CN208792870U - A kind of novel steel tube fixation kit - Google Patents
A kind of novel steel tube fixation kit Download PDFInfo
- Publication number
- CN208792870U CN208792870U CN201821379981.5U CN201821379981U CN208792870U CN 208792870 U CN208792870 U CN 208792870U CN 201821379981 U CN201821379981 U CN 201821379981U CN 208792870 U CN208792870 U CN 208792870U
- Authority
- CN
- China
- Prior art keywords
- fixed
- adjustable plate
- steel pipe
- bolt
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model provides a kind of novel steel tube fixation kit, including fixed plate, fixed cylinder, and the fixed plate is equipped with multiple fixation holes, and the fixation hole is correspondingly provided with foundation bolt, and fixed plate is fixed on concrete pier by foundation bolt;The internal diameter of the fixed cylinder is greater than the outer diameter of steel pipe, and the fixed cylinder is vertically fixed on the upper surface of fixed plate;The fixed cylinder is correspondingly provided with lateral fixing bolt and longitudinally fixed bolt;The outside of the fixed cylinder is also welded with more vertical fixing muscles, and the top of fixed cylinder is extend out at the top of the fixing muscle, and the top of the fixing muscle is equipped with tightening device, is further fixed by tightening device to steel pipe.Novel steel tube fixation kit described in the utility model effectively can vertically fix steel pipe, and lateral fixing bolt and longitudinally fixed bolt the level orientation of steel pipe is fixed, placing steel tubes inclination are passed through.
Description
Technical field
The utility model belongs to steel pipe technical field, more particularly, to a kind of novel steel tube fixation kit.
Background technique
Steel pipe is applied in many fields, when steel pipe vertically fix, digs certain depth on the ground mostly
Then hole puts in one end of steel pipe, filled with soil, achievees the effect that fixed, and not only stability is not or not the fixed steel pipe of this mode
It is enough, and soil is easy to corrode steel pipe, causes steel pipe service life short.
Summary of the invention
In view of this, the utility model is directed to a kind of novel steel tube fixation kit, carried out with solving existing steel pipe
Vertical fixed, stable row is inadequate, is easy the case where corrosion is caused to steel pipe.
In order to achieve the above objectives, the technical solution of the utility model is achieved in that
A kind of novel steel tube fixation kit, including fixed plate, fixed cylinder, the fixed plate are equipped with multiple fixation holes, institute
It states fixation hole and is correspondingly provided with foundation bolt, fixed plate is fixed on concrete pier by foundation bolt;
The internal diameter of the fixed cylinder is greater than the outer diameter of steel pipe, and the fixed cylinder is vertically fixed on the upper surface of fixed plate;Institute
It states fixed cylinder and is correspondingly provided with lateral fixing bolt and longitudinally fixed bolt, one end that the steel pipe is inserted into fixed cylinder is correspondingly provided with
Lateral fixation hole and longitudinally fixed hole, the transverse direction fixing bolt and longitudinally fixed bolt-through fixed cylinder and steel pipe, the other end
It is fixed by nut;
The outside of the fixed cylinder is also welded with more vertical fixing muscles, extend out to fixed cylinder at the top of the fixing muscle
The top of top, the fixing muscle is equipped with tightening device, is further fixed by tightening device to steel pipe.
Further, the lateral fixing bolt and longitudinally fixed bolt are all two.
Further, the side bottom of the fixed cylinder is equipped with drainage hole, and the drainage hole is connected to inside fixed cylinder.
Further, the fixing muscle is four, and the inside top of every two fixing muscles welds one piece of adjustable plate, the tune
Section plate is steel plate, and two pieces of adjustable plate opposite directions are welded and fixed, and the tightening device is mounted on adjustable plate.
Further, also it is welded with lacing wire between the fixing muscle, the lacing wire is welded on adjacent, and does not weld same
Between two fixing muscles on adjustable plate;
Every side is equipped with two lacing wires.
Further, the tightening device includes arc panel, U-shaped board, adjusting screw rod, and the arc panel is two, two
The installation of arc panel opposite direction, for fixing steel pipe, is welded with U-shaped board, the groove court of the U-shaped board on rear side of each arc panel
To arc panel, two sides are welded and fixed with arc panel;
The backboard of the U-shaped board is equipped with bolt hole corresponding with the adjusting screw rod, the adjusting screw rod and U-shaped board
It is threadedly coupled, and is fixed by fixture nut, the fixture nut is arranged on rear side of the backboard of U-shaped board;
The adjustable plate is equipped with unthreaded hole corresponding with the adjusting screw rod, and the other end of the adjusting screw rod passes through light
Hole extend out to the outside of adjustable plate;
The adjustable plate is fixed with the adjusting screw rod by the first adjusting nut and the second adjusting nut, and described
Side of the adjustable plate close to U-shaped board is arranged in one adjusting nut, and the other side of adjustable plate is arranged in second adjusting nut, leads to
Cross the spacing between the first adjusting nut and the second adjusting nut two arc panels of adjusting.
Further, each U-shaped board is correspondingly provided with two adjusting screw rods.
Further, the adjustable plate is additionally provided with sleeve, the sleeve and adjustable plate close to the side of the second adjusting nut
It is welded and fixed;
The sleeve is steel pipe, and the internal diameter of sleeve and the unthreaded hole internal diameter of adjustable plate are identical, and sleeve is connected to unthreaded hole, sleeve set
It is located at the outside of adjusting screw rod, sleeve is arranged between the second adjusting nut and adjustable plate.
Further, the top of the fixing muscle is in Z-shaped, and upper end is drawn close by bending to fixed cylinder direction.
Compared with the existing technology, novel steel tube fixation kit described in the utility model has the advantage that
(1) novel steel tube fixation kit described in the utility model effectively can vertically fix steel pipe, pass through
The level orientation of steel pipe is fixed in lateral fixing bolt and longitudinally fixed bolt, placing steel tubes inclination.
(2) novel steel tube fixation kit described in the utility model by tightening device to bottom slightly toward top steel pipe into
It is fixed to go, and steel pipe is fixed by fixed cylinder and tightening device two o'clock, further increases the stability of steel pipe.
(3) novel steel tube fixation kit described in the utility model by tightening device can steel pipe to different tube diameters into
Row is effectively fixed, and does not have to process steel pipe, is conducive to the utilization again of steel pipe.
Detailed description of the invention
The attached drawing for constituting a part of the utility model is used to provide a further understanding of the present invention, this is practical new
The illustrative embodiments and their description of type are not constituteed improper limits to the present invention for explaining the utility model.?
In attached drawing:
Fig. 1 is novel steel tube fixation kit structure chart described in the utility model embodiment;
Fig. 2 is tightening device structure chart described in the utility model embodiment.
Description of symbols:
1- fixed plate;2- fixed cylinder;3- fixing muscle;4- lacing wire;The longitudinally fixed bolt of 5-;6- transverse direction fixing bolt;7- tune
Save plate;81- arc panel;82-U template;83- adjusting screw rod;84- fixture nut;The first adjusting nut of 85-;86- sleeve;87-
Two adjusting nuts.
Specific embodiment
It should be noted that in the absence of conflict, the feature in the embodiments of the present invention and embodiment can
To be combined with each other.
In the description of the present invention, it should be understood that term " center ", " longitudinal direction ", " transverse direction ", "upper", "lower",
The orientation or positional relationship of the instructions such as "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside" is
It is based on the orientation or positional relationship shown in the drawings, is merely for convenience of describing the present invention and simplifying the description, rather than indicate
Or imply that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore cannot understand
For limitations of the present invention.In addition, term " first ", " second " etc. are used for description purposes only, and should not be understood as indicating
Or it implies relative importance or implicitly indicates the quantity of indicated technical characteristic." first ", " second " etc. are defined as a result,
Feature can explicitly or implicitly include one or more of the features.It is in the description of the present invention, unless another
It is described, the meaning of " plurality " is two or more.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified
Dress ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integrally
Connection;It can be mechanical connection, be also possible to be electrically connected;Can be directly connected, can also indirectly connected through an intermediary,
It can be the connection inside two elements.For the ordinary skill in the art, on being understood by concrete condition
State the concrete meaning of term in the present invention.
The utility model will be described in detail below with reference to the accompanying drawings and embodiments.
As shown in Figure 1, a kind of novel steel tube fixation kit, including fixed plate 1, fixed cylinder 2, the fixed plate 1 are equipped with
Multiple fixation holes, the fixation hole are correspondingly provided with foundation bolt, and fixed plate 1 is fixed on concrete pier by foundation bolt;
The internal diameter of the fixed cylinder 2 is greater than the outer diameter of steel pipe, and the fixed cylinder 2 is vertically fixed on the upper surface of fixed plate 1;
The fixed cylinder 2 is correspondingly provided with lateral fixing bolt 6 and longitudinally fixed bolt 5, and the steel pipe is inserted into one end pair of fixed cylinder 2
It should be equipped with lateral fixation hole and longitudinally fixed hole, the transverse direction fixing bolt 6 and longitudinally fixed bolt 5 run through fixed cylinder 2 and steel
Pipe, the other end are fixed by nut;
The outside of the fixed cylinder 2 is also welded with more vertical fixing muscles 3, and the top of the fixing muscle 3 extend out to fixation
The top of the top of cylinder 2, the fixing muscle 3 is equipped with tightening device, is further fixed by tightening device to steel pipe.
The transverse direction fixing bolt 6 and longitudinally fixed bolt 5 are all two.By lateral fixing bolt 6 and longitudinally fixed
The level orientation of steel pipe is fixed in bolt 5, placing steel tubes inclination.
The side bottom of the fixed cylinder 2 is equipped with drainage hole, and the drainage hole is connected to inside fixed cylinder 2.It can will enter
Rainwater in fixed cylinder 2 discharges, and prevents internal corrosion.
The fixing muscle 3 is four, and the inside top of every two fixing muscles 3 welds one piece of adjustable plate 7, the adjustable plate 7
For steel plate, two pieces of 7 opposite directions of adjustable plate are welded and fixed, and the tightening device is mounted on adjustable plate 7.
Also it is welded with lacing wire 4 between the fixing muscle 3, the lacing wire 4 is welded on adjacent, and does not weld same adjustable plate
Between two fixing muscles 3 on 7;Every side is equipped with two lacing wires 4.The stability between fixing muscle 3 is increased by lacing wire 4, and
And tightening device is effectively increased to the fixed function of steel pipe.
As shown in Fig. 2, the tightening device includes arc panel 81, U-shaped board 82, adjusting screw rod 83, the arc panel 81 is
Two, the opposite installation of two arc panels 81, for fixing steel pipe, the rear side of each arc panel 81 is welded with U-shaped board 82, institute
The groove of U-shaped board 82 is stated towards arc panel 81, two sides are welded and fixed with arc panel 81;
The backboard of the U-shaped board 82 is equipped with bolt hole corresponding with the adjusting screw rod 83, the adjusting screw rod 83
It is threadedly coupled with U-shaped board 82, and is fixed by fixture nut 84, the backboard of U-shaped board 82 is arranged in the fixture nut 84
Rear side;
The adjustable plate 7 is equipped with unthreaded hole corresponding with the adjusting screw rod 83, the other end of the adjusting screw rod 83
The outside of adjustable plate 7 is extend out to by unthreaded hole;
The adjustable plate 7 is consolidated with the adjusting screw rod 83 by the first adjusting nut 85 and the second adjusting nut 87
Fixed, adjustable plate 7 is arranged in close to the side of U-shaped board 82 in first adjusting nut 85, and the setting of the second adjusting nut 87 exists
The other side of adjustable plate 7 adjusts the spacing between two arc panels 81 by the first adjusting nut 85 and the second adjusting nut 87.
Adjusting method:
When need by two arc panels 81 close to when, that is, when tightening to steel pipe, loosen the second adjusting nut 87,
The first adjusting nut 85 is adjusted, moves the first adjusting nut 85 outward, under the turning of the first adjusting nut 85, adjusts spiral shell
Bar 83 pushes arc panel 81 to draw close to intermediate direction;
When need by two arc panels 81 far from when, that is, when loosening to the fixation of steel pipe, turn the first adjusting nut
85, keep the first adjusting nut 85 mobile to fixing bolt direction, then tightens the second adjusting nut 87, at this moment screw rod can be outward
Mobile, arc panel 81 is gradually distance from steel pipe.
There was only the first adjusting nut 85 and the rotation of the second adjusting nut 87 in adjustment process, adjusting screw rod 83 is in fixture nut
Under the action of 84, the case where being not in rotation.
Each U-shaped board 82 is correspondingly provided with two adjusting screw rods 83.Two adjusting screw rods 83 are effectively increased to steel pipe
Fixed function, when one of them stripped thread occurs, another can also play a supporting role.
The adjustable plate 7 is additionally provided with sleeve 86 close to the side of the second adjusting nut 87, and the sleeve 86 is welded with adjustable plate 7
Connect fixation;The sleeve 86 is steel pipe, and the internal diameter of sleeve 86 and the unthreaded hole internal diameter of adjustable plate 7 are identical, and sleeve 86 is connected to unthreaded hole,
Sleeve 86 is set in the outside of adjusting screw rod 83, and sleeve 86 is arranged between the second adjusting nut 87 and adjustable plate 7.Because adjusting
Hole on plate 7 is unthreaded hole, and adjusting screw rod 83 goes through the inclination for having certain angle, increased by sleeve 86 to adjusting screw rod
83 supporting role, keeps the tilt angle of adjusting screw rod 83 smaller, does not influence the subsequent fixation to steel pipe.
The top of the fixing muscle 3 is in Z-shaped, and upper end is drawn close by bending to 2 direction of fixed cylinder.It can play in this way pair
The effect that adjustable plate 7 supports inwardly, fixed steel pipe are more stable.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this
Within the spirit and principle of utility model, any modification, equivalent replacement, improvement and so on should be included in the utility model
Protection scope within.
Claims (9)
1. a kind of novel steel tube fixation kit, it is characterised in that: including fixed plate (1), fixed cylinder (2), on the fixed plate (1)
Equipped with multiple fixation holes, the fixation hole is correspondingly provided with foundation bolt, and fixed plate (1) is fixed on concrete pier by foundation bolt
On;
The internal diameter of the fixed cylinder (2) is greater than the outer diameter of steel pipe, and the fixed cylinder (2) is vertically fixed on the upper table of fixed plate (1)
Face;The fixed cylinder (2) is correspondingly provided with lateral fixing bolt (6) and longitudinally fixed bolt (5), and the steel pipe is inserted into fixed cylinder
(2) one end is correspondingly provided with lateral fixation hole and longitudinally fixed hole, the transverse direction fixing bolt (6) and longitudinally fixed bolt (5)
It is fixed through fixed cylinder (2) and steel pipe, the other end by nut;
The outside of the fixed cylinder (2) is also welded with more vertical fixing muscles (3), extend out at the top of the fixing muscle (3) solid
The top of the top of safety barrel (2), the fixing muscle (3) is equipped with tightening device, is further fixed by tightening device to steel pipe.
2. novel steel tube fixation kit according to claim 1, it is characterised in that: it is described transverse direction fixing bolt (6) and indulge
It is all two to fixing bolt (5).
3. novel steel tube fixation kit according to claim 1, it is characterised in that: the side bottom of the fixed cylinder (2)
Equipped with drainage hole, drainage hole connection fixed cylinder (2) is internal.
4. novel steel tube fixation kit according to claim 1, it is characterised in that: the fixing muscle (3) be four, every two
The inside top of root fixing muscle (3) welds one piece of adjustable plate (7), and the adjustable plate (7) is steel plate, and two pieces of adjustable plates (7) are opposite
It is welded and fixed, the tightening device is mounted on adjustable plate (7).
5. novel steel tube fixation kit according to claim 4, it is characterised in that: also welded between the fixing muscle (3)
Have lacing wire (4), the lacing wire (4) is welded on adjacent, and does not weld between two fixing muscles (3) on same adjustable plate (7);
Every side is equipped with two lacing wires (4).
6. novel steel tube fixation kit according to claim 4, it is characterised in that: the tightening device includes arc panel
(81), U-shaped board (82), adjusting screw rod (83), the arc panel (81) are two, and the opposite installation of two arc panels (81) is used for
Fixed steel pipe is welded with U-shaped board (82) on rear side of each arc panel (81), and the groove of the U-shaped board (82) is towards arc
Plate (81), two sides are welded and fixed with arc panel (81);
The backboard of the U-shaped board (82) is equipped with bolt hole corresponding with the adjusting screw rod (83), the adjusting screw rod
(83) it is threadedly coupled with U-shaped board (82), and is fixed by fixture nut (84), the fixture nut (84) is arranged U-shaped
On rear side of the backboard of plate (82);
The adjustable plate (7) be equipped with unthreaded hole corresponding with the adjusting screw rod (83), the adjusting screw rod (83) it is another
End extend out to the outside of adjustable plate (7) by unthreaded hole;
The adjustable plate (7) and the adjusting screw rod (83) are carried out by the first adjusting nut (85) and the second adjusting nut (87)
Fixed, the first adjusting nut (85) setting is in adjustable plate (7) close to the side of U-shaped board (82), second adjusting nut
(87) setting adjusts two arcs by the first adjusting nut (85) and the second adjusting nut (87) in the other side of adjustable plate (7)
Spacing between shape plate (81).
7. novel steel tube fixation kit according to claim 6, it is characterised in that: each U-shaped board (82) correspondence is set
There are two adjusting screw rod (83).
8. novel steel tube fixation kit according to claim 6, it is characterised in that: the adjustable plate (7) is adjusted close to second
The side of section nut (87) is additionally provided with sleeve (86), and the sleeve (86) is welded and fixed with adjustable plate (7);
The sleeve (86) is steel pipe, and the internal diameter of sleeve (86) is identical as the unthreaded hole internal diameter of adjustable plate (7), sleeve (86) and unthreaded hole
Connection, sleeve (86) are set in the outside of adjusting screw rod (83), and sleeve (86) is arranged in the second adjusting nut (87) and adjustable plate
(7) between.
9. novel steel tube fixation kit according to claim 1, it is characterised in that: the top of the fixing muscle (3) is in Z-shaped
Type, upper end are drawn close by bending to fixed cylinder (2) direction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821379981.5U CN208792870U (en) | 2018-08-24 | 2018-08-24 | A kind of novel steel tube fixation kit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821379981.5U CN208792870U (en) | 2018-08-24 | 2018-08-24 | A kind of novel steel tube fixation kit |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208792870U true CN208792870U (en) | 2019-04-26 |
Family
ID=66207107
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821379981.5U Expired - Fee Related CN208792870U (en) | 2018-08-24 | 2018-08-24 | A kind of novel steel tube fixation kit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208792870U (en) |
-
2018
- 2018-08-24 CN CN201821379981.5U patent/CN208792870U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208605206U (en) | A kind of highway soft rock tunnel bilayer arch supporting construction device | |
CN208073095U (en) | Mobile falling-proof bracket | |
CN208792870U (en) | A kind of novel steel tube fixation kit | |
CN213115824U (en) | Construction that conveniently adjusts height is with enclosing fender device | |
CN209509655U (en) | A kind of project installation protection fence | |
CN207567972U (en) | A kind of skyscraper interior wall self-dewatering type steel construction | |
CN108607230A (en) | A kind of device of spiral-screen column for sewage disposal | |
CN206503092U (en) | A kind of railway guardrail top side rail fixed connection apparatus | |
CN217115540U (en) | Multifunctional self-supporting cable support | |
CN210857492U (en) | Fabricated building structure system | |
CN210530131U (en) | Drawknot structure between steel construction roofing sandalwood strips | |
CN215764968U (en) | Street lamp pole with reinforcing flange | |
CN207260613U (en) | A kind of construction actinobacillus device | |
CN209099522U (en) | A kind of support steel construction | |
CN207960127U (en) | A kind of simple cross-arm of steel tube tower | |
CN215572954U (en) | Shield constructs total powerstation of guidance system and observes fixed platform | |
CN217079635U (en) | Scaffold even wall spare structure among assembled engineering | |
CN204780582U (en) | Suspension bridge guardrail | |
CN218266637U (en) | Chain type universal hoop for single-pipe tower | |
CN210801062U (en) | Lamp pole mounting structure | |
CN216110054U (en) | Guardrail structure for mining equipment work | |
CN210797871U (en) | Building wall steel structure frame | |
CN204590486U (en) | Node installed by a kind of flexible connecting device, side fascia and side fascia | |
CN219916883U (en) | Transformer piece is scattered and cooling allies oneself with tub bearing structure | |
CN221784074U (en) | Height-adjustable fixing support adapting to relief of topography |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190426 Termination date: 20210824 |