CN208718336U - A kind of top pipe network construction lifting platform - Google Patents

A kind of top pipe network construction lifting platform Download PDF

Info

Publication number
CN208718336U
CN208718336U CN201821299020.3U CN201821299020U CN208718336U CN 208718336 U CN208718336 U CN 208718336U CN 201821299020 U CN201821299020 U CN 201821299020U CN 208718336 U CN208718336 U CN 208718336U
Authority
CN
China
Prior art keywords
lifting device
pipe network
guide rail
network construction
pedestal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821299020.3U
Other languages
Chinese (zh)
Inventor
杨帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Chemical Engineering No16 Construction Co Ltd
Original Assignee
China National Chemical Engineering No16 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Chemical Engineering No16 Construction Co Ltd filed Critical China National Chemical Engineering No16 Construction Co Ltd
Priority to CN201821299020.3U priority Critical patent/CN208718336U/en
Application granted granted Critical
Publication of CN208718336U publication Critical patent/CN208718336U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a kind of top pipe network construction lifting platform, including pedestal, and base bottom is equipped with traveling wheel, the first lifting device is equipped on the upside of pedestal, it is equipped with station at the top of first lifting device, the second lifting device is equipped on the upside of station, is equipped at the top of the second lifting device and lifts platform.The hoistable platform is conducive to the laying to certain altitude pipe network, improves construction efficiency.

Description

A kind of top pipe network construction lifting platform
Technical field
The utility model belongs to the realm of building construction, and in particular to a kind of top pipe network construction lifting platform.
Background technique
It can be related to the laying of a variety of pipe networks, such as water supply and sewerage pipeline, fire protection pipeline and air supply pipe in construction The pipe networks such as road.And when laying construction ceiling pipe network, needing to build scaffold constructs, and needs a large amount of human resources, applies Work efficiency rate is lower.
Summary of the invention
The technical problem to be solved by the utility model is to provide a kind of top pipe network construction lifting platforms, are conducive to one Determine the laying of height pipe network, improves construction efficiency.
A kind of top pipeline network construction lifting that in order to solve the above technical problems, the technical scheme adopted by the utility model is: Platform, including pedestal, base bottom are equipped with traveling wheel, the first lifting device are equipped on the upside of pedestal, is set at the top of the first lifting device There is station, the second lifting device is equipped on the upside of station, is equipped at the top of the second lifting device and lifts platform.
In preferred scheme, first lifting device and the second lifting device are several hydraulically extensible cylinders or electronic push away Bar.
In preferred scheme, second lifting device bottom is equipped with mounting blocks, and mounting blocks are mounted on behaviour by movable stand Make on platform.
In further embodiment, the movable stand includes vertically disposed first guide rail and the second guide rail, the bottom of mounting blocks Portion is equipped with the first sliding block to slide along the first rail, and the first guide rail bottom is equipped with the second sliding block slided along the second guide rail.
In further scheme, the quantity of first guide rail and the second guide rail is two.
In preferred scheme, the station is surrounded by guardrail.
In preferred scheme, the pedestal is equipped with several support devices, and support device includes across pedestal and and pedestal The screw rod of threaded connection, screw rod lower end are equipped with support base, and screw rod upper end is equipped with handle.
A kind of top pipe network construction lifting platform provided by the utility model can be implemented to adjust according to the mounting height of pipe network Whole operating platform height, while what is be arranged lifts platform and can lift to the pipeline of preassembling, and construction personnel is facilitated to operate peace Dress, the hoistable platform can be moved flexibly, not need to build scaffold repeatedly.It is adjusted by construction height and improves the flexible of construction Property, it is strong to reduce labour for lifting platform and can lift to the pipeline of preassembling by setting, the convenient connections with other pipelines Degree.
Detailed description of the invention
The utility model is described in further detail with reference to the accompanying drawings and examples:
Fig. 1 is the overall structure diagram of the utility model.
Fig. 2 is the top view of the utility model.
In figure: pedestal 1, traveling wheel 2, the first lifting device 3, station 4, the second lifting device 5 lift platform 6, mounting blocks 7, the first guide rail 8, the second guide rail 9, the first sliding block 10, the second sliding block 11, screw rod 12, support base 13, handle 14, guardrail 15.
Specific embodiment
As shown in Figure 1 and 2, a kind of top pipe network construction lifting platform, including pedestal 1,1 bottom of pedestal are equipped with traveling wheel 2, It is equipped with the first lifting device 3 on the upside of pedestal 1, station 4 is equipped at the top of the first lifting device 3, is equipped with second liter on the upside of station 4 Falling unit 5 is equipped at the top of second lifting device 5 and lifts platform 6.
First lifting device 3 and the second lifting device 5 are several hydraulically extensible cylinders or electric pushrod.
In the present embodiment, the first lifting device 3 and the second lifting device 5 are two hydraulically extensible cylinders, pass through first Lifting device 3 realizes the lifting of station 4, and construction personnel is facilitated to carry out high-altitude application;The second lifting device 5 being arranged drives support Platform 6 is lifted to move up and down, it is convenient to lift the pipeline on platform 6 and lift to being placed on, it does not need artificially to carry out auxiliary to lift, Reduce labor intensity of operating staff and construction number.
When specifically used, rationally it is grouped according to design of pipe networks drawing and erection sequence first, it will on lifting platform 6 One group of pipeline progress is pre-splicing, and station 4 is risen to suitable operation height by the first lifting device 3 of starting, starts second Lifting device 5 will lift platform 6 and increase, and the pre-splicing pipeline connected is fixed and is spliced with other groups of pipe joint; Be movably walking wheel 2, reaches next installation site, reduces the second lifting device 5, the pre- of next group of pipeline is carried out on lifting platform 6 Splicing rises the second lifting device 5, completes the installation of this group of pipeline, be repeated in, until completing the connection of all pipe networks.
The traveling wheel 2 of setting, is conducive to the movement of hoistable platform, compares scaffold, duplicate dismounting is not needed, to mention High construction efficiency.
For complex grid, if all carrying out assembly in high-altitude, the high altitude operation time is on the one hand increased, and operation is imitated Rate is lower, by way of carrying out preassembling, improves construction efficiency, the platform 6 of lifting of setting may be implemented to preassembling pipeline It lifts.
The station 4 is surrounded by guardrail 15.The guardrail 15 of setting can play protective action to construction personnel.
The pedestal 1 is equipped with several support devices, and support device includes being threadedly coupled across pedestal 1 and with pedestal 1 Screw rod 12,12 lower end of screw rod are equipped with support base 13, and 12 upper end of screw rod is equipped with handle 14.
In the present embodiment, the quantity of support device is four, by rotating clockwise or counterclockwise 14 realization screw rods 12 Move up and down.After whole device is moved to installation site, support base 13 is held out against on ground by moving down screw rod 12 On face, guarantee the stability of entire platform, prevents random movement.
Second lifting device, 5 bottom is equipped with mounting blocks 7, and mounting blocks 7 are mounted on station 4 by movable stand.
The movable stand includes vertically disposed first guide rail 8 and the second guide rail 9, and the bottom of mounting blocks 7 is equipped with along first The first sliding block 10 that guide rail 8 slides, 8 bottom of the first guide rail are equipped with the second sliding block 11 slided along the second guide rail 9.
As shown in Fig. 2, the quantity of first guide rail 8 and the second guide rail 9 is two.
It is slided by mounting blocks 7 along the first guide rail 8, drive is lifted platform 5 and slided along the first guide rail 8, lifts platform 5 to realize Back-and-forth motion;It is slided by the first guide rail 8 along the second guide rail 9, realizes that the transverse direction for lifting platform 5 moves left and right, so as to adjust Whole to be placed on the position for lifting the pipeline of the preassembling on platform 5, when being spliced with the pipeline of other groups, operation is more flexible, is not required to It wants operator to move preassembling pipeline, reduces labor intensity, improve construction efficiency.
The above embodiments are only the optimal technical scheme of the utility model, and are not construed as the limit for the utility model System, the technical solution that the protection scope of the utility model should be recorded with claim, the technical solution recorded including claim The equivalents of middle technical characteristic are protection scope.Equivalent replacement i.e. within this range is improved, also in the utility model Protection scope within.

Claims (7)

1. a kind of top pipe network construction lifting platform, it is characterised in that: including pedestal (1), pedestal (1) bottom is equipped with traveling wheel (2), the first lifting device (3) are equipped on the upside of pedestal (1), are equipped with station (4) at the top of the first lifting device (3), station (4) Upside is equipped with the second lifting device (5), is equipped at the top of the second lifting device (5) and lifts platform (6).
2. a kind of top pipe network construction lifting platform according to claim 1, it is characterised in that: first lifting device (3) and the second lifting device (5) is several hydraulically extensible cylinders or electric pushrod.
3. a kind of top pipe network construction lifting platform according to claim 1, it is characterised in that: second lifting device (5) bottom is equipped with mounting blocks (7), and mounting blocks (7) are mounted on station (4) by movable stand.
4. a kind of top pipe network construction lifting platform according to claim 3, it is characterised in that: the movable stand includes hanging down The first guide rail (8) and the second guide rail (9) being directly arranged, the bottom of mounting blocks (7) are equipped with first slided along the first guide rail (8) and slide Block (10), the first guide rail (8) bottom are equipped with the second sliding block (11) slided along the second guide rail (9).
5. a kind of top pipe network construction lifting platform according to claim 4, it is characterised in that: first guide rail (8) Quantity with the second guide rail (9) is two.
6. a kind of top pipe network construction lifting platform according to claim 1, it is characterised in that: the station (4) four Week is equipped with guardrail (15).
7. a kind of top pipe network construction lifting platform according to claim 1, it is characterised in that: set on the pedestal (1) There are several support devices, support device includes across pedestal (1) and the screw rod (12) that is threadedly coupled with pedestal (1), screw rod (12) Lower end is equipped with support base (13), and screw rod (12) upper end is equipped with handle (14).
CN201821299020.3U 2018-08-13 2018-08-13 A kind of top pipe network construction lifting platform Active CN208718336U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821299020.3U CN208718336U (en) 2018-08-13 2018-08-13 A kind of top pipe network construction lifting platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821299020.3U CN208718336U (en) 2018-08-13 2018-08-13 A kind of top pipe network construction lifting platform

Publications (1)

Publication Number Publication Date
CN208718336U true CN208718336U (en) 2019-04-09

Family

ID=65977387

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821299020.3U Active CN208718336U (en) 2018-08-13 2018-08-13 A kind of top pipe network construction lifting platform

Country Status (1)

Country Link
CN (1) CN208718336U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113551082A (en) * 2021-07-17 2021-10-26 廉江市第三建筑工程有限公司 Lifting device for high-altitude indoor pipeline and air pipe

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113551082A (en) * 2021-07-17 2021-10-26 廉江市第三建筑工程有限公司 Lifting device for high-altitude indoor pipeline and air pipe
CN113551082B (en) * 2021-07-17 2022-02-01 廉江市第三建筑工程有限公司 Lifting device for high-altitude indoor pipeline and air pipe

Similar Documents

Publication Publication Date Title
CN208234503U (en) Subway overhauls aerial work platform
CN103556817B (en) Side wall concrete construction method employing side wall trolley
CN208718336U (en) A kind of top pipe network construction lifting platform
CN112267568B (en) Steel truss structure sectional hoisting construction method
CN204738226U (en) Arched bridge main arch bottom plate rail formula tool car
CN103557011B (en) A kind of side wall trolley
CN213742197U (en) Scaffold frame for construction convenient to adjust
CN220447263U (en) Waste material compression device
CN210636773U (en) Civil engineering wall brick builds auxiliary device
CN212583440U (en) Warning guardrail for building electric power engineering
CN114609366A (en) Rainfall simulation system for outdoor large-scale side slope model experiment
CN209603145U (en) A kind of deep foundation pit support structure
CN211447704U (en) Lifting device for bridge tunnel construction
CN208308286U (en) Tube coupling assembly guiding device and Lift-on/Lift-off System
CN208022659U (en) A kind of civil engineering elevator
CN208701882U (en) A kind of rack fabrication and installation net frame leveling device
CN206030194U (en) Precast concrete cloth machine
CN207309319U (en) Attaching/detaching apparatus
CN212875308U (en) Line support for municipal road engineering that expansibility is good
CN218786802U (en) Highway old road reforms transform safety and encloses fender
CN215854861U (en) Be used for civil engineering construction strutting arrangement convenient to remove
CN204531215U (en) For the mobile truss of Standard Factory Room under tile construction
CN209938666U (en) Ceramic tile haulage equipment for building engineering
CN213537195U (en) Lifting type operation platform for constructional engineering service