CN208700512U - A kind of material conveying device for building - Google Patents
A kind of material conveying device for building Download PDFInfo
- Publication number
- CN208700512U CN208700512U CN201820966334.8U CN201820966334U CN208700512U CN 208700512 U CN208700512 U CN 208700512U CN 201820966334 U CN201820966334 U CN 201820966334U CN 208700512 U CN208700512 U CN 208700512U
- Authority
- CN
- China
- Prior art keywords
- tube
- fixed
- welded
- installation
- shaft
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Sewage (AREA)
Abstract
The utility model discloses a kind of material conveying devices for building, including rectangular tube, motor switch and motor, the rectangular tube is by a upper tube, one or more middle pipe and a down tube composition, bottom surface inside down tube is equipped with a bottom plate, more than one casing is fixedly mounted in vertical welding on the surface of bottom plate, inside pipe casing is inserted into a pipeline, two engaging lugs of installation are also welded and fixed on the surface of bottom plate, it is right against on the top surface of upper tube at engaging lug and is equipped with a through-hole, upper tube upper end is transversely provided with a shaft, shaft is right against through hole and one reel of installation is welded and fixed, coiling is equipped with a wirerope on reel, wirerope one end extends to inside rectangular tube along through-hole, and it is fixedly connected on corresponding engaging lug.The utility model structure is simple, easy to use, avoids falling for pipeline during transportation, increases safety, and can directly take out pipeline after arriving at the destination, and is not necessarily to other steps, increases efficiency, save strength.
Description
Technical field
The utility model relates to a kind of material conveying devices for building.
Background technique
In building trade, the transport of material needs to expend a large amount of man power and material, in the prior art to building pipe
It when being carried, is generally completed by way of crane or manpower, when carrying out handling by crane, needs to lead in more root canal roads
It crosses wirerope to tighten, but during hanging oneself, since wirerope can not be fixed, to can constantly shake in the sky, holds
Easily cause pipeline it is hollow in fall, danger and is being transported to after designated position to the worker on ground, to the unbundlings of wirerope
It devotes a tremendous amount of time, seriously affects efficiency, and the mode of artificial carrying then inefficiency.
Summary of the invention
It is easy to use the technical problem to be solved by the utility model is to provide a kind of structure is simple, it avoids and is conveying
Pipeline is fallen in the process, increases safety, and can directly take out pipeline after arriving at the destination, without other steps
Suddenly, efficiency is increased, the material conveying device for building of strength is saved.
The utility model is achieved through the following technical solutions: a kind of material conveying device for building, including rectangular
Pipe, motor switch and motor, the rectangular tube are made of a upper tube, one or more middle pipe and a down tube, and one or more
Middle pipe be vertically installed between upper, lower tube, the lower ending opening of upper tube, upper end sealing, the upper end opening of down tube, lower end sealing,
It is communicated between the pipe of upper, middle and lower, the stitching portion of upper, middle and lower pipe is welded and fixed installation two fixed plates, between upper bottom plate
It offseting, and is bolted, the surface of upper tube is equipped with a discharge port, and the surface of down tube is equipped with a feed inlet, under
Bottom surface inside pipe is equipped with a bottom plate, and more than one casing, inside pipe casing is fixedly mounted in vertical welding on the surface of bottom plate
It is inserted into a pipeline, the sliding slot of a T-shape structure is vertically equipped on the two sides inside rectangular tube, bottom plate is right against at sliding slot
The sliding block of one T-shape structure of installation is welded and fixed, sliding block one end is slidably mounted in sliding slot, also welds on the surface of bottom plate
Two engaging lugs are fixedly mounted, two engaging lugs are in the right setting of a first from left, are right against at engaging lug and are equipped on the top surface of upper tube
One through-hole, upper tube upper end are transversely provided with a shaft, and shaft is right against through hole and is welded and fixed one reel of installation, equal disk on reel
It is arranged with a wirerope, wirerope one end extends to inside rectangular tube along through-hole, and is fixedly connected on corresponding connection
On ear.
The support rod of installation one or more, one or more branch is welded and fixed in upper tube side as a preferred technical solution,
One mounting plate of installation is welded and fixed in strut upper end, and motor is fixed by bolts on mounting plate, and the shaft of motor is opposite with shaft
Setting, and be fixedly connected by shaft coupling with shaft, upper tube, which is located at below mounting plate, is welded and fixed installation one " L " type bar, electricity
Machine switch is fixed by bolts in " L " type bar upper end, is electrically connected between motor switch and motor.
The inserted link of installation one or more is welded and fixed on the bottom surface of down tube as a preferred technical solution,.
It is welded and fixed among shaft as a preferred technical solution, and more than one bearing is installed, on the outer ring surface of bearing
One fixed block of installation is welded and fixed, lower end of fixing block is fixedly welded in upper tube.
The beneficial effects of the utility model are: the utility model structure is simple, and it is easy to use, it avoids during transportation
Pipeline is fallen, and increases safety, and can directly be taken out pipeline after arriving at the destination, other steps are not necessarily to, and is increased
Efficiency, saves strength.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment
Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only
It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor
Under, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is the overall structure diagram of the utility model;
Fig. 2 is the partial sectional view in Fig. 1 at A-A.
Specific embodiment
The embodiments of the present invention are described below in detail, examples of the embodiments are shown in the accompanying drawings, wherein from beginning
Same or similar element or element with the same or similar functions are indicated to same or similar label eventually.Below by ginseng
The embodiment for examining attached drawing description is exemplary, and is only used for explaining the utility model, and should not be understood as to the utility model
Limitation.
In the description of the present invention, it should be understood that term " center ", "upper", "lower", "front", "rear",
The orientation or positional relationship of the instructions such as "left", "right", "vertical", "horizontal", "top", "bottom" "inner", "outside" is based on attached drawing institute
The orientation or positional relationship shown, is merely for convenience of describing the present invention and simplifying the description, rather than indication or suggestion is signified
Device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as to this is practical
Novel limitation.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified
Dress ", " connected ", " setting " shall be understood in a broad sense, for example, it may be being fixedly linked, being arranged, may be a detachable connection, set
It sets, or is integrally connected, is arranged.For the ordinary skill in the art, it can understand that above-mentioned term exists with concrete condition
Concrete meaning in the utility model.
As depicted in figs. 1 and 2, a kind of material conveying device for building of the utility model, including rectangular tube, motor switch
13 and motor 17, the rectangular tube is made of one upper tube 11, one or more middle pipes 9 and a down tube 8, in one or more
Pipe 9 is vertically installed between upper, lower tube 11,8, the lower ending opening of upper tube 11, upper end sealing, the upper end opening of down tube 81, lower end
It seals, is communicated between upper, middle and lower pipe 11,9,8, two pieces of fixations of installation are welded and fixed in the stitching portion of upper, middle and lower pipe 11,9,8
Plate 10 offsets between upper bottom plate 10, and is bolted, and the surface of upper tube 11 is equipped with a discharge port 21, under
The surface of pipe 8 is equipped with a feed inlet 22, and the bottom surface inside down tube 8 is equipped with a bottom plate 2, vertical welding on the surface of bottom plate 2
More than one casing 1 is fixedly mounted, a pipeline 5 is inserted into inside casing 1, is vertically equipped on the two sides inside rectangular tube
The sliding slot 6 of one T-shape structure, bottom plate 2 are right against the sliding block 3 that one T-shape structure of installation is welded and fixed at sliding slot 6, sliding block 3 one
End is slidably mounted in sliding slot 6, and two engaging lugs 4 of installation are also welded and fixed on the surface of bottom plate 2, and two engaging lugs 4 are in one
The first from left right setting is right against at engaging lug 4 on the top surface of upper tube 11 and is equipped with a through-hole 15, and 11 upper end of upper tube is transversely provided with an axis
Bar 20, shaft 20 are right against at through-hole 15 and one reel 18 of installation are welded and fixed, and coiling is equipped with a wirerope 7 on reel 18,
7 one end of wirerope extends to inside rectangular tube along through-hole 15, and is fixedly connected on corresponding engaging lug 4.
In the present embodiment, the support rod 14 of installation one or more, one or more support rod is welded and fixed in 11 side of upper tube
One mounting plate 16 of installation is welded and fixed in 14 upper ends, and motor 17 is fixed by bolts on mounting plate 16, the shaft and axis of motor 17
Bar 20 is oppositely arranged, and is fixedly connected by shaft coupling with shaft 20, and peace is welded and fixed in the lower section that upper tube 11 is located at mounting plate 16
" L " type bar 12 is filled, motor switch 13 is fixed by bolts in 12 upper end of " L " type bar, electric between motor switch 13 and motor 17
Property connection, rotating and reverse for motor can effectively be controlled by motor switch, it is convenient to control moving up and moving down for bottom plate
The transport up and down of pipeline, wherein at work, motor can be connect by electric wire with the power supply in construction site, make motor
It is powered.
In the present embodiment, the inserted link of installation one or more is welded and fixed on the bottom surface of down tube 8, inserted link is inserted into ground
Afterwards, can some rectangular tube is fixed.
It in the present embodiment, is welded and fixed among shaft 20 and more than one bearing 19 is installed, on the outer ring surface of bearing 19
One fixed block of installation is welded and fixed, lower end of fixing block is fixedly welded in upper tube 11, by bearing can some by shaft positioning and
It is fixed, avoid the displacement of shaft.
Working principle: since rectangular tube is made of upper, middle and lower pipe, and the quantity of middle pipe is more, can be according to the height of building
The quantity of pipe makes the length of rectangular tube and the length of building to realize the adjustment of square shaped length of tube in increasing or reducing
It is identical, at this moment, by the intubation on the pipeline insertion bottom plate for needing to transport, it is vertically installed in pipeline in rectangular tube, after the completion,
Start motor by motor switch, rotates forward the shaft of motor, the rotation of shaft has driven shaft, and the rotation of shaft has driven volume
Disk can be rolled wirerope by the reel of rotation, and rolling for wirerope can pull up bottom plate, move up bottom plate along sliding slot,
The movement of bottom plate has driven pipeline, makes pipeline is vertical in rectangular tube to move up, until be moved in upper tube, it is at this moment, suitable
Discharge nozzle pipeline can be extracted from casing, be not necessarily to other the step of, increase the efficiency of taking-up and loading, simultaneously because
Pipeline moves in rectangular tube, can avoid pipeline effectively by seal for pipe joints by rectangular tube and fall, increase safety.
The beneficial effects of the utility model are: the utility model structure is simple, and it is easy to use, it avoids during transportation
Pipeline is fallen, and increases safety, and can directly be taken out pipeline after arriving at the destination, other steps are not necessarily to, and is increased
Efficiency, saves strength.
Above description is only a specific implementation of the present invention, but the protection scope of the utility model is not limited to
In this, any change or replacement expected without creative work be should be covered within the scope of the utility model.
Therefore, the protection scope of the utility model should be determined by the scope of protection defined in the claims.
Claims (4)
1. a kind of material conveying device for building, it is characterised in that: including rectangular tube, motor switch and motor, the rectangular tube
It being made of a upper tube, one or more middle pipe and a down tube, one or more middle pipe is vertically installed between upper, lower tube,
The lower ending opening of upper tube, upper end sealing, the upper end opening of down tube, lower end seal, communicate between the pipe of upper, middle and lower, upper, middle and lower pipe
Stitching portion installation two fixed plates are welded and fixed, offset between upper bottom plate, and be bolted, upper tube
Surface is equipped with a discharge port, and the surface of down tube is equipped with a feed inlet, and the bottom surface inside down tube is equipped with a bottom plate, bottom plate
More than one casing is fixedly mounted in vertical welding on surface, and inside pipe casing is inserted into a pipeline, the two sides inside rectangular tube
On be vertically equipped with the sliding slot of a T-shape structure, bottom plate is right against at sliding slot the cunning that one T-shape structure of installation is welded and fixed
Block, sliding block one end are slidably mounted in sliding slot, and two engaging lugs of installation, two engaging lugs are also welded and fixed on the surface of bottom plate
In the right setting of a first from left, it is right against at engaging lug on the top surface of upper tube and is equipped with a through-hole, upper tube upper end is transversely provided with a shaft,
Shaft is right against through hole and one reel of installation is welded and fixed, and coiling is equipped with a wirerope on reel, and wirerope one end is suitable
Through-hole extend to inside rectangular tube, and be fixedly connected on corresponding engaging lug.
2. material conveying device for building according to claim 1, it is characterised in that: installation one is welded and fixed in upper tube side
One mounting plate of installation is welded and fixed in support rod more than root, one or more post upper, and motor is fixed by bolts in peace
In loading board, shaft and the shaft of motor are oppositely arranged, and are fixedly connected by shaft coupling with shaft, and upper tube is located under mounting plate
Installation one " L " type bar is welded and fixed in side, and motor switch is fixed by bolts in " L " type bar upper end, between motor switch and motor
It is electrically connected.
3. material conveying device for building according to claim 1, it is characterised in that: peace is welded and fixed on the bottom surface of down tube
Fill one or more inserted link.
4. material conveying device for building according to claim 1, it is characterised in that: installation one is welded and fixed among shaft
One fixed block of installation is welded and fixed on the outer ring surface of bearing in a above bearing, and lower end of fixing block is fixedly welded in upper tube.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820966334.8U CN208700512U (en) | 2018-06-22 | 2018-06-22 | A kind of material conveying device for building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820966334.8U CN208700512U (en) | 2018-06-22 | 2018-06-22 | A kind of material conveying device for building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208700512U true CN208700512U (en) | 2019-04-05 |
Family
ID=65936881
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820966334.8U Expired - Fee Related CN208700512U (en) | 2018-06-22 | 2018-06-22 | A kind of material conveying device for building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208700512U (en) |
-
2018
- 2018-06-22 CN CN201820966334.8U patent/CN208700512U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108729949B (en) | Rapid sealing device for underground communication roadway and using method thereof | |
CN208700512U (en) | A kind of material conveying device for building | |
CN111099392B (en) | Clear storehouse equipment of cement storehouse | |
CN216381449U (en) | Intelligent anchoring equipment and automatic charging system thereof | |
CN211081864U (en) | Tunneling equipment | |
CN208975415U (en) | A kind of building civil engineering tower crane environmental protection type sprinkling device for reducing dust | |
CN105569686A (en) | Tunnel sidewall concrete injection construction method | |
CN216740819U (en) | Grouting device for joint repairing of high concrete surface | |
CN208618270U (en) | A kind of pier stud automatic spray health promotion system | |
CN208233204U (en) | A kind of wheeled climbing level robot with manipulator | |
CN216785021U (en) | Vacuum pipeline transportation device pushed by air pump | |
CN207635291U (en) | A kind of municipal works concertina type lamp stand | |
CN107587777A (en) | One kind transport drilling installation electric wire lever apparatus | |
CN209716829U (en) | A kind of device automatically delivering welding for pipeline | |
CN208530881U (en) | A kind of flood control sandbag sack-filling device | |
CN207214931U (en) | Tunnel Engineering blasting cartridge automated production powder charge mechanism | |
CN215363163U (en) | Feeding device of production line body strides | |
CN207048796U (en) | A kind of special concrete wet shot chassis containing Simple mechanical arm | |
CN218953345U (en) | Anchor rod hole orifice grouting device and construction equipment | |
CN220058884U (en) | Concrete pouring device | |
CN216188224U (en) | Rod piece conveying device used in dismantling process of buckling support | |
CN214301190U (en) | Crack pouring device for highway maintenance | |
CN221957210U (en) | Building construction concrete placement equipment | |
CN215213533U (en) | Construction maintenance device suitable for tunnel crack repair | |
CN208614104U (en) | A kind of packaged type welding-machine operation table |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |