CN208687162U - Docking facilities are used in a kind of connection of PE pipe - Google Patents

Docking facilities are used in a kind of connection of PE pipe Download PDF

Info

Publication number
CN208687162U
CN208687162U CN201821268804.XU CN201821268804U CN208687162U CN 208687162 U CN208687162 U CN 208687162U CN 201821268804 U CN201821268804 U CN 201821268804U CN 208687162 U CN208687162 U CN 208687162U
Authority
CN
China
Prior art keywords
ring
fixedly installed
pipe
pedestal
rubber ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821268804.XU
Other languages
Chinese (zh)
Inventor
王丽丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Bodao Building Materials Technology Co Ltd
Original Assignee
Liaoning Bodao Building Materials Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaoning Bodao Building Materials Technology Co Ltd filed Critical Liaoning Bodao Building Materials Technology Co Ltd
Priority to CN201821268804.XU priority Critical patent/CN208687162U/en
Application granted granted Critical
Publication of CN208687162U publication Critical patent/CN208687162U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Quick-Acting Or Multi-Walled Pipe Joints (AREA)

Abstract

The utility model discloses a kind of PE pipe connection docking facilities, including pedestal, pillar is fixedly installed at the top of the pedestal, the top of the pillar is fixedly installed with transverse tube, the inner sidewall left and right ends of the transverse tube are fixedly installed with the first rubber ring and the second rubber ring respectively, the lateral wall left end of first rubber ring is equipped with the first cambered surface, the lateral wall right end of second rubber ring is equipped with the second cambered surface, the top left and right ends of the pedestal are fixedly installed with connecting rod, the utility model respectively compresses the tube wall of two PE pipes by the first rubber ring and the second rubber ring, first rubber ring and the second rubber ring pass through the first apical ring and the control of the second apical ring respectively, this device can effectively prevent leak at the docking of two PE pipes, it mounts and dismounts easier, and the PE pipe of different thicknesses can be connected, practicability compared with By force, and in transverse tube restraining position ring block is installed, played into the effect for once preventing leak.

Description

Docking facilities are used in a kind of connection of PE pipe
Technical field
The utility model relates to PE pipe docking technique field, docking facilities are used in specially a kind of PE pipe connection.
Background technique
It usually requires PE pipe in gardens or field to be irrigated, this just needs the connection between two PE pipes, at present Common two PE pipe connections are docked by pipe collar, are then fixed by iron wire, this mode is not only It is time-consuming and laborious, and leak is easy at the docking of two PE pipes, installation and removal are more troublesome, for this purpose, it is proposed that a kind of PE Docking facilities are used in pipe connection.
Utility model content
The purpose of this utility model is to provide a kind of PE pipe connection docking facilities, to solve to mention in above-mentioned background technique Out the problem of.
To achieve the above object, the utility model provides the following technical solutions: a kind of PE pipe connection docking facilities, including Pedestal is fixedly installed with pillar at the top of the pedestal, and the top of the pillar is fixedly installed with transverse tube, the inside of the transverse tube Wall left and right ends are fixedly installed with the first rubber ring and the second rubber ring respectively, and the lateral wall left end of first rubber ring is equipped with First cambered surface, the lateral wall right end of second rubber ring are equipped with the second cambered surface, and the top left and right ends of the pedestal are fixed Connecting rod is installed, the top of two connecting rods is fixedly installed with male-pipe, and the lateral wall of two male-pipes is equal It is bolted with nut, first movement ring, the inner sidewall right end of the first movement ring are fixedly installed on the right side of a nut It is fixedly installed with the first apical ring, the right end of first apical ring is equipped with the first round slip surface, and the left side of another nut is solid Dingan County is equipped with the second shift(ing) ring, and the inner sidewall left end of second shift(ing) ring is fixedly installed with the second apical ring, second apical ring Left end be equipped with the second round slip surface.
Preferably, it is fixedly installed with fixed ring in the middle part of the inner sidewall of the transverse tube, the left and right ends of the fixed ring are solid Dingan County is equipped with stop collar, and the lateral wall of two stop collars is equipped with limit cambered surface.
Preferably, the right end of the pedestal is equipped with water channel, and the inner sidewall of the water channel is fixedly installed with water flowing ring, described logical The right end of water ring is fixedly installed with rotary table pipe, and the bottom end interlocking of the fixed ring has one end of communicating pipe, the communicating pipe it is another The bottom end that one end penetrates through transverse tube is fixedly mounted at the top of the base, and the right end of the pedestal is fixedly installed with tube body, the pipe Body is connected with water channel, and the upper and lower ends of the tube body are equipped with slide opening, vertical bar is slidably fitted in the slide opening, described in two One end of vertical bar is respectively positioned on the outside of tube body, and the other end of two vertical bars is fixedly installed with arc panel, and two described perpendicular Spring is socketed on the side wall of bar.
Preferably, the lateral wall top of the transverse tube is fixedly installed with handle.
Preferably, grounding rod is fixedly installed at the bottom four corners of the pedestal.
Preferably, the lateral wall of the nut is fixedly installed with bull stick.
Compared with prior art, the utility model has the beneficial effects that the utility model passes through the first rubber ring and second Rubber ring respectively compresses the tube wall of two PE pipes, and the first rubber ring and the second rubber ring pass through the first apical ring and respectively The control of two apical rings, this device can effectively prevent leak at the docking of two PE pipes, and installation and removal are easier, and can connect The PE of different thicknesses is managed, and practicability is stronger, and restraining position ring block is installed in transverse tube, is played into the effect for once preventing leak, It is equipped with water channel, water channel and fixed ring in pedestal by communicating pipe, facilitates and connects other PE pipe, carry out the irrigation of different location, By the design of arc panel, facilitates and fix PE pipe.
Detailed description of the invention
Fig. 1 is the overall schematic of the utility model.
In figure: 1, pedestal, 2, pillar, 3, transverse tube, the 4, first rubber ring, the 5, first cambered surface, the 6, second rubber ring, 7, second Cambered surface, 8, connecting rod, 9, male-pipe, 10, nut, 11, first movement ring, the 12, first apical ring, the 13, first round slip surface, 14, Two shift(ing) rings, the 15, second apical ring, the 16, second round slip surface, 17, handle, 18, grounding rod, 19, bull stick, 20, fixed ring, 21, limit Position ring, 22, limit cambered surface, 23, water channel, 24, water flowing ring, 25, rotary table pipe, 26, communicating pipe, 27, tube body, 28, slide opening, 29, perpendicular Bar, 30, spring, 31, arc panel.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Referring to Fig. 1, the utility model provides a kind of technical solution: a kind of connection of PE pipe docking facilities, including pedestal 1, the top of pedestal 1 is fixedly installed with pillar 2, and the top of pillar 2 is fixedly installed with transverse tube 3, is used to be inserted into two PE in transverse tube 3 Pipe, the inner sidewall left and right ends of transverse tube 3 are fixedly installed with the first rubber ring 4 and the second rubber ring 6,4 He of the first rubber ring respectively The inner sidewall of second rubber ring 6 can be pressed on respectively on the tube wall of two PE pipes, and the lateral wall left end of the first rubber ring 4 is equipped with the The lateral wall right end of one cambered surface 5, the second rubber ring 6 is equipped with the second cambered surface 7, and the top left and right ends of pedestal 1 are fixedly installed with Connecting rod 8, the top of two connecting rods 8 are fixedly installed with male-pipe 9, and the lateral wall of two male-pipes 9 is bolted with nut 10, the right side of a nut 10 is fixedly installed with first movement ring 11, and the inner sidewall right end of first movement ring 11 is fixedly installed with First apical ring 12, the first apical ring 12 are located at the left side of the first rubber ring 4, and the right end of the first apical ring 12 is equipped with the first round slip surface 13, The left side of another nut 10 is fixedly installed with the second shift(ing) ring 14, and the inner sidewall left end of the second shift(ing) ring 14 is fixedly installed with Second apical ring 15, the second apical ring 15 are located at the right side of the second rubber ring 6, and the left end of the second apical ring 15 is equipped with the second round slip surface 16.
Specifically, being fixedly installed with fixed ring 20 in the middle part of the inner sidewall of transverse tube 3, the left and right ends of fixed ring 20 are fixed Restraining position ring block 21 is installed, the lateral wall of two stop collars 21 is equipped with limit cambered surface 22, limits the design of cambered surface 22, can both limit One end of PE pipe processed can also dock the PE pipe of different thicknesses, while limiting mountable in cambered surface 22 has rubber layer (not draw in figure Out), an end cap of PE pipe is played in limit cambered surface 22 into the effect for once preventing leak, is rotated further by fixed with nut 10 The firmly tube wall of PE pipe.
Specifically, the right end of pedestal 1 is equipped with water channel 23, the inner sidewall of water channel 23 is fixedly installed with water flowing ring 24, water flowing The right end of ring 24 is fixedly installed with rotary table pipe 25, and rotary table pipe 25 is similar to rotary table, and inside is equipped with hole, and rotary table pipe 25 as shown in Figure 1 Butt end be connected with the right end of water flowing ring 24, the interlocking of the bottom end of fixed ring 20 has one end of communicating pipe 26, communicating pipe 26 it is another The bottom end that one end penetrates through transverse tube 3 is fixedly mounted on the top of pedestal 1, is connected with water channel 23 communicating pipe 26, the right end of pedestal 1 It is fixedly installed with tube body 27, tube body 27 is connected with water channel 23, and the upper and lower ends of tube body 27 are equipped with slide opening 28, slides in slide opening 28 Dynamic to be equipped with vertical bar 29, one end of two vertical bars 29 is respectively positioned on the outside of tube body 27, the fixed peace of the other end of two vertical bars 29 Equipped with arc panel 31, two arc panels 31 are symmetric, and spring 30 is socketed on the side wall of two vertical bars 29, such as Fig. 1 institute Show that spring 30 is in normal condition.
Specifically, the lateral wall top of transverse tube 3 is fixedly installed with handle 17, the design of handle 17 is convenient for carrying entire Device.
Specifically, being fixedly installed with grounding rod 18 at the bottom four corners of pedestal 1, grounding rod 18 can be iron nail, can lead to It crosses grounding rod 18 to be inserted into soil, carrys out firm banking 1.
Specifically, the lateral wall of nut 10 is fixedly installed with bull stick 19, the design of bull stick 19 facilitates rotating nut 10.
Working principle: when two PE pipes of connection, one end that two PE pipes are needed to dock is respectively from two male-pipes 9 The left and right sides is inserted into transverse tube 3, and by an end cap of PE pipe in limit cambered surface 22, then rotating nut 10, make the first apical ring 12 move right, and the first round slip surface 13 is withstood in the first cambered surface 5, and in motion process, the ring wall with the first rubber ring 4 gradually becomes Thickness is pressed on the inner sidewall of the first rubber ring 4 on the tube wall of PE pipe, while rotating another nut 10, makes the second apical ring 15 It moves downward, the second round slip surface 16 is withstood in the second cambered surface 7, and in motion process, the ring wall with the second rubber ring 6 gradually becomes Thickness makes the second rubber ring 6 obtain inner sidewall and is pressed on the tube wall of PE pipe, when needing to irrigate different location, pulls downward on tube body 27 The vertical bar 29 of lower section, then other PE pipe is inserted into water channel 23 from tube body 27, so that one end of PE pipe is inserted in rotary table pipe 25 On lateral wall, it is clamped on the tube wall of PE pipe by two arc panels 31.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of PE pipe connection docking facilities, it is characterised in that: including pedestal (1), the top of the pedestal (1) is fixedly mounted Have pillar (2), the top of the pillar (2) is fixedly installed with transverse tube (3), the inner sidewall left and right ends difference of the transverse tube (3) It is fixedly installed with the first rubber ring (4) and the second rubber ring (6), the lateral wall left end of first rubber ring (4) is equipped with first The lateral wall right end of cambered surface (5), second rubber ring (6) is equipped with the second cambered surface (7), top of the pedestal (1) or so two End is fixedly installed with connecting rod (8), and the top of two connecting rods (8) is fixedly installed with male-pipe (9), and two described outer The lateral wall of screwed pipe (9) is bolted with nut (10), is fixedly installed with first movement ring on the right side of a nut (10) (11), the inner sidewall right end of the first movement ring (11) is fixedly installed with the first apical ring (12), first apical ring (12) Right end is equipped with the first round slip surface (13), is fixedly installed with the second shift(ing) ring (14) on the left of another described nut (10), described The inner sidewall left end of second shift(ing) ring (14) is fixedly installed with the second apical ring (15), and the left end of second apical ring (15) is equipped with the Two round slip surfaces (16).
2. a kind of PE pipe connection docking facilities according to claim 1, it is characterised in that: the inside of the transverse tube (3) It being fixedly installed with fixed ring (20) in the middle part of wall, the left and right ends of the fixed ring (20) are fixedly mounted restraining position ring block (21), and two The lateral wall of a stop collar (21) is equipped with limit cambered surface (22).
3. a kind of PE pipe connection docking facilities according to claim 2, it is characterised in that: the right end of the pedestal (1) Equipped with water channel (23), the inner sidewall of the water channel (23) is fixedly installed with water flowing ring (24), and the right end of the water flowing ring (24) is solid Dingan County is equipped with rotary table pipe (25), and the bottom end interlocking of the fixed ring (20) has one end of communicating pipe (26), the communicating pipe (26) The other end penetrate through the bottom end of transverse tube (3) and be fixedly mounted on the top of pedestal (1), the right end of the pedestal (1) is fixedly mounted Having tube body (27), the tube body (27) is connected with water channel (23), and the upper and lower ends of the tube body (27) are equipped with slide opening (28), It being slidably fitted with vertical bar (29) in the slide opening (28), one end of two vertical bars (29) is respectively positioned on the outside of tube body (27), The other end of two vertical bars (29) is fixedly installed with arc panel (31), is socketed on the side wall of two vertical bars (29) There are spring (30).
4. a kind of PE pipe connection docking facilities according to claim 1, it is characterised in that: the outside of the transverse tube (3) Wall top is fixedly installed with handle (17).
5. a kind of PE pipe connection docking facilities according to claim 1, it is characterised in that: the bottom of the pedestal (1) Four corners are fixedly installed with grounding rod (18).
6. a kind of PE pipe connection docking facilities according to claim 1, it is characterised in that: the outside of the nut (10) Wall is fixedly installed with bull stick (19).
CN201821268804.XU 2018-08-08 2018-08-08 Docking facilities are used in a kind of connection of PE pipe Expired - Fee Related CN208687162U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821268804.XU CN208687162U (en) 2018-08-08 2018-08-08 Docking facilities are used in a kind of connection of PE pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821268804.XU CN208687162U (en) 2018-08-08 2018-08-08 Docking facilities are used in a kind of connection of PE pipe

Publications (1)

Publication Number Publication Date
CN208687162U true CN208687162U (en) 2019-04-02

Family

ID=65884304

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821268804.XU Expired - Fee Related CN208687162U (en) 2018-08-08 2018-08-08 Docking facilities are used in a kind of connection of PE pipe

Country Status (1)

Country Link
CN (1) CN208687162U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113048298A (en) * 2021-04-13 2021-06-29 金根海 Connecting device for hydraulic engineering pipeline and connecting method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113048298A (en) * 2021-04-13 2021-06-29 金根海 Connecting device for hydraulic engineering pipeline and connecting method thereof

Similar Documents

Publication Publication Date Title
CN208687162U (en) Docking facilities are used in a kind of connection of PE pipe
CN207812623U (en) A kind of drainage pipeline being easily installed
CN205996663U (en) A kind of platen chute cleaning plant with blowing function
CN208565955U (en) A kind of inner wall anti-rust metal antirust bellows
CN208886128U (en) A kind of chemical industry equipment pipeline support frame
CN205124599U (en) Irrigate with telescopic rotary -type hydrant
CN204565487U (en) A kind of isometrical steel elbow welding special fixture
CN204168829U (en) Multifunctional demountable formula plantation frame
CN204036026U (en) Machine-Tool Control box
CN205217683U (en) Manual pipe bender
CN106628689B (en) A kind of quick discharge material receiving port of granular material
CN215410672U (en) Double-flange limiting expansion joint convenient to install
CN205201100U (en) Locking tool
CN205325616U (en) Hand -held type hydraulic crushing pick switching -over valve case
CN208874201U (en) A kind of MPP cable protection pipe improving structure
CN208483493U (en) A kind of novel large flange centering tool
CN210034445U (en) Pneumatic butterfly valve convenient to installation
CN207879033U (en) A kind of support paulin top node connector
CN209688259U (en) A kind of pipeline support of the adjustable transmission liquid of pharmaceutical purpose
CN214062419U (en) Earthen ruins weathering prevention device
CN203650913U (en) Conveniently-washed vacuum pump pipeline of extruder
CN210978766U (en) Novel oil field gathering and transportation oil gas pipeline simple energy-saving device
CN209440746U (en) Vacuum tank with sealing and connecting device
CN213018167U (en) Quick-connecting pipeline for agricultural ponding irrigation in hilly areas
CN204494091U (en) A kind of be easy to dredge coal gas drainer under liquid pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190402

Termination date: 20190808

CF01 Termination of patent right due to non-payment of annual fee