CN208792625U - High-strength recycled concrete superposed column - Google Patents

High-strength recycled concrete superposed column Download PDF

Info

Publication number
CN208792625U
CN208792625U CN201820632893.5U CN201820632893U CN208792625U CN 208792625 U CN208792625 U CN 208792625U CN 201820632893 U CN201820632893 U CN 201820632893U CN 208792625 U CN208792625 U CN 208792625U
Authority
CN
China
Prior art keywords
strength
steel
steel pipe
hole
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820632893.5U
Other languages
Chinese (zh)
Inventor
张建伟
李翔宇
曹万林
董宏英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing University of Technology
Original Assignee
Beijing University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing University of Technology filed Critical Beijing University of Technology
Priority to CN201820632893.5U priority Critical patent/CN208792625U/en
Application granted granted Critical
Publication of CN208792625U publication Critical patent/CN208792625U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The utility model relates to technical field of structural engineering, disclose a kind of high-strength recycled concrete superposed column, the superposed column includes steel pipe, the first high-strength regeneration concrete being cast in the steel pipe and the second high-strength regeneration concrete being cast in outside the steel pipe, further includes: steel tie;The steel tie passes through the steel pipe and is divided into first part, second part and Part III by the steel pipe;The second part is anchored in the described first high-strength regeneration concrete, and the first part and Part III are anchored at respectively in the described second high-strength regeneration concrete.The high-strength recycled concrete superposed column of the utility model effectively can connect the concrete inside and outside steel pipe to form entirety, make the cooperative compensating when resisting horizontal earthquake action jointly of the concrete in the concrete and steel pipe of steel pipe periphery, improves recoverability after the shock resistance and shake of superposed column.

Description

High-strength recycled concrete superposed column
Technical field
The utility model relates to technical field of structural engineering, more particularly to a kind of high-strength recycled concrete superposed column.
Background technique
With construction industry high speed development, the demand of sandstone aggregate increasingly increases;Old building dismounting simultaneously and nature Disaster damage produces a large amount of building wastes.Discarded concrete is broken, processing forms recycled aggregate, for matching preparation, regeneration coagulation Soil both can solve natural aggregate resources problem in short supply, protect the ecological environment in the aggregate place of production, and can solve the heap of urban waste It puts, take up an area and the problems such as environmental pollution, there is significant society, economical and environmentally friendly benefit, therefore recycled concrete is recognized For the effective measures for being raising building waste renewable resources utilization rate.High-strength regeneration concrete is in high-rise and super high-rise building, bridge Beam engineering, unique construction engineering field have vast potential for future development, are self-possessed low, to dead load is reduced, improve anti-seismic performance Favorably.But since the shrinkage and creep of high-strength regeneration concrete deforms larger, durability is poor, the discretenesses of various mechanical properties compared with Greatly, it is not yet promoted the use of at present in the area of providing fortification against earthquakes in China.
Column is main vertical supporting member in skyscraper.Steel tube concrete superposed column refers to the steel pipe in the middle part of by section Column made of reinforced concrete combination outside concrete and steel pipe has big bearing capacity height, rigidity, fire resistance and anti-seismic performance The advantages that good.It is combined using high-strength regeneration concrete and superposed column, the advantage that can use combined member mechanical property is effective The mechanical deficiencies for making up regeneration concrete are the improvement to regeneration concrete on layer of structure.But pipe inner concrete pours Belong to concealed work, the shrinkage and creep deformation of high-strength regeneration concrete is larger, discreteness is larger, concrete concertedness inside and outside steel pipe Can be poor, pouring quality and anti-seismic performance are difficult to ensure, quality testing is also more taken a lot of work.
Utility model content
(1) technical problems to be solved
Purpose of the utility model is to solve high-strength regeneration concrete shrinkage and creeps existing in the prior art to deform Greatly, the problem of discreteness is big, and concrete synergisticing performance is poor inside and outside steel pipe, and superposed column construction quality is difficult to ensure provides a kind of high Strong recycled concrete superposed column.
(2) technical solution
In order to solve the above-mentioned technical problem, the utility model provides a kind of high-strength recycled concrete superposed column, including steel pipe, The high-strength regeneration concrete of first be cast in the steel pipe and the second high-strength regeneration concrete being cast in outside the steel pipe, also It include: steel tie;The steel tie passes through the steel pipe and is divided into first part, second part and third by the steel pipe Part;The second part is anchored in the described first high-strength regeneration concrete, and the first part and Part III distinguish anchor Gu in the described second high-strength regeneration concrete.
Further, the steel pipe walls are equipped with first through hole and the second through-hole, and the first part of the steel tie wears The first through hole is crossed to be connected with the second part, the second part of the steel tie pass through second through-hole with it is described Part III is connected.
Further, the first part of the steel tie, second part and Part III are integral.
Further, the high-strength recycled concrete superposed column includes multiple steel ties;The steel pipe walls are equipped with more Arrange first through hole corresponding with the steel tie and the second through-hole;The first part of each steel tie passes through described the One through-hole is connected with the second part, and the second part of the steel tie passes through corresponding second through-hole and the third Part is connected.
Further, often ranked first through-hole and the second through-hole be in same level, and first through hole described in upper row and The line of second through-hole and the line of first through hole described in lower row and the second through-hole are mutually perpendicular to.
Further, first through hole and the second through-hole described in every row are set along the diametrically opposite of the cross section of the steel pipe It sets.
Further, the strength grade of the described first high-strength regeneration concrete is C50-C80, and the second high-strength regeneration is mixed The strength grade for coagulating soil is C40-C60, and the regeneration high-strength lower than described second of the intensity of the second high-strength regeneration concrete is mixed Coagulate the intensity of soil.
It further, further include that the steel reinforcement cage formed is bound by multiple vertical muscle and stirrup, the steel reinforcement cage is arranged described The periphery of steel pipe;The one end of first part and Part III far from the second part of the steel tie respectively with the steel Muscle cage is connected;Or
The first part of the steel tie and Part III are formed far from one end end clod wash of the second part to be hooked Shape structure, and the vertical muscle with the steel reinforcement cage opposite sides links respectively.
Further, the diameter D of the steel pipe is the 1/2 of the high-strength recycled concrete superposed column pillar height, and D >= 200mm;Thickness H >=120mm of the steel pipe, and D/H≤75.
(3) beneficial effect
A kind of high-strength recycled concrete superposed column provided by the utility model, the high-strength recycled concrete superposed column is using high Strong regeneration concrete and superposed column combine, and the advantage that can use combined member mechanical property effectively makes up regeneration concrete Mechanical deficiencies, the effect of contraction of steel pipe can be effectively improved the brittleness problems of high-strength regeneration concrete, reduce recycled aggregate to group The influence of stiffness of structural member and mechanical property discreteness is closed, while by the way that steel tie across steel pipe, to be partially anchored at outside steel pipe, Part is anchored in steel pipe, effectively can connect the concrete inside and outside steel pipe to form entirety, make the concrete of steel pipe periphery with Concrete in the steel pipe cooperative compensating when resisting horizontal earthquake action jointly, the shrinkage and creep for reducing high-strength regeneration concrete become Shape enhances to the effect of contraction of concrete inside and outside pipe and the shear resistance in section, avoids concrete when stress is larger and steel pipe Wall disengages, and delays the cracking of concrete and the buckling of steel pipe, improves recoverability after the shock resistance and shake of superposed column.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of high-strength recycled concrete superposed column of the utility model embodiment;
Fig. 2 is the overlooking structure diagram of the high-strength recycled concrete superposed column of Fig. 1;
Fig. 3 is the schematic view of the front view of the high-strength recycled concrete superposed column of Fig. 1.
Specific embodiment
With reference to the accompanying drawings and examples, specific embodiment of the present utility model is described in further detail.Below Example is not intended to limit the scope of the present invention for illustrating the utility model.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified Dress ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integrally Connection;It can be mechanical connection, be also possible to be electrically connected;Can be directly connected, can also indirectly connected through an intermediary, It can be the connection inside two elements.For the ordinary skill in the art, above-mentioned art can be understood with concrete condition The concrete meaning of language in the present invention.
Fig. 1 gives a kind of structural schematic diagram of high-strength recycled concrete superposed column of the utility model.The utility model A kind of high-strength recycled concrete superposed column that embodiment provides, as shown in Figure 1, comprising: steel pipe 1 is cast in the steel pipe 1 First high-strength regeneration concrete 3, the second high-strength regeneration concrete 4 being cast in outside the steel pipe 1 and steel tie 2;It is described Steel tie 2 passes through the steel pipe 1 and is divided by the steel pipe 1 for first part 21, second part 22 and Part III 23;It is described Second part 22 is anchored in the described first high-strength regeneration concrete 3, and the first part 21 and Part III 23 anchor respectively In the described second high-strength regeneration concrete 4.
Wherein, the high-strength regeneration concrete of casting, the effect of contraction of steel pipe 1 improve high-strength regeneration concrete in steel pipe 1 Brittleness and discreteness, meanwhile, the compression strength of pipe inner concrete is increased substantially, High Strength Concrete Under Compressive Cyclic Loading intensity is given full play to High advantage increases use space to reduce the sectional dimension of column;Under axis pressure and horizontal earthquake action, due to steel pipe 1 With the presence of concrete, process of the superposed column from surrender to destruction is extended, the turning power of styletable plastic hinge is improved, makes to fold Zygostyle has good ductility and energy dissipation capacity, and the degree of safety of building is higher, more conducively pushes the popularization and use of regeneration concrete, Preferably adapt to energy conservation type, environmentally friendly social development demand.But due to 1 inner concrete of steel pipe pour belong to it is hidden Engineering is covered, the shrinkage and creep deformation of high-strength regeneration concrete is larger, discreteness is larger, and concrete synergisticing performance is poor inside and outside steel pipe 1, Its pouring quality and anti-seismic performance are difficult to ensure that quality testing is also more taken a lot of work, mixed to regeneration high-strength inside and outside steel pipe 1 in order to enhance Coagulate soil effect of contraction and section shear resistance, using steel tie 2 pass through 1 part of steel pipe be anchored at first it is high-strength again In growing concrete 3, be partially anchored in the second high-strength regeneration concrete 4, make the first high-strength regeneration concrete 3 and second it is high-strength again It is whole that the connection of growing concrete 4 forms a stress.
First part 21, second part 22 and the Part III 23 of steel tie 2 can connect and be integral, and can be straight steel The reinforcing bar of muscle or other irregular shapes, diameter range preferably in 4mm-8mm, the present embodiment to the shape of steel tie 2 and Diameter is not specifically limited.First high-strength regeneration concrete 3 and the second high-strength regeneration concrete 4 are high-strength regeneration coagulation respectively Soil, the strength grade range of the first high-strength regeneration concrete 3 is preferably in C50-C80, the intensity etc. of the second high-strength regeneration concrete 4 Grade range can mix appropriate steel fibre in the second high-strength regeneration concrete 4 preferably outside C40-C60, steel pipe 1 to improve ductility, Between 30%-60%, fine aggregate should not replace recycled concrete coarse aggregate Replacement rate used.
It is general in view of the core that 1 inner concrete of steel pipe is superposed column, in practice, in steel pipe 1 first it is high-strength again 3 intensity of growing concrete is higher than the second high-strength regeneration concrete 4 outside steel pipe 1, but the present embodiment is not construed as limiting this, outside steel pipe 1 The second high-strength regeneration concrete semi-finals degree be slightly below the first high-strength 3 intensity of regeneration concrete in steel pipe 1, steel pipe 1 can be reduced The axis pressure that peripheral armored concrete part undertakes makes it preferably undertake most horizontal force action in earthquake, improves The ductility of superposed column makes full use of the anti-pressure ability of core concrete filled steel tube, guarantees that sound construction does not collapse, reaches peripheral reinforcing bar Concrete and core concrete filled steel tube cooperative compensating and the effect for giving full play to respective drag.
" passing through " described above refers to that steel tie 2 is penetrated by the side of steel pipe 1 and is pierced by from the other side of steel pipe 1, draws The part (second part 22) of knot reinforcing bar 2 is anchored in the first high-strength regeneration concrete 3, part (first part 21 and third portion Divide and 23) be anchored in the second high-strength regeneration concrete 4, so that the high-strength regeneration concrete inside and outside steel pipe 1 be made to be linked together, makes steel The first high-strength regeneration concrete 3 in the second high-strength regeneration concrete 4 and steel pipe 1 of 1 periphery of pipe is resisting horizontal earthquake jointly Cooperative compensating when effect, the settable multiple mutually isostructural steel ties 2 of the present embodiment, so that the second high-strength regeneration concrete 4 It is stronger reliable with the connection of the first high-strength regeneration concrete 3.Side and the other side herein is preferably opposite two sides, with steel The central axes of pipe 1 are line of symmetry, and side and the other side are that axis center is symmetrical.For more preferably, steel tie 2 can be with steel pipe 1 Central axes intersection, to obtain better stress integral structure.In addition, in some cases, steel tie 2, which can have, certain to incline Gradient might not be each perpendicular to the setting of 1 direction of steel pipe.More specific expansion can hereafter be done.
A kind of high-strength recycled concrete superposed column provided by the embodiment of the utility model using high-strength regeneration concrete and is folded Zygostyle combines, and the advantage that can use combined member mechanical property effectively makes up the mechanical deficiencies of regeneration concrete, steel pipe 1 Effect of contraction can be effectively improved the brittleness problems of high-strength regeneration concrete, reduce recycled aggregate to combined member rigidity and mechanics The influence of performance discreteness, while by the way that steel tie 2 is passed through steel pipe 1, it is partially anchored at outside steel pipe 1, is partially anchored at steel It in pipe 1, effectively can connect the concrete inside and outside steel pipe 1 to form entirety, in the concrete and steel pipe 1 for making the periphery of steel pipe 1 Concrete cooperative compensating when resisting horizontal earthquake action jointly reduces the shrinkage and creep deformation of high-strength regeneration concrete, enhancing The shear resistance of effect of contraction and section to concrete inside and outside pipe avoids concrete from disengaging when stress is larger with steel pipe walls, Delay the cracking of concrete and the buckling of steel pipe, improves recoverability after the shock resistance and shake of superposed column.
Based on the above embodiment, as a kind of preferred embodiment, referring to Fig. 1 and Fig. 3,1 wall of steel pipe is equipped with first Through-hole 11 and the second through-hole 12, the first part 21 of the steel tie 2 pass through the first through hole 11 and the second part 22 are connected, and the second part 22 of the steel tie 2 passes through second through-hole 12 and is connected with the Part III 23.
Wherein, for facilitating steel tie 2 to pass through steel pipe 1, described first is logical for the first through hole 11 and the second through-hole 12 The positional relationship and quantity of hole 11 and the second through-hole 12 can pass through the mode of steel pipe 1 with steel tie 2 and quantity is configured, example Such as, steel tie 2 is inserted through steel pipe 1 along the diametrical direction of steel pipe 1, then the first through hole 11 and the second through-hole 12 can edges The diametrically opposite setting of steel pipe 1, the present embodiment are not construed as limiting this, the diameter of the first through hole 11 and the second through-hole 12 For range preferably in 30-40mm, the present embodiment is also not construed as limiting this.
First through hole 11 and the second through-hole 12 is arranged in the present embodiment on 1 wall of steel pipe, not only facilitates wearing for steel tie 2 It crosses, can also greatly improve construction quality under the premise of faint to 1 strength reduction of steel pipe, it is high-strength convenient for pouring in steel pipe 1 first The defects of being vented when regeneration concrete 3, mitigating inside concrete microcrack, bubble guarantees pouring quality.
The first high-strength regeneration concrete 3 and the second high-strength regeneration concrete 4 are connected in order to further increase steel tie 2 Intensity improves the connection reliability of concrete inside and outside steel pipe 1, based on the above embodiment, as a kind of preferred embodiment, the height Strong recycled concrete superposed column includes multiple steel ties 2;1 wall of steel pipe is equipped with multiple rows of corresponding with the steel tie 2 First through hole 11 and the second through-hole 12;It often ranked first through-hole 11 and the second through-hole 12 be in same level, and upper row institute The line of the line and first through hole 11 described in lower row and the second through-hole 12 of stating first through hole 11 and the second through-hole 12 is mutually perpendicular to; The first part 21 of each steel tie 2 passes through the first through hole 11 and is connected with the second part 22, the drawknot The second part 22 of reinforcing bar 2 passes through corresponding second through-hole 12 and is connected with the Part III 23.
Specifically, often ranked first at through-hole 11 and the second through-hole 12 in the same horizontal line, and on ranked first through-hole 11 with The line of second through-hole 12 and under ranked first through-hole 11 and the line of the second through-hole 12 is mutually perpendicular to, described in even more preferably every row Along the diametrically opposite setting in the cross section of the steel pipe 1, i.e., each steel tie 2 is right for first through hole 11 and the second through-hole 12 The first through hole 11 being in same level and the second through-hole 12 should be passed through, and upper and lower steel tie 2 is staggeredly set in cross It sets, which can enhance the high-strength regeneration concrete of first be cast in steel pipe 13 and be cast in outside steel pipe 1 and is second high-strength The shear resistance of regeneration concrete 4 improves shock resistance.
The pouring structure for generally enhancing concrete, need to first make steel reinforcement cage, then the casting concrete in steel reinforcement cage, be based on Above-described embodiment further includes being formed by multiple vertical muscle 51 and the binding of stirrup 52 referring to Fig. 1 and Fig. 2 as a kind of preferred embodiment Steel reinforcement cage 5, the periphery of the steel pipe 1 is arranged in the steel reinforcement cage 5;The first part 21 and third portion of the steel tie 2 23 one end far from the second part 22 are divided to be connected respectively with the steel reinforcement cage 5;Or
One end end clod wash of first part 21 and Part III 23 far from the second part 22 of the steel tie 2 Hook arrangement is formed, and the vertical muscle 51 with 5 opposite sides of steel reinforcement cage links respectively.
Specifically, the periphery that steel pipe 1 is arranged in muscle 51 is indulged, is formed and is centered around outside steel pipe 1 by the binding of stirrup 52 Steel reinforcement cage 5, the first high-strength regeneration concrete 3 are cast in the steel pipe 1, and the second high-strength regeneration concrete 4 is cast in the steel In muscle cage 5.The both ends of steel tie 2 are separately fixed on steel reinforcement cage 5 or the both ends clod wash of steel tie 2 forms hook and hooks It is connected on the vertical muscle 51 of 5 two sides of steel reinforcement cage.To keep structure stronger, stirrup 52 can also exist vertical muscle 51 and the binding of steel tie 2 Together, steel tie 2, the first high-strength regeneration concrete 3 and the second high-strength regeneration concrete 4 can be made to be sufficiently formed firm one Body can reduce the shrinkage and creep deformation of regeneration concrete, enhance to the effect of contraction of concrete inside and outside pipe and the shearing resistance in section Ability delays the cracking of concrete and the buckling of steel pipe, further increases recoverability after the shock resistance and shake of superposed column.
Based on the above embodiment, as a kind of preferred embodiment, the diameter D of the steel pipe is the high-strength regeneration concrete The 1/2 of superposed column pillar height, and D >=200mm;Thickness H >=120mm of the steel pipe, and D/H≤75.
Wherein, the high-strength steel of Q345 and the above intensity can be used in steel pipe 1, indulges muscle 51 and uses HRB500 grades or more intensity Reinforcing bar.
1 diameter of steel pipe is 1/2 or so of superposed column pillar height, can effectively improve element bearing capacity and superposed column can be direct Node area is passed through, and the vertical muscle 51 of steel reinforcement cage 5 can directly be anchored at node area, can also pass through outside superposed column, so that section Point processing is relatively simple, improves construction efficiency and quality.
The high-strength recycled concrete superposed column of the utility model embodiment the production method is as follows:
Step S1: prefabricated steel pipe 1 is inserted into basis 6 and is anchored;
Step S2:, will be described in the prefabricated steel reinforcement cage 5 formed by vertical muscle 51 and the binding of stirrup 52 in the periphery of the steel pipe 1 Steel reinforcement cage 5 is inserted into anchoring in described basic 6;
Step S3: steel tie 2 is passed through into the steel pipe 1, is divided by the steel pipe 1 for first part 21, second part 22 With Part III 23;The both ends of the steel tie 2 are respectively fixedly connected on the steel reinforcement cage 5 or the both ends of the steel tie 2 Clod wash forms hook arrangement, and is linked on the vertical muscle 51 of 5 opposite sides of steel reinforcement cage respectively;
Step S4: setting up template outside steel reinforcement cage 5, and the first high-strength regeneration concrete 3 is poured in the steel pipe 1, anchoring The second part 22 of the steel tie 2;The second high-strength regeneration concrete 4 is poured in the steel pipe 1, anchors the drawknot steel The first part 21 of muscle 2 and Part III 23;
Step S5: demoulding maintenance forms high-strength recycled concrete superposed column.
Detailed process is as follows:
Step S1: prefabricated processing steel cylindrical tube 1 beats first through hole 11 every certain vertical distance in tube wall opposite sides With the second through-hole 12, often ranked first at through-hole 11 and the second through-hole 12 in same horizontal line, and on ranked first through-hole 11 and second The line of through-hole 12 ranked first the line of through-hole 11 and the second through-hole 12 in 90 ° of settings under.
Step S2: the steel pipe 1 being inserted into basis 6 and is fixed, and by stirrup 52 and is indulged outside steel pipe 1 by the design size of column The binding of muscle 51 forms rectangular steel reinforcement cage 5, and protrudes into fixed in basis 6.
Step S3: the steel tie 2 by the both ends processed with crotch is successively from first through hole 11 and corresponding second through-hole 12 pass through (or first pass through steel tie 2 from first through hole 11 and corresponding second through-hole 12, then carry out the curved of both ends at the scene Folding, the bending angle at 2 both ends of steel tie can be 90 ° or 180 °, but not limited to this), 2 both ends of steel tie catch on one respectively Root indulges muscle 51, is integrated afterwards with the binding of steel reinforcement cage 5.
Step S4: setting up template outside steel reinforcement cage 5, first pours the first high-strength regeneration concrete 3 in steel pipe 1, then pours The outer second high-strength regeneration concrete 4 of steel pipe 1 pours when vibrating to predetermined absolute altitude that its surface is levelling.
Step S5: demoulding maintenance forms high-strength recycled concrete superposed column.
Details are not described herein for structure same as the previously described embodiments.
The high-strength recycled concrete superposed column of the utility model, gives full play to the performance of superposed column and regeneration concrete material Advantage wears the mode of muscle using punching on steel pipe in hole, improve construction quality, improves stress performance, makes peripheral armored concrete With core concrete filled steel tube when resisting horizontal earthquake action jointly cooperative compensating, improving can after the shock resistance and shake of superposed column Prosthetic.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Within the spirit and principle of utility model, any modification, equivalent replacement, improvement and so on should be included in the utility model Protection scope within.

Claims (8)

1. a kind of high-strength recycled concrete superposed column, including steel pipe, the first high-strength regeneration concrete being cast in the steel pipe With the second high-strength regeneration concrete being cast in outside the steel pipe, which is characterized in that further include: steel tie;The drawknot steel Muscle passes through the steel pipe and is divided into first part, second part and Part III by the steel pipe;The second part is anchored at In the first high-strength regeneration concrete, the first part and Part III are anchored at the described second high-strength regeneration coagulation respectively In soil;
The steel pipe walls are equipped with first through hole and the second through-hole, and the first part of the steel tie passes through the first through hole It is connected with the second part, the second part of the steel tie passes through second through-hole and is connected with the Part III.
2. high-strength recycled concrete superposed column as described in claim 1, which is characterized in that first of the steel tie Divide, second part and Part III are integral.
3. high-strength recycled concrete superposed column as claimed in claim 2, which is characterized in that described high-strength recycled concrete superposed Column includes multiple steel ties;The steel pipe walls are equipped with multiple rows of first through hole corresponding with the steel tie and second and lead to Hole;The first part of each steel tie passes through the first through hole and is connected with the second part, the steel tie Second part pass through corresponding second through-hole and be connected with the Part III.
4. high-strength recycled concrete superposed column as claimed in claim 3, which is characterized in that first through hole described in every row and described Second through-hole is in same level, and first through hole described in the line of first through hole described in upper row and the second through-hole and lower row It is mutually perpendicular to the line of the second through-hole.
5. high-strength recycled concrete superposed column as claimed in claim 4, which is characterized in that first through hole described in every row and second Diametrically opposite setting of the through-hole along the cross section of the steel pipe.
6. high-strength recycled concrete superposed column as described in claim 1, which is characterized in that the first high-strength regeneration concrete Strength grade be C50-C80, the strength grade of the second high-strength regeneration concrete is C40-C60, and described second high-strength The intensity of regeneration concrete is lower than the intensity of the described second high-strength regeneration concrete.
7. high-strength recycled concrete superposed column as claimed in any one of claims 1 to 6, which is characterized in that further include by multiple vertical Muscle and stirrup bind the steel reinforcement cage to be formed, and the periphery of the steel pipe is arranged in the steel reinforcement cage;First of the steel tie Divide and the one end of Part III far from the second part is connected with the steel reinforcement cage respectively;Or
One end end clod wash formation hook knot of first part and Part III far from the second part of the steel tie Structure, and the vertical muscle with the steel reinforcement cage opposite sides links respectively.
8. high-strength recycled concrete superposed column as claimed in claim 7, which is characterized in that the diameter D of the steel pipe is described The 1/2 of high-strength recycled concrete superposed column pillar height, and D >=200mm;Thickness H >=120mm of the steel pipe, and D/H≤75.
CN201820632893.5U 2018-04-28 2018-04-28 High-strength recycled concrete superposed column Expired - Fee Related CN208792625U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820632893.5U CN208792625U (en) 2018-04-28 2018-04-28 High-strength recycled concrete superposed column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820632893.5U CN208792625U (en) 2018-04-28 2018-04-28 High-strength recycled concrete superposed column

Publications (1)

Publication Number Publication Date
CN208792625U true CN208792625U (en) 2019-04-26

Family

ID=66199599

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820632893.5U Expired - Fee Related CN208792625U (en) 2018-04-28 2018-04-28 High-strength recycled concrete superposed column

Country Status (1)

Country Link
CN (1) CN208792625U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108590035A (en) * 2018-04-28 2018-09-28 北京工业大学 High-strength recycled concrete superposed column and preparation method thereof
CN112282213A (en) * 2020-09-09 2021-01-29 华南理工大学 Steel bar regenerated block/aggregate concrete prefabricated column and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108590035A (en) * 2018-04-28 2018-09-28 北京工业大学 High-strength recycled concrete superposed column and preparation method thereof
CN112282213A (en) * 2020-09-09 2021-01-29 华南理工大学 Steel bar regenerated block/aggregate concrete prefabricated column and construction method thereof

Similar Documents

Publication Publication Date Title
CN106012809B (en) Restorative procedure after a kind of steel fibrous composite material concrete combination column and its shake
CN108590035A (en) High-strength recycled concrete superposed column and preparation method thereof
CN109707037A (en) A kind of assembling frame structure Self-resetting dissipative devices and its construction method
CN206385460U (en) Combined floorings
CN206308801U (en) Steel tube binding type steel regeneration concrete post and reinforced beam end plate connecting node
CN106381804B (en) A kind of precast assembly bridge pier and its Joining Technology using U-shaped reinforcement fabrication
CN208668683U (en) The built-in built-in steel plate combined shear wall of presstressed reinforcing steel steel pipe concrete frame
CN208792625U (en) High-strength recycled concrete superposed column
CN108678225A (en) The built-in steel plate combined shear wall of built-in presstressed reinforcing steel steel pipe concrete frame and the practice
CN206800795U (en) A kind of hollow multi-cavity steel tube concrete post
CN106626032A (en) Integral type inner protrusion hollow uplift pile and preparation method thereof
CN104100041A (en) Steel skeleton-steel pipe fiber concrete cross shaped section composite column
CN109577492A (en) A kind of steel sections package concrete column and reinforced beam node connecting structure
CN109537806A (en) A kind of " T-type " partial precast combination beam
CN201722813U (en) Confined masonry structure
CN202610797U (en) Prestress solid concrete precast pile
CN104100042A (en) Steel skeleton-steel pipe fiber concrete T-shaped section composite column
CN106337512A (en) The bottom reinforced concrete-filled steel tubular frame high-strength concrete composite shear wall and manufacturing method
CN206784661U (en) The steel plate concrete combined shear wall of steel plate built in the middle part of the outsourcing of end
CN110042749A (en) UHPC steel tube concrete overlap-type lattice column structure and its construction method
CN207260375U (en) A kind of steel plate concrete combined shear wall
CN106759857B (en) Steel tube regeneration monolith assembling structure
CN205741868U (en) A kind of all-steel-pipe concrete composite bridge
CN103924728B (en) End soap-free emulsion polymeization variable strength reinforced beam
CN105040828B (en) A kind of round steel pipe binding type steel concrete column and steel beam joint structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190426