CN208711919U - Central intelligent control system for ore production - Google Patents
Central intelligent control system for ore production Download PDFInfo
- Publication number
- CN208711919U CN208711919U CN201821163270.4U CN201821163270U CN208711919U CN 208711919 U CN208711919 U CN 208711919U CN 201821163270 U CN201821163270 U CN 201821163270U CN 208711919 U CN208711919 U CN 208711919U
- Authority
- CN
- China
- Prior art keywords
- group
- level
- unit
- ore production
- transformer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 47
- 238000012216 screening Methods 0.000 claims abstract description 38
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 31
- 238000012544 monitoring process Methods 0.000 claims description 11
- 238000005507 spraying Methods 0.000 claims description 6
- 239000000463 material Substances 0.000 claims description 4
- 238000009736 wetting Methods 0.000 claims 1
- 238000012806 monitoring device Methods 0.000 abstract 1
- 239000004575 stone Substances 0.000 description 3
- 238000000034 method Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 230000001351 cycling effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000003912 environmental pollution Methods 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- JEGUKCSWCFPDGT-UHFFFAOYSA-N h2o hydrate Chemical compound O.O JEGUKCSWCFPDGT-UHFFFAOYSA-N 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 230000003340 mental effect Effects 0.000 description 1
- 239000010865 sewage Substances 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Landscapes
- Crushing And Grinding (AREA)
- Disintegrating Or Milling (AREA)
- Manufacture And Refinement Of Metals (AREA)
Abstract
The utility model provides a central intelligent control system of ore production, is including industrial control host computer and the industrial display that is connected, the industrial control host computer is connected with ore production equipment group, water supply equipment group, power supply equipment group, drainage equipment group and real time monitoring device, ore production equipment group includes hydraulic crushing hammer, one-level breaker group, second grade breaker group, one-level screening unit, tertiary breaker group, second grade screening unit and tertiary screening unit. The utility model provides a central intelligent control system of ore production, energy saving and emission reduction, comprehensive control has realized the information-based management to ore production.
Description
Technical field
The utility model relates to ore production technical field, especially a kind of central intelligent control system of ore production.
Background technique
After ore extraction, production process is to first pass through crusher to be crushed biggish stone, after being formed compared with finger stone,
Two are carried out again to break, and are then sieved again;Existing production system power consumption in ore production process is big, high production cost,
Also easily there is voltage instability situation, delay production or damage equipment;And position equipments at different levels are often completely by manually monitoring,
Lack comprehensive monitoring;The dust generated in process of production also will cause environmental pollution, increase corporate environment treatment cost.
Utility model content
In order to overcome the disadvantages mentioned above of the prior art, the purpose of the utility model is to provide a kind of central intelligence of ore production
It can control system, energy-saving and emission-reduction, overall monitor realizes the information system management to ore production.
The technical scheme adopted by the utility model to solve the technical problem is as follows: a kind of central intelligence control of ore production
System, including the Industry Control host being connected and industrial display, the Industry Control host is connected with ore production equipment
Group, supply equipment group, power supply unit group, drainage equipment group and real time monitoring apparatus, the ore production equipment group includes hydraulic
Quartering hammer, level-one are crushed unit, two-stage crushing unit, level-one screening unit, tertiary crusher group, second level screening unit and three-level
Sieve unit;The supply equipment group includes indusqtrial water supply equipment and living water equipment, and the indusqtrial water supply equipment includes supplying
Water water pump and several water supply lines for supplying water for ore production district are equipped with electromagnetic flowmeter and electricity on the water supply line
Magnetic current control valve, the water supply pump are mounted in reservoir;The power supply unit group includes transformer group and is used for as mine
Several distribution boxs of stone production district, Office Area and living area power supply, the transformer group are connected with reactive-load compensation equipment, the change
Depressor group is mounted in electric substation;The drainage equipment group includes the liquidometer and several suction pumps in setting pot, described
Suction pump is connected to circulating water pipeline, the setting pot communicated drainage ditch.
The level-one is crushed unit, two-stage crushing unit and level-one screening unit and passes sequentially through conveyer belt company along feedstock direction
It connects, the level-one screening machine group passes through conveying band connection tertiary crusher group and tail mud stockyard respectively;The tertiary crusher group
Discharge end the feed end of unit is sieved by conveying band connection second level, the discharge end of second level screening unit passes through defeated respectively
Feed end, product stockyard and the three-level screening unit of band connection tertiary crusher group are sent, the three-level screening unit passes through conveying
Band connection product stockyard;The product stockyard is divided into several subregions for stacking size fractionated material, and several subregions are equipped with
Weighbridge, the weighbridge connect Industry Control host by wireless signal.
It includes 1 PXZ1600 gyratory crusher or 1 PXZ1400 gyratory crusher that the level-one, which is crushed unit,;Described two
The broken unit of grade includes 2 PYB-2200 gyratory crushers;The tertiary crusher group includes 4 PYD2200 gyratory crushers;
The level-one screening unit includes 2 YA2570 circular vibrating screens;The second level screening unit and three-level screening unit respectively include 4
YA2570 circular vibrating screen.
The ore production equipment group further includes several spraying dust-proof devices, and several spraying dust-proof devices are respectively arranged on
The level-one is crushed unit, two-stage crushing unit, level-one screening unit, tertiary crusher group, second level screening unit and three-level sieve
The feed end and discharge end of extension set group.
The real time monitoring apparatus includes several monitoring cameras for being mounted on ore production district.
The transformer group includes 4 transformers, and 4 transformers include S11-630-10/6.3 transformer, S11-
M800-10/0.4 transformer, S11-M2000-10/6.3 transformer and S11-M400-10/0.4 transformer.
Compared with prior art, the utility model has the beneficial effects that a kind of central intelligent control system of ore production,
Its Industry Control host connection ore production equipment group is simultaneously monitored the working condition of wherein each unit;Power supply unit assembles
For reactive-load compensation equipment, while ensureing voltage stabilization, effectively save electric energy reduces production cost;Industry Control master
Machine is adjusted water supply by the electromagnetic flowmeter and electromagnetic flow control valve real-time measurement water supply on water supply line;
Liquidometer and several suction pumps are equipped in setting pot, can cycling use of water, reach emission reduction sewage effect;The utility model can also lead to
The weighbridge for crossing product stockyard obtains the weight of size fractionated material in real time, convenient for observation manufacturing schedule;Ore production district, Office Area
And living area is mounted on monitoring camera, can produce to ore and carry out overall monitor.
Detailed description of the invention
Fig. 1 is the system block diagram of the utility model.
Specific embodiment
Now in conjunction with Detailed description of the invention, the present invention will be further described with embodiment:
Case study on implementation: referring to Figure 1, a kind of central intelligent control system of ore production, including the industry control being connected
Host 1 and industrial display 2 processed, the Industry Control host be connected with ore production equipment group 3, supply equipment group 4, power supply set
Standby group 5, drainage equipment group 6 and real time monitoring apparatus 7, the ore production equipment group include hydraulic breaking hammer, level-one crusher
Group, two-stage crushing unit, level-one screening unit, tertiary crusher group, second level screening unit and three-level sieve unit;The water supply
Equipment group includes indusqtrial water supply equipment and living water equipment, and the indusqtrial water supply equipment includes water supply pump and is used for as ore
Several water supply lines that production district supplies water are equipped with electromagnetic flowmeter and electromagnetic flow control valve on the water supply line, described
Water supply pump is mounted in reservoir;The power supply unit group include transformer group and for for ore production district, Office Area and
Several distribution boxs of living area power supply, the transformer group are connected with reactive-load compensation equipment, and the transformer group is mounted on power transformation
In institute;The drainage equipment group includes the liquidometer and several suction pumps in setting pot, and the suction pump is connected to recirculated water
Pipeline, the setting pot communicated drainage ditch.
The level-one is crushed unit, two-stage crushing unit and level-one screening unit and passes sequentially through conveyer belt company along feedstock direction
It connects, the level-one screening machine group passes through conveying band connection tertiary crusher group and tail mud stockyard respectively;The tertiary crusher group
Discharge end the feed end of unit is sieved by conveying band connection second level, the discharge end of second level screening unit passes through defeated respectively
Feed end, product stockyard and the three-level screening unit of band connection tertiary crusher group are sent, the three-level screening unit passes through conveying
Band connection product stockyard;The product stockyard is divided into several subregions for stacking size fractionated material, and several subregions are equipped with
Weighbridge, the weighbridge connect Industry Control host by wireless signal.
It includes 1 PXZ1600 gyratory crusher or 1 PXZ1400 gyratory crusher that the level-one, which is crushed unit,;Described two
The broken unit of grade includes 2 PYB-2200 gyratory crushers;The tertiary crusher group includes 4 PYD2200 gyratory crushers;
The level-one screening unit includes 2 YA2570 circular vibrating screens;The second level screening unit and three-level screening unit respectively include 4
YA2570 circular vibrating screen.
The ore production equipment group further includes several spraying dust-proof devices, and several spraying dust-proof devices are respectively arranged on
The level-one is crushed unit, two-stage crushing unit, level-one screening unit, tertiary crusher group, second level screening unit and three-level sieve
The feed end and discharge end of extension set group.
The real time monitoring apparatus includes several monitoring cameras for being mounted on ore production district.
The transformer group includes 4 transformers, and 4 transformers include S11-630-10/6.3 transformer, S11-
M800-10/0.4 transformer, S11-M2000-10/6.3 transformer and S11-M400-10/0.4 transformer.
In conclusion after those skilled in the art read the utility model file, skill according to the present utility model
Art scheme and technical concept are not necessarily to creative mental labour and make other various corresponding conversion schemes, and it is practical new to belong to this
The range that type is protected.
Claims (6)
1. a kind of central intelligent control system of ore production, it is characterised in that: including the Industry Control host being connected and work
Industry display, the Industry Control host are connected with ore production equipment group, supply equipment group, power supply unit group, drainage equipment
Group and real time monitoring apparatus, the ore production equipment group include hydraulic breaking hammer, level-one be crushed unit, two-stage crushing unit,
Level-one sieves unit, tertiary crusher group, second level screening unit and three-level and sieves unit;The supply equipment group includes that industry supplies
Wetting system and living water equipment, the indusqtrial water supply equipment include water supply pump and several for supplying water for ore production district
Water supply line is equipped with electromagnetic flowmeter and electromagnetic flow control valve on the water supply line, and the water supply pump is mounted on storage
In pond;The power supply unit group includes transformer group and several for powering for ore production district, Office Area and living area
Distribution box, the transformer group are connected with reactive-load compensation equipment, and the transformer group is mounted in electric substation;The drainage equipment
Group includes the liquidometer and several suction pumps in setting pot, and the suction pump is connected to circulating water pipeline, and the setting pot connects
Logical gutter.
2. a kind of central intelligent control system of ore production according to claim 1, it is characterised in that: the level-one is broken
Broken unit, two-stage crushing unit and level-one screening unit pass sequentially through conveying band connection, the level-one screening machine along feedstock direction
Group passes through conveying band connection tertiary crusher group and tail mud stockyard respectively;The discharge end of the tertiary crusher group passes through conveyer belt
The feed end of second level screening unit is connected, the discharge end of the second level screening unit passes through conveying band connection tertiary crusher respectively
Feed end, product stockyard and the three-level of group sieve unit, and the three-level screening unit passes through conveying band connection product stockyard;It is described
Product stockyard is divided into several subregions for stacking size fractionated material, and several subregions are equipped with weighbridge, and the weighbridge passes through nothing
Line signal connects Industry Control host.
3. a kind of central intelligent control system of ore production according to claim 1 or 2, it is characterised in that: described one
The broken unit of grade includes 1 PXZ1600 gyratory crusher or 1 PXZ1400 gyratory crusher;The two-stage crushing unit includes
2 PYB-2200 gyratory crushers;The tertiary crusher group includes 4 PYD2200 gyratory crushers;The level-one screening machine
Group includes 2 YA2570 circular vibrating screens;The second level screening unit and three-level screening unit respectively include 4 YA2570 circular vibrating screens.
4. a kind of central intelligent control system of ore production according to claim 1, it is characterised in that: the ore is raw
Produce equipment group further include several spraying dust-proof devices, several spraying dust-proof devices be respectively arranged on the level-one be crushed unit,
Two-stage crushing unit, level-one screening unit, tertiary crusher group, second level screening unit and three-level are sieved the feed end of unit and are gone out
Expect end.
5. a kind of central intelligent control system of ore production according to claim 1, it is characterised in that: the real-time prison
Controlling device includes several monitoring cameras for being mounted on ore production district.
6. a kind of central intelligent control system of ore production according to claim 1, it is characterised in that: the transformer
Group include 4 transformers, 4 transformers include S11-630-10/6.3 transformer, S11-M800-10/0.4 transformer,
S11-M2000-10/6.3 transformer and S11-M400-10/0.4 transformer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821163270.4U CN208711919U (en) | 2018-07-23 | 2018-07-23 | Central intelligent control system for ore production |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821163270.4U CN208711919U (en) | 2018-07-23 | 2018-07-23 | Central intelligent control system for ore production |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208711919U true CN208711919U (en) | 2019-04-09 |
Family
ID=65974374
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821163270.4U Active CN208711919U (en) | 2018-07-23 | 2018-07-23 | Central intelligent control system for ore production |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208711919U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110215996A (en) * | 2019-06-18 | 2019-09-10 | 日昌升集团有限公司 | A kind of mechanism sandstone production technology |
-
2018
- 2018-07-23 CN CN201821163270.4U patent/CN208711919U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110215996A (en) * | 2019-06-18 | 2019-09-10 | 日昌升集团有限公司 | A kind of mechanism sandstone production technology |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204294346U (en) | Crushing and screening intelligent optimization and safety interlocking control device | |
CN203417731U (en) | High-efficiency dust-free ore crusher | |
CN208711919U (en) | Central intelligent control system for ore production | |
CN202201987U (en) | Open production line device for crushing aluminium oxide crusting block | |
CN210385975U (en) | Cone crusher | |
CN105233982A (en) | Staged combined sorting machine | |
CN103537338A (en) | Vertical mill | |
CN213377131U (en) | Multipurpose aggregate crushing and screening production line | |
CN206425069U (en) | A kind of polyvinyl chloride acetylene calcium carbide conveying equipment | |
CN101748435A (en) | Method and system for cleaning and reclaiming electrolyte | |
CN104452537A (en) | Energy-saving and environment-friendly road old asphalt mixture feeding device | |
CN103041907A (en) | Double-roller press parallel grinding system | |
CN202316065U (en) | Closed-loop production line device for crushing aluminum oxide crusting block | |
CN203018168U (en) | Grinding equipment for alumina crusting block | |
CN202169199U (en) | Bucket lifter production line device for crushing alumina crust block | |
CN103332470A (en) | Gravity discharging mineral feeding device and control method of gravity discharging | |
CN201358312Y (en) | Electrolyte cleaning and recycling system | |
CN202967472U (en) | Ore separation device capable of conveniently regulating ore feeding quantity | |
CN208878661U (en) | A kind of efficient ore reduction device | |
CN219913619U (en) | Comprehensive mining working face three-machine cooling water recovery device | |
CN214778243U (en) | Numerical control gate | |
CN208449569U (en) | A kind of broken machine production line for exportable two kinds broken waste material sizes | |
CN203725199U (en) | Grinding device of vertical mill | |
CN202893770U (en) | Control device used for broken quartz sand dust collection | |
CN209271563U (en) | A kind of Multifunctional sieve sand device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |