CN208701846U - A kind of municipal drainage canal - Google Patents

A kind of municipal drainage canal Download PDF

Info

Publication number
CN208701846U
CN208701846U CN201821107561.1U CN201821107561U CN208701846U CN 208701846 U CN208701846 U CN 208701846U CN 201821107561 U CN201821107561 U CN 201821107561U CN 208701846 U CN208701846 U CN 208701846U
Authority
CN
China
Prior art keywords
plate
water inlet
municipal drainage
water outlet
drainage canal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821107561.1U
Other languages
Chinese (zh)
Inventor
王晓青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Huida Construction Engineering Co Ltd
Original Assignee
Shenzhen Huida Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Huida Construction Engineering Co Ltd filed Critical Shenzhen Huida Construction Engineering Co Ltd
Priority to CN201821107561.1U priority Critical patent/CN208701846U/en
Application granted granted Critical
Publication of CN208701846U publication Critical patent/CN208701846U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a kind of municipal drainage canals, its key points of the technical solution are that including bottom plate, the vertical side plate for being set to bottom plate two sides, the water inlet plate that bottom plate rear and front end is arranged in and the water outlet plate of setting on the ground, the water inlet plate and the middle part for being discharged plate offer inlet and outlet, multiple inlet and outlet are uniformly installed between the water inlet plate and water outlet plate, useless plate is kept off there are two being uniformly arranged between inlet and outlet, two are kept off useless plate and form three sedimentation basins with water inlet plate and the hardened conjunction of water outlet respectively, are equipped with baffle above each sedimentation basin.The utility model solves how to be precipitated to the rubbish in municipal wastewater to guarantee that municipal garbage may not flow into the technical problem in city planting ductwork.

Description

A kind of municipal drainage canal
Technical field
The utility model relates to municipal drainage field, in particular to a kind of municipal drainage canal.
Background technique
Municipal drainage canal refer to by near gutter, intercepting ditch, roadbed and the water at the low-lying place of premises guide to roadbed and live Ditch other than homestead, the water level in gutter and section gutter should have enough conveyances power of water and design water level appropriate, These sanitary sewages are drained into city planting ductwork by municipal drainage canal.
In the prior art, the Authorization Notice No. that can refer to is the Chinese patent of CN206667438U, and it discloses a kind of cities Political affairs anti-blocking water ditch, including groove body are provided with cover board on the groove body, and the upper surface of cover board is equidistant to be offered and groove body inner cavity The dirt discharge groove of connection is also provided with the miscellaneous device of collection on the groove body, collects miscellaneous device and includes two and is overlapped on two at the top of groove body respectively The snap-gauge of side and two groups of flabellum plates are welded with shaft on each snap-gauge.The municipal administration anti-blocking water ditch, is pushed away using the effect of water flow Dynamic arc panel rotation, and then drive side plate rotation, under the mating reaction of connecting plate and arc panel, the sundries in water fall in connecting plate, In the cavity that arc panel and side plate are formed, these sundries are picked up with the rotation of side plate, are then fallen under gravity into It collects in basket, to achieve the purpose that clear up sundries in water, prevents the blocking in gutter.
Due to having many rubbish in municipal drainage ditch, some rubbish are larger, and some rubbish are smaller, in the process of draining In, if do not handled timely these rubbish, these rubbish influence city planting ductwork because municipal garbage is more Pollution discharge capability.
Utility model content
In view of the deficienciess of the prior art, passing through the purpose of this utility model is to provide a kind of municipal drainage canal It is arranged two in the bottom of drainage ditch and keeps off useless plate, then by cooperatively forming the sedimentation basin of three-level with water inlet plate and water outlet plate, gives up It being drained into city planting ductwork again after the sedimentation basin precipitating that rubbish in water passes through three-level, baffle is able to extend the path of water flow, Guarantee the effect of water flow.
To achieve the above object, the utility model provides following technical solution: a kind of municipal drainage canal, feature exist In: including be arranged bottom plate on the ground, the vertical side plate set on bottom plate two sides, the water inlet plate that bottom plate rear and front end is set and It is discharged plate, the water inlet plate and the middle part for being discharged plate offer inlet and outlet, between the water inlet plate and water outlet plate Multiple inlet and outlet are uniformly installed with, are uniformly arranged between inlet and outlet there are two useless plate is kept off, two gears are useless Plate forms three sedimentation basins with water inlet plate and the hardened conjunction of water outlet respectively, is equipped with baffle above each sedimentation basin.
By using above-mentioned technical proposal, municipal wastewater is entered in municipal drainage canal by the inlet channel for plate of intaking, into The hardened conjunction of giving up of water plate and a gear adjacent thereto forms first stage precipitation tank, and the hardened conjunction of giving up of two gears forms second-level settling pond, out The hardened conjunction of giving up of water plate and gear adjacent thereto forms three-level sedimentation basin, and waste water is formed by water inlet plate, water outlet plate, side plate and bottom plate Drainage ditch in, then carry out three-level precipitatings by three sedimentation basins, by the way that baffle is arranged on the top of each sedimentation basin respectively, It can continue to be fed forward around baffle when waste water is by baffle, extend the path that waste water flows through, guarantee deposition efficiency.
The utility model is further arranged to: the top of three baffles is connected with horizontally disposed cover board, the lid Elevating mechanism is connected on plate, the elevating mechanism includes the driving motor being installed on the wall on cover board top, is installed in drive The screw rod being vertically arranged and the connector sleeve being installed on screw rod, the wire rod thread on dynamic motor are connected in connector sleeve.
Work as gear by setting baffle at various height to realize different functions by using above-mentioned technical proposal Flow path is longer when plate is lower, and sedimentation effect is more preferable, can be used for the biggish occasion of the water flows such as flood discharge when baffle is higher, When needing baffle to be gone up and down, driving motor work drives screw rod to rotate in connector sleeve, since the two sides of baffle are by side plate Stopped, so that cover board is driven to be gone up and down, lifting while cover board lifting is to realize three baffles.
The utility model is further arranged to: the cover board top is installed with multiple guide posts being vertically arranged, the guide post Top sliding be connected in wall.
By using above-mentioned technical proposal, during cover board lifting, guide post equally moves up and down and portion on the cover board Wall on slide, so that guide post plays the role of guiding to cover board.
The utility model is further arranged to: the top of each guide post is installed with horizontally disposed block.
By using above-mentioned technical proposal, the block at the top of guide post can prevent cover board and screw rod to be detached from and fall to draining On canal, in cover board because when unexpected and screw rod is detached from, the block at the top of guide post can be stuck in the top of wall to play to block The effect of support.
The utility model is further arranged to: the side plate is corresponded to be installed at the positions of baffle two sides and is vertically arranged Two fixture blocks, the distance of two fixture blocks are the thickness of baffle, and the two sides of the baffle slide respectively to be connected in two fixture blocks.
By using above-mentioned technical proposal, guarantee baffle during upper and lower sliding by the way that fixture block is arranged on side plate It will not shift.
The utility model is further arranged to be installed with the liquid level tube being connected to the inside of sedimentation basin on the side plate.
By using above-mentioned technical proposal, facilitated by setting liquid level tube liquid level inside observation sedimentation basin with it is muddy Turbidity, in order to obtain the effect of precipitating.
The utility model is further arranged to: water inlet is offered on the inside of the liquid level tube, the water inlet is equipped with Water inlet net.
By using above-mentioned technical proposal, net is intake by the water inlet setting in liquid level tube to prevent biggish rubbish It enters in liquid level tube and causes the blocking of liquid level tube.
The utility model is further arranged to: the water outlet is equipped with filter screen.
By using above-mentioned technical proposal, by the way that filter screen is arranged come to small in sewage on the water outlet on water outlet plate Granule foreign is filtered, and is guaranteed that the sewage of discharge is more clean, is reduced the sewage load of city planting ductwork.
The utility model is further arranged to: the water outlet plate includes left connection board and the right side for being located at filter screen two sides Connecting plate, the left connection board and right connection board, which correspond to, offers slippage slot at the position of filter screen, the two sides of the filter screen Sliding is connected in the card slot of left connection board and right connection board respectively.
By using above-mentioned technical proposal, two side slips of filter screen are connected in slippage slot, when on the network interface of filter screen When collecting a certain amount of, filter screen can be taken out along slippage slot and clean, prevent the rubbish on filter screen excessively and then stifled Fill in mesh.
The utility model is further arranged to: being installed with handle at the top of the filter screen.
By using above-mentioned technical proposal, filter screen is pulled out by handle, it is more convenient.
In conclusion the utility model has the advantages that the utility model by arranging compared with the prior art The bottom of water channel is arranged two and keeps off useless plate, then by cooperatively forming the sedimentation basin of three-level with water inlet plate and water outlet plate, in waste water Rubbish by being drained into city planting ductwork again after the sedimentation basin of three-level precipitating, baffle is able to extend the path of water flow, guarantees The effect of water flow.
Detailed description of the invention
Fig. 1 is overall structure figure in embodiment;
Fig. 2 is the perspective view of the explosion of embodiment saliency baffle and filter screen;
Fig. 3 is liquid level tube structural schematic diagram in embodiment.
In figure: 1, bottom plate;2, water inlet plate;21, left connecting plate;22, right connecting plate;23, water inlet;3, it is discharged plate;31, left connection Plate;32, right connection board;33, slippage slot;34, filter screen;341, handle;35, water outlet;4, side plate;41, liquid level tube;411, enter The mouth of a river;42, water inlet net;5, useless plate is kept off;51, first stage precipitation tank;52, second-level settling pond;53, three-level sedimentation basin;54, fixture block;6, Baffle;61, cover board;62, connector sleeve;63, guide post;631, block;7, elevating mechanism;71, driving motor;72, screw rod;8, wall Body.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawing.The wherein identical attached drawing of identical components Label indicates.It should be noted that word "front", "rear" used in the following description, "left", "right", "up" and "down" refer to It is the direction in attached drawing, word " bottom surface " and " top surface ", "inner" and "outside" are referred respectively to towards or away from particular elements geometry The direction at center.
Embodiment: a kind of municipal drainage canal, as shown in Figure 1, including bottom plate 1, water inlet plate 2, water outlet plate 3, side plate 4, keeping off and giving up Plate 5, baffle 6 and elevating mechanism 7.
As depicted in figs. 1 and 2, bottom plate 1 is horizontally disposed and is set to the bottom of dug out groove, intake plate 2 and water outlet Plate 3 is vertically arranged and is installed in respectively the rear and front end on floor, and water inlet plate 2 includes left connecting plate 21 and right connecting plate 22.Zuo Lian Plate 21 and right connecting plate 22, which combine, forms water inlet 23, and sewage enters the width phase of width and water inlet 23 in water inlet 23 Deng, water outlet plate 3 include left connection board 31 and right connection board 32.Left connection board 31 and right connection board 32 is vertically arranged and the two In conjunction with formation water outlet 35.The two sides of bottom plate 1 are fixedly arranged on there are two side plate 4 is total and vertically, the both ends of side plate 4 are respectively at water inlet plate 2 are fixedly connected with water outlet plate 3.Sewage enters in drainage ditch from water inlet 23 in this way, and the width of such drainage ditch is greater than disengaging The width of water, drainage ditch can hoard the sewage of a part.
In order to further be filtered to waste water, it is vertical to offer on the inner sidewall of left connection board 31 and right connection board 32 The slippage slot 33 of setting is equipped with filter screen 34 in slippage slot 33 and its two sides slides be connected to left connection board 31 and right company respectively In slippage slot 33 on fishplate bar 32, the top of filter screen 34 is installed with handle 341.Two side slips of filter screen 34 in this way are connected to In slippage slot 33, when collecting a certain amount of on the network interface of filter screen 34, filter screen 34 can be taken out into progress along slippage slot 33 Cleaning prevents the rubbish on filter screen 34 excessively and then blocks mesh more to save by being pulled out filter screen 34 with handle 341 Power.
It is installed in there are two the useless plate 5 of gear is total and vertically on bottom plate 1, two bottom plates 1 and intake plate 2 and the parallel row of water outlet plate 3 Arrange and be uniformly arranged, thus formed three sedimentation basins, baffle 6 altogether there are three and be respectively correspondingly arranged in three sedimentation basins just on Side, the two sides of baffle 6 are affixed with two sides side plate 4 respectively, and the top of three baffles 6 is fixedly connected with horizontally disposed cover board 61, Elevating mechanism 7 is arranged on the wall 8 right above cover board 61 and is connected with cover board 61.
Since municipal wastewater is entered in municipal drainage canal by the inlet channel for plate 2 of intaking, the plate 2 and adjacent thereto of intaking One is kept off useless plate 5 and combines and forms first stage precipitation tank 51, and two are kept off useless plate 5 and combine and form second-level settling pond 52, be discharged plate 3 and and its The useless plate 5 of adjacent gear, which combines, forms three-level sedimentation basin 53.Waste water is formed by water inlet plate 2, water outlet plate 3, side plate 4 and bottom plate 1 In drainage ditch, three-level precipitating then is carried out by three sedimentation basins, by the way that baffle 6 is arranged on the top of each sedimentation basin respectively, It can continue to be fed forward around baffle 6 when waste water is by baffle 6, extend the path that waste water flows through, guarantee deposition efficiency.
Block 631 shifts during moving up and down in order to prevent, corresponding each on the inner sidewall of two side plates 4 Fixed there are two the fixture block 54 being vertically arranged at the position of baffle 6, the distance between two neighboring fixture block 54 is the thickness of baffle 6 Degree, the two sides of each baffle 6, which slide, to be connected between two neighboring fixture block 54.Elevating mechanism 7 drives baffle 6 to carry out in this way During lower movement, baffle 6 can carry out sliding up and down between two neighboring fixture block 54, so that fixture block 54 plays baffle 6 Anti-bias effect.
Elevating mechanism 7 includes driving motor 71 and screw rod 72.Driving motor 71 is vertically arranged and is installed on wall 8, Screw rod 72 is vertically arranged and is installed in the underface of driving motor 71, and the top of screw rod 72 and the shaft of driving motor 71 are fixed It connects, is installed with the cylindrical connector sleeve 62 being vertically arranged, the lower part spiral shell of screw rod 72 at the position of the corresponding screw rod 72 of cover board 61 Line is connected in connector sleeve 62.
In this way by setting baffle 6 at various height to realize different functions, the flow path when baffle 6 is lower Longer, sedimentation effect is more preferable, can be used for the biggish occasion of the water flows such as flood discharge when baffle 6 is higher, and baffle 6 is being needed to carry out When lifting, driving motor 71 works, and drives screw rod 72 to rotate in connector sleeve 62, since the two sides of baffle 6 are hindered by side plate 4 Gear, so that cover board 61 is driven to be gone up and down, the lifting while lifting of cover board 61 is to realize three baffle 6.
It is solid at the corner location of cover board 61 in order to further prevent baffle 6 to shift during moving up and down Equipped with the guide post 63 being vertically arranged, the top of guide post 63 and the sliding of wall 8 are connected.In this way during cover board 61 is gone up and down, lead Column 63 is equally moved up and down and is slid on the wall 8 on 61 top of cover board, so that guide post 63 plays the role of guiding to cover board 61.
The top of guide post 63 is interspersed with the setting of wall 8, and the top of guide post 63 is installed with horizontally disposed block 631, block 631 diameter is greater than the diameter of guide post 63.In this way when cover board 61 is because of the unexpected disengaging with screw rod 72, the block at 63 top of guide post 631 can be stuck in the top of wall 8 to play the role of support to block 631.
As shown in figure 3, fixed in each side plate 4, there are three the liquid level tube 41 being connected to respectively with three sedimentation basins, liquid levels Pipe 41 is vertically arranged and its underpart offers the water inlet 411 that corresponding sedimentation basin is arranged, and is installed on water inlet 411 into water net 42.Facilitate the liquid level and turbidity inside observation sedimentation basin, by setting liquid level tube 41 in this way in order to obtain precipitating Effect, water inlet net 42 can prevent biggish rubbish from entering the blocking in liquid level tube 41 and causing liquid level tube 41.
The above is only the preferred embodiment of the utility model, and the protection scope of the utility model is not limited merely to Above-described embodiment, technical solution belonging to the idea of the present invention belong to the protection scope of the utility model.It should refer to Out, for those skilled in the art, it is without departing from the principle of the utility model it is several improvement and Retouching, these improvements and modifications also should be regarded as the protection scope of the utility model.

Claims (10)

1. a kind of municipal drainage canal, it is characterised in that: including bottom plate (1) on the ground is arranged, is set to bottom plate (1) two sides vertically Side plate (4), setting bottom plate (1) rear and front end water inlet plate (2) and water outlet plate (3), the water inlet plate (2) and be discharged plate (3) middle part offers water inlet (23) and water outlet (35), uniformly fixed between the water inlet plate (2) and water outlet plate (3) There are multiple water inlets (23) and water outlet (35), is uniformly arranged that there are two keep off useless plate between water inlet (23) and water outlet (35) (5), two are kept off useless plate (5) and combine three sedimentation basins of formation with water inlet plate (2) and water outlet plate (3) respectively, each sedimentation basin it is upper Side is equipped with baffle (6).
2. a kind of municipal drainage canal according to claim 1, it is characterised in that: the top connection of three baffles (6) Have horizontally disposed cover board (61), be connected with elevating mechanism (7) on the cover board (61), the elevating mechanism (7) includes fixed Driving motor (71) on the wall (8) on cover board (61) top, the screw rod being vertically arranged being installed on driving motor (71) (72) it is threaded in connector sleeve (62) with the connector sleeve (62) that is installed on screw rod (72), the screw rod (72).
3. a kind of municipal drainage canal according to claim 2, it is characterised in that: cover board (61) top is installed with multiple The top sliding of the guide post (63) being vertically arranged, the guide post (63) is connected in wall (8).
4. a kind of municipal drainage canal according to claim 3, it is characterised in that: the top of each guide post (63) is solid Equipped with horizontally disposed block (631).
5. a kind of municipal drainage canal according to claim 1, it is characterised in that: corresponding baffle (6) two sides of the side plate (4) Position at be installed with two fixture blocks (54) being vertically arranged, the distance of two fixture blocks (54) is the thickness of baffle (6), described The two sides of baffle (6) slide respectively to be connected in two fixture blocks (54).
6. a kind of municipal drainage canal according to claim 1, it is characterised in that: be installed with and precipitate on the side plate (4) The liquid level tube (41) of the inside connection in pond.
7. a kind of municipal drainage canal according to claim 6, it is characterised in that: offered on the inside of the liquid level tube (41) Water inlet (411), the water inlet (411) are equipped with water inlet net (42).
8. a kind of municipal drainage canal according to claim 1, it is characterised in that: the water outlet (35) is equipped with filter screen (34)。
9. a kind of municipal drainage canal according to claim 8, it is characterised in that: the water outlet plate (3) includes being located at The left connection board (31) and right connection board (32) of filter screen (34) two sides, the left connection board (31) and right connection board (32) are corresponding It is offered at the position of filter screen (34) slippage slot (33), the two sides of the filter screen (34) slide respectively is connected to left connection board (31) and in the card slot of right connection board (32).
10. a kind of municipal drainage canal according to claim 9, it is characterised in that: the top of the filter screen (34) is fixed There are handle (341).
CN201821107561.1U 2018-07-11 2018-07-11 A kind of municipal drainage canal Expired - Fee Related CN208701846U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821107561.1U CN208701846U (en) 2018-07-11 2018-07-11 A kind of municipal drainage canal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821107561.1U CN208701846U (en) 2018-07-11 2018-07-11 A kind of municipal drainage canal

Publications (1)

Publication Number Publication Date
CN208701846U true CN208701846U (en) 2019-04-05

Family

ID=65938642

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821107561.1U Expired - Fee Related CN208701846U (en) 2018-07-11 2018-07-11 A kind of municipal drainage canal

Country Status (1)

Country Link
CN (1) CN208701846U (en)

Similar Documents

Publication Publication Date Title
CN210385126U (en) Sewage treatment device
CN206955795U (en) Dirty tank car is taken out in a kind of sewage purification separation
CN207462730U (en) A kind of boat form settlement of sewage processing unit
CN208701846U (en) A kind of municipal drainage canal
CN200943059Y (en) Treating apparatus for fouling raw water
CN210078926U (en) Rain sewage filtering and precipitating device for river, lake, storehouse and sea sewage draining port
CN218204830U (en) Town road drainage device
CN207761000U (en) Online Processing System with precipitation and filtering function
CN102659268A (en) Novel air-floatation water purifying equipment
CN216092633U (en) Filtering device for water inflow of reclaimed water pond
CN110917668A (en) Precipitation device for sewage treatment
CN214437206U (en) Three-stage sedimentation tank
CN214302063U (en) Sewage pipeline slag removal assembly
CN214763916U (en) High-efficient hierarchical cleaning device for sewage treatment
CN213698939U (en) Solid suspension liquid quick settling device
CN212127658U (en) Industrial wastewater settling tank
CN108245940A (en) A kind of settling tank in sanitary sewage disposal
CN209974483U (en) Water treatment system
CN100392196C (en) Domestic water saving system
CN208843825U (en) Integrated precipitating pond
CN207628082U (en) A kind of sedimentation basin of sewage disposal
CN218374316U (en) Municipal drainage filtration
CN219186002U (en) Waste water treatment equipment
CN220715139U (en) Medical wastewater treatment equipment
CN211339222U (en) Anti-blocking septic tank

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190405

Termination date: 20200711

CF01 Termination of patent right due to non-payment of annual fee