CN208734322U - A kind of fracturing work system suitable for hot water preparing fracturing fluid system - Google Patents

A kind of fracturing work system suitable for hot water preparing fracturing fluid system Download PDF

Info

Publication number
CN208734322U
CN208734322U CN201821454518.2U CN201821454518U CN208734322U CN 208734322 U CN208734322 U CN 208734322U CN 201821454518 U CN201821454518 U CN 201821454518U CN 208734322 U CN208734322 U CN 208734322U
Authority
CN
China
Prior art keywords
hot water
fracturing
region
truck
area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821454518.2U
Other languages
Chinese (zh)
Inventor
刘音
张曙光
王晓磊
刘楠
杨东海
黄其
刘正德
周广龙
刘雨晨
刘云博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
CNPC Bohai Drilling Engineering Co Ltd
Original Assignee
CNPC Bohai Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNPC Bohai Drilling Engineering Co Ltd filed Critical CNPC Bohai Drilling Engineering Co Ltd
Priority to CN201821454518.2U priority Critical patent/CN208734322U/en
Application granted granted Critical
Publication of CN208734322U publication Critical patent/CN208734322U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of fracturing work systems suitable for hot water preparing fracturing fluid system, including hot water deposit region, pressing crack construction region, fracturing sand storage area, chemical industry material storage area and the rear service region in operating area;It includes hot water soft pot group, continuous mixing truck, hot water surge tank group and pharmacy jar group that hot water, which lays in region,;Pressing crack construction region includes an at least fracturing blender truck, at least two pressure break pump trucks and outlet tank;Two well site entrances are respectively adjacent to hot water deposit region and outlet tank setting;Chemical industry material storage area is located at the idle area between two well site entrances;Fracturing sand storage area is positioned adjacent to vacant at the toolhouse in rear service region;Rational deployment is carried out to equipment used in functional area while the fracturing work system is by carrying out rational deployment to different function region, realize that overall operation system footprint area is smaller, each function distribution is compact and meets safety work requirement in order to pressing crack construction.

Description

A kind of fracturing work system suitable for hot water preparing fracturing fluid system
Technical field
The utility model relates to pressing crack construction technical field of operation, in particular to a kind of to be suitable for hot water preparing fracturing fluid body The fracturing work system of system.
Background technique
Certain domestic oil recovery factory's oil property has the characteristics that high-solidification point, non-asphaltenes, low sulfur-bearing, oil density Average out to 0.868t/m3, (50 DEG C) of ground Crude viscosity average 33mPa.s, 42 DEG C of freezing point or so, 53-61 DEG C of wax precipitation temperature. The special nature of oil is coagulated according to the market height, there are cold damages to in-place oil with normal-temperature water preparing fracturing fluid, influence crude oil It is precipitated, especially flowing of the influence crude oil from remote well area to nearly well.Enter well with 20 DEG C of normal-temperature water preparing fracturing fluids and does simulation examination It tests and shows that under conditions of 260m stitches long, temperature is lower than crude oil wax precipitation temperature in off-seam mouth 125m range crack;In addition, from adopting Oily factory's Production development data find out two o'clock, first is that the cold damage difficulty of crude oil removes, second is that having used with normal-temperature water preparing fracturing fluid Hot water carries out the well of pressing crack construction with liquid, and technique increases daily output crude oil amount than before.Therefore, in order to control fracturing fluid to storage The cold damage of layer, oil recovery factory requires construction operation side's hot water (about 60-70 DEG C) preparing fracturing fluid system, and has been determined that pressure break is applied Work prepares fracturing work system using hot water.
Utility model content
The purpose of the utility model is to provide a kind of pressures suitable for hot water preparing fracturing fluid system for overcoming drawbacks described above Split operating system.
For this purpose, technical solutions of the utility model are as follows:
A kind of fracturing work system suitable for hot water preparing fracturing fluid system, including along neighbouring road extending direction certainly Hot water deposit region, pressing crack construction region and the rear service region set gradually in operating area;Wherein,
It includes hot water soft pot group, continuous mixing truck, hot water surge tank group and pharmacy jar group that hot water, which lays in region,;Its In, hot water soft pot group includes multiple rows of hot water soft pots of series connection;Hot water surge tank group includes multiple hot water surge tanks, medicine Agent tank group includes multiple pharmacy jars, and multiple hot water surge tanks and multiple pharmacy jars are successively arranged as a row;Continuous mixing truck is set It sets between hot water soft pot group and hot water surge tank group, makes each hot water soft pot, each hot water surge tank and each medicament Tank is connect by a hydraulic pipeline with continuous mixing truck respectively;
Pressing crack construction region is arranged near well head comprising from one side of hot water reserve zone domain to rear service region side At least fracturing blender truck that sets gradually, at least two pressure break pump trucks and outlet tank;Wherein, in the sand inlet of neighbouring fracturing blender truck Place is provided at least two sand hopper vehicles, and pressure break pump truck neighbour side is provided with a measuring truck;The discharge port of every fracturing blender truck is equipped with For connecting sediment transport pipeline with the feed inlet of pressure break pump truck, two pressure break pump trucks are connected to well head, outlet tank by pressure duct It is connected at well head by blowout preventing pipe assemblage.
Further, neighbouring road side is provided at least two well site entrances, one of well site entrance pair Neighbouring hot water reserve zone domain is arranged, another well site entrance is arranged adjacent to outlet tank.
Further, chemical industry material storage area is set as in the idle area being located between two well site entrances.
Further, rear service region includes that rows of at least one toolhouse and extremely is arranged along operating area boundary Few two meeting rooms.
Further, the idle area at the toolhouse in neighbouring rear service region is set as fracturing sand storage area.
This is suitable for the fracturing work system of hot water preparing fracturing fluid system by carrying out reasonable cloth to different function region Rational deployment is carried out to equipment used in functional area while office, realizes that overall operation system footprint area is smaller, each function Compact layout and safety work requirement can be met, be convenient for pressing crack construction.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the fracturing work system suitable for hot water preparing fracturing fluid system of the utility model.
Specific embodiment
With reference to the accompanying drawing and specific embodiment is described further the utility model, but following embodiments are right absolutely not The utility model has any restrictions.
As shown in Figure 1, should include rational deployment in operation suitable for the fracturing work system of hot water preparing fracturing fluid system Hot water deposit region, pressing crack construction region, fracturing sand storage area, chemical industry material storage area and rear service area in region Domain;Wherein,
Hot water lay in region, pressing crack construction region and rear service region in operating area along road extending direction successively Setting, and there are two well sites to import and export in neighbouring road side setting, wherein import and export 6-1 opposite direction hot water deposit in the first well site The setting of 6-2 opposite direction pressing crack construction region is imported and exported in region setting, the second well site.
Specifically, hot water deposit region includes hot water soft pot group, continuous mixing truck 1-2, hot water surge tank group and medicine Agent tank group;Wherein,
Hot water soft pot group includes 2 rows of hot water soft pot 1-1 of series connection;Hot water soft pot is used to lay in hot water, Actual volume is selected according to pressing crack construction with aqueous amount;The hot water that operation field uses is generally outside Jing Chang by drawing waterwheel 1-5 is sent into Jing Chang, is then connect by hydraulic pipeline with continuous mixing truck 1-2 in the soft pot 1-1 for being pumped into storage hot water, It can be pumped directly into hot water surge tank 1-3;Using multiple hot water soft pot 1-1 of series connection, convenient for observing remaining liquid Amount avoids sand plug phenomenon caused by not enough causing replacement amount insufficient because of liquid, avoids the tank of the hot water soft pot 1-1 because of large volume The area that body bottom is spread out causes greatly the remaining hot water of tank bottom can't pump out, and also be easy to cause constructional difficulties in this way;
Hot water surge tank group is made of 10 hot water surge tank 1-3, and pharmacy jar group is made of 5 pharmacy jar 1-4, and 10 Hot water surge tank 1-3 and 5 pharmacy jar 1-4 successively vertically arranges in a row;
Continuous mixing truck 1-2 is arranged between hot water soft pot group and hot water surge tank group;Each hot water soft pot 1-1's The inlet of liquid outlet, each hot water surge tank 1-3 and each pharmacy jar 1-4 is provided with a hydraulic pipeline, in use, often The liquid outlet of a hot water soft pot 1-1, and participate in each hot water surge tank 1-3 and each pharmacy jar 1-4 with liquid and distinguish It is connect by hydraulic pipeline with continuous mixing truck 1-2, the hot water a part stored in hot water soft pot 1-1 is made to pass through continuous mixture Vehicle 1-2 is pumped in different hot water surge tank 1-3 for preparing slippery water fracturing fluid system, and another part passes through continuous mixture Vehicle 1-2 is pumped in different pharmacy jar 1-4 for being swollen the additive kinds solution such as guar gum, dissolution expansion-resisting agent, dissolution alkali;Every The liquid outlet of a hot water surge tank 1-2 and each pharmacy jar 1-4 are provided with an infusion pipeline.
Pressing crack construction region is arranged near well head comprising from one side of hot water reserve zone domain to rear service region side What the fracturing blender truck 2-1 and two pressure break pump truck 2-4 that set gradually and a neighbouring well site second import and export 6-2 were arranged Outlet tank 2-7;Wherein,
Two sand hopper vehicle 2-2 are provided at fracturing blender truck 2-1 sand inlet, for transporting sand to fracturing blender truck 2-1;Fracturing blender truck Be provided with feeding pipe at the feeding inlet of 2-1, for being connect with the sand export of sand hopper vehicle 2-2, by the sand in sand hopper vehicle 2-2 send to In fracturing blender truck 2-1, and the infusion being arranged at the liquid outlet of the liquid inlet of fracturing blender truck 2-1 and hot water surge tank 1-2 and pharmacy jar 1-4 Piping connection is uniformly mixed fracturing fluid system and sand adequately in fracturing blender truck 2-1;
The liquid outlet of fracturing blender truck 2-1 and two pressure break pump truck 2-4 lead to sediment transport piping connection, two pressure break pump truck 2-4 respectively It is connected at well head by high pressure pipe joint 2-5, outlet tank 2-7 is connected at well head by blowout preventing pipe assemblage 2-6, realizes fracturing blender truck 2- Mixed load fluid is pumped into underground by high pressure pipe joint by pressure break pump truck in 1, carries out pressing crack construction operation.After construction, pressure break It returns drain to flow in outlet tank by control blowout manifold, this completes the entire mistakes for going out the row's of returning raffinate from pressing crack construction to open flow Journey;
Two pressure break pump truck neighbour sides are provided with a measuring truck 2-3, for monitoring the operation pressure in fracturing process, pump Discharge capacity, sand feeding amount, the total liquid measure of pumping etc. are sent, realizes the real-time data transmission of fracturing work whole process.
Rear service region includes being made for respectively along the rows of toolhouse 3-1 of operating area boundary setting and two The meeting room 3-2 that industry team and pressure break team use.
The storage area 5 of additive is arranged at the idle area being located between two well site entrances, setting away from More nearby from hot water deposit region, convenient for preparing medicament.
Fracturing sand storage area 4 is positioned adjacent at the toolhouse 3-1 in rear service region, slightly apart from hot water deposit region At a distance, it one is easy for fracturing sand and is fitted into sand hopper vehicle, second is that far from water source, prevent sand from making moist or liquid tank leak pollution pressure break Sand.
This is suitable for the fracturing work system of hot water preparing fracturing fluid system by the rational deployment to each functional area, accounts for Ground area is smaller, compact, is convenient for pressing crack construction.

Claims (5)

1. a kind of fracturing work system suitable for hot water preparing fracturing fluid system, which is characterized in that including prolonging along neighbouring road Direction is stretched in hot water deposit region, pressing crack construction region and the rear service region set gradually from operating area;Wherein,
It includes hot water soft pot group, continuous mixing truck, hot water surge tank group and pharmacy jar group that hot water, which lays in region,;Wherein, hot Water soft pot group includes multiple rows of hot water soft pots of series connection;Hot water surge tank group includes multiple hot water surge tanks, pharmacy jar Group includes multiple pharmacy jars, and multiple hot water surge tanks and multiple pharmacy jars are successively arranged as a row;Continuous mixing truck setting exists Between hot water soft pot group and hot water surge tank group, keep each hot water soft pot, each hot water surge tank and each pharmacy jar equal It is connect respectively by a hydraulic pipeline with continuous mixing truck;
Pressing crack construction region is arranged near well head comprising successively from one side of hot water reserve zone domain to rear service region side At least fracturing blender truck that is arranged, at least two pressure break pump trucks and outlet tank;Wherein, it is set at the sand inlet of neighbouring fracturing blender truck At least two sand hopper vehicles are equipped with, pressure break pump truck neighbour side is provided with a measuring truck;The discharge port of every fracturing blender truck is equipped with and is used for Sediment transport pipeline is connect with the feed inlet of pressure break pump truck, two pressure break pump trucks are connected to well head by pressure duct, and outlet tank passes through Blowout preventing pipe assemblage is connected at well head.
2. the fracturing work system according to claim 1 suitable for hot water preparing fracturing fluid system, which is characterized in that Neighbouring road side is provided at least two well site entrances, and one of well site entrance sets neighbouring hot water reserve zone domain It sets, another well site entrance is arranged adjacent to outlet tank.
3. the fracturing work system according to claim 2 suitable for hot water preparing fracturing fluid system, which is characterized in that Idle area between two well site entrances is set as chemical industry material storage area.
4. the fracturing work system according to claim 1 suitable for hot water preparing fracturing fluid system, which is characterized in that raw Logistics region living includes that at least one rows of toolhouse and at least two meeting rooms is arranged along operating area boundary.
5. the fracturing work system according to claim 2 suitable for hot water preparing fracturing fluid system, which is characterized in that Idle area at the toolhouse in neighbouring rear service region is set as fracturing sand storage area.
CN201821454518.2U 2018-09-05 2018-09-05 A kind of fracturing work system suitable for hot water preparing fracturing fluid system Expired - Fee Related CN208734322U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821454518.2U CN208734322U (en) 2018-09-05 2018-09-05 A kind of fracturing work system suitable for hot water preparing fracturing fluid system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821454518.2U CN208734322U (en) 2018-09-05 2018-09-05 A kind of fracturing work system suitable for hot water preparing fracturing fluid system

Publications (1)

Publication Number Publication Date
CN208734322U true CN208734322U (en) 2019-04-12

Family

ID=66032904

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821454518.2U Expired - Fee Related CN208734322U (en) 2018-09-05 2018-09-05 A kind of fracturing work system suitable for hot water preparing fracturing fluid system

Country Status (1)

Country Link
CN (1) CN208734322U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110805439A (en) * 2019-11-12 2020-02-18 中国石油集团渤海钻探工程有限公司 Method for identifying high-condensation oil by using chromatographic plate
CN112412427A (en) * 2020-12-02 2021-02-26 大庆石油管理局有限公司 Remote linkage liquid supply and distribution system
CN112483061A (en) * 2019-09-12 2021-03-12 中国石油天然气股份有限公司 Fracturing construction system and fracturing construction heat preservation method
CN112761605A (en) * 2021-01-08 2021-05-07 成都理工大学 Method for preventing oil well cementation interface sealing failure of gas well
CN113107454A (en) * 2021-05-12 2021-07-13 刘常青 Reservoir transformation method and application of normal-pressure shale gas horizontal well

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112483061A (en) * 2019-09-12 2021-03-12 中国石油天然气股份有限公司 Fracturing construction system and fracturing construction heat preservation method
CN110805439A (en) * 2019-11-12 2020-02-18 中国石油集团渤海钻探工程有限公司 Method for identifying high-condensation oil by using chromatographic plate
CN110805439B (en) * 2019-11-12 2022-04-08 中国石油集团渤海钻探工程有限公司 Method for identifying high-condensation oil by using chromatographic plate
CN112412427A (en) * 2020-12-02 2021-02-26 大庆石油管理局有限公司 Remote linkage liquid supply and distribution system
CN112761605A (en) * 2021-01-08 2021-05-07 成都理工大学 Method for preventing oil well cementation interface sealing failure of gas well
CN113107454A (en) * 2021-05-12 2021-07-13 刘常青 Reservoir transformation method and application of normal-pressure shale gas horizontal well

Similar Documents

Publication Publication Date Title
CN208734322U (en) A kind of fracturing work system suitable for hot water preparing fracturing fluid system
CN102226390B (en) Testing device for deep wells and high-temperature and high-pressure wells
CN103721619B (en) A kind of fracturing fluid continuous mixing device
CN104033142B (en) A kind of huge discharge Integrated Fracturing high-low pressure manifold apparatus
CN105043933B (en) A kind of high parameter fracturing fluid property test evaluation device
CN104533404A (en) Observable experiment equipment for simulating propping agent migration in complex fracture network
CN104632152B (en) A kind of ultra-low penetration water injection well in oil fields augmented injection depressurizing system and its method
CN207437046U (en) Continuous ball-throwing apparatus
CN104445038A (en) Small underground oil depot
CN207877348U (en) Efficient aluminium salt medicine system
CN207213651U (en) A kind of high-pressure natural gas long distance pipeline hydrate inhibitor fills skid-mounted unit
CN107780915A (en) A kind of experimental provision for being used to evaluate slippery water solid-carrying performance
CN204571938U (en) Well mouth of oil well automatic medicine adding apparatus
CN103397887B (en) A kind of shield machine add mud, foaming system
CN109306858B (en) Polymer injection well online concentration device and method
CN205225231U (en) Mulling device, fracturing blender truck and fracturing unit
CN207451605U (en) Fracturing unit fuel oil concentrates automatic filling device
CN104456085A (en) Integrated carbinol and agent injection device
CN207032886U (en) A kind of skyscraper cement concrete pumps structure
CN204026157U (en) Integration note alcohol injecting device
CN202170786U (en) Intelligent dosing device of oil well
CN208734323U (en) A kind of batch production pressing crack construction operating system
CN109967507A (en) A kind of injected system for soil and underground water in-situ immobilization
CN209431096U (en) A kind of double-screw type oil gas mixes defeated device
CN201512737U (en) Asphalt supply device of asphalt mixture cold regenerating mixing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201110

Address after: 300457 Tianjin Binhai New Area Development Zone No. second, No. 83, China Petroleum Tianjin building Bohai Drilling Engineering Co., Ltd.

Patentee after: CNPC Bohai Drilling Engineering Co.,Ltd.

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Address before: 300457 Tianjin Binhai New Area Development Zone No. second, No. 83, China Petroleum Tianjin building Bohai Drilling Engineering Co., Ltd.

Patentee before: CNPC Bohai Drilling Engineering Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190412

CF01 Termination of patent right due to non-payment of annual fee