CN208731628U - Stand for piling up for concrete prefabricated board class component - Google Patents
Stand for piling up for concrete prefabricated board class component Download PDFInfo
- Publication number
- CN208731628U CN208731628U CN201821267663.XU CN201821267663U CN208731628U CN 208731628 U CN208731628 U CN 208731628U CN 201821267663 U CN201821267663 U CN 201821267663U CN 208731628 U CN208731628 U CN 208731628U
- Authority
- CN
- China
- Prior art keywords
- piling
- stand
- prefabricated board
- concrete prefabricated
- class component
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a kind of stand for piling up for concrete prefabricated board class component, it is related to concrete component, the problem of aiming to solve the problem that the limited amount of concrete prefabricated board superposed and stacked, it is unable to fully the longitudinal space using stockyard, its key points of the technical solution are that: a kind of stand for piling up for concrete prefabricated board class component, including two in the rectangular frame being oppositely arranged, and the bottom beam that both ends are welded and fixed with rectangular frame simultaneously, the quantity of the bottom beam is two, and is individually fixed in the bottom end two sides of rectangular frame;Rectangular frame top two sides are respectively arranged with plug division, and rectangular frame bottom end two sides are respectively arranged with the spliced eye for plug division insertion.A kind of stand for piling up for concrete prefabricated board class component of the utility model, the quantity of the superposed and stacked of concrete prefabricated board is unrestricted, reaches and makes full use of longitudinal space, the technical effect to save floor occupying area.
Description
Technical field
The utility model relates to concrete components, more specifically, it relates to which a kind of be used for concrete prefabricated board class component
Stand for piling up.
Background technique
In Current Engineering Construction, to reduce site operation duration, precast concrete is used more and more, this kind of
Precast concrete completes production generally in concrete prefabricated element factory, then transports to construction site and construct.
Concrete prefabricated board after completing production, needs to store the regular hour in component factory, pre- to reduce concrete
The land occupation area of making sheet is generally stacked by the way of overlapping, but to avoid lower concrete prefabricated board because bearing gravity
Excessive and generate crushing, general provision is not greater than six pieces of prefabricated boards while stacking, and a limited number of there are superposed and stacked ask
Topic is unable to fully the longitudinal space using stockyard;Therefore it needs to propose the new scheme of one kind to solve this problem.
Utility model content
In view of the deficienciess of the prior art, the purpose of this utility model is to provide one kind to be used for concrete prefabricated board class
The quantity of the stand for piling up of component, the superposed and stacked of concrete prefabricated board is unrestricted, reaches and makes full use of longitudinal space, and saving accounts for
The technical effect of ground area.
The above-mentioned technical purpose of the utility model has the technical scheme that a kind of pre- for concrete
The stand for piling up of plate class member processed, it is solid with rectangular frame welding simultaneously in the rectangular frame and both ends being oppositely arranged including two
Fixed bottom beam, the quantity of the bottom beam is two, and is individually fixed in the bottom end two sides of rectangular frame;The rectangular frame top
Two sides are respectively arranged with plug division, and rectangular frame bottom end two sides are respectively arranged with the spliced eye for plug division insertion.
By using above-mentioned technical proposal, two opposite rectangular frames cooperate two foundation beams formation, one forward sight to be in U-shape
Placement space;When needing superposed and stacked concrete prefabricated board, six block concrete of superposed and stacked is prefabricated in each stand for piling up
Plate successively slings two stand for piling up and is directed at each plug division and corresponding spliced eye, and the stand for piling up being lifted is stacked in lower section
Stand for piling up on, combined to form the stand for piling up that one has three layers of independent placed layer by three stand for piling up, under this state
Six block concrete prefabricated boards are all had in every layer of placed layer, and every layer of concrete prefabricated board is not in contact with each other, and then avoids bottom
Concrete prefabricated board stress it is overweight and be damaged, the quantity for reaching the superposed and stacked of concrete prefabricated board is unrestricted, fills
Divide and utilizes longitudinal space, the technical effect to save floor occupying area, simultaneously because the overall U-shaped design of stand for piling up, so that concrete
The both ends of prefabricated board are able to extend stand for piling up, to provide convenience for detection concrete prefabricated board;When needing to transport, pass through
Purlin vehicle is sling stand for piling up and is stacked in the form of bilevel on flat bed transport vehicle, to reach pre- without monolithic concrete
Making sheet successively lifts, and realizes the technical effect of batch lifting, and then provides convenience for entrucking;When needing to unload, with building site
On tower crane hang out stand for piling up, the technical effect unloaded of batch can be realized, while passing through stand for piling up superposition stacking concrete
Prefabricated board is in the technical effect for the area on building site, equally reducing concrete prefabricated board occupancy construction site.
The utility model is further arranged to: two bottom beam both ends are respectively arranged with grafting ring, four grafting
Ring is mating plate, and four plates are respectively connected with cable wire, and four described cable wire one end are fixed with plate, the other end
It is connected with each other, and is provided with the steel loop for connecting purlin vehicle or tower crane.
By using above-mentioned technical proposal, four cable wire cooperation plate compositions are exclusively used in slinging the suspender of stand for piling up, and lead to
It crosses steel loop to be attached with purlin vehicle or tower crane, to only need what a set of suspender was applicable to all stand for piling up to sling requirement;
When needing to sling stand for piling up, four plates is guided to be plugged in corresponding grafting ring respectively, and by purlin vehicle or tower crane to steel
Rope applies upper pulling force and slings stand for piling up, and upper pulling force directly acts on bottom beam in hoisting process, acts on compared to upper pulling force
On rectangular frame, rectangular frame and bottom beam is effectively prevent to damage welding position because pullling power.
The utility model is further arranged to: the vertical restricted bolt of grafting of the grafting ring, the plate offer confession
Limit the spliced eye of bolt insertion.
By using above-mentioned technical proposal, after plate is inserted into grafting ring, limitation bolt passes perpendicularly through grafting ring and is inserted into
In spliced eye, to effectively prevent the improper disengaging grafting ring of plate by the mobility of limitation bolt limitation plate.
The utility model is further arranged to: being provided with rope between limitation bolt and the plate and is connected.
By using above-mentioned technical proposal, limitation bolt and plate are connected by rope, to avoid limiting bolt
It omits.
The utility model is further arranged to: the diagonal of the rectangular frame is provided with oblique reinforcing rod.
By using above-mentioned technical proposal, improve the structural strength of rectangular frame, thus avoid rectangular frame because undertaking on
The gravity of square stand for piling up and be damaged.
The utility model is further arranged to: the plug division includes four curved metals with elastic deformation ability
Item, four curved metal tops are fixed to each other, to form tapered plug division.
By using above-mentioned technical proposal, when two stand for piling up are stacked with, top stand for piling up is gradually reduced height, grafting
Portion is gradually inserted into the spliced eye of top stand for piling up, and elastic deformation occurs for curved metal item during this, and utilizes elastic potential energy
The inner wall in spliced eye is pushed against, so that it is guaranteed that the grafting intensity of plug division and spliced eye, and then ensure the stacking of two stand for piling up
Stability.
The utility model is further arranged to: four plug divisions wherein three height it is equal, remaining one height
Degree is greater than the other three.
By using above-mentioned technical proposal, when stacking stand for piling up, it is first directed at a plug division and spliced eye, and decline height
Degree to the plug division is inserted in corresponding spliced eye, then rotates top stand for piling up until a lower height of plug division pair of the other three
Standard is in corresponding spliced eye, and finally the height of decline top stand for piling up is until complete to stack;In conclusion be not necessarily to while being directed at four
Plug division and corresponding spliced eye, to provide convenience to be directed at two stand for piling up up and down.
The utility model is further arranged to: the rectangular frame is provided with cushioning piece along plug division edge.
By using above-mentioned technical proposal, so that there are cushioning pieces between adjacent stand for piling up, to utilize its damping function
Can, the conduction of shaking force is reduced, and then avoid top stand for piling up shaking during transportation excessively violent.
In conclusion the utility model has the following beneficial effects: forming one by three stand for piling up has three layers of independence
The stand for piling up of placed layer combines, so that every six block concretes prefabricated board is independently placed, to avoid the concrete prefabricated board of bottom
Stress is overweight and is damaged, and the quantity for reaching the superposed and stacked of concrete prefabricated board is unrestricted, makes full use of longitudinal space,
The technical effect to save floor occupying area;The overall U-shaped design of stand for piling up, so that the both ends of concrete prefabricated board are able to extend code
Frame is put, to provide convenience for detection concrete prefabricated board;In loading-unloading vehicle, by lifting stand for piling up, to realize concrete
The batch entrucking of prefabricated board is unloaded, and then provides convenience for loading-unloading vehicle;Four cable wire cooperation plate compositions are exclusively used in slinging
The suspender of stand for piling up, and be attached by steel loop and purlin vehicle or tower crane, so that a set of suspender only be needed to be applicable to own
Stand for piling up slings requirement;Upper pulling force directly acts on bottom beam in hoisting process, effectively prevent rectangular frame and bottom beam
Welding position is damaged because pullling power;By the mobility of limitation bolt limitation plate, it effectively prevent the improper disengaging grafting of plate
Ring;Limitation bolt and plate are connected by rope, so that limitation bolt be avoided to omit;Plug division is pushed against using elastic potential energy
In the inner wall of spliced eye, so that it is guaranteed that the grafting intensity of plug division and spliced eye, and then ensure that the stacking of two stand for piling up is stablized
Property;Without four plug divisions of alignment and corresponding spliced eye simultaneously, to provide convenience to be directed at two stand for piling up up and down;Using subtracting
Gasket shock-absorbing function is shaken, the conduction of shaking force is reduced, and then avoids top stand for piling up shaking during transportation excessively violent.
Detailed description of the invention
Structural schematic diagram when Fig. 1 is the utility model superposed and stacked concrete prefabricated board;
Fig. 2 is the overall structure diagram of the utility model;
Fig. 3 is the overall structure diagram at another visual angle of the utility model;
Fig. 4 is the structural schematic diagram that the utility model slings state;
Fig. 5 is the structural schematic diagram of the utility model suspender;
Fig. 6 is the portion the A enlarged diagram of Fig. 2, the main structure for indicating plug division.
Detailed description of the invention: 1, rectangular frame;11, bottom beam;12, plug division;13, spliced eye;14, grafting ring;15, plate;16,
Cable wire;17, steel loop;18, bolt is limited;19, spliced eye;20, rope;21, oblique reinforcing rod;22, curved metal item;23, subtract
Shake gasket.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
It is in be oppositely arranged including two as shown in Figure 1, Figure 2, Figure 3 shows for the stand for piling up of concrete prefabricated board class component
The bottom beam 11 that rectangular frame 1 and both ends are welded and fixed with rectangular frame 1 simultaneously, the quantity of bottom beam 11 are two, and solid respectively
Due to the bottom end two sides of rectangular frame 1, so that two foundation beams 11 form what a forward sight was in U-shape with two rectangular frames 1
Displacement structure;1 top two sides of rectangular frame are respectively arranged with plug division 12, and 1 bottom end two sides of rectangular frame are reserved with respectively for inserting
The spliced eye 13 that socket part 12 is inserted into.
When needing superposed and stacked concrete prefabricated board, the six block concrete prefabricated board of superposed and stacked in each stand for piling up,
It successively slings two stand for piling up and is directed at each plug division 12 and corresponding spliced eye 13, and the stand for piling up being lifted is stacked in lower section
Stand for piling up on, combined to form the stand for piling up that one has three layers of independent placed layer by three stand for piling up, under this state
Six block concrete prefabricated boards are all had in every layer of placed layer, and every layer of concrete prefabricated board is not in contact with each other, and then avoids bottom
Concrete prefabricated board stress it is overweight and be damaged, the quantity for reaching the superposed and stacked of concrete prefabricated board is unrestricted, fills
Divide and utilizes longitudinal space, the technical effect to save floor occupying area;Simultaneously as the overall U-shaped design of stand for piling up, so that concrete
The both ends of prefabricated board are able to extend stand for piling up, to provide convenience for detection concrete prefabricated board;When needing to transport, pass through
Purlin vehicle is sling stand for piling up and is stacked in the form of bilevel on flat bed transport vehicle, to reach pre- without monolithic concrete
Making sheet successively lifts, and realizes the technical effect of batch lifting, and then provides convenience for entrucking;When needing to unload, with building site
On tower crane hang out stand for piling up, the technical effect unloaded of batch can be realized;Meanwhile it being superimposed by stand for piling up and stacking concrete
Prefabricated board is in the technical effect for the area on building site, equally reducing concrete prefabricated board occupancy construction site.
The utility model can be lifted using the purlin vehicle in workshop and the tower crane of construction site in the following way, such as be schemed
3, shown in Fig. 4, two foundation beams, 11 both ends, which are respectively welded, is fixed with grafting ring 14, and four grafting rings 14 are mating plate
15, four plates 15 are respectively connected with cable wire 16, and four 16 one end of cable wire and plate 15 are fixed, and the other end is connected with each other, and fixed
There is the steel loop 17 for connecting purlin vehicle or tower crane;Four cable wires 16 cooperate the composition of plate 15 to be exclusively used in slinging hanging for stand for piling up
Tool, and be attached by steel loop 17 and purlin vehicle or tower crane, so that a set of suspender only be needed to be applicable to all stand for piling up
Requirement is sling, when needing to sling stand for piling up, four plates 15 is guided to be plugged in corresponding grafting ring 14 respectively, and passes through purlin vehicle
Or tower crane applies upper pulling force to cable wire 16 and slings stand for piling up, upper pulling force directly acts on bottom beam 11 in hoisting process,
Bottom beam 11 directly supports concrete prefabricated board, acts on rectangular frame 1 compared to upper pulling force, effectively prevent rectangular frame 1
Welding position is damaged because pullling power with bottom beam 11.
To prevent the improper disengaging of plate 15 in grafting ring 14, as shown in Figure 4, Figure 5, grafting ring 14 is vertically mating to be had
Bolt 18 is limited, plate 15 offers the spliced eye 19 being inserted into for limitation bolt 18;After plate 15 is inserted into grafting ring 14, limitation
Bolt 18 passes perpendicularly through grafting ring 14 and is inserted into spliced eye 19, to limit the mobility of plate 15 by limitation bolt 18, has
Effect prevents the improper disengaging grafting ring 14 of plate 15.
It should be noted that prevent limitation bolt 18 from omitting, as shown in figure 5, being set between limitation bolt 18 and plate 15
It is equipped with rope 20 to be connected, so that sharp rope 20 avoids limitation bolt 18 from omitting.
When several stand for piling up stack composition stand for piling up group, the needs of rectangular frame 1 of lower section stand for piling up undertake top stand for piling up
And the gravity of concrete prefabricated board, therefore the structural strength of rectangular frame 1 is most important, thus as shown in Figure 1 and Figure 2, along rectangle
The diagonal of frame 1 is provided with oblique reinforcing rod 21, and oblique 21 both ends of reinforcing rod are welded and fixed with rectangular frame 1, from
And oblique reinforcing rod 21 is utilized to promote the structural strength of rectangular frame 1, and then improve the load-bearing capacity of stand for piling up.
Plug division 12 is mating by such as flowering structure and spliced eye 13, and as shown in Fig. 3, Fig. 6, plug division 12 includes four
Curved metal item 22 with elastic deformation ability, four 22 tops of curved metal item are fixed to each other, to be formed tapered
Plug division 12;When two stand for piling up are stacked with, top stand for piling up is gradually reduced height, and plug division 12 is gradually inserted into top and is piled up
In the spliced eye 13 of frame, elastic deformation occurs for curved metal item 22 during this, and is pushed against using elastic potential energy in spliced eye 13
Inner wall, so that it is guaranteed that the grafting intensity of plug division 12 and spliced eye 13, and then ensure the stacking stability of two stand for piling up.
It should be noted that as shown in figure 4, four plug divisions 12 wherein three height it is equal, remaining one height
Greater than the other three, when stacking stand for piling up, it is first directed at plug division 12 and spliced eye 13, and falling head is to the plug division
12 are inserted in corresponding spliced eye 13, then rotate top stand for piling up until a lower height of plug division of the other three 12 is in alignment with phase
Spliced eye 13 is answered, finally the height of decline top stand for piling up is until complete to stack;In conclusion be not necessarily to while being directed at four grafting
Portion 12 and corresponding spliced eye 13, to provide convenience to be directed at two stand for piling up up and down.
In transport, stand for piling up is placed on flat bed transport vehicle in a manner of double stacked, as shown in Fig. 1, Fig. 6, to keep away
Exempt from the stand for piling up of top because excessively violent shaking occurs for vibration, rectangular frame 1 is fixed with damping along 12 edge of plug division
Gasket 23 to reduce the conduction of shaking force using the shock-absorbing function of cushioning piece 23, and then avoids top during transportation
Stand for piling up shakes excessively violent.
Specific embodiment is only the explanation to the utility model, is not limitations of the present invention, this field
Technical staff can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but only
It will be in the scope of the claims of the utility model all by the protection of Patent Law.
Claims (8)
1. a kind of stand for piling up for concrete prefabricated board class component, it is characterised in that: including two in the rectangle being oppositely arranged
The bottom beam (11) that frame (1) and both ends are welded and fixed with rectangular frame (1) simultaneously, the quantity of the bottom beam (11) are two,
And it is individually fixed in the bottom end two sides of rectangular frame (1);Rectangular frame (1) the top two sides are respectively arranged with plug division
(12), rectangular frame (1) the bottom end two sides are respectively arranged with the spliced eye (13) for plug division (12) insertion.
2. the stand for piling up according to claim 1 for concrete prefabricated board class component, it is characterised in that: two bottoms
Beam (11) both ends are respectively arranged with grafting ring (14), and four grafting rings (14) are mating to be had plate (15), four institutes
Plate (15) to be stated to be respectively connected with cable wire (16), four described cable wire (16) one end and plate (15) are fixed, and the other end is connected with each other,
And it is provided with the steel loop (17) for connecting purlin vehicle or tower crane.
3. the stand for piling up according to claim 2 for concrete prefabricated board class component, it is characterised in that: the grafting ring
(14) the vertical restricted bolt of grafting (18), the plate (15) offer the spliced eye (19) for limitation bolt (18) insertion.
4. the stand for piling up according to claim 3 for concrete prefabricated board class component, it is characterised in that: the limitation is inserted
Rope (20) is provided between pin (18) and plate (15) to be connected.
5. the stand for piling up according to claim 1 for concrete prefabricated board class component, it is characterised in that: along the rectangle
The diagonal of frame (1) is provided with oblique reinforcing rod (21).
6. the stand for piling up according to claim 1 for concrete prefabricated board class component, it is characterised in that: the plug division
It (12) include four curved metal items (22) with elastic deformation ability, four curved metal item (22) tops are mutually solid
It is fixed, to form tapered plug division (12).
7. the stand for piling up according to claim 1 for concrete prefabricated board class component, it is characterised in that: four described slotting
Socket part (12) wherein three height it is equal, remaining one height be greater than the other three.
8. the stand for piling up according to claim 1 for concrete prefabricated board class component, it is characterised in that: the rectangle frame
Frame (1) is provided with cushioning piece (23) along plug division (12) edge.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821267663.XU CN208731628U (en) | 2018-08-07 | 2018-08-07 | Stand for piling up for concrete prefabricated board class component |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821267663.XU CN208731628U (en) | 2018-08-07 | 2018-08-07 | Stand for piling up for concrete prefabricated board class component |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208731628U true CN208731628U (en) | 2019-04-12 |
Family
ID=66029830
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821267663.XU Active CN208731628U (en) | 2018-08-07 | 2018-08-07 | Stand for piling up for concrete prefabricated board class component |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208731628U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108706208A (en) * | 2018-08-07 | 2018-10-26 | 锦萧建筑科技有限公司 | Stand for piling up for concrete prefabricated board class component |
-
2018
- 2018-08-07 CN CN201821267663.XU patent/CN208731628U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108706208A (en) * | 2018-08-07 | 2018-10-26 | 锦萧建筑科技有限公司 | Stand for piling up for concrete prefabricated board class component |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108706208A (en) | Stand for piling up for concrete prefabricated board class component | |
CN108516228B (en) | A kind of prefabricated components stack, the method for transport, turnover device and stacking, transport, overturning | |
CN107244382A (en) | The assemble method of lashing bridge and container ship | |
CN104692227B (en) | Steel mesh lifting appliance and lifting method of steel mesh | |
CN208731628U (en) | Stand for piling up for concrete prefabricated board class component | |
CN203639095U (en) | Inner-side-column lifting device for reverse installation method | |
CN202658590U (en) | Integral assembled drilling platform | |
CN207104886U (en) | A kind of double-deck piling bin | |
CN210914946U (en) | Lifting appliance with sling tensioning device | |
CN103663144A (en) | Special turnover device used for steel members | |
CN208616372U (en) | Three-dimensional assembled architecture superimposed sheet storage shelf | |
CN205527291U (en) | A frame type frame for hoisting two superimposed sheets | |
CN214692858U (en) | Floor transportation frock | |
CN111847218A (en) | Bottom plate balance lifting appliance for precast concrete composite slab and manufacturing method thereof | |
CN209522051U (en) | Piling bin for prefabricated components | |
CN209668612U (en) | A kind of aerated blocks handling apparatus convenient for assembling and being used in turn | |
CN101985839B (en) | Large tonnage pile static loading test ballasting platform counter-force device and mounting method thereof | |
CN109515977A (en) | Piling bin and its manufacture craft and stacking method for prefabricated components | |
CN214828335U (en) | Double-hoop integral hoisting structure for bent cap construction | |
CN110027994A (en) | Prefabricated components intensively stack Secondary Transport system | |
CN212403153U (en) | Bearing device for hoisting articles at high altitude | |
CN211594758U (en) | Superimposed sheet hoist | |
CN220564078U (en) | Sleeve type lifting frame | |
CN105040991B (en) | The supporting construction and method for supporting of large-span steel segmental hoisting | |
CN212224636U (en) | Building construction is platform is stacked with template in scene |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |