CN208757294U - A kind of wet method fume desulfurizing system flue gas cool-down and absorption tower auto-flushing coupling device - Google Patents

A kind of wet method fume desulfurizing system flue gas cool-down and absorption tower auto-flushing coupling device Download PDF

Info

Publication number
CN208757294U
CN208757294U CN201721889482.6U CN201721889482U CN208757294U CN 208757294 U CN208757294 U CN 208757294U CN 201721889482 U CN201721889482 U CN 201721889482U CN 208757294 U CN208757294 U CN 208757294U
Authority
CN
China
Prior art keywords
absorption tower
flue gas
flushing
gas cool
flue
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721889482.6U
Other languages
Chinese (zh)
Inventor
刘茂省
赵琛杰
孙琦明
凌有基
王超凡
金圣�
付鹏瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Pyneo Technology Co Ltd
Original Assignee
Zhejiang Pyneo Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Pyneo Technology Co Ltd filed Critical Zhejiang Pyneo Technology Co Ltd
Priority to CN201721889482.6U priority Critical patent/CN208757294U/en
Application granted granted Critical
Publication of CN208757294U publication Critical patent/CN208757294U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treating Waste Gases (AREA)

Abstract

A kind of wet method fume desulfurizing system flue gas cool-down of the utility model and absorption tower auto-flushing coupling device, it is arranged in the flue of absorption tower, it is coupled by FGD-DCS including flue gas cool-down spray system and absorption tower rinse-system, including flue gas cool-down spray system and absorption tower rinse-system individually or simultaneously to carry out flue gas cool-down or absorption tower and rinse.The utility model provides a kind of smoke-gas wet desulfurization system flue gas cool-down and absorption tower entrance automatic flushing device, both being able to achieve reduces flue-gas temperature to alleviate dry and wet interface severity, it is able to achieve in system operation again and absorption tower dry and wet interface real-time online is cleared up, to clear up entrance fouling, guarantee system direct motion.

Description

A kind of wet method fume desulfurizing system flue gas cool-down and absorption tower auto-flushing coupling device
Technical field
The utility model relates to flue gas denitrification systems, specially a kind of to drop for coal steam-electric plant smoke wet desulfurization system flue gas Coupling device of the warm and flue gas into tower inlet auto-flushing.
Background technique
Wet desulphurization tower flue gas, which enters at tower, has dry, wet interface, i.e. the higher former flue gas of temperature and the lower circulation of temperature Sprayed slurry is collided here to be converged.Since most domestic heat-engine plant wet desulphurization system is that later period environmental transformation is newly-increased, The factors such as site space deficiency are limited by, in most cases desulphurization system equipment characteristics of compact layout, narrow, enter tower flue trend and cigarette In road flue gas flow field can not reasonable Arrangement, therefore former flue gas still has little time to enter to stream and inhales in absorption tower entrance dry and wet interface Receive tower, easy negative pressure return zone formed here.Absorption tower circulated sprinkling slurries are involved in by flue gas into dry in this negative pressure return zone Wet interface, the gypsum of the carrying in slurries easily deposit and solidify herein with the dust in former flue gas, long it, entrance dry and wet interface Place's fouling, which is constantly accumulated, to thicken, and blocks former flue gas circulation passage, increases desulphurization system resistance, reduces desulphurization system efficiency.In addition, Most domestic creates wet desulfurization system GGH (flue gas heat-exchange unit) is no longer arranged at present, and it is higher to enter tower original flue-gas temperature, will more Aggravate this situation.
Currently, the processing mode common for absorption tower entrance scale formation is mostly manual type cleaning, this cleaning side Formula is time-consuming, laborious and must carry out in the case where system shutdown, and operating environment is also relatively more severe and there are security risks.Few portion Divide and uses on-line rinsing mode periodic flushing flue entrance, although this backwashing manner is simpler compared with manual cleaning, convenient, by It is not high to be trapped in system automation degree, cannot achieve really automatic real-time online cleaning.
Summary of the invention
It is de- to provide a kind of flue gas wet process for existing on-line auto-cleaning and the technological deficiency of manual cleaning for the utility model It is serious to alleviate dry and wet interface to be both able to achieve reduction flue-gas temperature for sulphur system flue gas cool-down and absorption tower entrance automatic flushing device Degree, and be able to achieve in system operation and absorption tower dry and wet interface real-time online is cleared up, to clear up entrance fouling, guarantee system System direct motion.
To achieve the above object, a kind of wet method fume desulfurizing system flue gas cool-down of the utility model rushes automatically with absorption tower Coupling device is washed, speciality is to arrange two sets of water injection systems in the flue of absorption tower, and a set of is flue gas cool-down spray system, separately A set of is absorption tower rinse-system, and two sets of water injection systems are coupled by FGD-DCS, can individually realize flue gas Cooling and absorption tower pre-washing function, and above-mentioned function can be realized simultaneously.
Further, the flue gas cool-down spray system includes the alloy spiral nozzle for being parallel to flue gas flow direction arrangement, For the alloy spiral nozzle equidistant placement on shower water branch pipe, the shower water branch pipe is connected to spraying cooling jellyfish pipe On, the spraying cooling jellyfish pipe is connected to this coupled system technique supply mains.
Further, motor-driven valve, electric control valve and electromagnetic flowmeter are set on the spraying cooling jellyfish pipe, it is described Motor-driven valve, electric control valve and electromagnetic flowmeter start stop signal be connected on FGD-DCS, with flue-gas temperature, absorption tower system hinder The parametric linkages such as power.
Further, the absorption tower rinse-system includes universal with the alloy of the angled arrangement of flue gas flow direction Nozzle, the water that nozzle sprays can clean absorption tower entrance, and the universal nozzle of the alloy is equidistantly evenly arranged on flushing water branch pipe On, the flushing water branch pipe is connected to flushing water main pipe, and the flushing water main pipe is connected to this coupled system technique supply mains.
Further, motor-driven valve, electric control valve and electromagnetic flowmeter, the electricity are set in the flushing water main pipe Dynamic valve, electric control valve and electromagnetic flowmeter start stop signal are connected on FGD-DCS, with flue-gas temperature, absorption tower system resistance etc. Parametric linkage.
Further, motor-driven valve, the motor-driven valve, electric control valve are set in the coupled system process water main pipe And electromagnetic flowmeter start stop signal is connected on FGD-DCS, with the parametric linkages such as flue-gas temperature, absorption tower system resistance.
A kind of smoke-gas wet desulfurization system flue gas cool-down provided by the utility model and absorption tower entrance automatic flushing device, Conventional smoke gas spraying ventilating device and absorption tower manual cleaning mode can be substituted, and the degree of automation is higher.By into The flue gas spray for entering absorption tower, can be effectively reduced flue-gas temperature to alleviate the severity of absorption tower entrance Dry-wet interface;It is logical The flushing to absorption tower inlet is crossed, the deposition of gypsum and dust can be effectively reduced.In addition, coupling device and flue-gas temperature, The progress of the parameters such as absorption tower resistance is chain, to realize the automatic progress of flue gas spraying cooling and absorption tower flushing.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of embodiment 1.
Specific embodiment
Below by application example, and in conjunction with attached drawing, the utility model is described in further detail:
Embodiment 1
As shown in Figure 1, a kind of smoke-gas wet desulfurization system flue gas cool-down of the utility model rushes automatically with absorption tower entrance Cleaning device includes absorption tower gas approach 1, flue-gas temperature monitor 2, flue gas pressures monitor 3, technique supply mains, and 4, process water General pipeline electric switching valve 5, spraying cooling jellyfish pipe 6, spraying cooling jellyfish pipe electric switching valve 7, spraying cooling jellyfish pipe are adjusted Valve 8, spraying cooling water regulating valve service valve 9, spraying cooling jellyfish pipe electromagnetic flowmeter 10, shower water branch pipe 11, spray nozzle 12, flushing water main pipe 13, flushing water main pipe electric switching valve 14, flushing water main pipe regulating valve 15, the inspection of flushing water main pipe regulating valve Repair valve 16, flushing water main pipe electromagnetic flowmeter 17, flushing water branch pipe 18, Flushing nozzle 19, desulfurization automatic control system (FGD- DCS)20。
Wherein, flue-gas temperature monitor 2, flue gas pressures monitor 3 are mounted on absorption tower gas approach 1 by interface.
Technique supply mains electric switching valve 5 is placed on technique supply mains 4.
Spraying cooling jellyfish pipe 6, spraying cooling jellyfish pipe electric switching valve 7, spraying cooling jellyfish pipe regulating valve 8, spray Cool down water regulating valve service valve 9, and spraying cooling jellyfish pipe electromagnetic flowmeter 10 is mounted in spraying cooling main pipe 6.
Flushing water main pipe electric switching valve 14, flushing water main pipe regulating valve 15, flushing water main pipe regulating valve service valve 16, punching Wash water main pipe electromagnetic flowmeter 17 is mounted in flushing water main pipe 13.
It is at least mounted on shower water branch pipe 11 there are two spray nozzle 12, the horizontal interval of two spray nozzles 12 is set as H1, wherein 10mm≤H1≤1000mm;At least two shower water branch pipes 11 are placed in flue 1, two shower water branch pipes 11 Perpendicular separation is set as H2, wherein 20mm≤H2≤2000mm;11 one end of shower water branch pipe is fixed in flue 1, and one end passes through set Pipe is connect with spraying cooling jellyfish pipe 6.
It is at least mounted on flushing water branch pipe 18 there are two Flushing nozzle 19, the horizontal interval of two Flushing nozzles 19 is set as H3, wherein 10mm≤H3≤1000mm;18 one end of flushing water branch pipe is fixed in flue 1, and one end is by casing and rinses jellyfish Pipe 13 connects.
In addition, flue-gas temperature monitor 2, flue gas pressures monitor 3, technique supply mains electric switching valve 5, spraying cooling water Main pipe electric switching valve 7, spraying cooling jellyfish pipe regulating valve 8, spraying cooling jellyfish pipe electromagnetic flowmeter 10, flushing water main pipe electricity Dynamic switch valve 14, flushing water main pipe regulating valve 15, flushing water main pipe electromagnetic flowmeter 17 wait instrument valves I/O signal to pass through instrument control Cable transfer is into desulfurization automatic control system (FGD-DCS) 20.
Flue gas cool-down provided by the utility model and absorption tower auto-flushing coupling device working principle are as follows:
Wet desulphurization original flue gas enters wet desulfuration tower by flue 1.Flue-gas temperature monitor 2, flue gas pressures monitor 3 It is mounted on flue 1 by adapter tube, flue-gas temperature monitor 2 and flue gas pressures monitor 3 are each responsible for real time on-line monitoring cigarette Gas temperature and pressure, and by electric signal transmission into desulfurization automatic control system (FGD-DCS) 20.
Technique supply mains electric switching valve 5 is in normally open, spraying cooling jellyfish pipe electric switching valve 7, spraying cooling Jellyfish pipe regulating valve 8 is in normally off and is arranged with flue-gas temperature chain;Flushing water main pipe electric switching valve 14, flushing water Main pipe regulating valve 15 is in normally off and is arranged with flue gas pressures chain.
When flue-gas temperature is more than set temperature, 7 automatic linkage of spraying cooling jellyfish pipe electric switching valve is opened, and is sprayed simultaneously Leaching 8 automatic linkage of temperature lowering water main pipe regulating valve is opened into valve maximum opening, and process water is entered by spraying cooling jellyfish pipe 6 to be sprayed Water branch pipe 11 finally sprays into flue 1 after the atomization of spray nozzle 12, since selected 12 atomizing particle size of spray nozzle is smaller, spray Firing angle degree is bigger, and cooling effect is more preferable compared with traditional drop, can reduce former flue-gas temperature moment.As flue-gas temperature gradually drops Low, 8 aperture of spraying cooling jellyfish pipe regulating valve gradually decreases, when flue-gas temperature is lower than setting value, spraying cooling jellyfish pipe tune It saves 8 automatic linkage of valve to close, after several seconds, spraying cooling jellyfish pipe electric switching valve 7 also close by automatic linkage.
When flue gas pressures loss is more than setting value, 14 automatic linkage of flushing water main pipe electric switching valve is opened, and is rushed simultaneously 15 automatic linkage of wash water main pipe regulating valve is opened into valve maximum opening, and process water enters flushing water branch pipe by flushing water main pipe 13 18, then after the atomization of Flushing nozzle 19, rinse absorption tower flue entrance bottom plate at a certain angle downwards to clean inlet stone Cream and flue dust.Losing with flue gas pressures reduces, and 15 aperture of flushing water main pipe regulating valve gradually decreases, when flue gas pressures loss is low When setting value, 15 automatic linkage of flushing water main pipe regulating valve is closed, after several seconds, flushing water main pipe electric switching valve 14 also from Move chain closing.
Above description is only the chain operation logic of the independence of flue gas cool-down and flusher under respective trigger condition, removes this Except, spraying cooling jellyfish pipe electric switching valve 7, spray drop can be set in desulfurization automatic control system (FGD-DCS) 20 Warm water main pipe regulating valve 8 and flushing water main pipe electric switching valve 14, flushing water main pipe regulating valve 15 periodically automatically turn on program. The sequence opening degree of this coupling device also can be set in desulfurization automatic control system (FGD-DCS) 20 simultaneously, i.e., first certainly It moves and opens spraying cooling jellyfish pipe electric switching valve 7 and spraying cooling jellyfish pipe regulating valve 8, after interval of time, then automatically Flushing water main pipe electric switching valve 14 and flushing water main pipe regulating valve 15 are opened, vice versa.
It can be seen from the above description that the utility model the above embodiments are realized that
Flue gas cool-down provided by the utility model and absorption tower auto-flushing coupling device, may be implemented flue gas cool-down and Absorption tower rinse automatic running and can accurately control, so that technique water consumption and manual cleaning cost be greatly lowered.
The above descriptions are merely preferred embodiments of the present invention, and the description is not restricted to the utility model. Therefore, if those skilled in the art is inspired by the spirit and principles of the utility model, in the ancestor for not departing from the utility model In the case of purport, any change, improvement and equivalent replacement for being done etc., should be included in the protection scope of the utility model it It is interior.

Claims (5)

1. a kind of wet method fume desulfurizing system flue gas cool-down and absorption tower auto-flushing coupling device, it is characterised in that: setting exists In the flue of absorption tower, including flue gas cool-down spray system and absorption tower rinse-system, including flue gas cool-down spray system and absorption Tower rinse-system is coupled by FGD-DCS individually or simultaneously to carry out flue gas cool-down or absorption tower and rinse.
2. wet method fume desulfurizing system flue gas cool-down as described in claim 1 and absorption tower auto-flushing coupling device, special Sign is: the flue gas cool-down spray system includes the alloy spiral nozzle for being parallel to flue gas flow direction arrangement, the alloy On shower water branch pipe, the shower water branch pipe is connected on spraying cooling jellyfish pipe spiral nozzle equidistant placement, described Spraying cooling jellyfish pipe is connected to this coupled system technique supply mains.
3. wet method fume desulfurizing system flue gas cool-down as claimed in claim 2 and absorption tower auto-flushing coupling device, special Sign is: setting motor-driven valve, electric control valve and electromagnetic flowmeter on the spraying cooling jellyfish pipe, the motor-driven valve, Electric control valve and electromagnetic flowmeter start stop signal are connected on FGD-DCS, are connected with flue-gas temperature, absorption tower system drag parameter Lock.
4. wet method fume desulfurizing system flue gas cool-down and absorption tower auto-flushing as described in claim 1-3 any claim Coupling device, it is characterised in that: the absorption tower rinse-system includes logical with the alloy of the angled arrangement of flue gas flow direction With type nozzle, the water that nozzle sprays can clean absorption tower entrance, and the universal nozzle of the alloy is equidistantly evenly arranged on flushing water On branch pipe, the flushing water branch pipe is connected to flushing water main pipe, and it is total that the flushing water main pipe is connected to this coupled system process water Pipe.
5. wet method fume desulfurizing system flue gas cool-down as claimed in claim 4 and absorption tower auto-flushing coupling device, special Sign is: motor-driven valve, electric control valve and electromagnetic flowmeter be set in the flushing water main pipe, it is the motor-driven valve, electronic Regulating valve and electromagnetic flowmeter start stop signal are connected on FGD-DCS, chain with flue-gas temperature, absorption tower system drag parameter.
CN201721889482.6U 2017-12-29 2017-12-29 A kind of wet method fume desulfurizing system flue gas cool-down and absorption tower auto-flushing coupling device Expired - Fee Related CN208757294U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721889482.6U CN208757294U (en) 2017-12-29 2017-12-29 A kind of wet method fume desulfurizing system flue gas cool-down and absorption tower auto-flushing coupling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721889482.6U CN208757294U (en) 2017-12-29 2017-12-29 A kind of wet method fume desulfurizing system flue gas cool-down and absorption tower auto-flushing coupling device

Publications (1)

Publication Number Publication Date
CN208757294U true CN208757294U (en) 2019-04-19

Family

ID=66124786

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721889482.6U Expired - Fee Related CN208757294U (en) 2017-12-29 2017-12-29 A kind of wet method fume desulfurizing system flue gas cool-down and absorption tower auto-flushing coupling device

Country Status (1)

Country Link
CN (1) CN208757294U (en)

Similar Documents

Publication Publication Date Title
CN107349778A (en) Flue gas removes fog cooling apparatus and flue gas demisting cooling means
CN105950226A (en) Vertical type spray cooling and dehydration integrated system for coal gas
CN108889480A (en) A kind of sol particle object injection apparatus and clean method
CN102586523B (en) Blast furnace gas purification plant
CN208757294U (en) A kind of wet method fume desulfurizing system flue gas cool-down and absorption tower auto-flushing coupling device
CN202141159U (en) Easy-cleaning central air-conditioning ventilation duct
CN205676432U (en) Coal gas Horizental showering cooling and dewatering integral system
CN107030044B (en) A kind of magnetic cleaner
CN209156542U (en) A kind of black dirt of power plant's low-temperature flue gas processing system adds buck rinse-system
CN208968350U (en) A kind of indirect cool tower flushing water reclamation system
CN210057878U (en) Back-flushing system of standby cooling and slurry supply pipeline of reaction tower
CN103130264B (en) There is titanium tetrachloride brass wire tower and the copper wire balls cleaning method thereof of self-cleaning function
CN208389773U (en) A kind of condensing type heating stove wet-desulfurizing dust remover
CN208220831U (en) Air water automatic atomising dust-extraction unit
CN105885961B (en) The horizontal dewatering integrated system of gas washing
CN219764989U (en) Wet flue gas desulfurization thick liquid waste heat utilization system
CN208182676U (en) A kind of water treatment system for converter dedusting line
CN205252643U (en) A filter equipment for fertile production of liquid
CN205329080U (en) Anticorrosive type blast furnace gas pressure regulating valves
CN209464849U (en) A kind of Novel anti-blockage system of desulfuration absorbing tower entrance original flue
CN204429075U (en) Industrial Boiler water conservancy diversion template fiberglass desulfurization cigarette tower
CN201867126U (en) Sprayer arranged on evaporator
CN105861076A (en) Horizontal type spray cooling and dewatering integrated system for gas
CN218166293U (en) Defeated filter equipment of coal bed gas collection
CN105149298B (en) A kind of visor cleaning system and its application method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A coupling device for flue gas cooling and automatic flushing of absorption tower in wet flue gas desulfurization system

Effective date of registration: 20211206

Granted publication date: 20190419

Pledgee: Hangzhou High-tech Financing Guarantee Co.,Ltd.

Pledgor: PYNEO CO.,LTD.

Registration number: Y2021980014098

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20220322

Granted publication date: 20190419

Pledgee: Hangzhou High-tech Financing Guarantee Co.,Ltd.

Pledgor: PYNEO CO.,LTD.

Registration number: Y2021980014098

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A coupling device between flue gas cooling and automatic flushing of absorption tower in wet flue gas desulfurization system

Effective date of registration: 20220322

Granted publication date: 20190419

Pledgee: Shanghai Guotai Junan Securities Asset Management Co.,Ltd.

Pledgor: PYNEO CO.,LTD.

Registration number: Y2022990000160

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20230131

Granted publication date: 20190419

Pledgee: Shanghai Guotai Junan Securities Asset Management Co.,Ltd.

Pledgor: PYNEO CO.,LTD.

Registration number: Y2022990000160

PC01 Cancellation of the registration of the contract for pledge of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190419

CF01 Termination of patent right due to non-payment of annual fee