CN208757168U - It is a kind of to prepare preparing ceramic clinker exhaust gas dust collection device - Google Patents

It is a kind of to prepare preparing ceramic clinker exhaust gas dust collection device Download PDF

Info

Publication number
CN208757168U
CN208757168U CN201821449543.1U CN201821449543U CN208757168U CN 208757168 U CN208757168 U CN 208757168U CN 201821449543 U CN201821449543 U CN 201821449543U CN 208757168 U CN208757168 U CN 208757168U
Authority
CN
China
Prior art keywords
dust
collecting box
dust collecting
discharge port
movable plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821449543.1U
Other languages
Chinese (zh)
Inventor
荣日峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Pan Sheng New Mstar Technology Ltd
Original Assignee
Anhui Pan Sheng New Mstar Technology Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Pan Sheng New Mstar Technology Ltd filed Critical Anhui Pan Sheng New Mstar Technology Ltd
Priority to CN201821449543.1U priority Critical patent/CN208757168U/en
Application granted granted Critical
Publication of CN208757168U publication Critical patent/CN208757168U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Filtering Of Dispersed Particles In Gases (AREA)

Abstract

Preparing ceramic clinker exhaust gas dust collection device is prepared the utility model discloses a kind of, including dust collecting box, dirt pocket is equipped with above dust collecting box, dirt pocket lower end is equipped with several conical discharge ports, is equipped with dust hopper in dust collecting box at position corresponding with conical discharge port;It is equipped with movable plate below dust hopper, is equipped with first through hole at movable plate position corresponding with dust hopper discharge port;It is equipped with fixed plate below movable plate, is equipped with the second through-hole at fixed plate position corresponding with dust hopper discharge port;The bottom plate and left and right side plates of fixed plate and dust collecting box collectively form dust collection chamber;The right side plate of dust collecting box is equipped with electric cylinder, and the extension end of electric cylinder is connect with movable plate;Blower is equipped with below dust collecting box, the air outlet of blower is connected to by pipeline with dust collection chamber left end.The utility model design is simple, and design rationally, by the setting of dust collecting box, focuses on the indoor dust of dedusting, saved manpower, reduced production cost.

Description

It is a kind of to prepare preparing ceramic clinker exhaust gas dust collection device
Technical field
The utility model relates to preparing ceramic clinker preparation fields, and in particular to be received for a kind of preparing ceramic clinker for preparing with exhaust gas dust Acquisition means.
Background technique
Preparing ceramic clinker is one of primary raw material of glaze, is the key factor for determining glaze quality superiority and inferiority.Preparing ceramic clinker is Glaze is mixed according to a certain percentage with raw material, then the molten system of high temperature in smelting furnace directly drops down the raw material of molten condition into cooling In sink.Due to rapid cooling under the action of raw material is in cooling water, granular solids can be fragmented into, by salvaging, water After washing, drying, the frit finished product just dried.Preparing ceramic clinker when high temperature melting, can generate a large amount of cigarette in smelting furnace Gas, a large amount of dust can be contained in flue gas, and flue gas needs be handled in dirt pocket.In the prior art, under each dirt pocket There is a dust collecting bag, for carrying out dust collection, so need to each discharging in end toper discharge port position Dust collecting bag on mouth position is cleared up, very troublesome, time-consuming and laborious.
Utility model content
The utility model exactly a kind of prepares preparing ceramic clinker exhaust gas dust in view of the deficienciess of the prior art, providing Collection device.
It is a kind of to prepare preparing ceramic clinker exhaust gas dust collection device, including dust collecting box, it is equipped with above dust collecting box Dirt pocket, dirt pocket lower end are equipped with several conical discharge ports, and conical discharge port is plugged in dust collection roof box.Dust collection Dust hopper is equipped in case at position corresponding with conical discharge port.Movable plate is equipped with below dust hopper, movable plate goes out with dust hopper First through hole is equipped at the corresponding position of material mouth.
It is equipped with fixed plate below movable plate, is equipped with the second through-hole at fixed plate position corresponding with dust hopper discharge port.Gu The bottom plate and left and right side plates of fixed board and dust collecting box collectively form dust collection chamber.The right side plate of the dust collecting box It is equipped with electric cylinder, the extension end of electric cylinder is connect with movable plate.Blower is equipped with below dust collecting box, the air outlet of blower is logical Piping is connected to dust collection chamber left end;Dust collecting box bottom plate right end is equipped with discharge port, is tied with dust bag on discharge port.
As an improvement of the above scheme, the dust hopper is screwed on the top plate of dust collecting box by screw.
As an improvement of the above scheme, the corresponding position of the dust collecting box left and right side plates is equipped with groove, activity Plate is actively plugged in groove.
As an improvement of the above scheme, it is equipped at position corresponding with conical discharge port on the dirt pocket several into cigarette Mouthful.
The design of the utility model structure is simple, and design rationally, can be indoor to dedusting by the setting of dust collecting box Dust centralized processing, avoids and sets dust bag in the lower section of the conical discharge port of each dirt pocket, saved manpower, reduce Production cost.
Detailed description of the invention
Fig. 1 is the structural schematic diagram for preparing preparing ceramic clinker exhaust gas dust collection device;
Fig. 2 is the cross-sectional view for preparing dust collecting box in preparing ceramic clinker exhaust gas dust collection device.
In figure: dust collecting box 1, dust hopper 11, discharge port 12, groove 13, dirt pocket 2, conical discharge port 21, smoke intaking hole 22, movable plate 3, first through hole 31, fixed plate 4, the second through-hole 41, dust collection chamber 5, electric cylinder 6, blower 7, dust bag 8.
Specific embodiment
With reference to the accompanying drawing, the technical solution of the utility model is further described.Obviously, described embodiment Only the utility model a part of the embodiment, instead of all the embodiments.Based on the embodiments of the present invention, ability It is practical new to belong to this for domain those of ordinary skill every other embodiment obtained without making creative work The range of type protection.
Referring to Fig.1-2, a kind of to prepare preparing ceramic clinker exhaust gas dust collection device, including dust collecting box 1, dust hopper 11, discharge port 12, groove 13, dirt pocket 2, conical discharge port 21, smoke intaking hole 22, movable plate 3, first through hole 31, fixed plate 4, Second through-hole 41, dust collection chamber 5, electric cylinder 6, blower 7, dust bag 8.
Dirt pocket 2 is equipped with above the dust collecting box 1, dirt pocket 2 is fixed by rack, set below dust collecting box 1 There is strut, strut plays the role of supporting and fixing to dust collecting box 1.
2 lower end of dirt pocket is equipped with several conical discharge ports 21, and the dust hopper 11 is screwed onto dust by screw and receives On the top plate of header 1.Several smoke inlets 22 are equipped on dirt pocket 2 at position corresponding with conical discharge port 21.Conical discharge port 21 are plugged in 1 top plate of dust collecting box.Dust hopper is equipped in dust collecting box 1 at position corresponding with conical discharge port 21 11.Movable plate 3 is equipped with below dust hopper 11, the corresponding position of 1 left and right side plates of dust collecting box is equipped with groove 13, living Movable plate 3 is actively plugged in groove 13.The movable plate 3 is equipped with first through hole at position corresponding with 11 discharge port of dust hopper 31。
Fixed plate 4 is equipped with below movable plate 3, it is logical to be equipped with second at the position corresponding with 11 discharge port of dust hopper of fixed plate 4 Hole 41.The bottom plate and left and right side plates of fixed plate 4 and dust collecting box 1 collectively form dust collection chamber 5.Dust collecting box 1 Right side plate be equipped with electric cylinder 6, the extension end of electric cylinder 6 is connect with movable plate 3.Blower 7 is equipped with below dust collecting box 1, The air outlet of blower 7 is connected to by pipeline with 5 left end of dust collection chamber.1 bottom plate right end of dust collecting box is equipped with discharge port 12, out Dust bag 8 is tied in material mouth 12.
When being worked, first starting electric cylinder 6 makes first through hole 31 be staggered with 11 discharge port of dust hopper, and movable plate 3 rises To the effect for blocking 11 discharge port of dust hopper;Flue gas enters in dirt pocket 2 from smoke intaking hole 22, and dirt pocket 2 is by the powder in flue gas Dirt filters out, and dust rushes conical discharge port 21 and enters in dust hopper 11, reaches a certain amount to dust, starting electric cylinder 6 makes First through hole 31 on movable plate 3 is overlapped with 11 discharge port of dust hopper, and dust is fallen by first through hole 31 and the second through-hole 41 Into dust collection chamber 5, starting electric cylinder 6 makes first through hole 31 be staggered with 11 discharge port of dust hopper, restarts blower 7, blower 7 Dust is blown into dust bag 8.

Claims (4)

1. a kind of prepare preparing ceramic clinker exhaust gas dust collection device, it is characterised in that: including dust collecting box (1), dust is received Dirt pocket (2) are equipped with above header (1), dirt pocket (2) lower end is equipped with several conical discharge ports (21), and conical discharge port (21) is inserted It is connected in dust collecting box (1) top plate;Dust hopper is equipped in dust collecting box (1) at position corresponding with conical discharge port (21) (11);Movable plate (3) are equipped with below dust hopper (11), movable plate (3) is equipped at position corresponding with dust hopper (11) discharge port First through hole (31);Fixed plate (4) are equipped with below movable plate (3), fixed plate (4) position corresponding with dust hopper (11) discharge port Place is equipped with the second through-hole (41);The bottom plate and left and right side plates of fixed plate (4) and dust collecting box (1) collectively form dust receipts Collect chamber (5);The right side plate of the dust collecting box (1) is equipped with electric cylinder (6), the extension end and movable plate (3) of electric cylinder (6) Connection;Blower (7) are equipped with below dust collecting box (1), the air outlet of blower (7) passes through pipeline and dust collection chamber (5) left end Connection;Dust collecting box (1) bottom plate right end is equipped with discharge port (12), is tied with dust bag (8) on discharge port (12).
2. a kind of preparing ceramic clinker exhaust gas dust collection device is prepared according to claim 1, it is characterised in that: described Dust hopper (11) is screwed on the top plate of dust collecting box (1) by screw.
3. a kind of preparing ceramic clinker exhaust gas dust collection device is prepared according to claim 1, it is characterised in that: described The corresponding position of dust collecting box (1) left and right side plates is equipped with groove (13), and movable plate (3) is actively plugged in groove (13) It is interior.
4. a kind of preparing ceramic clinker exhaust gas dust collection device is prepared according to claim 1, it is characterised in that: described Several smoke inlets (22) are equipped at position corresponding with conical discharge port (21) on dirt pocket (2).
CN201821449543.1U 2018-09-05 2018-09-05 It is a kind of to prepare preparing ceramic clinker exhaust gas dust collection device Active CN208757168U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821449543.1U CN208757168U (en) 2018-09-05 2018-09-05 It is a kind of to prepare preparing ceramic clinker exhaust gas dust collection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821449543.1U CN208757168U (en) 2018-09-05 2018-09-05 It is a kind of to prepare preparing ceramic clinker exhaust gas dust collection device

Publications (1)

Publication Number Publication Date
CN208757168U true CN208757168U (en) 2019-04-19

Family

ID=66134311

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821449543.1U Active CN208757168U (en) 2018-09-05 2018-09-05 It is a kind of to prepare preparing ceramic clinker exhaust gas dust collection device

Country Status (1)

Country Link
CN (1) CN208757168U (en)

Similar Documents

Publication Publication Date Title
CN205252755U (en) Simple and easy waste gas dust collector
CN104387112B (en) The preparation method of the ceramic film support that a kind of ceramic fiber strengthens
CN206695531U (en) A kind of drying system for gypsum production line
CN105126552B (en) A kind of screw concrete formula dedusting recovery system
CN208757168U (en) It is a kind of to prepare preparing ceramic clinker exhaust gas dust collection device
CN104748510A (en) Fluid bed drying device
CN202078952U (en) Material grinding system
CN202061809U (en) V separator
CN204185500U (en) Stainless steel slag is dried, pneumatic separation device
CN104291719A (en) System for producing building gypsum powder through rapid dehydration, and method thereof
CN204594098U (en) Fluidisation drying system
CN203177612U (en) Flash dryer
CN216537601U (en) Dust collecting equipment in building cutting environment
CN207147187U (en) A kind of stone flour dry activation device with dust arrester
CN215261055U (en) Ceramsite drying device
CN109053010A (en) A kind of production technology of hydrophobic pearlite
CN205088541U (en) A stoving gumming system that gathers materials for asphalt mixing plant
CN205995245U (en) There is the collecting bin collection device of moistureproof dust removing effects
CN108286872A (en) A kind of sand drying device
CN208758172U (en) Vibrating screen is washed with water in a kind of preparing ceramic clinker for preparing
CN201008775Y (en) Large wind quantity combined broaching filter cartridge precipitator
CN209013709U (en) Environment-friendly type quartz sand automatic drier
CN208742124U (en) A kind of bag-type dust slurrying device
CN202024581U (en) Shakeout drying device for dry process over-moisture granulation of ceramic tile
CN207147185U (en) A kind of stone flour dry activation device of hot air circulation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant