CN208815408U - Sea area construction of cast-in-situ box-beam bracket - Google Patents

Sea area construction of cast-in-situ box-beam bracket Download PDF

Info

Publication number
CN208815408U
CN208815408U CN201821161722.5U CN201821161722U CN208815408U CN 208815408 U CN208815408 U CN 208815408U CN 201821161722 U CN201821161722 U CN 201821161722U CN 208815408 U CN208815408 U CN 208815408U
Authority
CN
China
Prior art keywords
bracket
steel
pier
bridge pier
cast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821161722.5U
Other languages
Chinese (zh)
Inventor
邵文勇
刘炳东
项小伟
陈辉辉
吴江锋
王强
肖珊珊
邵彬彬
王小龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Jiaogong Hongtu Transportation Construction Co Ltd
Original Assignee
Zhejiang Jiaogong Hongtu Transportation Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Jiaogong Hongtu Transportation Construction Co Ltd filed Critical Zhejiang Jiaogong Hongtu Transportation Construction Co Ltd
Priority to CN201821161722.5U priority Critical patent/CN208815408U/en
Application granted granted Critical
Publication of CN208815408U publication Critical patent/CN208815408U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model is related to a kind of sea area construction of cast-in-situ box-beam bracket, including;The bridge pier of several longitudinal arrangements, number fewer than bridge pier number one and steel pipe pier of the one-to-one correspondence between two neighboring bridge pier, number is identical as bridge pier number and corresponds loaded on the hood type bearing assembly on bridge pier, several transverse directions are set side by side and loaded on the Bailey beams on steel pipe pier and anchor ear bearing assembly, distribution beam group set on Bailey beam upper end, set on distribution beam group upper end and upper end is higher than the bowl buckle bracket of bridge pier upper end;It is longitudinally concave that bowl buckle branch is provided with the box beam accommodating that and bottom surface opposite with bridge pier is flushed with the upper end of bridge pier.The sea area construction of cast-in-situ box-beam bracket is suitable for sea area construction of cast-in-situ box-beam.

Description

Sea area construction of cast-in-situ box-beam bracket
Technical field
The utility model relates to construction of cast-in-situ box-beam apparatus field, especially a kind of sea area construction of cast-in-situ box-beam bracket.
Background technique
Chinese Patent Application No.: a kind of whole landing mould bases of cast-in-situ box girder of the disclosure of the invention of 201711389770.X, It is included in the symmetrically arranged fore-stock in adjacent bridge pier center line both ends and after-poppet, the case with bearing is connected on template bottom cross beam Beam external mold, template bottom cross beam top are provided with counterweight far from bridge pier center, and fore-stock and after-poppet include frame body, main liter Drop oil cylinder is fixed on lateral ram beam, and lateral ram beam lower part is provided with lateral coupling beam and the two opposite can be slided, laterally Transverse adjusting oil cylinder is provided between coupling beam and lateral ram beam.Cast-in-situ box girder entirety landing mould bases, which exists, is not suitable for sea area Therefore the deficiency of construction of cast-in-situ box-beam designs a kind of sea area construction of cast-in-situ box-beam bracket suitable for sea area construction of cast-in-situ box-beam, As urgent problem to be solved.
Utility model content
Exist the purpose of this utility model is to overcome current cast-in-situ box girder entirety landing mould bases and is not suitable for sea The deficiency of domain construction of cast-in-situ box-beam provides a kind of sea area construction of cast-in-situ box-beam bracket suitable for sea area construction of cast-in-situ box-beam.
The specific technical solution of the utility model is:
A kind of sea area construction of cast-in-situ box-beam bracket, including;The bridge pier of several longitudinal arrangements, number fewer than bridge pier number one A and one-to-one correspondence is set to the steel pipe pier between two neighboring bridge pier, and number is identical as bridge pier number and corresponds loaded on bridge pier On hood type bearing assembly, several transverse directions are set side by side and loaded on the Bailey beams on steel pipe pier and anchor ear bearing assembly, if Distribution beam group in Bailey beam upper end, set on distribution beam group upper end and upper end is higher than the bowl buckle bracket of bridge pier upper end;Bowl buckle bracket It is longitudinally concave equipped with the box beam accommodating that opposite and bottom surface is flushed with the upper end of bridge pier with bridge pier.The sea area construction of cast-in-situ box-beam When bracket uses, in the steel pipe insertion sea area of steel pipe pier, supported by the hood type bearing assembly and steel pipe pier that are loaded on bridge pier Bailey beam, distribution beam group, bowl buckle bracket accommodate longitudinally concave middle carry out construction of cast-in-situ box-beam in the box beam of bowl buckle bracket, are applicable in In sea area construction of cast-in-situ box-beam.
Preferably, the steel pipe pier includes;The sub- pier of several longitudinal arrangements;Sub- pier includes;Several are laterally arranged The steel-pipe pile of column, the load bearing cross beam loaded on steel-pipe pile upper end;It is equipped with what several were arranged above and below between two adjacent steel-pipe piles Lateral bridging;Bailey beam lower end is connect with load bearing cross beam upper end.The steel-pipe pile of steel pipe pier is conducive in insertion sea area, load bearing cross beam It is conducive to the firm of steel pipe pier with lateral bridging and improves strength and stiffness.
The lateral bridging includes;Two arranged in a crossed manner and both ends are respectively provided with the strut of a lateral part, and adjacent Connect one to one two upper brackets of two steel-pipe piles and two lower brackets;Lateral part and upper bracket positioned at strut upper end It connects one to one;Lateral part positioned at strut lower end connects one to one with lower bracket.
Preferably, the steel-pipe pile upper end is equipped with the transverse concave groove that width is adapted to load bearing cross beam width, load-bearing is horizontal The lower end of beam is embedded in transverse concave groove and connect with steel-pipe pile.The strut of lateral bridging is by lateral part and is connected on steel-pipe pile Upper bracket connected with lower bracket, production and it is easy for installation.
Preferably, the bridge pier includes;Box beam bearing cross beam, several transversely arranged and upper ends support box beam branch Hold the pier stud of crossbeam;Hood type bearing assembly includes;Number is identical as pier stud number and corresponds loaded on the anchor ear on pier stud, Two are respectively arranged on the Bailey beam bearing cross beam on front side of bridge pier with rear side;Anchor ear set there are two under two Bailey beam bearing cross beams Hold the support bracket to connect one to one;Bailey beam lower end is connect with Bailey beam bearing cross beam upper end.Hood type bearing assembly Anchor ear is loaded on assembly and disassembly are conducive on pier stud, Bailey beam bearing cross beam is loaded on stable connection on the support bracket of anchor ear.
Preferably, the distribution beam group includes point that multiple longitudinal directions are set side by side and connect respectively with Bailey beam upper end With beam, longitudinal reinforcement group is connected between two adjacent distribution beams and be layed in longitudinal reinforcement group for preventing junk Bamboo plate or template.It is connected with longitudinal reinforcement group between the distribution beam connecting with Bailey beam upper end and is layed in longitudinal reinforcement group For preventing the bamboo plate or template of junk, improve safety.
Preferably, the box beam of the bowl buckle bracket, which accommodates longitudinally concave bottom, indulges stupefied and I-shaped equipped with I-steel The lumps of wood cross that steel indulges stupefied connection is stupefied, indulges the horizontal stupefied upper laying high-strength bamboo offset plate of the stupefied and lumps of wood in I-steel;Bowl buckle branch is provided with vertically Bridging and horizontal cross brace.Intensity and toughness and stability are high.
Compared with prior art, the utility model has the beneficial effects that the sea area construction of cast-in-situ box-beam bracket uses When, in the steel pipe insertion sea area of steel pipe pier, by loaded on bridge pier hood type bearing assembly and steel pipe pier support Bailey beam, Distribution beam group, bowl buckle bracket accommodate longitudinally concave middle carry out construction of cast-in-situ box-beam in the box beam of bowl buckle bracket, existing suitable for sea area Pour box girder construction.The steel-pipe pile of steel pipe pier is conducive in insertion sea area, and load bearing cross beam and lateral bridging are conducive to the firm of steel pipe pier And improve strength and stiffness.The strut of lateral bridging is connected by lateral part with the upper bracket and lower bracket being connected on steel-pipe pile It connects, makes and easy for installation.Loaded on assembly and disassembly are conducive on pier stud, Bailey beam bearing cross beam is loaded on to be embraced the anchor ear of hood type bearing assembly Stable connection on the support bracket of hoop.It is connected with longitudinal reinforcement group between the distribution beam connecting with Bailey beam upper end and is layed in vertical The bamboo plate or template for being used to prevent junk in reinforcing bar group, improves safety.The box beam accommodating of bowl buckle bracket is longitudinally concave Bottom be equipped with I-steel to indulge lumps of wood cross that is stupefied, indulging stupefied connection with I-steel stupefied, indulge the stupefied upper laying of stupefied and lumps of wood cross in I-steel High-strength bamboo slab rubber;Bowl buckle branch is provided with vertical bridging and horizontal cross brace;Intensity and toughness and stability are high.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of the utility model;
Fig. 2 is the A-A view of Fig. 1;
Fig. 3 is the planar structure schematic diagram of bowl buckle bracket.
In figure: Bailey beam 1, bridge pier 2, box beam bearing cross beam 21, pier stud 22, hood type bearing assembly 3, anchor ear 31, Bei Lei Beam support crossbeam 32, support bracket 33, distribution beam 4, bowl buckle bracket 5, box beam accommodate longitudinally concave 51, I-steel and indulge stupefied 52, side Wooden horizontal stupefied 53, vertical bridging 54, horizontal cross brace 55, sub- pier 6, steel-pipe pile 61, load bearing cross beam 62, lateral bridging 63, flat Join part 64, strut 65, upper bracket 66, lower bracket 67, transverse concave groove 68.
Specific embodiment
The utility model is described further shown in reference to the accompanying drawing.
As shown in attached drawing 1, attached drawing 2, attached drawing 3: a kind of sea area construction of cast-in-situ box-beam bracket, including;Two longitudinal arrangements Bridge pier 2, a steel pipe pier being set between two neighboring bridge pier 2, number is identical as 2 numbers of bridge pier and corresponds loaded on bridge pier Hood type bearing assembly 3 on 2, the Bailey beam 1 that several transverse directions are set side by side and are loaded on steel pipe pier and anchor ear bearing assembly, Distribution beam group set on 1 upper end of Bailey beam, set on distribution beam group upper end and upper end is higher than the bowl buckle bracket 5 of 2 upper end of bridge pier;Bowl buckle Bracket 5 is equipped with the box beam accommodating longitudinally concave 51 that and bottom surface opposite with bridge pier 2 is flushed with the upper end of bridge pier 2.
The steel pipe pier includes;The sub- pier 6 of two longitudinal arrangements;Sub- pier 6 includes;11 transversely arranged steel-pipe piles 61, the load bearing cross beam 62 loaded on 61 upper end of steel-pipe pile;The lateral being arranged above and below there are two being set between two adjacent steel-pipe piles 61 Bridging 63;1 lower end of Bailey beam is connect with 62 upper end of load bearing cross beam.
The lateral bridging 63 includes;Two arranged in a crossed manner and both ends are respectively welded with the strut of a lateral part 64 65, the two upper brackets 66 and two lower brackets 67 of welding are corresponded with two adjacent steel-pipe piles 61;On strut 65 The lateral part 64 at end and upper bracket 66, which correspond, to be welded;It is corresponded positioned at the lateral part 64 of 65 lower end of strut and lower bracket 67 Welding.The infall welding of two struts 65.
In the present embodiment, 61 upper end of steel-pipe pile is equipped with the transverse concave groove that width is adapted to 62 width of load bearing cross beam 68, the lower end of load bearing cross beam 62 is embedded in transverse concave groove 68 and welds with steel-pipe pile 61.
The bridge pier 2 includes;Box beam bearing cross beam 21, four transversely arranged and upper end supports box beam bearing cross beam 21 Pier stud 22;Hood type bearing assembly 3 includes;Number is identical as 22 numbers of pier stud and corresponds loaded on the anchor ear on pier stud 22 31, two are respectively arranged on the Bailey beam bearing cross beam 32 of 2 front side and rear side of bridge pier;Anchor ear 31 set there are two with two Bailey beam branch Hold the support bracket 33 that 32 lower end of crossbeam corresponds welding;1 lower end of Bailey beam and 32 upper end of Bailey beam bearing cross beam are welded.
The distribution beam group includes the distribution beam 4 that multiple longitudinal directions are set side by side and weld respectively with 1 upper end of Bailey beam, phase Longitudinal reinforcement group (being not drawn into attached drawing), which is welded with, between two adjacent distribution beams 4 and is layed in longitudinal reinforcement group is used to prevent The bamboo plate (being not drawn into attached drawing) of falling stop object.
The bottom that the box beam of the bowl buckle bracket 5 accommodates longitudinally concave 51 is equipped with I-steel and indulges stupefied 52, indulges with I-steel The lumps of wood cross stupefied 53 of stupefied 52 screw connection is indulged in I-steel and is laid with high-strength bamboo offset plate (in attached drawing not on stupefied 52 and lumps of wood cross stupefied 53 It draws);Bowl buckle bracket 5 is equipped with vertical bridging 54 and horizontal cross brace 55.
Using the sea area construction of cast-in-situ box-beam method of above-mentioned sea area construction of cast-in-situ box-beam bracket, step 1 sets steel pipe Stake 61, is first put 61 positioning guiding rack of steel-pipe pile to stake position with loop wheel machine, is then lifted by crane steel-pipe pile 61 and is entered position and accurate positioning, And check position and the verticality of 61 positioning guiding rack of steel-pipe pile;Heavy steel-pipe pile 61 is beaten using vibration;Beat heavy steel-pipe pile 61 with It controls based on the construction pile penetration determined by test pile, observes supplemented by 61 absolute altitude of steel-pipe pile;Pile penetration have reached sets requirement and When 61 upper end absolute altitude of steel-pipe pile is not up to, it should be hit by every gust 10 and continue 613 gusts of steel-pipe pile of hammering, the pile penetration for continuing hammering is equal to Construction pile penetration;Stake position and the verticality that steel-pipe pile 61 is detected during beating heavy steel-pipe pile 61, find deviation timely correction; Step 2, after being put in place load bearing cross beam 62 with loop wheel machine, load bearing cross beam 62 is welded in 61 upper end of steel-pipe pile;Step 3, in phase The surveying and locating that lateral position is carried out on adjacent two steel-pipe piles 61 after surveying 61 lateral length of steel-pipe pile, carries out lateral part 64 With 65 blanking of strut and be welded into sub-assembly;Upper bracket 66 and lower bracket 67 are welded on steel-pipe pile 61 respectively, lifting combination After part positioning and lateral part 64 and upper bracket 66 and lower bracket 67 are corresponded and is welded;Step 4, anchor ear 31 are installed, will be high Degree is the pier that the anchor ear 31 that 100cm and the sub- anchor ear that is arranged above and below by three are constituted reaches 75% or more design strength loaded on intensity On column 22, it is lined with the geotextiles with a thickness of 2mm between anchor ear 31 and pier stud 22, increases the frictional force between steel band and pier stud 22, And 22 outside of protection pier stud is injury-free;Step 5, after Bailey beam bearing cross beam 32 is put in place with loop wheel machine, Bailey beam bearing Crossbeam 32 is welded on support bracket 33;Step 6, Bailey beam 1 are installed, and by assembled good modulus are 9m or the shellfish of 12m with loop wheel machine After thunder beam 1 is put in place, Bailey beam 1 is welded with 62 upper end of load bearing cross beam and 32 upper end of Bailey beam bearing cross beam respectively;Span is big When the Bailey beam 1 of 10m is assembled, reinforcement hanging stick should be added, enhances the stability of shellfish thunder, and two adjacent spans are greater than 10m Bailey beam 1 it is in place after, channel steel is welded to connect between the opposite flank of two Bailey beams 1 and is limited, prevent 1 side of Bailey beam to Sliding;In the present embodiment, the span of Bailey beam 1 is 9m;Step 7, distribution beam 4 is installed, according to structural load, 5 lotus of bowl buckle bracket It carries, the distribution of construction loads, and the spacing of distribution beam 4 is corresponding with bowl buckle bracket 5, determines the installation site of distribution beam 4;Use loop wheel machine After distribution beam 4 is put in place, stiffening plate is set in the junction of distribution beam 4 and Bailey beam 1, stiffening plate respectively with distribution beam 4 Lower end and with 1 upper end of Bailey beam weld;Bailey beam 1 two sides setting prevent 1 transverse shifting of Bailey beam and with 4 lower end of distribution beam The block of welding;It welds the longitudinal reinforcement group between two neighboring distribution beam 4 and is laid in longitudinal reinforcement group for anti-falling stop The bamboo plate of object;Step 8, sets up bowl buckle bracket 5, and in length and breadth spacing of the bowl buckle bracket 5 at cast-in-situ box girder both ends is 0.6m* 0.6m, the spacing in length and breadth at the wing plate of bowl buckle bracket 5 is 0.9m * 0.9m, and the spacing in length and breadth of 5 remaining position of bowl buckle bracket is 0.9m*0.6m, the step pitch of bowl buckle bracket 5 are 1.2m;Vertical bridging 54 and horizontal cross brace 55 are installed;Welding is set to bowl buckle The I-steel that the box beam of bracket 5 accommodates longitudinally concave 51 bottom indulges stupefied 52, installation and indulges stupefied 52 lumps of wood cross being spirally connected with I-steel Stupefied 53, it is indulged in I-steel and is laid with high-strength bamboo offset plate on stupefied 52 and lumps of wood cross stupefied 53;At the lower part bowl buckle of the upright bar of bowl buckle bracket 5 One of longitudinal horizontal rod and multiple horizontal rods are set as bar of sweeping the floor, 400mm is not to be exceeded apart from ground level in bar of sweeping the floor, It laterally sweeps the floor in the upright bar that bar should be fixed below longitudinal bar of sweeping the floor using right-angle coupler, when upright bar basis is not in same height When on degree, it is necessary to the longitudinal direction of eminence bar of sweeping the floor to lower be extended two across fixing with upright bar, difference of height is less than 1m;Step 9, sea Software can be folded water pocket and be placed on precompressed position, i.e. box beam accommodating longitudinally concave 51 by the test of domain construction of cast-in-situ box-beam pre-pressing bracket In and be placed on high-strength bamboo slab rubber and carry out precompressed by cross, pour sequence by box beam concrete, injected water into water pump by box beam In the soft foldable water pocket that pouring order of concrete is gradually unfolded, when the water-filling soft foldable water pocket as prefabricating load Weight starts precompressed test when reaching box beam weight, until prefabricating load reaches 110% box beam weight;Detect the inspection of each setting The settling amount of measuring point sea area construction of cast-in-situ box-beam bracket simultaneously carries out data record;Meet the settling amount average value of each test point for 24 hours It is less than one of 5mm condition less than 1mm or 72h settling amount average value, so that it may determine that sea area construction of cast-in-situ box-beam pre-pressing bracket is tested It is qualified;Settling amount unloads prefabricating load after meeting setting value;Step 10, cast-in-situ box girder pour, and are arrived building mould handling with loop wheel machine It in box beam accommodating longitudinally concave 51 and is placed on high-strength bamboo slab rubber after fixation, carries out concreting.
The beneficial effects of the utility model are: when the sea area construction of cast-in-situ box-beam bracket uses, the steel pipe of steel pipe pier It is inserted into sea area, by loaded on the hood type bearing assembly and steel pipe pier bearing Bailey beam, distribution beam group, bowl buckle branch on bridge pier Frame accommodates longitudinally concave middle carry out construction of cast-in-situ box-beam in the box beam of bowl buckle bracket, is suitable for sea area construction of cast-in-situ box-beam.Steel pipe The steel-pipe pile of pier is conducive in insertion sea area, and load bearing cross beam and lateral bridging are conducive to the firm of steel pipe pier and improve intensity and just Degree.The strut of lateral bridging is connect by lateral part with the upper bracket and lower bracket being connected on steel-pipe pile, production and installation It is convenient.The anchor ear of hood type bearing assembly is loaded on the support bracket of anchor ear loaded on assembly and disassembly, Bailey beam bearing cross beam is conducive on pier stud Upper stable connection.It is connected with longitudinal reinforcement group between the distribution beam connecting with Bailey beam upper end and is layed in longitudinal reinforcement group For preventing the bamboo plate or template of junk, safety is improved.The box beam of bowl buckle bracket accommodates longitudinally concave bottom equipped with work It is stupefied that word steel indulges lumps of wood cross stupefied, that stupefied connection is indulged with I-steel, indulges the horizontal stupefied upper laying high-strength bamboo offset plate of the stupefied and lumps of wood in I-steel;Bowl Button branch is provided with vertical bridging and horizontal cross brace;Intensity and toughness and stability are high.
In addition to the implementation, in the range disclosed in claims of the utility model and specification, this is practical Novel technical characteristic or technical data can be reselected and be combined, to constitute new embodiment, these are all these Field technical staff is without carrying out what creative work can be realized, therefore the implementation that these the utility model are not described in Example also should be regarded as specific embodiment of the utility model and be within the protection scope of the utility model.

Claims (7)

1. a kind of sea area construction of cast-in-situ box-beam bracket, including;The bridge pier of several longitudinal arrangements, characterized in that the sea area Construction of cast-in-situ box-beam bracket further include: number fewer than bridge pier number one and steel of the one-to-one correspondence between two neighboring bridge pier Pipe pier, number is identical as bridge pier number and corresponds loaded on the hood type bearing assembly on bridge pier, several laterally set side by side The Bailey beam set and be loaded on steel pipe pier and anchor ear bearing assembly, the distribution beam group set on Bailey beam upper end are set to distribution beam group Upper end and upper end are higher than the bowl buckle bracket of bridge pier upper end;Bowl buckle branch is provided with and bottom surface opposite with bridge pier and flushes with the upper end of bridge pier Box beam accommodating it is longitudinally concave.
2. construction of cast-in-situ box-beam bracket in sea area according to claim 1, it is characterized in that: the steel pipe pier includes;It is several The sub- pier of a longitudinal arrangement;Sub- pier includes;Several transversely arranged steel-pipe piles, the load bearing cross beam loaded on steel-pipe pile upper end;Phase Several lateral bridgings being arranged above and below are equipped between two adjacent steel-pipe piles;Bailey beam lower end and load bearing cross beam upper end connect It connects.
3. construction of cast-in-situ box-beam bracket in sea area according to claim 2, it is characterized in that: the lateral bridging includes; Two arranged in a crossed manner and both ends are respectively provided with the strut of a lateral part, two to connect one to one with two adjacent steel-pipe piles Upper bracket and two lower brackets;Lateral part positioned at strut upper end connects one to one with upper bracket;Positioned at the flat of strut lower end Connection part connects one to one with lower bracket.
4. construction of cast-in-situ box-beam bracket in sea area according to claim 2, it is characterized in that: the steel-pipe pile upper end is equipped with width The transverse concave groove being adapted to load bearing cross beam width is spent, the lower end of load bearing cross beam is embedded in transverse concave groove and connect with steel-pipe pile.
5. construction of cast-in-situ box-beam bracket in sea area according to claim 1 or 2 or 3 or 4, it is characterized in that: the bridge pier packet It includes;Box beam bearing cross beam, several transversely arranged and upper ends support the pier stud of box beam bearing cross beam;Hood type bearing assembly packet It includes;Number is identical as pier stud number and corresponds loaded on the anchor ear on pier stud, and two are respectively arranged on front side of bridge pier and rear side Bailey beam bearing cross beam;Anchor ear sets that there are two the support brackets that connect one to one with two Bailey beam bearing cross beam lower ends;Shellfish The lower end Lei Liang is connect with Bailey beam bearing cross beam upper end.
6. construction of cast-in-situ box-beam bracket in sea area according to claim 1 or 2 or 3 or 4, it is characterized in that: the distribution beam Group includes the distribution beam that multiple longitudinal directions are set side by side and connect respectively with Bailey beam upper end, is connected between two adjacent distribution beams The bamboo plate or template for being used to prevent junk for having longitudinal reinforcement group and being layed in longitudinal reinforcement group.
7. construction of cast-in-situ box-beam bracket in sea area according to claim 1 or 2 or 3 or 4, it is characterized in that: the bowl buckle branch The box beam of frame accommodates longitudinally concave bottom, and equipped with I-steel to indulge lumps of wood cross stupefied, that stupefied connection is indulged with I-steel stupefied, in I-steel Indulge the horizontal stupefied upper laying high-strength bamboo offset plate of the stupefied and lumps of wood;Bowl buckle branch is provided with vertical bridging and horizontal cross brace.
CN201821161722.5U 2018-07-20 2018-07-20 Sea area construction of cast-in-situ box-beam bracket Active CN208815408U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821161722.5U CN208815408U (en) 2018-07-20 2018-07-20 Sea area construction of cast-in-situ box-beam bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821161722.5U CN208815408U (en) 2018-07-20 2018-07-20 Sea area construction of cast-in-situ box-beam bracket

Publications (1)

Publication Number Publication Date
CN208815408U true CN208815408U (en) 2019-05-03

Family

ID=66271362

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821161722.5U Active CN208815408U (en) 2018-07-20 2018-07-20 Sea area construction of cast-in-situ box-beam bracket

Country Status (1)

Country Link
CN (1) CN208815408U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108999085A (en) * 2018-07-20 2018-12-14 浙江交工宏途交通建设有限公司 Sea area construction of cast-in-situ box-beam bracket and sea area construction of cast-in-situ box-beam method
CN110804948A (en) * 2019-10-31 2020-02-18 安徽省路港工程有限责任公司 Construction method of steel pipe pile bailey truss foundation full-space bracket system
CN110823173A (en) * 2019-10-28 2020-02-21 李光普 Pile settlement measuring device and method used in building inclination correcting process
CN111188274A (en) * 2019-12-31 2020-05-22 湖北省路桥集团有限公司 Large-section steel truss girder moving and transporting system of large-span steel-concrete composite bridge and construction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108999085A (en) * 2018-07-20 2018-12-14 浙江交工宏途交通建设有限公司 Sea area construction of cast-in-situ box-beam bracket and sea area construction of cast-in-situ box-beam method
CN110823173A (en) * 2019-10-28 2020-02-21 李光普 Pile settlement measuring device and method used in building inclination correcting process
CN110804948A (en) * 2019-10-31 2020-02-18 安徽省路港工程有限责任公司 Construction method of steel pipe pile bailey truss foundation full-space bracket system
CN110804948B (en) * 2019-10-31 2021-05-11 安徽省路港工程有限责任公司 Construction method of steel pipe pile bailey truss foundation full-space bracket system
CN111188274A (en) * 2019-12-31 2020-05-22 湖北省路桥集团有限公司 Large-section steel truss girder moving and transporting system of large-span steel-concrete composite bridge and construction method

Similar Documents

Publication Publication Date Title
CN208815408U (en) Sea area construction of cast-in-situ box-beam bracket
CN108999085A (en) Sea area construction of cast-in-situ box-beam bracket and sea area construction of cast-in-situ box-beam method
CN108660903A (en) CFST Arch Bridge and construction method
CN101935986B (en) Overwater large-span steel tube pile cast-in-situ trestle and building method thereof
CN204690605U (en) The self-propelled triangular truss hanging basket of large span beam bridge
CN104452597B (en) Pier prestressed cap beam with extra length Construction Supporting System in water
CN107841953B (en) High-altitude oblique crossing Liang Doupo side span cast-in-situ section construction support and construction method
CN110453613B (en) Full-section one-step suspension casting construction method for large-span beam bridge box girder
CN104404887B (en) A kind of long-span steel pipe arch bridge is without support hoisting
CN106087746A (en) A kind of cast-in-situ box girder falsework construction method and bridge
CN106522112A (en) Cable-stayed bridge side span beam section erecting system and method thereof
CN103866696A (en) Cast-in-situ support of long-cantilever zero segment of short-pylon cable-stayed bridge
CN103410102A (en) H-shaped double column pier wide-bridge-surface cantilever temporary consolidation structure and construction method thereof
CN105714692A (en) Cast-in-cantilever beam concrete filled steel tube temporary concretion system
CN205242278U (en) A triangle string basket method is hanged and is watered device for deck bridge construction
CN215366868U (en) Prepressing system for hanging basket of cantilever beam
CN206376178U (en) A kind of steel reinforced concrete beam rigid framed structure arch bridge
CN106638265A (en) Steel reinforced concrete beam rigid framework bridge
CN216194102U (en) Bent cap support is used in overpass construction
CN215947924U (en) Support bearing structure for pier stud bent cap
CN207244633U (en) Brick retaining wall steel bar girder hardened system on foundation pit enclosure top beam
CN205296206U (en) Tower cane foundation
CN203741727U (en) Cast-in-place support for zero section of long cantilever of extradosed cable-stayed bridge
CN107724252A (en) Continuous box girder hanging basket cantilever method construction and close up block
CN210104781U (en) Tower crane foundation and structure of supporting sharing stand pile that links to each other