CN208792139U - A kind of closure stiff skeleton fast lockign apparatus - Google Patents

A kind of closure stiff skeleton fast lockign apparatus Download PDF

Info

Publication number
CN208792139U
CN208792139U CN201821319496.9U CN201821319496U CN208792139U CN 208792139 U CN208792139 U CN 208792139U CN 201821319496 U CN201821319496 U CN 201821319496U CN 208792139 U CN208792139 U CN 208792139U
Authority
CN
China
Prior art keywords
plate
force bearing
bearing plate
closure
tie rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821319496.9U
Other languages
Chinese (zh)
Inventor
魏强
俞文龙
杨峰
王泽升
王艳峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 15th Bureau Group Co Ltd
Fifth Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Original Assignee
China Railway 15th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 15th Bureau Group Co Ltd filed Critical China Railway 15th Bureau Group Co Ltd
Priority to CN201821319496.9U priority Critical patent/CN208792139U/en
Application granted granted Critical
Publication of CN208792139U publication Critical patent/CN208792139U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to equipment for bridge construction, specifically a kind of closure stiff skeleton fast lockign apparatus.The utility model efficiently solve when execution conditions cannot simultaneously welded steel beam both ends when, successively weld the problem that the stiff skeleton of formation is easy to cause later period beam body stress inconsistent.A kind of closure stiff skeleton fast lockign apparatus, including connecting plate, end force bearing plate, girder steel, compression bar and pull rod;Two connecting plates are fixed on the left and right both ends of closure section;End force bearing plate is fixed on the connecting plate of closure section left end, and end force bearing plate is equipped with strut kong and tie rod hole, and the left end of girder steel is equipped with end buttcover plate;Compression bar is screwed in strut kong;Pull rod sequentially passes through end buttcover plate, end force bearing plate.The utility model is suitable for the construction operation of closure section.

Description

A kind of closure stiff skeleton fast lockign apparatus
Technical field
The utility model relates to closure construction equipment, specifically a kind of closure stiff skeleton quick lock in dress It sets.
Background technique
At present when closure to guarantee the common stress in closure section both ends and keep that absolute altitude is consistent, prevents closure section temperature from splitting The generation of seam generally carries out temporary locking using girder steel to both ends beam body all before closure.The main member of girder steel generally uses work Word steel or Two bors d's oeuveres steel I-beam, girder steel are welded with the steel plate being embedded in the beam body of closure section both ends, form stiff skeleton.Girder steel with The welding of steel plate usually requires that when temperature is more stable in one day while welding locking.
But it is had the following problems in actual job, construction site welding machine is equipped with often deficiency, generally can not meet all The requirement that girder steel welds simultaneously is substantially welding locking one by one, and which results in the locking temperature of each girder steel is different It causes, when the welding locking construction time is longer, temperature change is larger, this stiffness bone successively formed under condition of different temperatures Frame force difference is larger, and then it is certain inconsistent to cause beam body after closure to exist in the axial force in same section, to beam body by There are certain adverse effects for power.At the same time, if after a certain girder steel is first locked, and other girder steels have not enough time to lock, Once temperature change is larger, locked girder steel is easy to cause weld seam disengagement occur under temperature load effect.
Therefore, in order to solve when execution conditions cannot simultaneously welded steel beam both ends when, successively weld the stiff skeleton of formation The problem for being easy to cause later period beam body stress inconsistent, it is very necessary for designing a kind of closure girder steel fast lockign apparatus 's.
Summary of the invention
The utility model in order to solve when execution conditions cannot simultaneously welded steel beam both ends when, successively weld the stiffness of formation The problem that skeleton is easy to cause later period beam body stress inconsistent provides a kind of closure stiff skeleton fast lockign apparatus.
The utility model adopts the following technical scheme that realization:
A kind of closure stiff skeleton fast lockign apparatus, including connecting plate, end force bearing plate, girder steel, have outer spiral shell The compression bar of line and have externally threaded pull rod;
Two connecting plates horizontal left and right both ends for being fixed on closure section respectively;End force bearing plate is perpendicularly fixed at bridge The connection plate surface of beam closure section left end offers several strut kongs and several force bearing plate pull rods in the plate face of end force bearing plate Hole, the strut kong are screw hole, and the strut kong, force bearing plate tie rod hole are symmetrically distributed in the two sides of plate face center line;It is described Girder steel is connected across on the connecting plate at the left and right both ends of closure section, and its bottom is fixed with connecting plate;The left end of girder steel is equipped with end Portion's buttcover plate, the end buttcover plate and end force bearing plate are facing each other, and its plate face is equipped with the load with end force bearing plate The one-to-one buttcover plate tie rod hole of plate tie rod hole;Several compression bars are screwed correspondingly in strut kong, and head is located at end The left of portion's force bearing plate, tail portion are close to the left plate face of end buttcover plate;Several pull rods sequentially pass through on the buttcover plate of end The force bearing plate tie rod hole of buttcover plate tie rod hole, end force bearing plate, head are located at the right of end buttcover plate, and tail portion is located at end The left of portion's force bearing plate and it is equipped with pull-rod nut.
The end force bearing plate is to be formed by connecting by two pieces of vertical rectangular slabs facing each other by top.
The end buttcover plate is two pieces of vertical rectangular slabs facing each other, and one of left end positioned at girder steel is another Block passes perpendicularly through the web of girder steel, is equipped with several floors between the plate face of two pieces of vertical rectangular slabs.
The bottom surface of the connecting plate is equipped with the peg being arranged in array;The connecting plate passes through peg and is fixed on bridge The left and right both ends of closure section.
It further include two big small three stiffeners;The stiffener bottom is both secured to the connecting plate of closure section left end On, vertical edge is vertical with the left plate face of end force bearing plate to be fixed;Two big stiffener is facing each other, and small stiffener is located at two Between big stiffener.
Strut kong, force bearing plate tie rod hole on the end force bearing plate respectively surround rectangle, and force bearing plate tie rod hole is surround In strut kong periphery.
Force bearing plate tie rod hole on the end force bearing plate is respectively positioned between two big stiffener.
The application method of closure stiff skeleton fast lockign apparatus, includes the following steps;
A. in the pre-buried connecting plate in left and right both ends of closure section, and end is welded on the connecting plate of closure section left end Force bearing plate;
B. girder steel is connected across the left and right both ends of closure section, and the right end bottom of girder steel is welded in closure section right end On connecting plate, the end buttcover plate and end force bearing plate face of left end, and make its tail portion be close to end pair by screwing compression bar The pull-rod nut tensile ties of pull rod tail portion are tightened in the left plate face of fishplate bar;The left end of girder steel and end force bearing plate are carried out interim It is fixed;
C. the left end bottom of girder steel is welded on the connecting plate of closure section left end;
D. compression bar, pull rod, end force bearing plate and end buttcover plate are removed.
The utility model cooperates by first welding the right end of girder steel and connecting plate, then by compression bar, pull rod by steel Beam left end and end force bearing plate quick lock in again weld the left end of girder steel and connecting plate after forming this temporary connecting structure It connects, ensure that girder steel both ends are to connect at the same temperature while with connecting plate, avoiding leads to stiffness bone because of temperature difference Frame stress is different, reduces and generates the risk that weld seam disengages under extreme temperature.
The utility model efficiently solve when execution conditions cannot simultaneously welded steel beam both ends when, successively weld the strength of formation The problem that property skeleton is easy to cause later period beam body stress inconsistent.The utility model is suitable for the construction operation of closure section.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the connecting plate of the utility model and the structural schematic diagram of end force bearing plate.
Fig. 3 is the structural schematic diagram of the girder steel of the utility model.
Fig. 4 is the structural schematic diagram of the compression bar of the utility model.
Fig. 5 is the pull rod of the utility model and the structural schematic diagram of pull-rod nut.
In figure: 1- connecting plate, the end 2- force bearing plate, 3- girder steel, the end 4- buttcover plate, 5- strut kong, 6a- force bearing plate pull rod Hole, 6b- buttcover plate tie rod hole, 7- compression bar, 8- pull rod, 9- pull-rod nut, 10- peg, the big stiffener of 11a-, 11b- is small to put more energy into Plate.
Specific embodiment
It is described with reference to the accompanying drawings:
A kind of closure stiff skeleton fast lockign apparatus, including connecting plate 1, end force bearing plate 2, girder steel 3, with outer The compression bar 7 of screw thread and have externally threaded pull rod 8;
Two connecting plates 1 horizontal left and right both ends for being fixed on closure section respectively;End force bearing plate 2 is perpendicularly fixed at 1 surface of connecting plate of closure section left end offers several strut kongs 5 and several loads in the plate face of end force bearing plate 2 Plate tie rod hole 6a, the strut kong 5 are screw hole, and the strut kong 5, force bearing plate tie rod hole 6a are symmetrically distributed in plate face center line Two sides;The girder steel 3 is connected across on the connecting plate 1 at the left and right both ends of closure section, and its bottom and connecting plate 1 are fixed;Steel The left end of beam 3 is equipped with end buttcover plate 4, and the end buttcover plate 4 and end force bearing plate 2 are facing each other, and its plate face is equipped with With the one-to-one buttcover plate tie rod hole 6b of force bearing plate tie rod hole 6a of end force bearing plate 2;Several compression bars 7 screw correspondingly In in strut kong 5, head is located at the left of end force bearing plate 2, and tail portion is close to the left plate face of end buttcover plate 4;It is several Pull rod 8 sequentially passes through the force bearing plate tie rod hole 6a of buttcover plate tie rod hole 6b on end buttcover plate 4, end force bearing plate 2, head Positioned at the right of end buttcover plate 4, tail portion is located at the left of end force bearing plate 2 and is equipped with pull-rod nut 9.
Further, the end force bearing plate 2 is to be formed by connecting by two pieces of vertical rectangular slabs facing each other by top.
Further, the end buttcover plate 4 is two pieces of vertical rectangular slabs facing each other, one of to be located at girder steel 3 Left end, another block of web for passing perpendicularly through girder steel 3 be equipped with several floors between the plate face of two pieces of vertical rectangular slabs.
Further, the bottom surface of the connecting plate 1 is equipped with the peg 10 being arranged in array;The connecting plate 1 passes through Peg 10 is fixed on the left and right both ends of closure section.
It further, further include two big small three stiffeners;The stiffener bottom is both secured to closure Duan Zuo On the connecting plate 1 at end, vertical edge is vertical with the left plate face of end force bearing plate 2 to be fixed;Stiffener 11a two big is facing each other, Small stiffener 11b is between stiffener 11a two big.
Further, the strut kong 5 on the end force bearing plate 2, force bearing plate tie rod hole 6a respectively surround rectangle, and load Plate tie rod hole 6a is surrounded on 5 periphery of strut kong.
Further, the force bearing plate tie rod hole 6a on the end force bearing plate 2 is respectively positioned between stiffener 11a two big.
A kind of application method of closure stiff skeleton fast lockign apparatus, includes the following steps:
A. in the pre-buried connecting plate 1 in the left and right both ends of closure section, and the welding ends on the connecting plate of closure section left end 1 Portion's force bearing plate 2;
B. girder steel 3 is connected across the left and right both ends of closure section, and the right end bottom of girder steel 3 is welded in closure section right end Connecting plate 1 on, the end buttcover plate 4 of left end and 2 face of end force bearing plate, and by screwing compression bar 7 its tail portion is close to 9 tensile ties 8 of pull-rod nut of 8 tail portion of pull rod are tightened in the left plate face of end buttcover plate 4;By the left end of girder steel 3 and end load Plate 2 is fixed temporarily;
C. the left end bottom of girder steel 3 is welded on the connecting plate 1 of closure section left end;
D. compression bar 7, pull rod 8, end force bearing plate 2 and end buttcover plate 4 are removed.

Claims (7)

1. a kind of closure stiff skeleton fast lockign apparatus, it is characterised in that: including connecting plate (1), end force bearing plate (2), girder steel (3), with externally threaded compression bar (7) and have externally threaded pull rod (8);
Two connecting plates (1) horizontal left and right both ends for being fixed on closure section respectively;End force bearing plate (2) is perpendicularly fixed at Connecting plate (1) surface of closure section left end, offer several strut kongs (5) in the plate face of end force bearing plate (2) and if Dry force bearing plate tie rod hole (6a), the strut kong (5) are screw hole, and the strut kong (5), force bearing plate tie rod hole (6a) are symmetrical to be divided It is distributed in the two sides of plate face center line;The girder steel (3) is connected across on the connecting plate (1) at the left and right both ends of closure section, and its bottom Portion and connecting plate (1) are fixed;The left end of girder steel (3) is equipped with end buttcover plate (4), the end buttcover plate (4) and end load Plate (2) is facing each other, and its plate face is equipped with force bearing plate tie rod hole (6a) one-to-one buttcover plate with end force bearing plate (2) Tie rod hole (6b);Several compression bars (7) are screwed correspondingly in strut kong (5), and head is located at a left side for end force bearing plate (2) Side, tail portion is close to the left plate face of end buttcover plate (4);Several pull rods (8) sequentially pass through the docking on end buttcover plate (4) The force bearing plate tie rod hole (6a) of plate tie rod hole (6b), end force bearing plate (2), head are located at the right of end buttcover plate (4), Tail portion is located at the left of end force bearing plate (2) and is equipped with pull-rod nut (9).
2. a kind of closure stiff skeleton fast lockign apparatus according to claim 1, it is characterised in that: the end Force bearing plate (2) is to be formed by connecting by two pieces of vertical rectangular slabs facing each other by top.
3. a kind of closure stiff skeleton fast lockign apparatus according to claim 2, it is characterised in that: the end Buttcover plate (4) is two pieces of vertical rectangular slabs facing each other, and one of left end positioned at girder steel (3), another piece passes perpendicularly through The web of girder steel (3) is equipped with several floors between the plate face of two pieces of vertical rectangular slabs.
4. a kind of closure stiff skeleton fast lockign apparatus according to claim 3, it is characterised in that: the connection The bottom surface of plate (1) is equipped with the peg (10) being arranged in array;The connecting plate (1) is fixed on bridge conjunction by peg (10) The left and right both ends of imperial section.
5. a kind of closure stiff skeleton fast lockign apparatus according to claim 4, it is characterised in that: further include two Big small three stiffeners;The stiffener bottom is both secured on the connecting plate (1) of closure section left end, vertical edge with The left plate face of end force bearing plate (2) is vertically fixed;Two big stiffener (11a) is facing each other, and small stiffener (11b) is located at two Between big stiffener (11a).
6. a kind of closure stiff skeleton fast lockign apparatus according to claim 5, it is characterised in that: the end Strut kong (5), force bearing plate tie rod hole (6a) on force bearing plate (2) respectively surround rectangle, and force bearing plate tie rod hole (6a) is surrounded on Strut kong (5) periphery.
7. a kind of closure stiff skeleton fast lockign apparatus according to claim 6, it is characterised in that: the end Force bearing plate tie rod hole (6a) on force bearing plate (2) is respectively positioned between two big stiffener (11a).
CN201821319496.9U 2018-08-16 2018-08-16 A kind of closure stiff skeleton fast lockign apparatus Active CN208792139U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821319496.9U CN208792139U (en) 2018-08-16 2018-08-16 A kind of closure stiff skeleton fast lockign apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821319496.9U CN208792139U (en) 2018-08-16 2018-08-16 A kind of closure stiff skeleton fast lockign apparatus

Publications (1)

Publication Number Publication Date
CN208792139U true CN208792139U (en) 2019-04-26

Family

ID=66205709

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821319496.9U Active CN208792139U (en) 2018-08-16 2018-08-16 A kind of closure stiff skeleton fast lockign apparatus

Country Status (1)

Country Link
CN (1) CN208792139U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108914763A (en) * 2018-08-16 2018-11-30 中铁十七局集团第五工程有限公司 A kind of closure stiff skeleton fast lockign apparatus and its application method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108914763A (en) * 2018-08-16 2018-11-30 中铁十七局集团第五工程有限公司 A kind of closure stiff skeleton fast lockign apparatus and its application method
CN108914763B (en) * 2018-08-16 2024-02-20 中铁十七局集团第五工程有限公司 Application method of bridge closure stiffness framework quick locking device

Similar Documents

Publication Publication Date Title
US11105084B1 (en) Dry connection prefabricated assembly steel-concrete composite beam
CN105040817B (en) The prestressing force assembled intermediolateral column steel frame of recoverable function
CN104805958B (en) It is applied to double rank surrender power consumption steel coupling beam of Coupled Shear Wall structure
CN104032956A (en) Construction method for connecting reinforced concrete beams with steel reinforced concrete columns
CN108277977A (en) A kind of column mould reinforcement system and preparation method thereof
CN208792139U (en) A kind of closure stiff skeleton fast lockign apparatus
CN108914763A (en) A kind of closure stiff skeleton fast lockign apparatus and its application method
CN104652617A (en) Beam-column joint connection device of multi-story fabricated steel structure system
CN108842915A (en) A kind of rigid connection node and its processing installation method of steel construction rectangle rod piece
JP2002070326A (en) Reinforced structure for steel frame structural material
CN106088379B (en) A kind of shear-deformable nodal point connecting of BRB lockings and its installation method
CN208023723U (en) A kind of semi-rigid double web timber structure nodes of assembled
US5259160A (en) Knot for the connection of pillars and girders in spatial frames in metallic carpentry
CN106760014A (en) A kind of board-like adjustable damper embedded part of full assembled and installation method
CN104652616A (en) Half-welding half-bolt beam-column joint connection device of assembly type steel structure system
JP2015068005A (en) Welding joining continuous beam structure
CN215329313U (en) Structure with additional steel structure group nails for uniformly bearing shearing force
CN107435444A (en) A kind of bracing means of combined frame work height across part
CN208884716U (en) A kind of rigid connection node of steel construction rectangle rod piece
CN208472585U (en) A kind of Y type pier Construction of continuous beam π type bracket
CN207260607U (en) A kind of accumulation slippage construction equal proportion plays fall girder apparatus
Radu et al. Optimization solutions for truss beams elements welded joints
Dowswell Gusset plate stability using variable stress trajectories
CN212053198U (en) Novel connection node structure of secondary beam at main beam splicing part
CN207376879U (en) A kind of frame structure of assembled wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant