CN205894714U - Post is fixed and correcting unit temporarily - Google Patents

Post is fixed and correcting unit temporarily Download PDF

Info

Publication number
CN205894714U
CN205894714U CN201620476929.6U CN201620476929U CN205894714U CN 205894714 U CN205894714 U CN 205894714U CN 201620476929 U CN201620476929 U CN 201620476929U CN 205894714 U CN205894714 U CN 205894714U
Authority
CN
China
Prior art keywords
connector
pin
bolt
hole
rotatable support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620476929.6U
Other languages
Chinese (zh)
Inventor
赵应许
叶艳霞
刘卫军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Dongyan intelligent design and Research Institute Co.,Ltd.
Original Assignee
Dongfeng Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongfeng Design Institute Co Ltd filed Critical Dongfeng Design Institute Co Ltd
Priority to CN201620476929.6U priority Critical patent/CN205894714U/en
Application granted granted Critical
Publication of CN205894714U publication Critical patent/CN205894714U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a post is fixed and correcting unit temporarily belongs to industrial buildings construction technical field. Including stay bolt, four first connecting pieces, four second connecting pieces and rotatable support piece, four first connecting piece one end are articulated through a first pin, open at first pin center has the bolt hole, stay bolt upper portion is located through the bolt borehole jack to four first connecting piece one end, four second connecting piece one end are articulated through a first pin, the stay bolt lower part is located to the bolt borehole jack of four second connecting piece one end on through first pin, per two the other end and a rotatable support piece of the first connecting piece other end and per two second connecting pieces are articulated through a second pin jointly, two all be equipped with on the rotatable support piece and be used for supporting the backup pad on the lateral wall on rim of a cup basis. The utility model discloses at the in -process of tensioning, can be better with the contact of cylinder with the basic lateral wall of rim of a cup, play fine supporting role.

Description

A kind of post is fixed and correcting unit temporarily
Technical field
This utility model is related to industrial building construction technical field and in particular to a kind of post is fixed and correcting unit temporarily.
Background technology
With expanding economy, steel construction application is more and more, in industrial building, the application of steel construction more very, industrial factory Room typically adopts the version such as door steel, steel frame, steel truss, and when load is larger, the column foundation of these versions is typically adopted With plug-in type rim of a cup basis.During site operation, the temporarily fixing and correction of post is usually to fill in bolt (steel in rim of a cup Wedge), then bolt (gad) is impacted thus reaching jam-packed and playing interim using the weight of sledgehammer etc by workmen Fixing purpose, during correction post position, workmen needs the bolt (gad) of impact according to the set direction that pillar offsets, The method is simple to operate, but wooden unit can produce larger deformation due to being squeezed, and so that the post position after correction is occurred partially Move, in addition the power of impact bolt (gad) is difficult to control it is more difficult to realize the correction of post, generally requires through multi-pass operation Enable.
Utility model content
The purpose of this utility model is aiming at the defect of prior art, provides a kind of post temporarily fixing and correcting unit. To solve deficiency in fixing and correcting for the existing work progress center pillar temporarily.
The technical solution adopted in the utility model is: include stay bolt, four the first connectors, four the second connectors, And rotatable support, by first pin-hinges, described first pin center is opened for described four first connector one end There is bolt hole, described four first connector one end are sheathed on stay bolt top by bolt hole;Described four the second connectors First pin-hinges are passed through in one end, and described four second connector one end are sheathed on length by the bolt hole on the first pin Bolt bottom;The other end of the first connector other end and each two second connector described in each two and a rotatable support Part is commonly through second pin-hinges;Wherein, two described first connectors and two described second connectors are in long spiral shell The side of bolt forms tetragon, and the first connector described in another two is another in stay bolt with the second connector described in another two Side forms tetragon;Gripper shoe on the side wall basic for being supported on rim of a cup is equipped with two described rotatable support.
Further preferred structure, described first connector includes the first side plate of two block gaps settings, described two pieces the Pass through the first arc between the same side of side plate to connect, described first side plate two ends have first through hole.
Further preferred structure, described second connector includes the second side plate of two block gaps settings, described two pieces the Pass through the second arc between the same side of two side plates to connect, described second side plate two ends have the second through hole.
Further preferred structure, described rotatable support includes gripper shoe, and described gripper shoe both sides are connected to Connect side, described connection side has for being sheathed on the third through-hole on the second pin.
Further preferred structure, described stay bolt top has and screws hole.
This utility model can be rotated due to rotatable support, during tensioning, can preferable and cylinder and cup The contact of mouth foundation side wall, plays good supporting role.
Brief description
Fig. 1 is structural representation of the present utility model;
Fig. 2 is top view of the present utility model;
Fig. 3 is upward view of the present utility model;
Fig. 4 is side view of the present utility model;
Fig. 5 is the first connecting-piece structure schematic diagram;
Fig. 6 is the second connecting-piece structure schematic diagram;
Fig. 7 is rotatable support structural representation;
Fig. 8 is the first pin feature schematic diagram;
Fig. 9 is this utility model use state schematic diagram;
Figure 10 is this utility model another use state schematic diagram.
In figure, 1- stay bolt (1.1- screws hole), 2- first connector (2.1- first side plate, 2.2- first arc, 2.3- first through hole), 3- second connector (3.1- second side plate, 3.2- second arc, 3.3- second through hole), 4- rotatable Support member (4.1- gripper shoe, 4.2- third through-hole), 5- first pin (5.1- bolt hole), 6- second pin, 7- post, 8- cup Mouthful.
Specific embodiment
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings, is easy to clearly Solution this utility model, but they do not constitute restriction to this utility model.
As shown in Fig. 1 Fig. 4, this utility model include stay bolt 2, four the second connectors 3 of 1, four the first connectors, With rotatable support 4, described stay bolt 1 top has and screws hole 1.1, and described four the first connector 2 one end pass through one First pin 5 is hinged, and described first pin 5 center has bolt hole 5.1, and bolt is passed through in described four the first connector 2 one end Hole 5.1 is sheathed on stay bolt 1 top;Described four the second connector 3 one end are hinged by first pin 5, described four The bolt hole 5.1 that second connector 3 one end is passed through on the first pin 5 is sheathed on stay bolt 1 bottom;Wherein, described in each two The other end of a connection piece 2 other end and each two the second connector 3 and a rotatable support 4 are commonly through one second Pin 6 is hinged;Wherein, two described first connectors 2 and two described second connectors 3 form four in the side of stay bolt 1 Side shape, described in another two, the first connector 2 and the second connector 3 described in another two form tetragon in the opposite side of stay bolt 1; Be equipped with two described rotatable support 4 for be supported on rim of a cup 8 basis side wall on gripper shoe 4.1.
In technique scheme, in conjunction with shown in Fig. 5 Fig. 8, described first connector 2 includes the first of two block gap settings Side plate 2.1, is connected by the first arc 2.2 between the same side of described two piece of first side plate 2.1, described first side plate 2.1 Two ends have first through hole 2.3.Described second connector 3 include two block gaps setting the second side plate 3.1, described two pieces Connected by the second arc 3.2 between the same side of second side plate 3.1, described second side plate 3.1 two ends have second Through hole 3.3.First connector 2 to the second connector 3 is short, so in casting concrete, facilitates the movement of boom.If first If connector 2 is oversize, in cloth, also need boom is too high, construction is inconvenient, so making short lower length.Described can Rotatable support 4 includes gripper shoe 4.1, and described gripper shoe 4.1 both sides are connected to connection side, and described connection side has use In the third through-hole 4.2 being sheathed on the second pin 6.
As shown in Fig. 9 Figure 10, this utility model using method:
1st, post 7 lifts, is lifted into post 7 in rim of a cup 8 basis;
2nd, after insertion rim of a cup 8, first adjust absolute altitude, reverse in adjustment, adjust perpendicularity;
3rd, do rough adjustment using instruments such as crowbar, jack;
4th, temporarily fixing and correcting unit are put in rim of a cup 8, one of rotatable support 4 is supported on post 7;
5th, another rotatable support 4 is supported on the side wall on rim of a cup 8 basis;
6th, screw the stay bolt 1 with turn-knob hole using steel rod;
7th, cooperation theodolite do thin portion adjustment (put according to inclination and turn round hole stay bolt 1 to, the corresponding band surveyed of twisting, one Cylinder places 2 temporarily fixing and correcting units, as shown in figure 9, or placing 8 temporarily fixing and correcting units, such as Figure 10 Shown);
8th, after the solidification of rim of a cup 8 casting concrete, unclamp stay bolt 1, take out temporarily fixing and correcting unit.
The content that this specification is not described in detail belongs to prior art known to professional and technical personnel in the field.

Claims (5)

1. a kind of post is temporarily fixing and correcting unit it is characterised in that include stay bolt (1), four the first connectors (2), four Individual second connector (3) and rotatable support (4), first pin is passed through in described four the first connector (2) one end (5) hinged, described first pin (5) center has bolt hole (5.1), and bolt is passed through in described four the first connector (2) one end Hole (5.1) is sheathed on stay bolt (1) top;Described four the second connector (3) one end are hinged by first pin (5), The bolt hole (5.1) that described four the second connector (3) one end are passed through on the first pin (5) is sheathed on stay bolt (1) bottom;Often The other end of two described first connector (2) other ends and each two second connector (3) and a rotatable support (4) Hinged commonly through second pin (6);Wherein, two described first connectors (2) and two described second connectors (3) Form tetragon, the first connector (2) described in another two and the second connector (3) described in another two in the side of stay bolt (1) Form tetragon in the opposite side of stay bolt (1);It is equipped with for being supported on rim of a cup on two described rotatable support (4) (8) gripper shoe (4.1) on the side wall on basis.
2. a kind of post according to claim 1 is temporarily fixing and correcting unit is it is characterised in that described first connector (2) include first side plate (2.1) of two block gap settings, between the same side of described two piece of first side plate (2.1), pass through first Arc (2.2) connects, and described first side plate (2.1) two ends have first through hole (2.3).
3. a kind of post according to claim 1 is temporarily fixing and correcting unit is it is characterised in that described second connector (3) include second side plate (3.1) of two block gap settings, between the same side of described two piece of second side plate (3.1), pass through second Arc (3.2) connects, and described second side plate (3.1) two ends have the second through hole (3.3).
4. a kind of post according to claim 1 is temporarily fixing and correcting unit is it is characterised in that described rotatable support (4) include gripper shoe (4.1), described gripper shoe (4.1) both sides are connected to connection side, and described connection side has for covering Third through-hole (4.2) on the second pin (6).
5. a kind of post according to claim 1 is temporarily fixing and correcting unit is it is characterised in that described stay bolt (1) pushes up Portion has and screws hole (1.1).
CN201620476929.6U 2016-05-23 2016-05-23 Post is fixed and correcting unit temporarily Active CN205894714U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620476929.6U CN205894714U (en) 2016-05-23 2016-05-23 Post is fixed and correcting unit temporarily

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620476929.6U CN205894714U (en) 2016-05-23 2016-05-23 Post is fixed and correcting unit temporarily

Publications (1)

Publication Number Publication Date
CN205894714U true CN205894714U (en) 2017-01-18

Family

ID=57765784

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620476929.6U Active CN205894714U (en) 2016-05-23 2016-05-23 Post is fixed and correcting unit temporarily

Country Status (1)

Country Link
CN (1) CN205894714U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113062458A (en) * 2021-04-02 2021-07-02 西南科技大学 Anchor and wood structure connecting joint with same

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113062458A (en) * 2021-04-02 2021-07-02 西南科技大学 Anchor and wood structure connecting joint with same
CN113062458B (en) * 2021-04-02 2022-06-03 西南科技大学 Ground tackle and wood structure connecting node with same

Similar Documents

Publication Publication Date Title
CN107859173A (en) Steel house with scalable crossbeam
CN102912972B (en) Multifunctional lifting steel platform switching jig and construction method
CN208137457U (en) Discharging platform is used in a kind of construction of assembled architecture
CN207144503U (en) A kind of thickness of concrete floor control device
CN201116267Y (en) Externally hung supporting device for internally climbing tower crane
CN103572834B (en) A kind of large-span arch structure and construction method thereof
CN205894714U (en) Post is fixed and correcting unit temporarily
CN210622363U (en) Building structure reinforcing apparatus
CN208792760U (en) Falsework
CN208023413U (en) A kind of linear adjuster of track girder flexural pivot
CN207420082U (en) A kind of living area three ply board room
CN208668662U (en) The exposed steel kind design of the highly energy-consuming that can be quickly repaired after shake
CN206220116U (en) Factory building upright post basic
CN212317481U (en) Supporting claw for building template engineering
CN220115706U (en) Cantilever outer frame
CN219174017U (en) Construction device for concrete superposed beam
CN220522100U (en) Leveling device after tenon damage
CN214786280U (en) A consolidate bearing structure for building engineering
CN108915151A (en) A kind of new type roof truss construction structure
CN218492792U (en) Big breadth of a board stone material pendant with adjustable
CN220144611U (en) Multifunctional construction equipment for pile foundation
CN216713841U (en) Template fixing device is used in building engineering construction
CN203625878U (en) Dynamic compactor and gantry device thereof
CN207633843U (en) It is a kind of can fast erecting electric pole
CN209129389U (en) The limiting device of the exposed steel bar of component

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220106

Address after: 430056, No. 1, Dongfeng central, No. three Dongfeng Road, Wuhan economic and Technological Development Zone, Hubei, Wuhan, A

Patentee after: Wuhan Dongyan intelligent design and Research Institute Co.,Ltd.

Address before: 430056 Wuhan City, Hubei Province block a, Donghe center, No. 1, Dongfeng Third Road, Wuhan Economic and Technological Development Zone, Wuhan City, Hubei Province

Patentee before: DONGFENG DESIGN INSTITUTE Co.,Ltd.