CN208754217U - A kind of assembled photovoltaic bracket being installed on pipe pile foundation waterborne - Google Patents

A kind of assembled photovoltaic bracket being installed on pipe pile foundation waterborne Download PDF

Info

Publication number
CN208754217U
CN208754217U CN201821398768.9U CN201821398768U CN208754217U CN 208754217 U CN208754217 U CN 208754217U CN 201821398768 U CN201821398768 U CN 201821398768U CN 208754217 U CN208754217 U CN 208754217U
Authority
CN
China
Prior art keywords
anchor ear
support rod
pipe pile
pile foundation
cant beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821398768.9U
Other languages
Chinese (zh)
Inventor
阚锦照
魏田田
曾鹏
张贺
伍凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
Original Assignee
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University HHU filed Critical Hohai University HHU
Priority to CN201821398768.9U priority Critical patent/CN208754217U/en
Application granted granted Critical
Publication of CN208754217U publication Critical patent/CN208754217U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Photovoltaic Devices (AREA)

Abstract

The utility model relates to a kind of assembled photovoltaic brackets for being installed on pipe pile foundation waterborne, belong to technical field of photovoltaic power generation.The photovoltaic bracket includes multiple bracket institutions and multiple purlins;Each bracket institution includes pipe pile foundation, hoop component, support rod component and cant beam, pipe pile foundation is driven into water, and the stake top of pipe pile foundation stretches out the water surface, hoop component is mounted on the part that pipe pile foundation is located on the water surface, support rod component is mounted on hoop component, cant beam is tiltedly mounted on support rod component, and multiple bracket institutions are arranged in a row, and multiple cant beams of multiple bracket institutions are parallel to each other;Multiple purlins are parallel to each other, and each purlin is connect with the multiple cant beams being arranged in a row, and multiple purlins are for installing photovoltaic panel.The photovoltaic bracket installs hoop component, support rod component and cant beam, and the mounting purlines on cant beam can be applied to waters region so that photovoltaic panel may be mounted on purlin by squeezing into pipe pile foundation in water in pipe pile foundation.

Description

A kind of assembled photovoltaic bracket being installed on pipe pile foundation waterborne
Technical field
The utility model relates to technical field of photovoltaic power generation, in particular to a kind of assembled for being installed on pipe pile foundation waterborne Photovoltaic bracket.
Background technique
Solar energy is a kind of renewable energy of clean and environmental protection, and since the 21th century, solar energy is increasingly by people Attention and carry out Devoting Major Efforts To Developing.Traditional solar panel and photovoltaic panel is usually all disposed within ground, roof etc., but With the fast development of photovoltaic power generation project, the land resource that can be used to installation settings photovoltaic panel is fewer and fewer, therefore needs It to be extended to the place such as waters, desert, wilderness, but traditional photovoltaic bracket is carried out according to the characteristics of construction on the ground Design, it is unfavorable for directly being generalized to waters region, therefore be unfavorable for the popularization and development of photovoltaic power generation project waterborne.
Utility model content
In order to solve the problems, such as that existing photovoltaic bracket is only applicable to ground, the utility model provides one kind and is installed on water The assembled photovoltaic bracket of upper pipe pile foundation, the photovoltaic bracket include multiple bracket institutions and multiple purlins;
Each bracket institution includes that pipe pile foundation, hoop component, support rod component and cant beam, pipe pile foundation are driven into water In, and the stake top of pipe pile foundation stretches out the water surface, hoop component is mounted on the part that pipe pile foundation is located on the water surface, support bar group Part is mounted on hoop component, and cant beam is tiltedly mounted on support rod component, and multiple bracket institutions are arranged in a row, and multiple brackets Multiple cant beams of mechanism are parallel to each other;
Multiple purlins are parallel to each other, and each purlin is connect with the multiple cant beams being arranged in a row, and multiple purlins are for installing Photovoltaic panel.
The hoop component includes the identical anchor ear of two structures, respectively the first anchor ear and the second anchor ear, the first anchor ear It is installed in the part that the pipe pile foundation is located on the water surface with the second anchor ear, and the first anchor ear is located at the upper of the second anchor ear Side;
Each anchor ear includes the identical anchor ear piece of two structures, respectively the first anchor ear piece and the second anchor ear piece, Each anchor ear piece includes semicircle hoop plate, the first wing plate formed from semicircle hoop plate one end outward bending and from semicircle The second wing plate that the outward bending of the plate other end is formed is bound round, the length of the first wing plate is greater than the length of the second wing plate;
First anchor ear piece of each anchor ear and the second anchor ear piece pairing are mounted in the pipe pile foundation, the first anchor ear piece First wing plate is connect with the second wing plate of the second anchor ear piece by a fixing piece, the second wing plate of the first anchor ear piece and second armful First wing plate of hoop pieces is connected by another fixing piece, wherein the surface of the first wing plate of the first anchor ear piece, with the second anchor ear The surface of first wing plate of piece is located at approximately the same plane, and the plane passes through the center of the pipe pile foundation.
The strut component includes four support rods, respectively support rod one, support rod two, support rod three and support rod Four;
One end of support rod one is connect with the first anchor ear piece of first anchor ear, and the other end is connect with the cant beam, branch One end of strut two is connect with the second anchor ear piece of first anchor ear, and the other end is connect with the cant beam, support rod one and branch Strut two intersects;
One end of support rod three is connect with the first anchor ear piece of second anchor ear, and the other end is connect with the cant beam, branch One end of strut four is connect with the second anchor ear piece of second anchor ear, and the other end is connect with the cant beam;
In the four points of connection that four support rods and the cant beam are formed, the tie point of support rod three and the cant beam It is highly minimum, the height highest of the tie point of support rod four and the cant beam, the height of support rod one and the tie point of the cant beam Degree is lower than the height of the tie point of support rod four and the cant beam, and support rod one and the height of the tie point of the cant beam are higher than The height of the tie point of support rod two and the cant beam.
The cant beam is T-steel, and the tie point of four support rods and the cant beam is respectively positioned on the web of T-steel, The panel vertical with web is for installing the purlin in T-steel.
It is set on the web there are four strip hole, each strip hole installs a support rod by bolt, each Bolt is all made of nut and is locked.
In the T-steel on the panel vertical with web, if there are four purlin installation site, each purlin installation site A corresponding strip hole, and each purlin installation site is respectively positioned on above the strip hole corresponding to it, each purlin installation Position is installed by one purlin.
Four support rods are all made of Steel material and are made.
The cant beam and the purlin are orthogonal.
By above technical scheme, compared with the existing technology, the utility model has the following beneficial effects:
Photovoltaic bracket in the utility model by squeezing into pipe pile foundation in water, and installs anchor ear in pipe pile foundation Component, support rod component and cant beam, while the mounting purlines on cant beam, so that photovoltaic panel may be mounted on purlin, therefore, The photovoltaic bracket can be applied to waters region, be conducive to the popularization and development of photovoltaic power generation project waterborne.
Detailed description of the invention
The present invention will be further described with reference to the accompanying drawings and examples.
Fig. 1 is the structural schematic diagram that photovoltaic panel is mounted on the photovoltaic bracket of the utility model;
Fig. 2 is the attachment structure schematic diagram of support rod three, support rod four and the second anchor ear;
Fig. 3 is the attachment structure schematic diagram of support rod three, support rod four and the second anchor ear;
Fig. 4 is the structural schematic diagram of the bracket institution of the utility model;
Fig. 5 is the attachment structure schematic diagram of cant beam Yu support rod one;
Fig. 6 is the attachment structure schematic diagram between photovoltaic panel, purlin and cant beam.
In figure:
1 bracket institution, 2 purlins, 3 pipe pile foundations, 4 cant beams, 5 photovoltaic panels, 6 first anchor ears, 7 second anchor ears, 8 first armfuls Hoop pieces, 9 second anchor ear pieces, 10 semicircle hoop plates, 11 first wing plates, 12 second wing plates, 13 support rods one, 14 support rods two, 15 Support rod three, 16 support rods four, the web of 17T fashioned iron, the panel vertical with web 17 in 18T fashioned iron, 19 strip holes, 20 pressures Block, 21 bolts, 22 nuts.
Specific embodiment
The utility model is described in further detail presently in connection with attached drawing.These attached drawings are simplified schematic diagram, Only illustrate the basic structure of the utility model in a schematic way, therefore it only shows composition related with the utility model.
In order to solve the problems, such as that existing photovoltaic bracket is only applicable to ground, as shown in Figures 1 to 6, the utility model is mentioned A kind of assembled photovoltaic bracket for being installed on pipe pile foundation waterborne is supplied, which includes multiple bracket institutions 1 and multiple Purlin 2;
Each bracket institution 1 includes pipe pile foundation 3, hoop component, support rod component and cant beam 4, and pipe pile foundation 3 is squeezed into Into water, and the stake top of pipe pile foundation 3 stretches out water surface certain altitude, and hoop component is mounted on pipe pile foundation 3 and is located on the water surface Part, support rod component is mounted on hoop component, and cant beam 4 is tiltedly mounted on support rod component, multiple 1 rows of bracket institution It is in a row, and multiple cant beams 4 of multiple bracket institutions 1 are parallel to each other;
Multiple purlins 2 are parallel to each other, and each purlin 2 is connect with the multiple cant beams 4 being arranged in a row, and multiple purlins 2 are used for Photovoltaic panel 5 is installed.
Photovoltaic bracket in the utility model, by squeezing into pipe pile foundation 3 in water, and in pipe pile foundation 3, installation is embraced Component, support rod component and cant beam 4, while the mounting purlines 2 on cant beam 4 are bound round, so that photovoltaic panel 5 may be mounted at purlin 2 On, therefore, which can be applied to waters region, be conducive to the popularization and development of photovoltaic power generation project waterborne.
In the present invention, hoop component includes the identical anchor ear of two structures, respectively the first anchor ear 6 and second armful Hoop 7, the first anchor ear 6 and the second anchor ear 7 are installed in the part that pipe pile foundation 3 is located on the water surface, and the first anchor ear 6 is positioned at the The top of two anchor ears 7;
Each anchor ear includes the identical anchor ear piece of two structures, respectively the first anchor ear piece 8 and the second anchor ear piece 9, often A anchor ear piece includes semicircle hoop plate 10, from the first wing plate 11 of semicircle hoop 10 one end outward bending of plate formation and from partly The second wing plate 12 that 10 other end outward bending of circular, hoop plate is formed, the length of the first wing plate 11 are greater than the length of the second wing plate 12 Degree;
The the first anchor ear piece 8 and 9 pairing of the second anchor ear piece of each anchor ear are mounted in pipe pile foundation 3, the first anchor ear piece 8 First wing plate 11 is connect with the second wing plate 12 of the second anchor ear piece 9 by a fixing piece, the second wing plate 12 of the first anchor ear piece 8 It being connect with the first wing plate 11 of the second anchor ear piece 9 by another fixing piece, fixing piece may include screw bolt and nut, i.e., and first First wing plate 11 of anchor ear piece 8 is bolted with the second wing plate 12 of the second anchor ear piece 9, second wing of the first anchor ear piece 8 Plate 12 and the first wing plate 11 of the second anchor ear piece 9 are bolted, and each bolt is all made of nut check.
In the present invention, strut component includes four support rods, respectively support rod 1, support rod 2 14, branch Strut 3 15 and support rod 4 16;
One end of support rod 1 is connect with the first anchor ear piece 8 of the first anchor ear 6, specifically, can be in first anchor ear Two mounting holes are set on the first wing plate 11 of piece 8, and one is used to connect with the second anchor ear piece 9 of the first anchor ear 6, another is logical It crosses bolt to connect with support rod 1, the other end of support rod 1 is connect with cant beam 4;
One end of support rod 2 14 is connect with the second anchor ear piece 9 of the first anchor ear 6, specifically, can be in second anchor ear Two mounting holes are set on the first wing plate 11 of piece 9, and one is used to connect with the first anchor ear piece 8 of the first anchor ear 6, another is logical It crosses bolt to connect with support rod 2 14, the other end of support rod 2 14 is connect with cant beam 4, and support rod 1 and support rod 2 14 are handed over Fork;
Referring to figs. 2 and 3, one end of support rod 3 15 is connect with the first anchor ear piece 8 of the second anchor ear 7, specifically, can be with Two mounting holes are set on the first wing plate 11 of the first anchor ear piece 8, and one for the second anchor ear piece 9 with the second anchor ear 7 Connection, another is connect by bolt with support rod 3 15, and the other end of support rod 3 15 is connect with cant beam 4;
One end of support rod 4 16 is connect with the second anchor ear piece 9 of the second anchor ear 7, specifically, can be in second anchor ear Two mounting holes are set on the first wing plate 11 of piece 9, and one is used to connect with the first anchor ear piece 8 of the second anchor ear 7, another is logical It crosses bolt to connect with support rod 4 16, the other end of support rod 4 16 is connect with cant beam 4;
Referring to fig. 4, in the four points of connection that four support rods and cant beam 4 are formed, the connection of support rod 3 15 and cant beam 4 The height of point is minimum, the height highest of the tie point of support rod 4 16 and cant beam 4, the tie point of support rod 1 and cant beam 4 Height is lower than the height of the tie point of support rod 4 16 and cant beam 4, and support rod 1 and the height of the tie point of cant beam 4 are higher than The height of the tie point of support rod 2 14 and cant beam 4.
In the utility model, four support rods are all made of Steel material and are made.
In the present invention, referring to Fig. 5, cant beam 4 can be T-steel, the equal position of tie point of four support rods and cant beam 4 In on the web 17 of T-steel, the panel 18 vertical with web 17 is used for mounting purlines 2 in T-steel, and purlin 2 can pass through spiral shell Screw bolt and nut is mounted on panel 18 vertical with web 17 in T-steel.
In the present invention, it is set on web 17 there are four strip hole 19, each strip hole 19 passes through bolt installation one A support rod, each bolt are all made of nut and are locked, and setting strip hole 19 can overcome steel to expand with heat and contract with cold and steel Manufacture and installation bring error.
Preferably, on panel 18 vertical with web 17 in T-steel, referring to fig. 4, if there are four purlin installation site, The corresponding strip hole 19 of each purlin installation site, and each purlin installation site is respectively positioned on the strip hole 19 corresponding to it Side, each purlin installation site installs a purlin 2, so set, the load that purlin 2 can be made to pass over is more easily Be transmitted on four support rods, avoid cant beam 4 by biggish moment of flexure, make entire photovoltaic bracket cant beam 4 and support rod only by It is acted on to axle power, it is possible to reduce the size at interface, saving steel;Preferably, cant beam 4 and purlin 2 are orthogonal, for any armful Hoop, the surface of the first wing plate 11 of the first anchor ear piece 8 are located at same flat with the surface of the first wing plate 11 of the second anchor ear piece 9 Face, which passes through the center of pipe pile foundation 3, and the plane and purlin 2 are orthogonal, are designed in this way and facilitate entire photovoltaic bracket The power transmission of structure.
As shown in Figure 1, can by photovoltaic panel 5 on more purlins 2 array install, as shown in fig. 6, pressure can be passed through Block 20 is pressed in the surface of photovoltaic panel 5, and passes through briquetting 20, photovoltaic panel 5 by bolt 21 and be located under photovoltaic panel 5 The purlin 2 of side, and locked using nut 22, so realize the assembly of photovoltaic panel 5.
Photovoltaic bracket in the utility model, structure is simple, easy for installation, pipe pile foundation that can rapidly on the water surface It is installed on 3, easy to use, construction and installation are quick, and fastness is good, and wind resistance and anti-seismic performance are good, and install and dismantle It is all very convenient.Whole installation process does not need site welding, and speed of application is fast, and installation quality is more guaranteed.
It is enlightenment, through the above description, related work people with the above-mentioned desirable embodiment according to the utility model Member can carry out various changes and amendments in the range of without departing from this item utility model technical idea completely.This item is real It is not limited to the contents of the specification with novel technical scope, it is necessary to its technology is determined according to scope of the claims Property range.

Claims (8)

1. a kind of assembled photovoltaic bracket for being installed on pipe pile foundation waterborne, it is characterised in that: the photovoltaic bracket includes multiple Bracket institution and multiple purlins;
Each bracket institution includes that pipe pile foundation, hoop component, support rod component and cant beam, pipe pile foundation are driven into water, And the stake top of pipe pile foundation stretches out the water surface, hoop component is mounted on the part that pipe pile foundation is located on the water surface, support rod component It is mounted on hoop component, cant beam is tiltedly mounted on support rod component, and multiple bracket institutions are arranged in a row, and multiple timbering machines Multiple cant beams of structure are parallel to each other;
Multiple purlins are parallel to each other, and each purlin is connect with the multiple cant beams being arranged in a row, and multiple purlins are for installing photovoltaic Panel.
2. the assembled photovoltaic bracket according to claim 1 for being installed on pipe pile foundation waterborne, it is characterised in that: described armful Binding round component includes the identical anchor ear of two structures, respectively the first anchor ear and the second anchor ear, and the first anchor ear and the second anchor ear are pacified It is located at the part on the water surface mounted in the pipe pile foundation, and the first anchor ear is located at the top of the second anchor ear;
Each anchor ear includes the identical anchor ear piece of two structures, respectively the first anchor ear piece and the second anchor ear piece, each Anchor ear piece includes semicircle hoop plate, the first wing plate formed from semicircle hoop plate one end outward bending and binds round plate from semicircle The second wing plate that other end outward bending is formed, the length of the first wing plate are greater than the length of the second wing plate;
First anchor ear piece of each anchor ear and the second anchor ear piece pairing are mounted in the pipe pile foundation, and the first of the first anchor ear piece Wing plate is connect with the second wing plate of the second anchor ear piece by a fixing piece, the second wing plate of the first anchor ear piece and the second anchor ear piece The first wing plate connected by another fixing piece, wherein the surface of the first wing plate of the first anchor ear piece, with the second anchor ear piece The surface of first wing plate is located at approximately the same plane, and the plane passes through the center of the pipe pile foundation.
3. the assembled photovoltaic bracket according to claim 2 for being installed on pipe pile foundation waterborne, it is characterised in that: the support Bar assembly includes four support rods, respectively support rod one, support rod two, support rod three and support rod four;
One end of support rod one is connect with the first anchor ear piece of first anchor ear, and the other end is connect with the cant beam, support rod Two one end is connect with the second anchor ear piece of first anchor ear, and the other end is connect with the cant beam, support rod one and support rod Two intersect;
One end of support rod three is connect with the first anchor ear piece of second anchor ear, and the other end is connect with the cant beam, support rod Four one end is connect with the second anchor ear piece of second anchor ear, and the other end is connect with the cant beam;
In the four points of connection that four support rods and the cant beam are formed, the height of the tie point of support rod three and the cant beam Minimum, the height highest of the tie point of support rod four and the cant beam, support rod one is low with the height of the tie point of the cant beam In the height of support rod four and the tie point of the cant beam, and the height of the tie point of support rod one and the cant beam is higher than support The height of the tie point of bar two and the cant beam.
4. the assembled photovoltaic bracket according to claim 3 for being installed on pipe pile foundation waterborne, it is characterised in that: described oblique Beam is T-steel, and the tie point of four support rods and the cant beam is respectively positioned on the web of T-steel, in T-steel with web Vertical panel is for installing the purlin.
5. the assembled photovoltaic bracket according to claim 4 for being installed on pipe pile foundation waterborne, it is characterised in that: the abdomen It is set on plate there are four strip hole, each strip hole installs a support rod by bolt, and each bolt is all made of nut It is locked.
6. the assembled photovoltaic bracket according to claim 5 for being installed on pipe pile foundation waterborne, it is characterised in that: described In T-steel on the panel vertical with web, if there are four purlin installation site, the corresponding length of each purlin installation site Hole, and each purlin installation site is respectively positioned on above the strip hole corresponding to it, each purlin installation site installs an institute State purlin.
7. the assembled photovoltaic bracket according to claim 3 for being installed on pipe pile foundation waterborne, it is characterised in that: described four A support rod is all made of Steel material and is made.
8. the assembled photovoltaic bracket according to claim 1 for being installed on pipe pile foundation waterborne, it is characterised in that: described oblique Beam and the purlin are orthogonal.
CN201821398768.9U 2018-08-29 2018-08-29 A kind of assembled photovoltaic bracket being installed on pipe pile foundation waterborne Expired - Fee Related CN208754217U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821398768.9U CN208754217U (en) 2018-08-29 2018-08-29 A kind of assembled photovoltaic bracket being installed on pipe pile foundation waterborne

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821398768.9U CN208754217U (en) 2018-08-29 2018-08-29 A kind of assembled photovoltaic bracket being installed on pipe pile foundation waterborne

Publications (1)

Publication Number Publication Date
CN208754217U true CN208754217U (en) 2019-04-16

Family

ID=66082225

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821398768.9U Expired - Fee Related CN208754217U (en) 2018-08-29 2018-08-29 A kind of assembled photovoltaic bracket being installed on pipe pile foundation waterborne

Country Status (1)

Country Link
CN (1) CN208754217U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117155223A (en) * 2023-09-07 2023-12-01 广东缔美科技发展有限公司 Cold bending shearing-resistant photovoltaic support component, photovoltaic system and photovoltaic system construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117155223A (en) * 2023-09-07 2023-12-01 广东缔美科技发展有限公司 Cold bending shearing-resistant photovoltaic support component, photovoltaic system and photovoltaic system construction method
CN117155223B (en) * 2023-09-07 2024-03-26 广东缔美科技发展有限公司 Cold bending shearing-resistant photovoltaic support component, photovoltaic system and photovoltaic system construction method

Similar Documents

Publication Publication Date Title
WO2016045473A1 (en) Flexible photovoltaic bracket
CN206790401U (en) A kind of floating on water surface device of photovoltaic module
KR102115516B1 (en) Cable support structure for photovoltaic solar panels
CN206370808U (en) A kind of photovoltaic plate girder
CN208754217U (en) A kind of assembled photovoltaic bracket being installed on pipe pile foundation waterborne
CN206442336U (en) A kind of screw pile adjusting post photovoltaic power plant bracket
CN208424267U (en) A kind of angle adjustable cement roof solar photovoltaic bracket
CN203722559U (en) An angle-adjustable photovoltaic support of a cement roof
CN206418690U (en) Color steel tile roof photovoltaic bracket
CN208589452U (en) Solar battery array without frame three-dimensional structure
CN202039378U (en) Split mounting type reinforced concrete counterweight foundation
CN203103316U (en) Solar photovoltaic windproof adjustable fixed support
CN109617511A (en) A kind of photovoltaic power generation bracket being easily installed maintenance and its construction method of installation
CN214506948U (en) Variable-angle photovoltaic power generation device suitable for trapezoidal color steel tiles
CN204836046U (en) Manual adjustable inclination photovoltaic support
TWM626170U (en) Angle-adjustable solar module
CN106088468B (en) Combined net frame
CN206402153U (en) A kind of photovoltaic power plant bracket of adjustable inclination
CN201237394Y (en) Bearing tail support box of solar water heater thermal-collecting tube support frame
CN108396876A (en) The C-shaped purlin connecting component apparatus and its construction method of distributed photovoltaic roofing
CN220122806U (en) Fixed photovoltaic bracket system
CN104533023A (en) Connecting structure of purline, roof panel and steel beam
CN208486376U (en) The C-shaped purlin connecting component apparatus of distributed photovoltaic roofing
CN105305947B (en) Solar energy photovoltaic panel transfer
CN219875539U (en) Fixed photovoltaic bracket system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190416

Termination date: 20210829