062936U (en) Novel housing construction drainage system pipeline
CN103775100A (en) Prefabricated assembled urban comprehensive pipe gallery
CN208136954U (en) Precast splice type Pipe rack
CN110821210A (en) House system of assembled positive energy room
CN108894249A (en) A kind of assembled pipe gallery and its reinforce connection method
CN211821094U (en) Pipeline crossing protection system
CN205348225U (en) Prefabricated assembled underground pipe gallery
CN213086880U (en) Be used for utility tunnel shutter bottom connected node structure
CN211057848U (en) Circular utility tunnel extensible structure of individual layer
CN110409496B (en) Method for determining structure size of middle box culvert
CN211498946U (en) Utility tunnel hoist and mount hole block structure
CN207739279U (en) A kind of three-dimensional pipe gallery of steel modeling combination

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant