CN208735264U - A kind of L-CNG loading system - Google Patents

A kind of L-CNG loading system Download PDF

Info

Publication number
CN208735264U
CN208735264U CN201820989109.6U CN201820989109U CN208735264U CN 208735264 U CN208735264 U CN 208735264U CN 201820989109 U CN201820989109 U CN 201820989109U CN 208735264 U CN208735264 U CN 208735264U
Authority
CN
China
Prior art keywords
plunger pump
pressure
valve
sledge
high pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820989109.6U
Other languages
Chinese (zh)
Inventor
何晓强
郭慧君
胡志强
刁浩峰
汪至清
牛虎勋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JEREH (TIANJIN) PETROLEUM ENGINEERING & TECHNOLOGIES Co Ltd
Original Assignee
JEREH (TIANJIN) PETROLEUM ENGINEERING & TECHNOLOGIES Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JEREH (TIANJIN) PETROLEUM ENGINEERING & TECHNOLOGIES Co Ltd filed Critical JEREH (TIANJIN) PETROLEUM ENGINEERING & TECHNOLOGIES Co Ltd
Priority to CN201820989109.6U priority Critical patent/CN208735264U/en
Application granted granted Critical
Publication of CN208735264U publication Critical patent/CN208735264U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of L-CNG loading systems, including unloading unit, LNG storage tank, storage tank booster, plunger pump sledge, high pressure gasifier sledge, sequential control disk, caisson, CNG dispenser, instrument wind system, PLC station control system and flammable gas alarm, unloading unit, LNG storage tank, plunger pump sledge, high pressure gasifier sledge, sequential control disk, caisson and CNG dispenser are sequentially connected, storage tank booster is connected in LNG storage tank, flammable gas alarm is used to detect plunger pump sledge and whether high pressure gasifier sledge occurs natural gas leaking, on plunger pump sledge two plunger pumps in parallel on high pressure gasifier sledge between two high pressure gasifiers in parallel by the Push And Releases of 3 high-pressure stop valves, any one plunger pump can be achieved and correspond to any one high pressure gasifier.The utility model has the advantages that it is more convenient to operate other than the function of meeting existing L-CNG filling station, control more comprehensively, better meets maintenance and use demand.

Description

A kind of L-CNG loading system
Technical field
The utility model relates to field natural gas filling stations, and in particular to a kind of L-CNG loading system.
Background technique
Compressed natural gas (Compressed Natuial Gas, usually indicated with CNG), as a kind of green cleaning energy Source is one of substitute of traditional fuel.Compressed natural gas can be obtained by natural gas compressing, can also be pressurizeed by LNG Gasification obtains.
As the price of natural gas storage gas and increment gas merges, the procurement price of CNG gas station is up to historical high Position, and it is gradually market-oriented along with the further release and LNG spot trade of domestic LNG liquefaction plant production capacity, and LNG arrives at a station Price further drops.In this context, especially in part, LNG price has the region of certain competitive advantage, and LNG is converted into CNG Gas station will be expected to be rapidly developed.
Urgently a kind of L-CNG loading system thus, other than the function of meeting existing L-CNG filling station, it is more convenient to operate, Control more comprehensively, better meets maintenance and use demand.
Utility model content
The purpose of this utility model overcomes the deficiencies of the prior art and provide a kind of L-CNG loading system, is meeting existing L- Other than the function of CNG filling station, it is more convenient to operate, and control more comprehensively, better meets maintenance and use demand.
The purpose of this utility model is reached by following technical measures: a kind of L-CNG loading system, including dress of unloading It sets, LNG storage tank, storage tank booster, plunger pump sledge, high pressure gasifier sledge, sequential control disk, caisson, CNG dispenser, instrument Table wind system, PLC station control system and flammable gas alarm, the unloading unit, LNG storage tank, plunger pump sledge, high pressure gasifier Sledge, sequential control disk, caisson, CNG dispenser are sequentially connected by gas pipeline, and storage tank booster passes through natural gas tube Road is connected in LNG storage tank, and sequential control disk guarantees caisson switching inflation the pressure of caisson, instrument wind system The Push And Release united for automatically controlling the operated pneumatic valve in entire L-CNG loading system, PLC stand control system for automation control L-CNG fills process, and flammable gas alarm includes combustible gas probe and gas alarm, combustible gas probe It is respectively provided on plunger pump sledge and high pressure gasifier sledge, for detecting whether natural gas leaking occurs, gas alarm is set In control room, when natural gas leaking occurs, combustible gas probe and gas alarm are simultaneously emitted by alarm, plunger There are two plunger pumps in parallel, respectively the first plunger pump 1 and the second plunger pump 2, two plunger pump one work one on pump sledge Platform is spare, or in order to meet the needs of peak time aerating, two use simultaneously, have on high pressure gasifier sledge two it is in parallel High pressure gasifier, respectively the first high pressure gasifier 3 and the second high pressure gasifier 4, two high pressure gasifier one works one It is spare, it is equipped with 3 high-pressure stop valves between two plunger pumps in parallel high pressure gasifier in parallel with two, passes through control 3 The switch of high-pressure stop valve is, it can be achieved that any one plunger pump corresponds to any one high pressure gasifier.
Further, plunger pump sledge is connected with first pressure transmitter 5 from conveying entrance, defeated in first pressure transmitter 5 Outlet is connected with pipeline in parallel twice, wherein a pipeline is by the first quick action emergency valve 6, the first strainer valve 8, the first plunger pump 1, second pressure transmitter 10 and first check-valve 12 are successively linked in sequence along defeated air supply direction, are equipped on the first plunger pump 1 First temperature transmitter 14, another time pipeline is by the second quick action emergency valve 7, the second strainer valve 9, the second plunger pump 2, third pressure Transmitter 11 and second check-valve 13 are successively linked in sequence along defeated air supply direction, and second temperature is equipped on the second plunger pump 2 and is become Send device 15.
Further, high pressure gasifier sledge is connected with the first high pressure gasifier 3, the first high-pressure ball valve in turn from conveying entrance 21, the 4th pressure transmitter 23, third high-pressure ball valve 24 and third temperature transmitter 28, the input end of water-bath type heater 27 It is connected with the 4th high-pressure ball valve 25, the outlet end of water-bath type heater 27 is connected with the 5th high-pressure ball valve 26, the 4th high-pressure ball valve 25 input terminal is connected to the input terminal of third high-pressure ball valve 24, and the output end of the 5th high-pressure ball valve 26 is connected to third smash The output end of valve 24, the second high pressure gasifier 4 and the second high-pressure ball valve 22 along defeated air supply direction be sequentially connected after access the 4th pressure The input terminal of power transmitter 23.
Further, the first plunger pump 1, the second plunger pump 2, the first high pressure gasifier 3 and the second high pressure gasifier 4 are respective Export pipeline on all have additional release pipeline, diffuse the gas in pipeline after safety valve pressure release, be collected to high pressure EAG gasification It is diffused after being heated in device 29.
Further, it is connected with third quick action emergency valve 16 on the release pipeline of 1 output end of the first plunger pump, third is tight For guaranteeing the first plunger pump 1, bringing onto load does not carry out opening machine anxious stop valve 16, on the release pipeline of 2 output end of the second plunger pump It is connected with the 4th quick action emergency valve 17, bringing onto load does not carry out opening machine the 4th quick action emergency valve 17 for guaranteeing the second plunger pump 2.
Further, the return line of plunger pump sled is equipped with temperature transmitter.
Further, the return line of plunger pump sled is equipped with shut-off valve.
Further, blowdown line in parallel twice is had additional on the muffler of plunger pump sled, is divided on blowdown line Not She You stop valve, stop valve output end is equipped with safety valve wherein, another stop valve output end and safety valve export End merges output, it is ensured that can be discharged rapidly after superpressure.
Compared with prior art, the utility model has the beneficial effects that
1. the plunger pump and high pressure gasifier in this L-CNG loading system are all set as 2, a job one is spare, And it is realized any one between 2 plunger pumps in parallel and 2 high pressure gasifiers in parallel by 3 high-pressure stop valve controls Platform plunger pump corresponds to any one high pressure gasifier, has better met the demand for using and repairing.
2. being realized by the multiple temperature transmitters and pressure transmitter that are arranged to pipeline in this L-CNG loading system The monitoring of middle temperature and pressure will call the police shutdown when the preset value is exceeded.
3. diffusing the quick action emergency valve being arranged on pipeline after plunger pump, guaranteeing plunger pump, bringing onto load does not carry out opening machine.
4. by the plunger pump sled of optimization design and high pressure gasifier sled in this L-CNG loading system, so that operation is more Convenient, control more comprehensively, better meets maintenance and use demand.
It elaborates with reference to the accompanying drawings and detailed description to the utility model.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of L-CNG loading system.
Fig. 2 is the structural schematic diagram of plunger pump sled and high pressure gasifier sled connection.
Specific embodiment
As shown in Fig. 1 to 2, a kind of L-CNG loading system, including unloading unit, LNG storage tank, storage tank booster, plunger pump Sledge, high pressure gasifier sledge, sequential control disk, caisson, CNG dispenser, instrument wind system, PLC station control system and combustible gas Body alarm, the unloading unit, LNG storage tank, plunger pump sledge, high pressure gasifier sledge, sequential control disk, caisson, CNG Dispenser is sequentially connected by gas pipeline, and storage tank booster is connected in LNG storage tank by gas pipeline, sequential control Disk guarantees caisson switching inflation the pressure of caisson, and instrument wind system adds for automatically controlling entire L-CNG The Push And Release of operated pneumatic valve in injection system, PLC stand control system for automation control L-CNG filling process, fuel gas report Alert device includes combustible gas probe and gas alarm, and combustible gas probe is respectively provided at plunger pump sledge and high pressure gas Change on device sledge, be combustible gas probe 34 and combustible gas probe 35 respectively for detecting whether natural gas leaking occurs, Gas alarm is located in control room, when natural gas leaking occurs, combustible gas probe and gas alarm It is simultaneously emitted by alarm, there is two plunger pumps in parallel, respectively the first plunger pump 1 and the second plunger pump 2 on plunger pump sledge, two Plunger pump one work one is spare, works as peak time, and the two can also work at the same time, and accelerates the aeration speed of peak time, There are two high pressure gasifiers in parallel, respectively the first high pressure gasifier 3 and the second high pressure gasifier 4 on high pressure gasifier sledge, Two high pressure gasifier one work one are spare, are equipped between two plunger pumps in parallel high pressure gasifier in parallel with two 3 high-pressure stop valves, by controlling the switch of 3 high-pressure stop valves, it can be achieved that any one plunger pump corresponds to any one height Press gasifier.
Plunger pump sledge is connected with first pressure transmitter 5 from conveying entrance, connects in the output end of first pressure transmitter 5 There is pipeline in parallel twice, wherein a pipeline is pressed by the first quick action emergency valve 6, the first strainer valve 8, the first plunger pump 1, second Power transmitter 10 and first check-valve 12 are successively linked in sequence along defeated air supply direction, and the first temperature is equipped on the first plunger pump 1 Transmitter 14, another time pipeline is by the second quick action emergency valve 7, the second strainer valve 9, the second plunger pump 2, third pressure transmitter 11 It is successively linked in sequence along defeated air supply direction with second check-valve 13, second temperature transmitter 15 is equipped on the second plunger pump 2.It is logical Crossing first pressure transmitter 5 can be monitored in real time pressure before pump, when the first plunger pump 1 or 2 inlet pressure of the second plunger pump are lower than 0.3MPa can alarm.The pre-cooling of the first plunger pump 1 and feed liquor can be remotely controlled by the first quick action emergency valve 6.Pass through First strainer valve 8 can be with the impurity in filter pipe, it is ensured that into the LNG free from admixture of the first plunger pump 1, guarantees the first plunger pump 1 operates normally.The first temperature transmitter 14 is arranged in first plunger pump 1, carries out alarm shutdown when temperature is more than 65 DEG C.First column Pressure after pump can be monitored in real time in plug pump 1 output end setting second pressure transmitter 10, can be into when outlet pressure is higher than 25MPa Row alarm is shut down.First plunger pump, 1 output end is additionally provided with first check-valve 12, it is ensured that medium will not be flow backwards, and protect the first column Plug pump 1.Second quick action emergency valve 7, the second strainer valve 9, the second plunger pump 2, second temperature transmitter 15, third pressure transmitter 11 and second check-valve 13 effect respectively be same as above review state in the first quick action emergency valve 6, the first strainer valve 8, the first plunger pump 1, the first temperature transmitter 14, second pressure transmitter 10 and first check-valve 12, are not repeated explanation herein.
High pressure gasifier sledge is connected with the first high pressure gasifier 3, the first high-pressure ball valve the 21, the 4th pressure in turn from conveying entrance Power transmitter 23, third high-pressure ball valve 24 and third temperature transmitter 28, the input end of water-bath type heater 27 are connected with the 4th High-pressure ball valve 25, the outlet end of water-bath type heater 27 are connected with the 5th high-pressure ball valve 26, the input terminal of the 4th high-pressure ball valve 25 It is connected to the input terminal of third high-pressure ball valve 24, the output end of the 5th high-pressure ball valve 26 is connected to the defeated of third high-pressure ball valve 24 Outlet, the second high pressure gasifier 4 and the second high-pressure ball valve 22 along defeated air supply direction be sequentially connected after access the 4th pressure transmitter 23 input terminal.When the first high pressure gasifier 3 when not in use, the first high-pressure ball valve 21 is closed.4th pressure transmitter 23 can Pressure after being gasified with real-time monitoring, and it is chain with the first plunger pump 1 or the second plunger pump 2, it will call the police shutdown higher than 25MPa.The Temperature after gasification can be monitored in real time in three temperature transmitters 28, and chain with the first plunger pump 1 or the second plunger pump 2, is lower than 5 DEG C It will call the police shutdown.Water-bath type heater 27 will start carry out re-heat lower than 7 DEG C when CNG temperature.Water-bath type heater inlet and outlet are set The 4th high-pressure ball valve 25 and the 5th high-pressure ball valve 26 are set, and bypass third high-pressure ball valve 24 is set, when water bath type gasifier needs Maintenance, the 4th high-pressure ball valve 25 and the 5th high-pressure ball valve 26 are closed, and bypass third high-pressure ball valve 24 is opened.
First plunger pump 1, the second plunger pump 2, the first high pressure gasifier 3 and the respective efferent duct of the second high pressure gasifier 4 Release pipeline is all had additional on line, is diffused the gas in pipeline after safety valve pressure release, is collected in high pressure EAG gasifier 29 and adds It is diffused after heat.Gas temperature after ensuring to diffuse is higher than -107 DEG C, can float up to high-altitude rapidly.
It is connected with third quick action emergency valve 16 on the release pipeline of first plunger pump, 1 output end, when the first plunger pump 1 opens machine Before can open 5s and carry out pressure release, 5s can be opened before the first plunger pump 1 is shut down and carries out pressure release, guarantees the first plunger pump 1 without negative It is loaded into row and opens machine, the 4th quick action emergency valve 17, the 4th emergency cut-off are connected on the release pipeline of 2 output end of the second plunger pump For guaranteeing the second plunger pump 2, bringing onto load does not carry out opening machine valve 17.
The return line of plunger pump sled is equipped with temperature transmitter, suction temperature can be monitored in real time, when detecting return-air Temperature is lower than -120 DEG C, indicates that pre- cold flow is completed, certain interval of time (such as 5min) plunger pump can open machine.With the first column Temperature transmitter 30 is provided that in plug 1 corresponding return line of pump, is arranged in return line corresponding with the second plunger pump 2 Be temperature transmitter 31.
The return line of plunger pump sled is equipped with shut-off valve, and shut-off valve is in normally open position, when certain plunger pump long-time When not in use, shut-off valve need to be turned off manually.Shut-off valve is provided that in return line corresponding with the first plunger pump 1 32, shut-off valve 33 is provided that in return line corresponding with the second plunger pump 2.
Blowdown line in parallel twice is had additional on the muffler of plunger pump sled, and cutting is respectively equipped on blowdown line Valve, a stop valve output end is equipped with safety valve wherein, another stop valve output end merges output with safety valve output end, It can be discharged rapidly after ensuring superpressure.
It unloads process: LNG tank car-unloading unit-LNG storage tank
Tank car inner part LNG is returned at the top of LNG tank car by endothermic gasification after the booster of unloading in unloading unit, by Step increases the gaseous pressure of tank car.When LNG slot interior pressure is higher than 0.3 MPa or more of pressure of storage tank, using pressure difference by tank car Interior LNG is injected into LNG storage tank, since LNG is gradually reduced in tank car during unloading, needs constantly to be pressurized to tank car to keep Pressure difference pressure (0.3MPa).
CNG fills process: LNG storage tank-plunger pump-high pressure gasifier-caisson-CNG dispenser-CNG vehicle Carrier gas bottle
LNG cryogenic liquid is flowed into the pump chamber of plunger pump using pressure difference in LNG storage tank, passes through plunger pump pump head piston rod High speed reciprocating motion, the LNG of low pressure (0.3MPa-0.9MPa) is gradually pressurized, into high pressure gasifier, high pressure gasifier Due to drawing the heat in ambient air, LNG gasification is made to be transformed into CNG, CNG is by the regulation of sequential control disk, by suitable Sequence enters CNG caisson, and CNG dispenser takes gas out of CNG caisson, completes the aerating to automobile and works.Whole flow process By the control system control of the station PLC, when caisson pressure reaches the specified upper limit, plunger pump autostop;When the pressure of caisson When power is lower than specified lower limit, plunger pump starts automatically, realizes automatic inflating function.
Regulating process: LNG storage tank-storage tank booster-LNG storage tank
Part LNG is transported to storage tank booster in LNG storage tank, returns to storage tank gas phase after LNG endothermic gasification, improves LNG storage Pressure tank is to setting value, it is ensured that gas station even running.
Pressure release process: LNG storage tank-manual drain valve/self-draining valve/safety valve-desorption tube
When LNG storage tank pressure is higher than LNG storage tank service pressure, it is depressured using manual drain valve;When LNG storage tank pressure When power continues to be increased above self-draining valve setting pressure, self-draining valve can automatically turn on decompression;When LNG storage tank pressure is held It is continuous when being increased above LNG storage tank safety valve setting pressure, safety valve jumping up decompression.
Standby process
The quick action emergency valve of LNG storage tank liquid valve and selected plunger pump input terminal is switched on, and is kept liquid circulation, is made plunger Pump pump pond is continuously in low-temperature condition, can open pump aerating at any time.If not wanting that the plunger pump is allowed to carry out liquid circulation, pass through PLC Control system operatio of standing is changed to the pump " to shut down ";Or selection is automatic, it will autostop without operation in certain time.
Shut down process
The autocontrol valve controlled in system operatio control L-CNG loading system of being stood by PLC is closed, L-CNG filling system Unite other valves operate as needed on or off;As long as system does not power off, the monitoring such as pressure, liquid level, flammable, ESD still can be after It is continuous, to ensure that gas station is in a safe condition.

Claims (8)

1. a kind of L-CNG loading system, including unloading unit, LNG storage tank, storage tank booster, plunger pump sledge, high pressure gasifier Sledge, sequential control disk, caisson, CNG dispenser, instrument wind system, PLC station control system and flammable gas alarm, it is described Unloading unit, LNG storage tank, plunger pump sledge, high pressure gasifier sledge, sequential control disk, caisson, CNG dispenser pass through natural Air pipe is sequentially connected, and storage tank booster is connected in LNG storage tank by gas pipeline, and sequential control disk cuts caisson Inflation is changed to guarantee the pressure of caisson, instrument wind system is pneumatic in entire L-CNG loading system for automatically controlling The Push And Release of valve, PLC stand control system for automation control L-CNG filling process, and flammable gas alarm includes combustible gas Bulk detector and gas alarm, combustible gas probe are respectively provided on plunger pump sledge and high pressure gasifier sledge, are used for It detecting whether that natural gas leaking occurs, gas alarm is located in control room, when natural gas leaking occurs, fuel gas Detector and gas alarm are simultaneously emitted by alarm, it is characterised in that: there are two plunger pumps in parallel on plunger pump sledge, point The first plunger pump (1) and the second plunger pump (2) for not being, two plunger pump one work one is spare or two make simultaneously With having two high pressure gasifiers in parallel on high pressure gasifier sledge, respectively the first high pressure gasifier (3) and second high-pressure gasified Device (4), two high pressure gasifier one work one it is spare, two plunger pumps in parallel high pressure gasifier in parallel with two it Between be equipped with 3 high-pressure stop valves, by controlling the switch of 3 high-pressure stop valves, it can be achieved that any one plunger pump is corresponding any One high pressure gasifier.
2. L-CNG loading system according to claim 1, it is characterised in that: the plunger pump sledge is connected from conveying entrance There are first pressure transmitter (5), pipeline in parallel twice is connected in first pressure transmitter (5) output end, wherein a pipe Line is stopped by the first quick action emergency valve (6), the first strainer valve (8), the first plunger pump (1), second pressure transmitter (10) and first It goes back to valve (12) to be successively linked in sequence along defeated air supply direction, is equipped with the first temperature transmitter (14) on the first plunger pump (1), it is another Time pipeline is by the second quick action emergency valve (7), the second strainer valve (9), the second plunger pump (2), third pressure transmitter (11) and the Two check-valves (13) are successively linked in sequence along defeated air supply direction, are equipped with second temperature transmitter (15) on the second plunger pump (2).
3. L-CNG loading system according to claim 1, it is characterised in that: the high pressure gasifier sledge from conveying entrance It is connected with the first high pressure gasifier (3), the first high-pressure ball valve (21), the 4th pressure transmitter (23), third high-pressure ball valve in turn (24) and third temperature transmitter (28), the input end of water-bath type heater (27) are connected with the 4th high-pressure ball valve (25), water-bath The outlet end of formula heater (27) is connected with the 5th high-pressure ball valve (26), and the input terminal of the 4th high-pressure ball valve (25) is connected to third The output end of the input terminal of high-pressure ball valve (24), the 5th high-pressure ball valve (26) is connected to the output end of third high-pressure ball valve (24), Second high pressure gasifier (4) and the second high-pressure ball valve (22) along defeated air supply direction be sequentially connected after access the 4th pressure transmitter (23) input terminal.
4. L-CNG loading system according to claim 1, it is characterised in that: in first plunger pump (1), the second column Release pipeline is all had additional on plug pump (2), the first high pressure gasifier (3) and the second high pressure gasifier (4) respective export pipeline, The gas in pipeline is diffused after safety valve pressure release, is collected in high pressure EAG gasifier (29) and is diffused after heating.
5. L-CNG loading system according to claim 4, it is characterised in that: in the first plunger pump (1) output end It is connected with third quick action emergency valve (16) on release pipeline, third quick action emergency valve (16) is for guaranteeing the first plunger pump (1) no Bringing onto load carries out opening machine, is connected with the 4th quick action emergency valve (17) on the release pipeline of the second plunger pump (2) output end, and the 4th Quick action emergency valve (17) is for guaranteeing that the second plunger pump (2) bringing onto load does not carry out opening machine.
6. L-CNG loading system according to claim 1, it is characterised in that: in the return line of plunger pump sled Equipped with temperature transmitter.
7. L-CNG loading system according to claim 1, it is characterised in that: in the return line of plunger pump sled Equipped with shut-off valve.
8. L-CNG loading system according to claim 1, it is characterised in that: increase on the muffler of plunger pump sled Equipped with blowdown line in parallel twice, stop valve is respectively equipped on blowdown line, a stop valve output end is equipped with wherein Safety valve, another stop valve output end merge output with safety valve output end.
CN201820989109.6U 2018-06-26 2018-06-26 A kind of L-CNG loading system Active CN208735264U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820989109.6U CN208735264U (en) 2018-06-26 2018-06-26 A kind of L-CNG loading system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820989109.6U CN208735264U (en) 2018-06-26 2018-06-26 A kind of L-CNG loading system

Publications (1)

Publication Number Publication Date
CN208735264U true CN208735264U (en) 2019-04-12

Family

ID=66026146

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820989109.6U Active CN208735264U (en) 2018-06-26 2018-06-26 A kind of L-CNG loading system

Country Status (1)

Country Link
CN (1) CN208735264U (en)

Cited By (35)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108561750A (en) * 2018-06-26 2018-09-21 杰瑞(天津)石油工程技术有限公司 A kind of L-CNG loading systems
US10895202B1 (en) 2019-09-13 2021-01-19 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US10907459B1 (en) 2019-09-13 2021-02-02 Bj Energy Solutions, Llc Methods and systems for operating a fleet of pumps
US10954770B1 (en) 2020-06-09 2021-03-23 Bj Energy Solutions, Llc Systems and methods for exchanging fracturing components of a hydraulic fracturing unit
US10961908B1 (en) 2020-06-05 2021-03-30 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US10968837B1 (en) 2020-05-14 2021-04-06 Bj Energy Solutions, Llc Systems and methods utilizing turbine compressor discharge for hydrostatic manifold purge
US10989180B2 (en) 2019-09-13 2021-04-27 Bj Energy Solutions, Llc Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods
US11002189B2 (en) 2019-09-13 2021-05-11 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11015594B2 (en) 2019-09-13 2021-05-25 Bj Energy Solutions, Llc Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump
US11015536B2 (en) 2019-09-13 2021-05-25 Bj Energy Solutions, Llc Methods and systems for supplying fuel to gas turbine engines
US11022526B1 (en) 2020-06-09 2021-06-01 Bj Energy Solutions, Llc Systems and methods for monitoring a condition of a fracturing component section of a hydraulic fracturing unit
US11028677B1 (en) 2020-06-22 2021-06-08 Bj Energy Solutions, Llc Stage profiles for operations of hydraulic systems and associated methods
US11066915B1 (en) 2020-06-09 2021-07-20 Bj Energy Solutions, Llc Methods for detection and mitigation of well screen out
US11109508B1 (en) 2020-06-05 2021-08-31 Bj Energy Solutions, Llc Enclosure assembly for enhanced cooling of direct drive unit and related methods
US11125066B1 (en) 2020-06-22 2021-09-21 Bj Energy Solutions, Llc Systems and methods to operate a dual-shaft gas turbine engine for hydraulic fracturing
US11149533B1 (en) 2020-06-24 2021-10-19 Bj Energy Solutions, Llc Systems to monitor, detect, and/or intervene relative to cavitation and pulsation events during a hydraulic fracturing operation
US11193361B1 (en) 2020-07-17 2021-12-07 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations
US11208953B1 (en) 2020-06-05 2021-12-28 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US11208880B2 (en) 2020-05-28 2021-12-28 Bj Energy Solutions, Llc Bi-fuel reciprocating engine to power direct drive turbine fracturing pumps onboard auxiliary systems and related methods
US11220895B1 (en) 2020-06-24 2022-01-11 Bj Energy Solutions, Llc Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods
US11236739B2 (en) 2019-09-13 2022-02-01 Bj Energy Solutions, Llc Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods
US11268346B2 (en) 2019-09-13 2022-03-08 Bj Energy Solutions, Llc Fuel, communications, and power connection systems
CN114791084A (en) * 2021-10-19 2022-07-26 江苏国富氢能技术装备股份有限公司 Full-automatic control high-pressure gas storage cylinder air tightness detection pressure testing device and control method thereof
US11408794B2 (en) 2019-09-13 2022-08-09 Bj Energy Solutions, Llc Fuel, communications, and power connection systems and related methods
US11415125B2 (en) 2020-06-23 2022-08-16 Bj Energy Solutions, Llc Systems for utilization of a hydraulic fracturing unit profile to operate hydraulic fracturing units
US11428165B2 (en) 2020-05-15 2022-08-30 Bj Energy Solutions, Llc Onboard heater of auxiliary systems using exhaust gases and associated methods
US11473413B2 (en) 2020-06-23 2022-10-18 Bj Energy Solutions, Llc Systems and methods to autonomously operate hydraulic fracturing units
US11560845B2 (en) 2019-05-15 2023-01-24 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11624326B2 (en) 2017-05-21 2023-04-11 Bj Energy Solutions, Llc Methods and systems for supplying fuel to gas turbine engines
US11635074B2 (en) 2020-05-12 2023-04-25 Bj Energy Solutions, Llc Cover for fluid systems and related methods
US11639654B2 (en) 2021-05-24 2023-05-02 Bj Energy Solutions, Llc Hydraulic fracturing pumps to enhance flow of fracturing fluid into wellheads and related methods
US11867118B2 (en) 2019-09-13 2024-01-09 Bj Energy Solutions, Llc Methods and systems for supplying fuel to gas turbine engines
US11933153B2 (en) 2020-06-22 2024-03-19 Bj Energy Solutions, Llc Systems and methods to operate hydraulic fracturing units using automatic flow rate and/or pressure control
US11939853B2 (en) 2020-06-22 2024-03-26 Bj Energy Solutions, Llc Systems and methods providing a configurable staged rate increase function to operate hydraulic fracturing units
US11971028B2 (en) 2023-05-25 2024-04-30 Bj Energy Solutions, Llc Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump

Cited By (132)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11624326B2 (en) 2017-05-21 2023-04-11 Bj Energy Solutions, Llc Methods and systems for supplying fuel to gas turbine engines
CN108561750A (en) * 2018-06-26 2018-09-21 杰瑞(天津)石油工程技术有限公司 A kind of L-CNG loading systems
US11560845B2 (en) 2019-05-15 2023-01-24 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11598263B2 (en) 2019-09-13 2023-03-07 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US10989180B2 (en) 2019-09-13 2021-04-27 Bj Energy Solutions, Llc Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods
US11408794B2 (en) 2019-09-13 2022-08-09 Bj Energy Solutions, Llc Fuel, communications, and power connection systems and related methods
US10895202B1 (en) 2019-09-13 2021-01-19 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US11719234B2 (en) 2019-09-13 2023-08-08 Bj Energy Solutions, Llc Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump
US11002189B2 (en) 2019-09-13 2021-05-11 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11401865B1 (en) 2019-09-13 2022-08-02 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US11015594B2 (en) 2019-09-13 2021-05-25 Bj Energy Solutions, Llc Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump
US11015536B2 (en) 2019-09-13 2021-05-25 Bj Energy Solutions, Llc Methods and systems for supplying fuel to gas turbine engines
US11578660B1 (en) 2019-09-13 2023-02-14 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US11629584B2 (en) 2019-09-13 2023-04-18 Bj Energy Solutions, Llc Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods
US11060455B1 (en) 2019-09-13 2021-07-13 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11867118B2 (en) 2019-09-13 2024-01-09 Bj Energy Solutions, Llc Methods and systems for supplying fuel to gas turbine engines
US10907459B1 (en) 2019-09-13 2021-02-02 Bj Energy Solutions, Llc Methods and systems for operating a fleet of pumps
US11092152B2 (en) 2019-09-13 2021-08-17 Bj Energy Solutions, Llc Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump
US11619122B2 (en) 2019-09-13 2023-04-04 Bj Energy Solutions, Llc Methods and systems for operating a fleet of pumps
US11613980B2 (en) 2019-09-13 2023-03-28 Bj Energy Solutions, Llc Methods and systems for operating a fleet of pumps
US11608725B2 (en) 2019-09-13 2023-03-21 Bj Energy Solutions, Llc Methods and systems for operating a fleet of pumps
US11149726B1 (en) 2019-09-13 2021-10-19 Bj Energy Solutions, Llc Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump
US11655763B1 (en) 2019-09-13 2023-05-23 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US11156159B1 (en) 2019-09-13 2021-10-26 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11346280B1 (en) 2019-09-13 2022-05-31 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US11604113B2 (en) 2019-09-13 2023-03-14 Bj Energy Solutions, Llc Fuel, communications, and power connection systems and related methods
US11852001B2 (en) 2019-09-13 2023-12-26 Bj Energy Solutions, Llc Methods and systems for operating a fleet of pumps
US11859482B2 (en) 2019-09-13 2024-01-02 Bj Energy Solutions, Llc Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods
US11649766B1 (en) 2019-09-13 2023-05-16 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US10982596B1 (en) 2019-09-13 2021-04-20 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US11555756B2 (en) 2019-09-13 2023-01-17 Bj Energy Solutions, Llc Fuel, communications, and power connection systems and related methods
US11236739B2 (en) 2019-09-13 2022-02-01 Bj Energy Solutions, Llc Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods
US11460368B2 (en) 2019-09-13 2022-10-04 Bj Energy Solutions, Llc Fuel, communications, and power connection systems and related methods
US11725583B2 (en) 2019-09-13 2023-08-15 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11530602B2 (en) 2019-09-13 2022-12-20 Bj Energy Solutions, Llc Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods
US11512642B1 (en) 2019-09-13 2022-11-29 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US11268346B2 (en) 2019-09-13 2022-03-08 Bj Energy Solutions, Llc Fuel, communications, and power connection systems
US11767791B2 (en) 2019-09-13 2023-09-26 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11280266B2 (en) 2019-09-13 2022-03-22 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11280331B2 (en) 2019-09-13 2022-03-22 Bj Energy Solutions, Llc Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump
US11287350B2 (en) 2019-09-13 2022-03-29 Bj Energy Solutions, Llc Fuel, communications, and power connection methods
US11761846B2 (en) 2019-09-13 2023-09-19 Bj Energy Solutions, Llc Fuel, communications, and power connection systems and related methods
US11473503B1 (en) 2019-09-13 2022-10-18 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US11473997B2 (en) 2019-09-13 2022-10-18 Bj Energy Solutions, Llc Fuel, communications, and power connection systems and related methods
US11319878B2 (en) 2019-09-13 2022-05-03 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US11708829B2 (en) 2020-05-12 2023-07-25 Bj Energy Solutions, Llc Cover for fluid systems and related methods
US11635074B2 (en) 2020-05-12 2023-04-25 Bj Energy Solutions, Llc Cover for fluid systems and related methods
US11898504B2 (en) 2020-05-14 2024-02-13 Bj Energy Solutions, Llc Systems and methods utilizing turbine compressor discharge for hydrostatic manifold purge
US10968837B1 (en) 2020-05-14 2021-04-06 Bj Energy Solutions, Llc Systems and methods utilizing turbine compressor discharge for hydrostatic manifold purge
US11542868B2 (en) 2020-05-15 2023-01-03 Bj Energy Solutions, Llc Onboard heater of auxiliary systems using exhaust gases and associated methods
US11959419B2 (en) 2020-05-15 2024-04-16 Bj Energy Solutions, Llc Onboard heater of auxiliary systems using exhaust gases and associated methods
US11434820B2 (en) 2020-05-15 2022-09-06 Bj Energy Solutions, Llc Onboard heater of auxiliary systems using exhaust gases and associated methods
US11428165B2 (en) 2020-05-15 2022-08-30 Bj Energy Solutions, Llc Onboard heater of auxiliary systems using exhaust gases and associated methods
US11624321B2 (en) 2020-05-15 2023-04-11 Bj Energy Solutions, Llc Onboard heater of auxiliary systems using exhaust gases and associated methods
US11698028B2 (en) 2020-05-15 2023-07-11 Bj Energy Solutions, Llc Onboard heater of auxiliary systems using exhaust gases and associated methods
US11365616B1 (en) 2020-05-28 2022-06-21 Bj Energy Solutions, Llc Bi-fuel reciprocating engine to power direct drive turbine fracturing pumps onboard auxiliary systems and related methods
US11313213B2 (en) 2020-05-28 2022-04-26 Bj Energy Solutions, Llc Bi-fuel reciprocating engine to power direct drive turbine fracturing pumps onboard auxiliary systems and related methods
US11814940B2 (en) 2020-05-28 2023-11-14 Bj Energy Solutions Llc Bi-fuel reciprocating engine to power direct drive turbine fracturing pumps onboard auxiliary systems and related methods
US11603745B2 (en) 2020-05-28 2023-03-14 Bj Energy Solutions, Llc Bi-fuel reciprocating engine to power direct drive turbine fracturing pumps onboard auxiliary systems and related methods
US11208880B2 (en) 2020-05-28 2021-12-28 Bj Energy Solutions, Llc Bi-fuel reciprocating engine to power direct drive turbine fracturing pumps onboard auxiliary systems and related methods
US10961908B1 (en) 2020-06-05 2021-03-30 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US11109508B1 (en) 2020-06-05 2021-08-31 Bj Energy Solutions, Llc Enclosure assembly for enhanced cooling of direct drive unit and related methods
US11627683B2 (en) 2020-06-05 2023-04-11 Bj Energy Solutions, Llc Enclosure assembly for enhanced cooling of direct drive unit and related methods
US11891952B2 (en) 2020-06-05 2024-02-06 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US11300050B2 (en) 2020-06-05 2022-04-12 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US11746698B2 (en) 2020-06-05 2023-09-05 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US11129295B1 (en) 2020-06-05 2021-09-21 Bj Energy Solutions, Llc Enclosure assembly for enhanced cooling of direct drive unit and related methods
US11723171B2 (en) 2020-06-05 2023-08-08 Bj Energy Solutions, Llc Enclosure assembly for enhanced cooling of direct drive unit and related methods
US11378008B2 (en) 2020-06-05 2022-07-05 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US11208953B1 (en) 2020-06-05 2021-12-28 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US11598264B2 (en) 2020-06-05 2023-03-07 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US11261717B2 (en) 2020-06-09 2022-03-01 Bj Energy Solutions, Llc Systems and methods for exchanging fracturing components of a hydraulic fracturing unit
US11939854B2 (en) 2020-06-09 2024-03-26 Bj Energy Solutions, Llc Methods for detection and mitigation of well screen out
US11208881B1 (en) 2020-06-09 2021-12-28 Bj Energy Solutions, Llc Methods and systems for detection and mitigation of well screen out
US11566506B2 (en) 2020-06-09 2023-01-31 Bj Energy Solutions, Llc Methods for detection and mitigation of well screen out
US10954770B1 (en) 2020-06-09 2021-03-23 Bj Energy Solutions, Llc Systems and methods for exchanging fracturing components of a hydraulic fracturing unit
US11867046B2 (en) 2020-06-09 2024-01-09 Bj Energy Solutions, Llc Systems and methods for exchanging fracturing components of a hydraulic fracturing unit
US11015423B1 (en) 2020-06-09 2021-05-25 Bj Energy Solutions, Llc Systems and methods for exchanging fracturing components of a hydraulic fracturing unit
US11319791B2 (en) 2020-06-09 2022-05-03 Bj Energy Solutions, Llc Methods and systems for detection and mitigation of well screen out
US11022526B1 (en) 2020-06-09 2021-06-01 Bj Energy Solutions, Llc Systems and methods for monitoring a condition of a fracturing component section of a hydraulic fracturing unit
US11629583B2 (en) 2020-06-09 2023-04-18 Bj Energy Solutions, Llc Systems and methods for exchanging fracturing components of a hydraulic fracturing unit
US11066915B1 (en) 2020-06-09 2021-07-20 Bj Energy Solutions, Llc Methods for detection and mitigation of well screen out
US11339638B1 (en) 2020-06-09 2022-05-24 Bj Energy Solutions, Llc Systems and methods for exchanging fracturing components of a hydraulic fracturing unit
US11512570B2 (en) 2020-06-09 2022-11-29 Bj Energy Solutions, Llc Systems and methods for exchanging fracturing components of a hydraulic fracturing unit
US11085281B1 (en) 2020-06-09 2021-08-10 Bj Energy Solutions, Llc Systems and methods for exchanging fracturing components of a hydraulic fracturing unit
US11933153B2 (en) 2020-06-22 2024-03-19 Bj Energy Solutions, Llc Systems and methods to operate hydraulic fracturing units using automatic flow rate and/or pressure control
US11408263B2 (en) 2020-06-22 2022-08-09 Bj Energy Solutions, Llc Systems and methods to operate a dual-shaft gas turbine engine for hydraulic fracturing
US11125066B1 (en) 2020-06-22 2021-09-21 Bj Energy Solutions, Llc Systems and methods to operate a dual-shaft gas turbine engine for hydraulic fracturing
US11952878B2 (en) 2020-06-22 2024-04-09 Bj Energy Solutions, Llc Stage profiles for operations of hydraulic systems and associated methods
US11939853B2 (en) 2020-06-22 2024-03-26 Bj Energy Solutions, Llc Systems and methods providing a configurable staged rate increase function to operate hydraulic fracturing units
US11732565B2 (en) 2020-06-22 2023-08-22 Bj Energy Solutions, Llc Systems and methods to operate a dual-shaft gas turbine engine for hydraulic fracturing
US11028677B1 (en) 2020-06-22 2021-06-08 Bj Energy Solutions, Llc Stage profiles for operations of hydraulic systems and associated methods
US11898429B2 (en) 2020-06-22 2024-02-13 Bj Energy Solutions, Llc Systems and methods to operate a dual-shaft gas turbine engine for hydraulic fracturing
US11598188B2 (en) 2020-06-22 2023-03-07 Bj Energy Solutions, Llc Stage profiles for operations of hydraulic systems and associated methods
US11236598B1 (en) 2020-06-22 2022-02-01 Bj Energy Solutions, Llc Stage profiles for operations of hydraulic systems and associated methods
US11639655B2 (en) 2020-06-22 2023-05-02 Bj Energy Solutions, Llc Systems and methods to operate a dual-shaft gas turbine engine for hydraulic fracturing
US11572774B2 (en) 2020-06-22 2023-02-07 Bj Energy Solutions, Llc Systems and methods to operate a dual-shaft gas turbine engine for hydraulic fracturing
US11208879B1 (en) 2020-06-22 2021-12-28 Bj Energy Solutions, Llc Stage profiles for operations of hydraulic systems and associated methods
US11661832B2 (en) 2020-06-23 2023-05-30 Bj Energy Solutions, Llc Systems and methods to autonomously operate hydraulic fracturing units
US11473413B2 (en) 2020-06-23 2022-10-18 Bj Energy Solutions, Llc Systems and methods to autonomously operate hydraulic fracturing units
US11939974B2 (en) 2020-06-23 2024-03-26 Bj Energy Solutions, Llc Systems and methods of utilization of a hydraulic fracturing unit profile to operate hydraulic fracturing units
US11649820B2 (en) 2020-06-23 2023-05-16 Bj Energy Solutions, Llc Systems and methods of utilization of a hydraulic fracturing unit profile to operate hydraulic fracturing units
US11415125B2 (en) 2020-06-23 2022-08-16 Bj Energy Solutions, Llc Systems for utilization of a hydraulic fracturing unit profile to operate hydraulic fracturing units
US11428218B2 (en) 2020-06-23 2022-08-30 Bj Energy Solutions, Llc Systems and methods of utilization of a hydraulic fracturing unit profile to operate hydraulic fracturing units
US11466680B2 (en) 2020-06-23 2022-10-11 Bj Energy Solutions, Llc Systems and methods of utilization of a hydraulic fracturing unit profile to operate hydraulic fracturing units
US11566505B2 (en) 2020-06-23 2023-01-31 Bj Energy Solutions, Llc Systems and methods to autonomously operate hydraulic fracturing units
US11719085B1 (en) 2020-06-23 2023-08-08 Bj Energy Solutions, Llc Systems and methods to autonomously operate hydraulic fracturing units
US11255174B2 (en) 2020-06-24 2022-02-22 Bj Energy Solutions, Llc Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods
US11299971B2 (en) 2020-06-24 2022-04-12 Bj Energy Solutions, Llc System of controlling a hydraulic fracturing pump or blender using cavitation or pulsation detection
US11512571B2 (en) 2020-06-24 2022-11-29 Bj Energy Solutions, Llc Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods
US11149533B1 (en) 2020-06-24 2021-10-19 Bj Energy Solutions, Llc Systems to monitor, detect, and/or intervene relative to cavitation and pulsation events during a hydraulic fracturing operation
US11506040B2 (en) 2020-06-24 2022-11-22 Bj Energy Solutions, Llc Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods
US11746638B2 (en) 2020-06-24 2023-09-05 Bj Energy Solutions, Llc Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods
US11668175B2 (en) 2020-06-24 2023-06-06 Bj Energy Solutions, Llc Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods
US11542802B2 (en) 2020-06-24 2023-01-03 Bj Energy Solutions, Llc Hydraulic fracturing control assembly to detect pump cavitation or pulsation
US11220895B1 (en) 2020-06-24 2022-01-11 Bj Energy Solutions, Llc Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods
US11692422B2 (en) 2020-06-24 2023-07-04 Bj Energy Solutions, Llc System to monitor cavitation or pulsation events during a hydraulic fracturing operation
US11274537B2 (en) 2020-06-24 2022-03-15 Bj Energy Solutions, Llc Method to detect and intervene relative to cavitation and pulsation events during a hydraulic fracturing operation
US11391137B2 (en) 2020-06-24 2022-07-19 Bj Energy Solutions, Llc Systems and methods to monitor, detect, and/or intervene relative to cavitation and pulsation events during a hydraulic fracturing operation
US11603744B2 (en) 2020-07-17 2023-03-14 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations
US11365615B2 (en) 2020-07-17 2022-06-21 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations
US11920450B2 (en) 2020-07-17 2024-03-05 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations
US11255175B1 (en) 2020-07-17 2022-02-22 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations
US11608727B2 (en) 2020-07-17 2023-03-21 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations
US11193360B1 (en) 2020-07-17 2021-12-07 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations
US11193361B1 (en) 2020-07-17 2021-12-07 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations
US11867045B2 (en) 2021-05-24 2024-01-09 Bj Energy Solutions, Llc Hydraulic fracturing pumps to enhance flow of fracturing fluid into wellheads and related methods
US11639654B2 (en) 2021-05-24 2023-05-02 Bj Energy Solutions, Llc Hydraulic fracturing pumps to enhance flow of fracturing fluid into wellheads and related methods
US11732563B2 (en) 2021-05-24 2023-08-22 Bj Energy Solutions, Llc Hydraulic fracturing pumps to enhance flow of fracturing fluid into wellheads and related methods
CN114791084A (en) * 2021-10-19 2022-07-26 江苏国富氢能技术装备股份有限公司 Full-automatic control high-pressure gas storage cylinder air tightness detection pressure testing device and control method thereof
CN114791084B (en) * 2021-10-19 2023-08-11 江苏国富氢能技术装备股份有限公司 Full-automatic control high-pressure gas cylinder air tightness detection pressure test device and control method thereof
US11971028B2 (en) 2023-05-25 2024-04-30 Bj Energy Solutions, Llc Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump

Similar Documents

Publication Publication Date Title
CN208735264U (en) A kind of L-CNG loading system
CN108561750A (en) A kind of L-CNG loading systems
CN208764658U (en) A kind of LNG/L-CNG Qiao Zhuan gas station
CN109027662A (en) A kind of LNG/L-CNG Qiao Zhuan gas station
CN203384645U (en) Cryogenic liquid conveying and supercharging system with active supercharging capability
US6722399B1 (en) System and method for unloading compressed gas
CN104697861B (en) A kind of low energy consumption it is multistage from supercharging high-pressure tank atmosphere cyclic test system
CN108361547B (en) Novel LNG (liquefied Natural gas) filling station and working method thereof
CN203880390U (en) Skid-mounted device for recovering released BOG (Boil Off Gas) in tank car and storage tank
CN105043886B (en) A kind of natural gas pressure vessel carries out double dielectric testing devices of gas and water pressure experiment
CN204647843U (en) LNGV (liquefied natural gas vehicle) liquid-adding device
CN204060975U (en) A kind of high voltage/low voltage fuel gas supply system of Ship Power Equipment
CN204629077U (en) CNG air entraining substation trailer pipe-line system and CNG air entraining substation system
CN105757449B (en) A kind of automobile-used LNG active boosts system and its air supply method
CN110410665B (en) Unloading system for low-temperature liquefied gas tank wagon
CN204300680U (en) Skid-mounted LNG mono-pump two-shipper filling apparatus
CN216429792U (en) Self-pressurization gas supply system and ship with same
CN202791321U (en) Movable hydraulic-type pressurizing and gas discharging device
CN201221384Y (en) Drive air source circulating device for air power engine
CN102095071A (en) Method and device for supplying multifunctional mobile liquid-phase natural gas and gas-phase natural gas
CN210511034U (en) CNG gas storage well CNG recovery system
CN104819378A (en) Liquefied natural gas (LNG) automobile liquid adding device
CN202215938U (en) Butane propel device for pearl cotton production
CN209415019U (en) A kind of nuclear power station hydrogen booster system
CN203517303U (en) LNG (Liquefied Natural Gas) circulating system for maintaining stable working of immersed pump

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant