CN208749354U - Shallow buried covered excavation Urban Underground pipe gallery - Google Patents

Shallow buried covered excavation Urban Underground pipe gallery Download PDF

Info

Publication number
CN208749354U
CN208749354U CN201821922590.3U CN201821922590U CN208749354U CN 208749354 U CN208749354 U CN 208749354U CN 201821922590 U CN201821922590 U CN 201821922590U CN 208749354 U CN208749354 U CN 208749354U
Authority
CN
China
Prior art keywords
bracing members
mid
board
permanent vertical
permanent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201821922590.3U
Other languages
Chinese (zh)
Inventor
王成
王旭
王硕
胡浩方
刘俊奇
李鋆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FOURTH ENGINEERING Co Ltd OF CCCC FOURTH HIGHWAY ENGINEERING Co Ltd
CCCC Fourth Highway Engineering Co Ltd
Original Assignee
FOURTH ENGINEERING Co Ltd OF CCCC FOURTH HIGHWAY ENGINEERING Co Ltd
CCCC Fourth Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FOURTH ENGINEERING Co Ltd OF CCCC FOURTH HIGHWAY ENGINEERING Co Ltd, CCCC Fourth Highway Engineering Co Ltd filed Critical FOURTH ENGINEERING Co Ltd OF CCCC FOURTH HIGHWAY ENGINEERING Co Ltd
Priority to CN201821922590.3U priority Critical patent/CN208749354U/en
Application granted granted Critical
Publication of CN208749354U publication Critical patent/CN208749354U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a kind of shallow buried covered excavation Urban Underground pipe galleries, small pilot tunnel including multiple step excavations, the small pilot drive boundary and vertical mid-board overlapping position are equipped with more permanent vertical bracing members, the permanent vertically bracing members upper and lower ends respectively in small pilot tunnel preliminary bracing grid steel frame or steel arch-shelf connect;Spiral net is equipped between the adjacent permanent vertical bracing members, the spiral net is connect with the permanent vertical bracing members, the permanent vertical bracing members are as skeleton casting concrete, armored concrete mid-board is formed, the armored concrete mid-board, preliminary bracing, secondary lining form Pipe rack.The utility model improves the structural strength of mid-board while avoiding removing bracing members.

Description

Shallow buried covered excavation Urban Underground pipe gallery
Technical field
The utility model belongs to technical field of building construction more particularly to a kind of shallow buried covered excavation Urban Underground pipe gallery.
Background technique
Urban Underground pipe gallery is infrastructure construction column emerging in recent years, it is intensive by various municipal pipelines It lays and manages, improve the efficiency of management.Since the buried depth of piping lane is generally shallower, section is larger, applies when using shallow burial hidden digging Working hour, it is necessary to be divided into multiple small pilot drives, while set up falsework.It is removed wait before applying two linings, then by falsework. The installation and dismounting of falsework, not only very complicated, increases cost, and due to the limitation of falsework, cannot use Engineering machinery seriously constrains excavation progress.
Utility model content
The purpose of the utility model is to provide a kind of shallow buried covered excavation Urban Underground pipe galleries, and falsework is avoided frequently to pacify Dress is removed, and construction cost is reduced, and improves construction speed.
The utility model provides a kind of shallow buried covered excavation Urban Underground pipe gallery, and small including multiple step excavations is led Hole, small pilot drive boundary and vertical mid-board overlapping position are equipped with more permanent vertical bracing members, permanently above and below vertical bracing members Both ends respectively in small pilot tunnel preliminary bracing grid steel frame or steel arch-shelf connect;
Spiral net is equipped between adjacent permanent vertical bracing members, spiral net is connect with permanent vertical bracing members, Permanent vertical bracing members form armored concrete mid-board, armored concrete mid-board, initial stage branch as skeleton casting concrete Shield, secondary lining form Pipe rack.
Further, the quantity of permanent vertical bracing members is determined according to the size of vertical load.
Further, permanent vertical bracing members use H profile steel or double angle.
According to the above aspect of the present invention, by shallow buried covered excavation Urban Underground pipe gallery, using being configured at the permanent vertical of mid-board Bracing members undertake construction loads, play the role of falsework, are directly poured in when pouring secondary lining concrete In partition wall, while avoiding removing bracing members, the structural strength of mid-board is improved.
The above description is merely an outline of the technical solution of the present invention, in order to better understand the skill of the utility model Art means, and can be implemented in accordance with the contents of the specification, below on the preferred embodiment of the present invention and the accompanying drawings in detail It describes in detail bright as after.
Detailed description of the invention
Fig. 1 is the first Construction State figure of shallow buried covered excavation Urban Underground pipe gallery in an embodiment of the present invention;
Fig. 2 is the second Construction State figure of shallow buried covered excavation Urban Underground pipe gallery in an embodiment of the present invention;
Fig. 3 is the structural schematic diagram of completion shallow buried covered excavation Urban Underground pipe gallery in an embodiment of the present invention.
Figure label:
The leading pilot tunnel of 1-;Row pilot tunnel after 2-;3- preliminary bracing;The permanent vertical bracing members of 4-;5- secondary lining.
Specific embodiment
With reference to the accompanying drawings and examples, specific embodiment of the present utility model is described in further detail.Below Embodiment is not intended to limit the scope of the present invention for illustrating the utility model.
Join shown in Fig. 1 to 3, the present embodiment additionally provides a kind of shallow buried covered excavation Urban Underground pipe gallery, including multiple points Walk the small pilot tunnel (the present embodiment is that double cabins piping lanes include leading pilot tunnel 1 and rear row pilot tunnel 2) excavated, small pilot drive boundary and perpendicular Be equipped with more permanent vertical bracing members 4 to mid-board overlapping position, 4 upper and lower ends of permanent vertical bracing members respectively with small pilot tunnel initial stage Grid steel frame or steel arch-shelf connection in supporting 3;
Spiral net is equipped between adjacent permanent vertical bracing members 4, spiral net and permanent vertical bracing members 4 connect It connects, permanent vertical bracing members 4 are used as skeleton casting concrete, form armored concrete mid-board, armored concrete mid-board, just Phase supporting 3, secondary lining 5 form Pipe rack.
Through the shallow buried covered excavation Urban Underground pipe gallery, while guaranteeing that piping lane excavates safe, it is entirely avoided existing There are the work such as installation, dismounting and outward transport of falsework in pipe gallery, reduces labour cost while saving engineering material With, and shorten and excavate circulation time, construction speed is accelerated, meanwhile, improve the structural strength of mid-board.
In the present embodiment, the quantity of permanent vertical bracing members 4 (every circulation of excavating is set up) is according to the size of vertical load It determines.
In the present embodiment, permanent vertical bracing members 4 use H profile steel or double angle.
The construction procedure of double cabin piping lanes includes:
(1) according to piping lane ship cabin arrangement, entire excavated section is divided into two parts, two pilot tunnel step excavations are each led The size in hole and position and cabin position consistency.
(2) leading pilot tunnel 1 excavates, and after the completion of excavating drilling depth every time, applies preliminary bracing 3, sets up permanent vertical bracing members 4 Vertical temporary construction bracket is formed, for bearing the vertical load in work progress, permanent vertical bracing members 4 must assure that perpendicular Directly, vertical axis is overlapped with mid-board axis.
(3) row pilot tunnel 2 excavates afterwards, after the completion of each cyclic advance, applies preliminary bracing 3, sets up permanent vertical bracing members 4 Form vertical temporary construction bracket.
(4) after guide hole digging enough distances, 5 concrete of secondary lining is poured, in the permanent vertical bracing members 4 of mid-board (fashioned iron) casting concrete forms armored concrete mid-board.
By the construction method, the entire section of piping lane is divided into corresponding small pilot drive, every circulation according to ship cabin arrangement Permanent vertical bracing members are set at mid-board after the completion of excavation.It, will be during permanently vertical bracing members be used as when pouring secondary lining Partition backbone is directly cast in concrete, a part as middle partition wall structure.While avoiding removing bracing members, improve The structural strength of mid-board.
The above is only the preferred embodiment of the utility model, is not intended to limit the utility model, it is noted that For those skilled in the art, without deviating from the technical principle of the utility model, it can also do Several improvements and modifications out, these improvements and modifications also should be regarded as the protection scope of the utility model.

Claims (3)

1. a kind of shallow buried covered excavation Urban Underground pipe gallery, which is characterized in that the small pilot tunnel including multiple step excavations is described small Pilot drive boundary and vertical mid-board overlapping position are equipped with more permanent vertical bracing members, two above and below the permanent vertical bracing members End respectively in small pilot tunnel preliminary bracing grid steel frame or steel arch-shelf connect;
Spiral net, the spiral net and the permanent vertical steel branch are equipped between the adjacent permanent vertical bracing members Support connection, the permanent vertical bracing members form armored concrete mid-board, the reinforced concrete as skeleton casting concrete Native mid-board, preliminary bracing, secondary lining form Pipe rack.
2. a kind of shallow buried covered excavation Urban Underground pipe gallery according to claim 1, which is characterized in that described permanent vertical The quantity of bracing members is determined according to the size of vertical load.
3. a kind of shallow buried covered excavation Urban Underground pipe gallery according to claim 1, which is characterized in that described permanent vertical Bracing members use H profile steel or double angle.
CN201821922590.3U 2018-11-21 2018-11-21 Shallow buried covered excavation Urban Underground pipe gallery Withdrawn - After Issue CN208749354U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821922590.3U CN208749354U (en) 2018-11-21 2018-11-21 Shallow buried covered excavation Urban Underground pipe gallery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821922590.3U CN208749354U (en) 2018-11-21 2018-11-21 Shallow buried covered excavation Urban Underground pipe gallery

Publications (1)

Publication Number Publication Date
CN208749354U true CN208749354U (en) 2019-04-16

Family

ID=66086283

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821922590.3U Withdrawn - After Issue CN208749354U (en) 2018-11-21 2018-11-21 Shallow buried covered excavation Urban Underground pipe gallery

Country Status (1)

Country Link
CN (1) CN208749354U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109505609A (en) * 2018-11-21 2019-03-22 中交第四公路工程局有限公司 Shallow buried covered excavation Urban Underground pipe gallery non-stand construction method and pipe gallery

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109505609A (en) * 2018-11-21 2019-03-22 中交第四公路工程局有限公司 Shallow buried covered excavation Urban Underground pipe gallery non-stand construction method and pipe gallery
CN109505609B (en) * 2018-11-21 2023-11-14 中交建筑集团有限公司 Bracket-free construction method for underground comprehensive pipe rack of shallow-buried underground excavation city and comprehensive pipe rack

Similar Documents

Publication Publication Date Title
CN109505609A (en) Shallow buried covered excavation Urban Underground pipe gallery non-stand construction method and pipe gallery
CN106337686B (en) Three layers of subway station canopy structure of rocky stratum tunneling and construction method
CN101864963B (en) Large-section loess tunnel construction method
CN103775092B (en) Tunnels in Shallow Buried tunneling remaining core soil in advance improvement CRD construction
CN110821503B (en) Construction method for main body of ultra-deep shield section air shaft after tunnel advance
CN103046933B (en) Shield station-crossing tunneling and station parallel construction method
CN103469817B (en) Existing subway station main structure broadening construction method
CN104533446A (en) Construction method and structure of two-layer preliminary support for preventing geological disaster of large-section weak surrounding rock tunnel
CN105298507A (en) Underground pipe gallery construction method of machine performing open excavation on upper portion and tunneling on lower portion
CN108286442A (en) Excavation method suitable for a Support System in Soft Rock Tunnels quick closure cyclization of two steps
CN205712137U (en) Foundation pit supporting construction
CN106968691A (en) Improve CD method construction methods in a kind of extremely frigid zones silty clay tunnel
CN110486021B (en) Construction method for converting large-section tunnel into two small-section tunnels
CN104806251A (en) Subsidiary inverted excavation construction method for urban subway station under complex environment
CN110306592A (en) It is a kind of elder generation shield after well underground pipe gallery construction method
CN110242305A (en) A kind of inclined shaft applies the construction technique in main hole into single side heading method
CN104653188A (en) Method for arranging large-diameter shield receiving and originating well in underground-excavated air duct
CN104564091A (en) Method and device for removing anchor rods from shield crossing area
CN103953355A (en) Method of acceptance construction in slurry shield tunnel
JP2007303155A (en) Construction method of underground cavity and tunnel construction method
CN208749354U (en) Shallow buried covered excavation Urban Underground pipe gallery
CN205036380U (en) Block of four encircles PBA and secretly digs subway station major structure
CN204457789U (en) A kind of stake arch wall supports the subway station digging large diameter shield tunnel and build
CN204851266U (en) Secretly dig shaft structure directly over station
CN103352470B (en) Foundation pit supporting structure and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20190416

Effective date of abandoning: 20231114

AV01 Patent right actively abandoned

Granted publication date: 20190416

Effective date of abandoning: 20231114

AV01 Patent right actively abandoned