- CN208792162U CN208792162U CN201821156335.2U CN201821156335U CN208792162U CN 208792162 U CN208792162 U CN 208792162U CN 201821156335 U CN201821156335 U CN 201821156335U CN 208792162 U CN208792162 U CN 208792162U
- Authority
- CN
- China
- Prior art keywords
- bracket
- depth
- width ratio
- door opening
- transfinites
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Gates (AREA)
Abstract
The utility model discloses a kind of brackets that door opening upper bracket depth-width ratio transfinites to set up structure.The structure includes rigid support body (1), is located at depth-width ratio transfinites on door opening (2) bracket (3) and steel pipe (4);The one end for the bracket (3) that the depth-width ratio transfinites is fixed on rigid support body (1), and the two sides for the bracket (3) that the depth-width ratio transfinites are connect by steel pipe (4) with rigid support body (1).The utility model is linked together strutting system relatively independent on door opening and side compared with stabilising system by steel pipe, improve the resistance to capsizing of strutting system relatively independent on door opening, it transfinites existing danger of toppling to solve bracket depth-width ratio, and it is convenient to draw materials, it is easy to accomplish.
Description
Technical field
The utility model relates to brackets to set up building field, and in particular to a kind of bracket that door opening upper bracket depth-width ratio transfinites
Set up structure.
Background technique
In the construction of bracket erection construction, according to code requirement, bracket depth-width ratio be should not be too large, and when depth-width ratio is excessive, be answered
Take strengthening measure.In existing bracket erection construction technology, seldom encounter the case where door opening overhead support depth-width ratio transfinites,
Therefore usually reach the trouble free service operation that the depth-width ratio of bracket does not transfinite by using the bracket for setting up large area.
Then, when in face of include to the bracket erection construction of overpass gate-type beam during, due to beam lower part wherein side
It still needs to be open to traffic, therefore door opening need to be set in bracket lower part.At this point, setting up width without the same expanded stent of image of Buddha conventional stent to drop
Low depth-width ratio.
Therefore, the bracket that how to solve door opening upper bracket depth-width ratio transfinites is set up, and is had important practical significance.
Utility model content
The purpose of this utility model is that in view of the deficiencies of the prior art, providing a kind of door opening upper bracket depth-width ratio transfinites
Bracket set up structure.
The purpose of this utility model is achieved through the following technical solutions.
A kind of bracket that door opening upper bracket depth-width ratio transfinites sets up structure, which includes rigid support body, is located at door opening
The bracket and steel pipe that upper depth-width ratio transfinites;The one end for the bracket that the depth-width ratio transfinites is fixed on rigid support body, described
The two sides for the bracket that depth-width ratio transfinites are connect by steel pipe with rigid support body.
Preferably, the steel pipe is horizontally disposed, and both ends are connected to what the depth-width ratio transfinited by fastener respectively
Bracket and the rigid support body.
It is furthermore preferred that the arrangement of the steel pipe are as follows: every two step is across a piece steel pipe of arrangement along the vertical direction, and along water
Square to every two across arrangement a piece steel pipe.
Still more preferably, along the vertical direction, the cradle top arrangement that steel pipe is transfinited by depth-width ratio on door opening is until door
At hole;In the horizontal direction, the arrangement for the bracket that steel pipe depth-width ratio on door opening transfinites by door opening side until door opening it is another
Side.
Still more preferably, the steel pipe of same level arrangement is attached by slash.
Preferably, the rigid support body includes full framing or cast-in-situ wall.
Preferably, the door opening is the door opening for setting up Bailey beam after setting up steel pipe buttress and being formed, and super with the depth-width ratio
The bracket of limit, which is integrated, sets up structure.
Preferably, the depth-width ratio, which transfinites, is greater than 3 for depth-width ratio.
Compared with prior art, the utility model is had the following advantages and beneficial effects:
Strutting system relatively independent on door opening and side are connected to one compared with stabilising system by steel pipe by the utility model
Rise, improve the resistance to capsizing of strutting system relatively independent on door opening, thus solve bracket depth-width ratio transfinite it is existing
It topples danger, and it is convenient to draw materials, it is easy to accomplish.
Detailed description of the invention
Fig. 1 is to be provided with the structural schematic diagram that the bracket for the overpass gate-type beam that door opening is open to traffic is set up in specific embodiment;
Fig. 2 is A-A cross-sectional view in Fig. 1;
Fig. 3 is that the door opening upper bracket of the overpass gate-type beam in Fig. 1 adds the A-A profile direction structural representation of steel pipe reinforcement
Figure;
Attached drawing mark: 1- full framing, 2- door opening, the bracket that 3- depth-width ratio transfinites, 4- steel pipe, 5- brace, 6- gate-type beam,
7- pier stud, overpass 8.
Specific embodiment
The technical solution of the utility model is described in further detail below in conjunction with specific embodiments and drawings, but this
The protection scope and embodiment of utility model are without being limited thereto.
As shown in Figure 1 and 2, it in specific embodiment, is provided in the overpass gate-type beam that door opening is open to traffic, gate-type beam 6 is by left and right
The pier stud 7 of two sides supports, and is provided with overpass 8 above the left side of gate-type beam 6, constructs to overpass 8 and gate-type beam 6 etc.
In the process, since the lower right of gate-type beam 6 still needs to be open to traffic, therefore it need to be arranged in the lower right of gate-type beam 6 and set up steel pipe buttress after-frame
If the door opening 2 that Bailey beam is formed.Since the height of overpass 8 is higher, so while the lower right of gate-type beam 6 is provided with door opening 2
Reduce support height, but the depth-width ratio for the bracket 3 integrally set up above door opening 2 still exceeds Criterion restriction 3(h/b > 3);And by
In being provided with door opening 2, the bracket 3 that depth-width ratio transfinites can not improve strutting system width to bracket is added along vertical bridge to reduce height
Wide ratio.
In specific embodiment, the bracket that the door opening overhead support depth-width ratio of above-mentioned overpass gate-type beam transfinites sets up structure such as
Shown in Fig. 3, it includes riding upon the firm existing full framing in the left side that the bracket which transfinites, which sets up structure,
1, depth-width ratio transfinites on door opening 2 bracket 3 and steel pipe 4;The one end for the bracket 3 that depth-width ratio transfinites is vertically fixed on full hall
On bracket 1, the two sides for the bracket 3 that depth-width ratio transfinites are connect by steel pipe 4 with firm existing support body 1.
Wherein, steel pipe 4 is horizontally disposed, both ends respectively by fastener be connected to bracket 3 that depth-width ratio transfinites and
Full framing 1;The arrangement of steel pipe 4 are as follows: every two step is across a piece steel pipe of arrangement, and in the horizontal direction every two along the vertical direction
Across a piece steel pipe of arrangement;And along the vertical direction, 3 top layout of bracket that steel pipe 4 is transfinited by depth-width ratio on door opening 2 is until door opening 2
Place;In the horizontal direction, the arrangement for the bracket 3 that the depth-width ratio on door opening 2 of steel pipe 4 transfinites by door opening 2 side until door opening 2 it is another
Side;Meanwhile the steel pipe 4 of same level arrangement is attached by slash 5.
Above-mentioned structure of setting up passes through steel pipe for strutting system and the more stable full framing in side relatively independent on door opening
System links together, and improves the resistance to capsizing of strutting system relatively independent on door opening, so that it is high wide to solve bracket
Than existing danger of toppling of transfiniting, and it is convenient to draw materials, it is easy to accomplish.
Above embodiments are only the preferred embodiment of the utility model, be only that the technical solution of the utility model make into
The detailed description of one step, but the protection scope of the utility model and embodiment are without being limited thereto, it is any without departing from the utility model
Change, combination, deletion, replacement or modification that Spirit Essence is made etc. will be protected within the protection scope of the present utility model.
Claims (8)
1. a kind of bracket that door opening upper bracket depth-width ratio transfinites sets up structure, which is characterized in that the structure includes rigid support body
(1), it is located at the bracket (3) and steel pipe (4) that depth-width ratio transfinites on door opening (2);The one end for the bracket (3) that the depth-width ratio transfinites
It is fixed on rigid support body (1), the two sides for the bracket (3) that the depth-width ratio transfinites pass through steel pipe (4) and rigid support body (1)
Connection.
2. the bracket that a kind of door opening upper bracket depth-width ratio according to claim 1 transfinites sets up structure, which is characterized in that institute
State steel pipe (4) be it is horizontally disposed, both ends are connected to bracket (3) that the depth-width ratio transfinites and described by fastener respectively
Rigid support body (1).
3. the bracket that a kind of door opening upper bracket depth-width ratio according to claim 2 transfinites sets up structure, which is characterized in that institute
State the arrangement of steel pipe (4) are as follows: every two step is across a piece steel pipe of arrangement along the vertical direction, and in the horizontal direction every two across arrangement
A piece steel pipe.
4. the bracket that a kind of door opening upper bracket depth-width ratio according to claim 3 transfinites sets up structure, which is characterized in that edge
Vertical direction, bracket (3) top layout that steel pipe (4) is transfinited by depth-width ratio on door opening (2) is until door opening (2);Along level side
To, the bracket (3) that steel pipe (4) depth-width ratio on door opening (2) transfinites arrangement by the side of door opening (2) until door opening (2) it is another
Side.
5. the bracket that a kind of door opening upper bracket depth-width ratio according to claim 3 or 4 transfinites sets up structure, feature exists
In the steel pipe (4) of same level arrangement is attached by slash (5).
6. the bracket that a kind of door opening upper bracket depth-width ratio according to claim 1 transfinites sets up structure, which is characterized in that institute
Stating rigid support body (1) includes full framing or cast-in-situ wall.
7. the bracket that a kind of door opening upper bracket depth-width ratio according to claim 1 transfinites sets up structure, which is characterized in that institute
Stating door opening (2) is the door opening for setting up Bailey beam after setting up steel pipe buttress and being formed, and the bracket (3) to transfinite with the depth-width ratio is one
Body sets up structure.
8. the bracket that a kind of door opening upper bracket depth-width ratio according to claim 1 transfinites sets up structure, which is characterized in that institute
It states depth-width ratio and transfinites and be greater than 3 for depth-width ratio.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821156335.2U CN208792162U (en) | 2018-07-20 | 2018-07-20 | A kind of bracket that door opening upper bracket depth-width ratio transfinites sets up structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821156335.2U CN208792162U (en) | 2018-07-20 | 2018-07-20 | A kind of bracket that door opening upper bracket depth-width ratio transfinites sets up structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208792162U true CN208792162U (en) | 2019-04-26 |
Family
ID=66202862
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821156335.2U Active CN208792162U (en) | 2018-07-20 | 2018-07-20 | A kind of bracket that door opening upper bracket depth-width ratio transfinites sets up structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208792162U (en) |
-
2018
- 2018-07-20 CN CN201821156335.2U patent/CN208792162U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203923914U (en) | Solely stub bent cap support | |
CN207620351U (en) | A kind of attachment type raise scaffold | |
CN208792162U (en) | A kind of bracket that door opening upper bracket depth-width ratio transfinites sets up structure | |
CN203769305U (en) | Formwork overturning passage plate of steel platform | |
CN208518307U (en) | A kind of fast pylon easy to install of adjustable platform width | |
CN205663282U (en) | Light -duty lattice formula steel column of large capacity | |
CN206503068U (en) | A kind of bridge construction anti-drop device | |
CN106522531B (en) | The support system of one discharge plate buckle type scaffold door opening position bracket | |
CN107675892A (en) | A kind of glass curtain wall monorail hoisting structure | |
CN207063567U (en) | A kind of seat-belt anchorage for standing-seam metal Roof | |
CN105113509A (en) | Tool type foundation pit suspended step ladder | |
CN206987720U (en) | A kind of double shield cage cat ladders | |
CN205957134U (en) | A novel suspended structure for boiler cigarette wind channel | |
CN205711733U (en) | A kind of Bridge guardrail keeping tensioning | |
CN108755710B (en) | Slope protection formwork device with irregular slope reinforced concrete grid structure | |
CN215052132U (en) | Mounting bracket platform for cable-stayed bridge of arc steel tower | |
CN213417607U (en) | Culvert for improving bearing capacity | |
CN218667160U (en) | Telescopic mould hanging bracket | |
CN218346774U (en) | Two-stage turnover plate splicing structure | |
CN215711300U (en) | Tower crane standard festival is from driver's passageway subassembly in area | |
CN220226320U (en) | Telescopic climbing frame operation layer horizontal net device | |
CN211621612U (en) | Building foundation pit supporting structure | |
CN216474569U (en) | Modular pier stud pours and uses ladder cage structure | |
CN220013418U (en) | Single-end suspension bracket structure of continuous beam side span cast-in-situ section | |
CN214246089U (en) | Anti-seismic steel structure K column |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |