CN208783716U - A kind of boiling blanching machine - Google Patents

A kind of boiling blanching machine Download PDF

Info

Publication number
CN208783716U
CN208783716U CN201721510681.1U CN201721510681U CN208783716U CN 208783716 U CN208783716 U CN 208783716U CN 201721510681 U CN201721510681 U CN 201721510681U CN 208783716 U CN208783716 U CN 208783716U
Authority
CN
China
Prior art keywords
conveyor belt
metal conveyor
insulation shell
metal
vertical height
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721510681.1U
Other languages
Chinese (zh)
Inventor
冯志河
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pingyu Lantian Agriculture Development Co Ltd
Original Assignee
Pingyu Lantian Agriculture Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pingyu Lantian Agriculture Development Co Ltd filed Critical Pingyu Lantian Agriculture Development Co Ltd
Priority to CN201721510681.1U priority Critical patent/CN208783716U/en
Application granted granted Critical
Publication of CN208783716U publication Critical patent/CN208783716U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Meat, Egg Or Seafood Products (AREA)

Abstract

A kind of boiling blanching machine, including insulation shell and the steam generation pond that insulation shell bottom is arranged in, insulation shell both ends are respectively equipped with inlet port and outlet port, the first metal conveyor belt, the second metal conveyor belt and third metal conveyor belt are equipped in insulation shell, baffle circumferentially distributed along its and vertical with its conveying direction is respectively equipped on first metal conveyor belt and third metal conveyor belt lateral surface, the vertical height of first metal conveyor belt discharge end is greater than the vertical height of its feed end, and the first metal conveyor belt feed end passes through feed inlet and is located at outside insulation shell.

Description

A kind of boiling blanching machine
Technical field
The utility model relates to food processing field more particularly to boiling blanching machines.
Background technique
Gingili leaf has good health-care effect.The mild-natured bitter of gingili leaf has the function of to nourish liver, kidney, moisturizing dryness and lubricating intestine, energy Treat liver, dizzy, post disease alopecia, body fluid depletion causing blood stasis, the constipation of kidney deficiency etc..Boor picks more and is used as vegetable edible in the past, nowadays Become the greasy good merchantable brand of solution in hotel, hotel again.Dry gingili leaf or can will be generally made in gingili leaf.
Present gingili leaf has become the optimum food that people adjust appetite, and the eating method of gingili leaf noodles is turned over constantly It is new: to be fried with chopped spring onion, capsicum, shredded ginger and condiments, be made into gingili leaf noodles and eat;With raw mutton fill up condiments it is quick-fried after, may be alternatively configured Gingili leaf noodles are eaten;It was simmered with soup-stock and sprinkles chickens' extract, and uniformly can be made gingili leaf noodles and eat.No matter eat in any case in a word How plus condiments, that special fragrance of gingili leaf it is never spoiled because adding condiments.Wherein especially with the white sesameseed leaf of Henan area Sub- fragrance is the strongest.
The traditional family manufacture method of dry gingili leaf is, sesame harvest pick within preceding 20~30 days sesame lower part it is fresh, Gingili leaf without disease pest, is fitly placed in basket after taking piecewise, and transports back processed rapidly.First gingili leaf is cleaned Afterwards, color protection is carried out within 3~5 minutes with the salt mixing vacuole of 0.1% sodium bicarbonate and 1.5% or so.It pulls out to drain the water, then with opening Water scalds 3~4 minutes, then pulls out again cooling with cold water.After draining the water, then gingili leaf is spread out in dry and ventilated place and is dried It is dry, or dried 5 hours or so in drying chamber with 50~65 DEG C of temperature and just done.Then it is contained with gunnysack etc., stacks 1 indoor ~2 days, gingili leaf is made to ease back.Finally weighing is wired up with plastic bag sealing, is put into and is saved or sell in moistureproof carton.Dry sesame Sesame slices, color is blackish green, has a distinctive fragrant of gingili leaf, edible time cold water or warm water bubble open can cook or cooking, Or cook filling etc..Dry sesame leaf water content is 12%~15%.
As the improvement of people's living standards, the resident in city is increasing to the demand of dry gingili leaf, dry sesame The traditional family manufacture method efficiency of leaf is too low, is unable to satisfy huge demand;In addition, it has been investigated that, in industrial metaplasia During production, traditional degree of heat scalded with boiled water and be easier to grasp gingili leaf is replaced to gingili leaf heating using steam, And the variation of the steam-heated process heating temperature of gingili leaf from low to high can make the gingili leaf mouthfeel processed more preferable, but The steam-heating apparatus type of current energy quantity-produced heating gingili leaf is less, and one is horizontally disposed defeated by one Band is sent, multiple steam generation ponds are arranged along horizontally disposed conveying tape feeding direction, this steam-heating apparatus volume is big, accounts for With biggish plant area space;Another kind is above to arrange a plurality of horizontally disposed biography along the vertical direction above a steam generation pond Band is sent, but this heating equipment vertical height is generally higher, feeding port is located at the upper end of equipment, and feeding is inconvenient, needs another Outer outfit material lifting mechanism.
Utility model content
In view of the deficiencies in the prior art, the purpose of this utility model is to provide a kind of boiling blanching machines, use Convenient and good airproof performance.
To achieve the above object, the technical solution adopted in the utility model are as follows: a kind of boiling blanching machine, including insulation shell With the steam generation pond that insulation shell bottom is arranged in, insulation shell both ends are respectively equipped with inlet port and outlet port, insulation shell Inside it is equipped with the first metal conveyor belt, the second metal conveyor belt and third metal conveyor belt, the first metal conveyor belt and third metal Baffle circumferentially distributed along its and vertical with its conveying direction, the discharging of the first metal conveyor belt are respectively equipped on conveyer belt lateral surface The vertical height at end is greater than the vertical height of its feed end, and the first metal conveyor belt feed end passes through feed inlet and is located at insulation cladding Outside body;Second metal conveyor belt is horizontally disposed, and the feed end of the second metal conveyor belt is located at the first metal conveyor belt discharge end Lower section, the rotation direction of the second metal conveyor belt is opposite with the rotation direction of the first metal conveyor belt;Third metal conveyor belt The vertical height of discharge end is greater than the vertical height of its feed end, and the feed end of third metal conveyor belt is located at the conveying of the second metal Lower section with discharge end, the discharge end of third metal conveyor belt pass through discharge port and are located at outside insulation shell, and third metal is defeated Send the rotation direction of band and the rotation direction of the second metal conveyor belt on the contrary, third metal conveyor belt is located on steam generation pond Side;The vertical height of insulation shell discharge port is greater than the vertical height of its feed inlet;Material is equipped with below second metal conveyor belt Cleaner, material cleaner include the support plate that pressing plate and rear and front end are fixedly connected with insulation shell front and rear inner side walls, pressing plate On the supporting plate by bolt pressing, the palm fiber upwardly extended is equipped between pressing plate and support plate, palm fiber upper end is to the second metal Conveyer belt lateral surface, which has, to upward pressure;Insulation shell lateral surface is equipped with the flexible modeling that lid is located at insulation shell discharge port top Flitch, flexible plastic sheet are connect by bolt with insulation shell, flexible plastic sheet lower end and third metal conveyor belt upper surface it Between distance be height of baffle plate half;Insulation shell lateral surface is equipped with the stock guide being obliquely installed, the charging of stock guide End is located at below insulation shell discharge port, and the vertical height of stock guide feed end is higher than the vertical height of stock guide discharge end, leads Flitch is made of stainless steel material, and stock guide upper surface is smooth flat.
The first metal conveyor belt left part and close to the part of its right end be respectively first level delivery section and it is horizontal into Material portion, first level delivery section and horizontal feed portion are horizontally disposed, and the vertical height of first level delivery section is higher than level The vertical height of feeder, part of first metal conveyor belt between first level delivery section and horizontal feed portion mention for first Ascending part, the second metal conveyor belt are located at below first level delivery section.
The third metal conveyor belt right part and close to its left end part be the second horizontal feed portion and horizontal discharging portion, Second horizontal feed portion and horizontal discharging portion are horizontally disposed, and the vertical height of horizontal discharging portion is higher than the second horizontal feed portion Vertical height, part of the third metal conveyor belt between the second horizontal feed portion and horizontal discharging portion be the second lifting parts, Second horizontal feed portion is located at below the second metal conveyor belt.
The first level delivery section, the second metal conveyor belt and the second horizontal feed portion be respectively positioned on steam generation pond just on Side, the first lifting parts and the second lifting parts are respectively positioned on the outside of steam generation pond.
Steam generation pond upper surface is located at the lower section of level ground.
First metal conveyor belt, the second metal conveyor belt and third metal conveyor belt are sheet metal mesh belt.
First metal conveyor belt, the second metal conveyor belt and third metal conveyor belt are equipped with mesh.
First metal conveyor belt, the second metal conveyor belt and third metal conveyor belt are made of stainless steel material.
Baffle rear and front end on first metal conveyor belt is concordant with the first metal conveyor belt rear and front end respectively;Institute The baffle rear and front end stated on third metal conveyor belt is concordant with third metal conveyor belt rear and front end respectively.
Electric heater unit is equipped in the steam generation pond.
The utility model structure is simple, easy to use, and the vertical height of the first metal conveyor belt discharge end is greater than its charging The vertical height at end improves the ease of use of the present apparatus to reduce the height of feeding.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the utility model material cleaner structural schematic diagram;
Fig. 3 is the utility model flexible plastic sheet mounting structure schematic diagram.
Specific embodiment
As shown in Figure 1 to Figure 3, a kind of boiling blanching machine, including insulation shell 1 and the steaming that 1 bottom of insulation shell is arranged in Vapour occurred pool 2, insulation shell 1 and steam generation pond 2 are the prior art, and insulation shell 1 is the closed type made of thermal insulation material Container, steam generation pond 2 is interior to be equipped with electric heater unit, and electric heater unit heats the water in steam generation pond 2 after being powered, To generate steam.1 both ends of insulation shell are respectively equipped with inlet port and outlet port, for passing in and out gingili leaf, set in insulation shell 1 There are the first metal conveyor belt 3, the second metal conveyor belt 4 and third metal conveyor belt 5, the first metal conveyor belt 3, the second metal are defeated It send band 4 and third metal conveyor belt 5 is sheet metal mesh belt, sheet metal mesh belt is the prior art, and rear and front end is respectively equipped with chain Item drives chain rotation to drive sheet metal mesh belt to rotate by driving device;First metal conveyor belt 3, the second metal are defeated Band 4 and third metal conveyor belt 5 is sent to be equipped with mesh, convenient for passing through for steam, to reach preferable heating effect.First gold medal Belong to conveyer belt 3, the second metal conveyor belt 4 and third metal conveyor belt 5 to be made of stainless steel material, is not easy to get rusty, increase The service life of the present apparatus.
It is respectively equipped on 5 lateral surface of first metal conveyor belt 3 and third metal conveyor belt circumferentially distributed and defeated with it along its The baffle 6 that direction is vertical is sent, baffle 6 can prevent gingili leaf and metal conveyor belt that relative motion occurs, make gingili leaf with metal The movement of conveyer belt and move.
The vertical height of first metal conveyor belt, 3 discharge end is greater than the vertical height of its feed end, the first metal conveyor belt 3 The vertical height of feed end is relatively low, and specially setting lifting device is not had to again when feeding, improves ease of use, the first gold medal Belong to 3 feed end of conveyer belt to pass through feed inlet and be located at outside insulation shell 1;Second metal conveyor belt 4 is horizontally disposed, the second metal The feed end of conveyer belt 4 is located at the lower section of 3 discharge end of the first metal conveyor belt, the rotation direction of the second metal conveyor belt 4 and the The rotation direction of one metal conveyor belt 3 is opposite, it is possible to reduce the length of the present apparatus in the horizontal direction, to reduce the present apparatus Volume;The vertical height of 5 discharge end of third metal conveyor belt is greater than the vertical height of its feed end, and gingili leaf is defeated from third metal There is certain vertical height after sending 5 discharge end of band to be discharged, can enter directly into gingili leaf cooling device and carry out at next step Reason, improves production efficiency, the feed end of third metal conveyor belt 5 is located at the lower section of 4 discharge end of the second metal conveyor belt, third The discharge end of metal conveyor belt 5 pass through discharge port and be located at insulation shell 1 outside, the rotation direction of third metal conveyor belt 5 with The rotation direction of second metal conveyor belt 4 is on the contrary, third metal conveyor belt 5 is located at 2 top of steam generation pond;Insulation shell 1 goes out The vertical height of material mouth is greater than the vertical height of its feed inlet.
The part of first metal conveyor belt, 3 left part and its close right end is respectively first level delivery section 7 and horizontal feed Portion 8, first level delivery section 7 and horizontal feed portion 8 are horizontally disposed, and the vertical height of first level delivery section 7 is higher than water The vertical height of flat feeder 8, part of first metal conveyor belt 3 between first level delivery section 7 and horizontal feed portion 8 are First lifting parts 9, the second metal conveyor belt 4 are located at 7 lower section of first level delivery section;Gingili leaf to be heated passes through horizontal feed Portion 8 enters in insulation shell 1, and the first lifting parts 9 drive gingili leaf to move obliquely, then from first level delivery section 7 It falls on the second metal conveyor belt 4.
The part of 5 right part of third metal conveyor belt and its close left end is the second horizontal feed portion 10 and horizontal discharging portion 11, the second horizontal feed portion 10 and horizontal discharging portion 11 are horizontally disposed, and the vertical height of horizontal discharging portion 11 is higher than second The vertical height in horizontal feed portion 10, third metal conveyor belt 5 is between the second horizontal feed portion 10 and horizontal discharging portion 11 Part is the second lifting parts 12, and the second horizontal feed portion 10 is located at 4 lower section of the second metal conveyor belt, and gingili leaf is defeated from the second metal It send and is fallen on band 4 in second horizontal feed portion 10, horizontal discharging portion 11 is then moved under the action of the second lifting parts 12, It is discharged under the action of horizontal discharging portion 11 from the discharge outlet of insulation shell 1.
First level delivery section 7, the second metal conveyor belt 4 and the second horizontal feed portion 10 are at a distance from steam generation pond 2 Successively successively decrease, in addition gingili leaf can block 5 upper layer of the first metal conveyor belt 3, the second metal conveyor belt 4 and third metal conveyor belt Mesh, the rising of steam is hindered, to keep gingili leaf horizontal in first level delivery section 7, the second metal conveyor belt 4 and second Heating process when successively moving in delivery section 10 in temperature from low to high meets the technique requirement of gingili leaf heating, makes most The dry gingili leaf mouthfeel that finishing comes out is more preferable.
Material cleaner 101 is equipped with below second metal conveyor belt 4, material cleaner 101 includes pressing plate 102 and front and back two The support plate 103 being fixedly connected with 1 front and rear inner side walls of insulation shell is held, pressing plate 102 is pressed together in support plate 103 by bolt, The palm fiber 104 upwardly extended is equipped between pressing plate 102 and support plate 103, the clamping generated by pressing plate 102 and support plate 103 Power is fixed by palm fiber 104, and 104 upper end of palm fiber, which has 4 lateral surface of the second metal conveyor belt, to upward pressure;To being adhered to second The gingili leaf of 4 downside of metal conveyor belt is cleaned, and is detached from it with the second metal conveyor belt 4, so that it be avoided to be adhered to Cause heating time too long on second metal conveyor belt 4, influences product quality.
1 lateral surface of insulation shell is equipped with the flexible plastic sheet 401 that lid is located at 1 discharge port top of insulation shell, flexiplast Plate 401 is connect by bolt with insulation shell 1, due to flexible plastic sheet 401 constantly with the baffle on third metal conveyor belt 5 6 frictions, are easier to wear, using the replacement being bolted convenient for flexible plastic sheet 401,401 lower end of flexible plastic sheet and the The distance between three metal conveyor belts, 5 upper surface is the half of 6 height of baffle, because of 5 upper surface of third metal conveyor belt Sesame leaf thickness be generally the half of 6 height of baffle, can be with by the collective effect of gingili leaf and flexible plastic sheet 401 By 1 discharge port top seal of insulation shell, the loss speed of heat in insulation shell 1 is reduced, to save electricity needed for heating Can, it economizes on resources, when the baffle 6 on third metal conveyor belt 5 passes through 1 discharge port of insulation shell, flexible plastic sheet 401 can be produced Change shape, do not influence baffle 6 on third metal conveyor belt 5 normal through;When the baffle 6 on three metal conveyor belts 5 passes through guarantor After warm 1 discharge port of shell, flexible plastic sheet 401 resets under the effect of gravity, again that 1 discharge port top of insulation shell is close Envelope.
1 lateral surface of insulation shell is equipped with the stock guide 501 being obliquely installed, and the feed end of stock guide 501 is located at insulation shell 1 Below discharge port, the vertical height of 501 feed end of stock guide is higher than the vertical height of 501 discharge end of stock guide, stock guide 501 by Stainless steel material is made, and 501 upper surface of stock guide is smooth flat, and the gingili leaf being discharged from horizontal discharging portion 11 is fallen in guide Plate 501 slides into required transfer position along 501 upper surface of stock guide under the effect of gravity.
First level delivery section 7, the second metal conveyor belt 4 and the second horizontal feed portion 10 are being respectively positioned on steam generation pond 2 just The utilization rate that steam generation pond 2 generates heat is improved in top, and the first lifting parts 9 and the second lifting parts 12 are respectively positioned on steam generation 2 outside of pond, makes the inlet port and outlet port of insulation shell 1 and steam generation pond 2 have certain distance, reduces steam generation pond 2 and produces The loss speed of heat amount.
2 upper surface of steam generation pond is located at the lower section of level ground, makes the vertical height of 3 feed end of the first metal conveyor belt It can further decrease, be easy to use.
6 rear and front end of baffle on first metal conveyor belt 3 is concordant with 3 rear and front end of the first metal conveyor belt respectively;Institute 6 rear and front end of baffle stated on third metal conveyor belt 5 is concordant with 5 rear and front end of third metal conveyor belt respectively, makes baffle 6 Area is bigger, stops the effect of gingili leaf more preferable.

Claims (10)

1. a kind of boiling blanching machine, including insulation shell and the steam generation pond that insulation shell bottom is arranged in, insulation shell two End is respectively equipped with inlet port and outlet port, it is characterised in that: the first metal conveyor belt is equipped in insulation shell, the second metal conveys It is respectively equipped on band and third metal conveyor belt, the first metal conveyor belt and third metal conveyor belt lateral surface circumferentially distributed along its And the baffle vertical with its conveying direction, the vertical height of the first metal conveyor belt discharge end are greater than the vertical height of its feed end Degree, the first metal conveyor belt feed end pass through feed inlet and are located at outside insulation shell;Second metal conveyor belt is horizontally disposed, the The feed end of two metal conveyor belts is located at the lower section of the first metal conveyor belt discharge end, the rotation direction of the second metal conveyor belt with The rotation direction of first metal conveyor belt is opposite;The vertical height of third metal conveyor belt discharge end is greater than the vertical of its feed end Highly, the feed end of third metal conveyor belt is located at the lower section of the second metal conveyor belt discharge end, and third metal conveyor belt goes out Expect that end passes through discharge port and is located at outside insulation shell, turn of the rotation direction of third metal conveyor belt and the second metal conveyor belt Move contrary, third metal conveyor belt is located above steam generation pond;The vertical height of insulation shell discharge port be greater than its into The vertical height of material mouth;Material cleaner is equipped with below second metal conveyor belt, material cleaner includes pressing plate and rear and front end The support plate being fixedly connected with insulation shell front and rear inner side walls, pressing plate are pressed on the supporting plate by bolt, pressing plate and support plate Between be equipped with the palm fiber that upwardly extends, palm fiber upper end, which has the second metal conveyor belt lateral surface, to upward pressure;Insulation shell Lateral surface is equipped with the flexible plastic sheet that lid is located at insulation shell discharge port top, and flexible plastic sheet is connected by bolt and insulation shell It connects, the distance between flexible plastic sheet lower end and third metal conveyor belt upper surface are the half of height of baffle plate;Insulation cladding Outside is equipped with the stock guide being obliquely installed, and the feed end of stock guide is located at below insulation shell discharge port, stock guide charging The vertical height at end is higher than the vertical height of stock guide discharge end, and stock guide is made of stainless steel material, and stock guide upper surface is Smooth flat.
2. a kind of boiling blanching machine according to claim 1, it is characterised in that: the first metal conveyor belt left part and lean on The part of its nearly right end is respectively first level delivery section and horizontal feed portion, the equal water of first level delivery section and horizontal feed portion Flat setting, and the vertical height of first level delivery section is higher than the vertical height in horizontal feed portion, the first metal conveyor belt is the Part between one horizontal feed portion and horizontal feed portion is the first lifting parts, and the second metal conveyor belt is located at first level conveying Below portion.
3. a kind of boiling blanching machine according to claim 2, it is characterised in that: the third metal conveyor belt right part and lean on The part of its nearly left end is the second horizontal feed portion and horizontal discharging portion, and the second horizontal feed portion and the equal level of horizontal discharging portion are set It sets, and the vertical height of horizontal discharging portion is higher than the vertical height in the second horizontal feed portion, third metal conveyor belt is in the second water Part between flat delivery section and horizontal discharging portion is the second lifting parts, and the second horizontal feed portion is located under the second metal conveyor belt Side.
4. a kind of boiling blanching machine according to claim 3, it is characterised in that: the first level delivery section, the second gold medal Belong to conveyer belt and the second horizontal feed portion is respectively positioned on right above steam generation pond, the first lifting parts and the second lifting parts are respectively positioned on steaming On the outside of vapour occurred pool.
5. a kind of boiling blanching machine according to claim 1, it is characterised in that: steam generation pond upper surface is located at water The lower section of plane earth.
6. a kind of boiling blanching machine according to any one of claims 1 to 5, it is characterised in that: first gold medal Belonging to conveyer belt, the second metal conveyor belt and third metal conveyor belt is sheet metal mesh belt.
7. a kind of boiling blanching machine according to any one of claims 1 to 5, it is characterised in that: first gold medal Belong to conveyer belt, the second metal conveyor belt and third metal conveyor belt and is equipped with mesh.
8. a kind of boiling blanching machine according to any one of claims 1 to 5, it is characterised in that: first gold medal Belong to conveyer belt, the second metal conveyor belt and third metal conveyor belt to be made of stainless steel material.
9. a kind of boiling blanching machine according to any one of claims 1 to 5, it is characterised in that: first gold medal The baffle rear and front end belonged on conveyer belt is concordant with the first metal conveyor belt rear and front end respectively;On the third metal conveyor belt Baffle rear and front end it is concordant with third metal conveyor belt rear and front end respectively.
10. a kind of boiling blanching machine according to any one of claims 1 to 5, it is characterised in that: the steam hair Electric heater unit is equipped in raw pond.
CN201721510681.1U 2017-11-14 2017-11-14 A kind of boiling blanching machine Active CN208783716U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721510681.1U CN208783716U (en) 2017-11-14 2017-11-14 A kind of boiling blanching machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721510681.1U CN208783716U (en) 2017-11-14 2017-11-14 A kind of boiling blanching machine

Publications (1)

Publication Number Publication Date
CN208783716U true CN208783716U (en) 2019-04-26

Family

ID=66198055

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721510681.1U Active CN208783716U (en) 2017-11-14 2017-11-14 A kind of boiling blanching machine

Country Status (1)

Country Link
CN (1) CN208783716U (en)

Similar Documents

Publication Publication Date Title
CN106720208A (en) A kind of quick method for preparing dry day-lily buds
CN101095483B (en) Slurry paving and cutting type processor of instant vermicelli
CN102669302B (en) Beancurd skin machine
CN108497370B (en) Kelp dry powder preparation facilities
CN106418338B (en) A method of quickly preparing dry pumpkin
CN208783716U (en) A kind of boiling blanching machine
CN208755105U (en) A kind of standing heater
CN205567701U (en) Dedicated safe boiling device of high nutrition multifunctional baking eel production
CN208783715U (en) A kind of sandwich tape steam heater
CN208783717U (en) A kind of gingili leaf steam heater
CN208755104U (en) A kind of energy conservation gingili leaf heating device
CN208783718U (en) A kind of gingili leaf steaming plant
CN108433087B (en) A device for preparing kelp sauce
CN216088540U (en) Fried slurry-coated bean curd production line
CN213208494U (en) Domestic fungus quick drying device
CN211896856U (en) Integrated multipurpose oil press with drum-type electromagnetic frying pan
CN205567786U (en) Sauce device in dedicated safety of high nutrition multifunctional baking eel production
CN106720209A (en) A kind of quick method for preparing dry wolfberry
CN100473288C (en) Oil saving, energy saving and pollution-free food vacuum frying and roasting seasoning method
CN208676228U (en) A kind of sea eel baking production dedicated cleaner
CN211298330U (en) Gas type frying pan
CN106616607A (en) Method for quickly preparing dried chillies
CN208692231U (en) A kind of food processing instant noodles drying oil-filtering apparatus
CN213819770U (en) Hawthorn cleaning machine who preheats
CN212754127U (en) Braised pork device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant