CN205711733U - A kind of Bridge guardrail keeping tensioning - Google Patents
A kind of Bridge guardrail keeping tensioning Download PDFInfo
- Publication number
- CN205711733U CN205711733U CN201620263619.6U CN201620263619U CN205711733U CN 205711733 U CN205711733 U CN 205711733U CN 201620263619 U CN201620263619 U CN 201620263619U CN 205711733 U CN205711733 U CN 205711733U
- Authority
- CN
- China
- Prior art keywords
- steel cable
- clip
- housing
- pull bar
- spring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model discloses a kind of Bridge guardrail keeping tensioning, including railing, column, clip, fixing bolt, steel cable, pull bar, housing, spring and steel cable clip, the upper end of described column is connected with the downside of described railing, described clip is fixed on described column by described fixing bolt, one end of described pull bar is provided with stopper, the other end of described pull bar is fixing with described clip to be connected, the stopper of described pull bar is positioned at described housing, described spring is between described housing and described stopper, described steel cable clip is positioned on described housing, described steel cable is connected between two described steel cable clips.Compared with prior art, this utility model passes through spring contraction steel cable, to keep steel cable to be in tensioned state, spring, under the restriction of housing, has certain stroke, therefore, in the case of there is protection effect, also there is buffering effect, there is the value promoted the use of.
Description
Technical field
This utility model relates to a kind of bridge auxiliary device, particularly relates to a kind of Bridge guardrail keeping tensioning.
Background technology
Bridge refers generally to be erected in rivers,lakes and seas, makes the structures that traffic etc. can pass through smoothly.For adapting to the modern times
The transportation industry of high speed development, bridge is also extended to cross over mountain stream, unfavorable geology or meet other traffic needs and making of setting up
Current building more easily.Bridge is typically made up of superstructure, substructure, bearing and attached structure, and top is tied
Structure, also known as bridge span structure, is across the primary structure of obstacle;Substructure includes abutment, bridge pier and basis;Bearing is spanning knot
Load transfer device set by the supporting of structure and bridge pier or abutment;Attached structure then refer to transition slab at bridge head, truncated cone banking, shore protection,
Training works etc..But in prior art, the guardrail of the steel cable type that bridge is used, temperature expand with heat and contract with cold or loosen etc. situation
Under, easily loosen, accordingly, there exist room for improvement.
Utility model content
The purpose of this utility model is that provides a kind of Bridge guardrail keeping tensioning to solve the problems referred to above.
This utility model is achieved through the following technical solutions above-mentioned purpose:
This utility model includes that railing, column, clip, fixing bolt, steel cable, pull bar, housing, spring and steel cable are fixed
Button, the upper end of described column is connected with the downside of described railing, and described clip is fixed on described vertical by described fixing bolt
On post, one end of described pull bar is provided with stopper, and the other end of described pull bar is fixing with described clip to be connected, described pull bar
Stopper is positioned at described housing, and described spring is between described housing and described stopper, and described steel cable clip is positioned at described
On housing, described steel cable is connected between two described steel cable clips.
The beneficial effects of the utility model are:
This utility model is a kind of Bridge guardrail keeping tensioning, and compared with prior art, this utility model passes through spring
Shrinking steel cable, to keep steel cable to be in tensioned state, spring, under the restriction of housing, has certain stroke, therefore, has
In the case of protection effect, also there is buffering effect, there is the value promoted the use of.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is part A partial enlarged drawing in Fig. 1.
In figure: 1-railing, 2-column, 3-clip, 4-fix bolt, 5-steel cable, 6-pull bar, 7-housing, 8-spring, 9-
Steel cable clip.
Detailed description of the invention
The utility model is described in further detail below in conjunction with the accompanying drawings:
As shown in Figure 1: this utility model includes railing 1, column 2, clip 3, fixing bolt 4, steel cable 5, pull bar 6, shell
Body 7, spring 8 and steel cable clip 9, the upper end of column 2 is connected with the downside of railing 6, and clip 3 is fixed by fixing bolt 4
On column 2, one end of pull bar 6 is provided with stopper, and the other end of pull bar 6 is fixing with clip 3 to be connected, the stopper position of pull bar 6
In housing 7, spring 8 is between housing 7 and stopper, and steel cable clip 9 is positioned on housing 7, and steel cable 5 is connected to two steel cables
Between clip 9.
Of the present utility model ultimate principle and principal character and of the present utility model advantage have more than been shown and described.One's own profession
Skilled person will appreciate that of industry, this utility model is not restricted to the described embodiments, described in above-described embodiment and description
Principle of the present utility model is simply described, on the premise of without departing from this utility model spirit and scope, this utility model is also
Have various changes and modifications, in the range of these changes and improvements both fall within claimed this utility model.This utility model
Claimed scope is defined by appending claims and equivalent thereof.
Claims (1)
1. the Bridge guardrail keeping tensioning, it is characterised in that: include railing, column, clip, fixing bolt, steel cable, draw
Bar, housing, spring and steel cable clip, the upper end of described column is connected with the downside of described railing, and described clip passes through institute
Stating fixing bolt to be fixed on described column, one end of described pull bar is provided with stopper, and the other end of described pull bar is solid with described
Fixed button is fixing to be connected, and the stopper of described pull bar is positioned at described housing, described spring between described housing and described stopper,
Described steel cable clip is positioned on described housing, and described steel cable is connected between two described steel cable clips.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620263619.6U CN205711733U (en) | 2016-03-31 | 2016-03-31 | A kind of Bridge guardrail keeping tensioning |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620263619.6U CN205711733U (en) | 2016-03-31 | 2016-03-31 | A kind of Bridge guardrail keeping tensioning |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205711733U true CN205711733U (en) | 2016-11-23 |
Family
ID=57311480
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620263619.6U Expired - Fee Related CN205711733U (en) | 2016-03-31 | 2016-03-31 | A kind of Bridge guardrail keeping tensioning |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205711733U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111926741A (en) * | 2020-08-10 | 2020-11-13 | 芜湖等莱智能科技有限公司 | View cable guardrail based on tension structure |
-
2016
- 2016-03-31 CN CN201620263619.6U patent/CN205711733U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111926741A (en) * | 2020-08-10 | 2020-11-13 | 芜湖等莱智能科技有限公司 | View cable guardrail based on tension structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207331431U (en) | A kind of bridge damping device | |
CN105672476B (en) | A kind of marmem is combined the beam column of steel structure splicing node of edge of a wing friction | |
CN205475692U (en) | Fricative steel structure beam and column of shape memory alloy composite wing reason concatenation node | |
CN107905090B (en) | A kind of municipal administration bridge earthquake resistance structure and construction method | |
CN107724226A (en) | Suspension cable suspension cable co-operative system bridge is turned round in a kind of four rope faces in the same direction | |
CN205711733U (en) | A kind of Bridge guardrail keeping tensioning | |
CN109235639A (en) | Prestressing without bondn assembling type node and construction method with energy-consuming device | |
CN209082693U (en) | Prestressing without bondn assembling type node with energy-consuming device | |
CN206143726U (en) | Combined type soil property core -wall rock -fill dam | |
CN209128902U (en) | A kind of deck crack bracing means | |
CN105155712B (en) | A kind of Self-resetting steel coupling beam system of use marmem pull bar | |
CN110359365A (en) | A kind of packaged type bridges shock-proof seat | |
CN105178466B (en) | A kind of Self-resetting steel coupling beam system of use composite braces | |
CN107386097A (en) | A kind of steel structure bridge builds damping device | |
CN209010999U (en) | A kind of soft protecting net system | |
CN207259949U (en) | A kind of novel bridge bearing | |
CN207376461U (en) | A kind of bridge anti-collision device | |
CN206941363U (en) | A kind of long-span arch bridge bridge floor beam supporting system | |
CN206529706U (en) | A kind of anti-rebound bridge prestress tensioning equipment | |
CN106012796A (en) | Stay cable intersected multi-pylon cable-stayed bridge | |
CN203921126U (en) | A kind of large-scale elongated truss column is in conjunction with mast | |
CN208501466U (en) | A kind of mitre minor radius multitower Curved Stayed-cable Bridge | |
CN203769402U (en) | Steel pipe tower safety climbing and treading device | |
CN206256365U (en) | Arch bridge | |
CN206859110U (en) | A kind of impact protector structure of bridge limit for height |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161123 Termination date: 20190331 |
|
CF01 | Termination of patent right due to non-payment of annual fee |