A kind of para-seismic support for building
Technical field
The utility model relates to para-seismic support technical field, specially a kind of para-seismic support for building.
Background technique
Para-seismic support is usually used in architectural engineering.In construction projects, need to install various pipelines, the installation of pipeline is usual
Load-bearing is carried out using para-seismic support, pipeline is positioned by the anchor ear with bolt.
But needed in pipe installation process it is multiple be bolted, install it is very inconvenient, cause installation effectiveness lower.And
And the distance between multiple para-seismic supports needs measure fixed point, and are easy to happen larger straightness error, lead to the branch having
Frame needs to recalibrate installation.
Utility model content
It is mentioned above in the background art to solve the purpose of this utility model is to provide a kind of para-seismic support for building
Problem.
To achieve the above object, the utility model provides the following technical solutions: a kind of para-seismic support for building, including ground
Face, the upper end on the ground are fixedly installed with support pole device, and the upper end of the support pole device is plugged with duct frame device;
The support pole device includes pedestal, first through hole, square groove, expansion bolt, square block, support column, slot, company
Hole and connecting rod are connect, the pedestal and ground face contact, the expansion bolt are fastenedly connected with ground, and the pedestal is provided with rectangular
Slot is connected with square block in the square groove, and the upper end of the square block is fixedly connected with support column, and the support column is provided with
Connecting hole is plugged with connecting rod in the connecting hole;
The duct frame device includes support frame, the second through-hole, resilient cushion, pipeline, clamping plate, locating rod, card slot, positioning
Axis, torsional spring, bayonet lock and square pole are pasted with resilient cushion in support frame as described above, pipeline, the pipeline are placed on the resilient cushion
Upper end be connected with clamping plate, the lower end of the clamping plate is fixedly connected with locating rod, and the lower end of support frame as described above is fixedly connected with fixed
Position axis, is socketed with torsional spring on the outside of the locating shaft, the outside movable sleeve of the locating shaft is connected to bayonet lock, the upper end of the torsional spring
It is fixedly connected with support frame, the lower end of the torsional spring is fixedly connected with bayonet lock, and the lower end of support frame as described above is fixedly connected with rectangular
Bar.
Preferably, the pedestal is provided with first through hole, and sliding sleeve is connected to expansion bolt in the first through hole.
Preferably, the support column is slidably socketed with pedestal, and the support column is provided with slot.
Preferably, the slot is rectangular, and sliding sleeve is connected to square pole in the slot.
Preferably, support frame as described above is provided with the second through-hole, and second through-hole is slidably socketed with locating rod.
Preferably, the locating rod is provided with card slot, and the card slot and bayonet lock are clamped.
Compared with prior art, the utility model has the beneficial effects that the para-seismic support for building uses support pole device
It can be realized with duct frame device easy for installation, and positioned between para-seismic support using connecting rod, reduce installation straightness
Error improves bracket and installs success rate.
Detailed description of the invention
Fig. 1 is the overall structure diagram of the utility model;
Fig. 2 is enlarged drawing at the A of the utility model;
Fig. 3 is the connection schematic diagram between the support pole device of the utility model;
Fig. 4 is enlarged drawing at the B of the utility model.
In figure: 1 ground, 2 support pole devices, 21 pedestals, 22 first through hole, 23 square grooves, 24 expansion bolts, 25 rectangular
Block, 26 support columns, 27 slots, 28 connecting holes, 29 connecting rods, 3 duct frame devices, 31 support frames, 32 second through-holes, 33 dampings
Pad, 34 pipelines, 35 clamping plates, 36 locating rods, 37 card slots, 38 locating shafts, 39 torsional springs, 310 bayonet locks, 311 square poles.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
In the description of the present invention, it should be understood that term " longitudinal direction ", " transverse direction ", "upper", "lower", " preceding ",
The orientation or positional relationship of the instructions such as " rear ", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside" be based on
Orientation or positional relationship shown in the drawings is merely for convenience of description the utility model, rather than the dress of indication or suggestion meaning
It sets or element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as to the utility model
Limitation.
Fig. 1-4 is please referred to, the utility model provides a kind of technical solution: a kind of para-seismic support for building, including ground 1,
The upper end on ground 1 is fixedly installed with support pole device 2, and the upper end of support pole device 2 is plugged with duct frame device 3;
Support pole device 2 includes pedestal 21, first through hole 22, square groove 23, expansion bolt 24, square block 25, support column
26, slot 27, connecting hole 28 and connecting rod 29, pedestal 21 are contacted with ground 1, and pedestal 21 is provided with first through hole 22, and first is logical
Sliding sleeve is connected to expansion bolt 24 in hole 22, and first through hole 22 is that expansion bolt 24 provides installation space, expansion bolt 24 with
Ground 1 is fastenedly connected, and pedestal 21 is provided with square groove 23, and square block 25 is connected in square groove 23, and square groove 23 is square block
25 provide installation space, and the upper end of square block 25 is fixedly connected with support column 26, and support column 26 is slidably socketed with pedestal 21, branch
Dagger 26 is provided with slot 27, slot 27 be it is rectangular, sliding sleeve is connected to square pole 311 in slot 27, and slot 27 is square pole 311
Installation space is provided, support column 26 is provided with connecting hole 28, and connecting rod 29 is plugged in connecting hole 28, and each support column 26 is set
2 connecting holes are set, connecting rod 29 is installed in each connecting hole 28, connecting rod 29 play the guiding role, convenient to next support
Column 26 is positioned, and ensure that straightness, and next support column 26 is avoided to shift, and improves installation success rate;
Duct frame device 3 includes support frame 31, the second through-hole 32, resilient cushion 33, pipeline 34, clamping plate 35, locating rod 36, card
Slot 37, locating shaft 38, torsional spring 39, bayonet lock 310 and square pole 311, support frame 31 are provided with the second through-hole 32, the second through-hole 32 with
Locating rod 36 is slidably socketed, and the second through-hole 32 is that locating rod 36 provides installation space, and resilient cushion 33 is pasted in support frame 31,
Pipeline 34 is placed on resilient cushion 33, resilient cushion 33 is made of rubber, and resilient cushion 33 has cushioning effect, pipeline 34 to pipeline 34
Upper end be connected with clamping plate 35, pipeline 34 is fixed in clamping plate 35, and the lower end of clamping plate 35 is fixedly connected with locating rod 36, positioning
Bar 36 is provided with card slot 37, and card slot 37 and bayonet lock 310 are clamped, bayonet lock 310 by being clamped with card slot 37, thus to locating rod 36 into
Row positioning, the lower end of support frame 31 are fixedly connected with locating shaft 38, and the outside of locating shaft 38 is socketed with torsional spring 39, and there is torsion to make
With the outside movable sleeve of locating shaft 38 is connected to bayonet lock 310, and the upper end of torsional spring 39 is fixedly connected with support frame 31, under torsional spring 39
End is fixedly connected with bayonet lock 310, and the lower end of support frame 31 is fixedly connected with square pole 311.
When the utility model is specifically implemented: when needing to install the para-seismic support, first by pedestal 21 and support column 26
It is slidably socketed, so that pedestal 21 reaches the bottom of support column 26, the square groove 23 of pedestal 21 and the square block of 26 lower end of support column
25 clampings then behind the position of calibration pedestal 21, are installed expansion bolt 24 in the first through hole 22 of pedestal 21, are carried out to pedestal 21
It is fixed, then the square pole 311 of 31 lower end of support frame and the slot 27 of support column 26 are slidably socketed, then in support column 26
28 interpolation of connecting hole extension bar 29 in succession, position next support pole device 2 by connecting rod 29, and support pole device 2 positions
After can be fastened by expansion bolt 24, by installing connecting rod 29 in each connecting hole 28, connecting rod 29 play the guiding role,
It is convenient that next support column 26 is positioned, it ensure that straightness, next support column 26 avoided to shift, and without surveying
The distance between each support column 26 is measured, installation success rate is improved;When needing to carry out clamping to pipeline 34, first pipeline 34 is placed in
On resilient cushion 33, the second through-hole 32 of the locating rod 36 and support frame 31 that then make 35 lower end of clamping plate is socketed, and then stirs card
Installation can be realized so that bayonet lock 310 is caught in the card slot 37 of locating rod 36 in pin 310, convenient and efficient, improves pipeline 34
Installation effectiveness.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.