CN208792760U - Falsework - Google Patents

Falsework Download PDF

Info

Publication number
CN208792760U
CN208792760U CN201821556610.XU CN201821556610U CN208792760U CN 208792760 U CN208792760 U CN 208792760U CN 201821556610 U CN201821556610 U CN 201821556610U CN 208792760 U CN208792760 U CN 208792760U
Authority
CN
China
Prior art keywords
drag link
falsework
bolt
adjustment
round button
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821556610.XU
Other languages
Chinese (zh)
Inventor
魏志光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201821556610.XU priority Critical patent/CN208792760U/en
Application granted granted Critical
Publication of CN208792760U publication Critical patent/CN208792760U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A kind of falsework, the drag link comprising more upright bars and adjacent two upright bar of connection;The upright bar includes casing and the telescoping tube that is assemblied in the casing, described sleeve pipe lower end is equipped with backing board, the upper and lower part of described sleeve pipe is equipped with round button disk, described sleeve pipe upper end is equipped with external screw thread, vertical long hole and equipment adjustment nut are equipped at the external screw thread, the telescoping tube is equipped with jacking plate and adjustment pin hole, and the upper surface of described adjusting nut is equipped with the adjustment bolt with the vertical long hole and the adjustment pin hole cooperation;The drag link includes drag link tube body, the both ends of the drag link tube body are equipped with drag link connector, the drag link connector is equipped with the lateral socket for round button disk insertion and the vertical jack for the insertion of drag link connecting bolt, and the connecting bolt hole with drag link connecting bolt cooperation is distributed on the round button disk.This falsework is built, dismantles simplicity, and stability is good, and support stiffness and intensity are high, is particularly suitable for the construction of post-cast strip.

Description

Falsework
Technical field
The utility model relates to a kind of falseworks for architecture construction.
Background technique
In cast-in-place concrete construction, roof template and beam bottom mother plate are supported using upright bar, between adjacent upright bar It is arranged and falsework is formed by the drag link and diagonal control arm of fastener connection.The assembly and building of the falsework of this kind of form Amount is big, construction efficiency is low, material of taking a lot of work, and the stability of bracket is poor, and support stiffness and intensity are low, influence pouring molding matter Amount;" concrete structure engineering construction quality accident specification " (GB50204-2015) requirement: template and bracket at post-cast strip are answered It is independently arranged.The falsework of above-mentioned form is particularly unsuitable for the construction of post-cast strip.
Summary of the invention
The purpose of this utility model is that the falsework is built, is dismantled in view of the above-mentioned problems, providing a kind of falsework Simplicity, stability is good, and support stiffness and intensity are high, is particularly suitable for the construction of post-cast strip.
Realizing the technical solution of above-mentioned purpose is: a kind of falsework, which includes more upright bars and be connected to Drag link between adjacent two upright bar;The upright bar includes casing and the telescoping tube that is assemblied in the casing, under described sleeve pipe End is equipped with backing board, and the upper and lower part of described sleeve pipe is respectively equipped with round button disk, and the upper end of described sleeve pipe is equipped with external screw thread, Vertical long hole and equipment adjustment nut, the tune that the telescoping tube is equipped with jacking plate and is vertically distributed are equipped at the external screw thread Whole pin hole is equipped in the upper surface of described adjusting nut and inserts with the adjustment of the vertical long hole and the adjustment pin hole cooperation Pin;The drag link includes drag link tube body, and the both ends of the drag link tube body are respectively equipped with drag link connector, the drag link The vertical jack that connector is equipped with the lateral socket for the round button disk insertion and is inserted into for drag link connecting bolt, The connecting bolt hole with drag link connecting bolt cooperation is distributed on the round button disk.
Above-mentioned falsework, the adjustment bolt are the anticreep bolt with U-shaped crank.
Above-mentioned falsework, the adjusting nut are the flange nut equipped with rotational handle.
Above-mentioned falsework, the end of the rotational handle, which is hinged, is connected to handle, extension rod.
This falsework is built, dismantles simplicity, and stability is good, and support stiffness and intensity are high, is particularly suitable for post-cast strip Construction.
Detailed description of the invention
Fig. 1 is this falsework schematic diagram.
Fig. 2 is the upright bar schematic diagram of this falsework.
Fig. 3 is the drag link schematic diagram of this falsework.
Fig. 4 is the adjustment bolt schematic diagram of this falsework.
Fig. 5 is the adjusting nut schematic diagram of this falsework.
In figure: 1, upright bar;11, casing;12, telescoping tube;13, backing board;14, round button disk;15, external screw thread;16, vertical Long hole;17, adjusting nut;18, jacking plate;19, pin hole is adjusted;110, bolt is adjusted;111, connecting bolt hole;112, hand is rotated Handle;113, handle, extension rod;2, drag link;21, drag link tube body;22, drag link connector;23, lateral socket;24, horizontal drawing Bar connecting bolt;25, vertical jack.
Specific embodiment
Specific embodiment of the present utility model is illustrated in conjunction with attached drawing.
Such as Fig. 1, this falsework is made of more upright bars 1 and the drag link 2 being connected between adjacent two upright bar 1.Fig. 1 is implemented Example is three upright bars 1 plus the falsework of the composition of drag link 2.According to construction site needs, more upright bars 1 plus drag link can be used 2 composition roof falseworks, beam bottom mother plate bracket and corresponding alter-pouring strips mould plate bracket.
Such as Fig. 2, the upright bar 1 includes casing 11 and the telescoping tube 12 being assemblied in the casing 11, described sleeve pipe 11 Lower end is equipped with backing board 13, and the upper and lower part of described sleeve pipe 11 is respectively equipped with round button disk 14, is distributed on the round button disk 14 There is connecting pin bores 111, the upper end of described sleeve pipe 11 is equipped with external screw thread 15, is equipped with vertical long hole 16 simultaneously at the external screw thread 15 Equipment adjustment nut 17, the adjustment pin hole 19 that the telescoping tube 12 is equipped with jacking plate 18 and is vertically distributed, in the adjustment spiral shell The upper surface of mother 17 is equipped with the adjustment bolt 110 cooperated with the vertical long hole 16 and the adjustment pin hole 19.Fig. 1, Fig. 2 are real The backing board 13 and jacking plate 18 for applying example are square plate, are respectively equipped with hole at four angles of its square plate, can be used for the company of assembly Connect nail or bolt.
Such as Fig. 3, the drag link 2 includes drag link tube body 21, and the both ends of the drag link tube body 21 are respectively equipped with horizontal drawing Bar connector 22, the drag link connector 22 are equipped with for the lateral socket 23 of the insertion of round button disk 14 and for drag link The vertical jack 25 that connecting bolt 24 is inserted into.The drag link connecting bolt 24 is the wedge-shaped bolt in rectangular section.
The utility model utilizes the height of 12 coarse adjustment upright bar 1 of telescoping tube, utilizes the height of 17 accurate adjustment upright bar 1 of adjusting nut.
If the adjustment bolt 110 of Fig. 4, this falsework are the anticreep bolt with U-shaped crank, the anticreep bolt is by round steel Bending process molding.
Such as Fig. 5, flange nut of the adjusting nut 17 of this falsework using end face of flange upward, to increase nut upper end The contact area in face and adjustment bolt 110;It is symmetrical arranged rotational handle 112 in the side of adjusting nut 17, to facilitate the nut Rotation;It is hinged handle, extension rod 113 in the end of rotational handle 112, keeps nut rotation more laborsaving.

Claims (4)

1. a kind of falsework, it is characterized in that: the falsework includes more upright bars (1) and is connected between adjacent two upright bar (1) Drag link (2);The upright bar (1) includes casing (11) and the telescoping tube (12) that is assemblied in the casing (11), the set The lower end for managing (11) is equipped with backing board (13), and the upper and lower part of described sleeve pipe (11) is respectively equipped with round button disk (14), described The upper end of casing (11) is equipped with external screw thread (15), and vertical long hole (16) and equipment adjustment spiral shell are equipped at the external screw thread (15) Female (17), the adjustment pin hole (19) that the telescoping tube (12) is equipped with jacking plate (18) and is vertically distributed, in the adjusting nut The upper surface of (17) it is equipped with the adjustment bolt (110) cooperated with the vertical long hole (16) and the adjustment pin hole (19);Institute The drag link (2) stated includes drag link tube body (21), and the both ends of the drag link tube body (21) are respectively equipped with drag link connector (22), which is equipped with for the lateral socket (23) of round button disk (14) insertion and for drag link The vertical jack (25) of connecting bolt (24) insertion, is distributed on the round button disk (14) and connect with the drag link The connecting bolt hole (111) of bolt (24) cooperation.
2. falsework according to claim 1, it is characterized in that: the adjustment bolt (110) is with U-shaped crank Anticreep bolt.
3. falsework according to claim 1, it is characterized in that: the adjusting nut (17) is equipped with rotational handle (112) flange nut.
4. falsework according to claim 3, it is characterized in that: the end of the rotational handle (112), which is hinged, is connected to hand Handle extension bar (113).
CN201821556610.XU 2018-09-25 2018-09-25 Falsework Active CN208792760U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821556610.XU CN208792760U (en) 2018-09-25 2018-09-25 Falsework

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821556610.XU CN208792760U (en) 2018-09-25 2018-09-25 Falsework

Publications (1)

Publication Number Publication Date
CN208792760U true CN208792760U (en) 2019-04-26

Family

ID=66210580

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821556610.XU Active CN208792760U (en) 2018-09-25 2018-09-25 Falsework

Country Status (1)

Country Link
CN (1) CN208792760U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110528396A (en) * 2019-09-24 2019-12-03 中铁十六局集团有限公司 Supporting apparatus for beam sections
CN111424970A (en) * 2019-01-09 2020-07-17 湖南好快省建筑科技有限公司 Method for constructing aluminum template supporting system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111424970A (en) * 2019-01-09 2020-07-17 湖南好快省建筑科技有限公司 Method for constructing aluminum template supporting system
CN110528396A (en) * 2019-09-24 2019-12-03 中铁十六局集团有限公司 Supporting apparatus for beam sections

Similar Documents

Publication Publication Date Title
CN104196235B (en) A kind of movable stencil supports truss and constructional method thereof
CN106801510B (en) Early dismantling system for plastic template
CN211114845U (en) Steel structure support frame for building engineering
CN208792760U (en) Falsework
CN102031868A (en) Building construction erecting formwork
CN201428249Y (en) Building template supporting structure
CN202672722U (en) Supporting structure for beam bottom template of pouring beam
CN112047251A (en) Auxiliary type installation equipment for road and bridge embedded parts
CN203640266U (en) Building template system
CN216840604U (en) Plane supporting unit for beam formwork and formwork supporting system
CN206971724U (en) A kind of construction engineering top board template support component
CN100387797C (en) Building template
CN211119239U (en) Tool for construction of solar street lamp
CN209924441U (en) Adjustable bracket of formwork support
CN207934203U (en) Modularization pre-embedded steel slab
CN206220116U (en) Factory building upright post basic
CN205894714U (en) Post is fixed and correcting unit temporarily
CN201635419U (en) Formwork support for steel deposit concrete
CN217299857U (en) Building aluminum formwork supporting device
CN209891763U (en) Support that building engineering used
CN219638391U (en) Standard plane multi-clamping template for water inlet tower construction
CN209817418U (en) Mould hanging device
CN220725771U (en) A plurality of design operation frames of establishing on aluminium mould back of body is stupefied
CN219887673U (en) Integral supporting system with hand-operated lifting device
CN218176636U (en) Beam slab supporting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant