CN208686052U - A kind of elevator climbing system - Google Patents
A kind of elevator climbing system Download PDFInfo
- Publication number
- CN208686052U CN208686052U CN201821165225.2U CN201821165225U CN208686052U CN 208686052 U CN208686052 U CN 208686052U CN 201821165225 U CN201821165225 U CN 201821165225U CN 208686052 U CN208686052 U CN 208686052U
- Authority
- CN
- China
- Prior art keywords
- elevator
- moving arm
- supporting leg
- movable supporting
- articulated section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
The utility model discloses a kind of elevator climbing systems, including elevator, well head is provided with out on elevator front face, in being provided with two fixed notch on the elevator rear surface, it further include being disposed in parallel in out well head, identical first climbing device of structure and the second climbing device between fixed notch, before first climbing device includes moving arm and is movably connected on moving arm, the movable supporting leg of rear end, moving arm is arranged along well head to fixed notch direction is gone out, pipe support is provided at the top of moving arm, before the moving arm, the bottom of rear end is respectively arranged with mounting base, movable supporting leg is by bolted splice on moving arm, it is connect between mounting base by elastomeric element on the movable supporting leg.The utility model is simple and reasonable, and entire use process is simple and convenient reliable, and is easily installed fixation, promotes working efficiency and maintenance efficiency, reduces maintenance cost.
Description
Technical field
The utility model relates to building field, in particular to a kind of elevator climbing system.
Background technique
Development and people's survivability requirement with society, skyscraper is more and more, and the utilization rate of elevator is also got over therewith
Come higher.But since elevator is special equipment, the safety of elevator is also concerning the safety for arriving user, so elevator makes often
With requiring that the electric utility in elevator and elevator is safeguarded and repaired after a period of time, to ensure the safety of elevator
Property.
But in the prior art, the station constructed in elevator generallys use the side for building console mode scaffold
Formula builds scaffold in elevator, and being constructed in how many height just will build how high scaffold, and completion of constructing
Afterwards, it is also necessary to be removed, increase the labor intensity and workload of worker, and this mode working efficiency is low, waste material
Material, maintenance cost is high, is inconvenient.
Summary of the invention
The purpose of this utility model is that in view of the above-mentioned problems, provide it is a kind of it is easy to use, work efficiency is high, maintenance at
This low elevator climbing system.
The utility model technical solution used for the above purpose are as follows:
A kind of elevator climbing system, including elevator are provided with out well head on the elevator front face, in the elevator
Two fixed notch are provided on well rear surface, further include be disposed in parallel in it is described go out structure between well head, fixed notch it is identical
The first climbing device and the second climbing device, first climbing device includes moving arm and is movably connected on the moving arm
The movable supporting leg of front and back ends, the moving arm is arranged along well head to the fixed notch direction out, at the top of the moving arm
Be provided with pipe support, be respectively arranged with mounting base in the bottom of the moving arm front and back ends, the movable supporting leg by bolted splice in
On the moving arm, it is connect between the mounting base by elastomeric element on the movable supporting leg.
Preferably, the movable supporting leg includes load receiving part, the first articulated section and the second articulated section, the load receiving part includes
Pedestal and several bearing blocks being juxtaposed in the pedestal by spacing distance, the top of the pedestal and the bearing block it
Between be formed with a limiting slot, the moving arm is set in the limiting slot, and first articulated section is connected to the pedestal upper end, should
First articulated section and the moving arm are hinged, and second articulated section is connected to the pedestal lower end, which passes through institute
Elastomeric element is stated to connect with the mounting base.
Preferably, first articulated section includes the first link block and the second company for being juxtaposed on the pedestal upper end
Block is connect, first link block and the second link block are sandwiched in the left and right end of the moving arm, and second articulated section includes arranged side by side
Be set to the third link block and the 4th link block of the pedestal lower end, the elastomeric element activity be arranged the third link block,
Between 4th link block.
Preferably, the load receiving part, the first articulated section and the second articulated section are an integral molding structure, before the load receiving part
End is vertically arranged with the second articulated section and is formed with bayonet.
Preferably, the elastomeric element includes the first linking arm, extends transversely through and be set to first linking arm front end
The second linking arm and the spring that is sheathed on first linking arm, the first linking arm back end activity be set to the installation
In seat, which is vertically arranged with the mounting base, and second linking arm is movably connected on the movable supporting leg,
The spring is between second linking arm and the mounting base.
Preferably, the load receiving part lower end court is arranged with several convex blocks for increasing friction force.
Preferably, the moving arm upper end is provided with several boss for being used to install pipe support by spacing distance, it is described convex
It is provided through mounting groove at the top of platform, is extended transversely through in the outside the boss face and is provided with the fixing threaded hole fixed with screw.
The utility model has the following beneficial effects: the utility model structure is simple, pass through the elevator in the height to need repairing
First climbing device and the second climbing device are installed in well, and again the first climbing device, build pipe support on the second climbing device;It is whole
A use process is simple and convenient reliable, and is easily installed fixation, promotes working efficiency and maintenance efficiency, reduces maintenance cost.
With reference to the accompanying drawing with embodiment, the present invention will be further described.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the rearview of elevator in the utility model;
Fig. 3 is the structural schematic diagram of the first climbing device in the utility model;
Fig. 4 is the structural schematic diagram A of movable supporting leg in the utility model;
Fig. 5 is the structural schematic diagram B of movable supporting leg in the utility model;
Fig. 6 is the structural schematic diagram of elastomeric element in the utility model.
Specific embodiment
As shown in Figures 1 to 6, in the present embodiment, a kind of elevator climbing system, including elevator, before the elevator
Well head is provided with out on wall surface, in being provided with two fixed notch on the elevator rear surface, further include be disposed in parallel in it is described go out
Identical first climbing device 1 of structure and the second climbing device 2 between well head, fixed notch, first climbing device 1 wrap
It includes moving arm 10 and is movably connected on the movable supporting leg 11 of 10 front and back ends of moving arm, the moving arm 10 is along the well out
Mouth to the fixed notch direction is arranged, and pipe support 3 is provided at the top of the moving arm 10, in the bottom of 10 front and back ends of moving arm
Portion is respectively arranged with mounting base 100, the movable supporting leg 11 by bolted splice on the moving arm 10, the movable supporting leg 11
It is upper to be connect between the mounting base 100 by elastomeric element 4.
In the present embodiment, the movable supporting leg 11 includes load receiving part 110, the first articulated section 111 and the second articulated section 112,
The load receiving part 110 includes pedestal 1100 and several bearing blocks being juxtaposed in the pedestal 1100 by spacing distance
1101, a limiting slot 1102 is formed between the pedestal 1100 and the top of the bearing block 1101, the moving arm 10 is set
It is placed in the limiting slot 1102, first articulated section 111 is connected to 1100 upper end of pedestal, first articulated section 111 and institute
It is hinged to state moving arm 10, second articulated section 112 is connected to 1100 lower end of pedestal, which passes through described
Elastomeric element 4 is connect with the mounting base 100;
Specifically, the quantity of bearing block 1101 is three pieces, 1101 front end of bearing block is provided with guiding piece, using high tenacity
Traction rope one end pinion guiding piece, the other end pinions weight, reinforces the stability of climbing system.
In the present embodiment, first articulated section 111 includes the first connection for being juxtaposed on 1100 upper end of pedestal
Block 1110 and the second link block 1111, first link block 1110 and the second link block 1111 are sandwiched in the moving arm 10
Left and right end, second articulated section 112 include the third link block 1120 and the 4th for being juxtaposed on 1100 lower end of pedestal
Link block 1121,4 activity of elastomeric element are arranged between the third link block 1120, the 4th link block 1121.
In the present embodiment, the load receiving part 110, the first articulated section 111 and the second articulated section 112 are an integral molding structure,
110 front end of load receiving part and the second articulated section 112, which are vertically arranged, is formed with bayonet 113.
In the present embodiment, the elastomeric element 4 includes the first linking arm 40, extends transversely through and be set to first linking arm
Second linking arm 41 of 40 front ends and the spring 42 being sheathed on first linking arm 40,40 rear end of the first linking arm are living
Dynamic to be set in the mounting base 100, which is vertically arranged with the mounting base 100, second linking arm 41
It is movably connected on the movable supporting leg 11, the spring 42 is between second linking arm 41 and the mounting base 100.
In the present embodiment, 110 lower end of the load receiving part court is arranged with several convex blocks for increasing friction force;
Specifically, several convex blocks enhance the road holding of movable supporting leg 11, and increase rubbing for movable supporting leg 11 and ground
Power is wiped, the stability of climbing system is increased.
In the present embodiment, 10 upper end of moving arm is provided with several for installing the boss of pipe support 3 by spacing distance
101, mounting groove 1010 is provided through at the top of the boss 101, is extended transversely through and is provided with and screw in 101 lateral surface of boss
Fixed fixing threaded hole 1011;
Specifically, boss 101 is cylindrical, in use, in the mounting groove 1010 of the connecting tube insertion boss 101 of pipe support 3,
And installed with screw alignment and fixation screw hole 1011, it is fixed on connecting tube in mounting groove 1010.
Pipe support 3 is screwed on moving arm 10 first;Movable supporting leg 11 is opened, movable supporting leg 11 and moving arm are made
10 are in horizontality;The movable supporting leg 11 of rear end is butted in fixed notch, then the movable supporting leg 11 of front end is butted on out well
Mouth edge;Assemble the first climbing device 1, the pipe support 3 on the second climbing device 2.
Specifically, before use, movable supporting leg 11 is closed, the load receiving part 110 and moving arm 10 of movable supporting leg 11 are perpendicular
State;When in use, pulling up load receiving part 110 opens movable supporting leg 11, and movable supporting leg 11 is rotated up 90 °, makes load-bearing
Portion 110 is contacted with moving arm 10;
Specifically, before use, movable supporting leg 11 and moving arm 10 in vertical state, at this point, spring 42 is in compressive state;
When in use, movable supporting leg 11 is in a horizontal state with moving arm 10, at this point, spring 42 is in relaxation state.
The use of the new type structure is simple, by installed in the elevator of the height to need repairing the first climbing device 1 and
Second climbing device 2, and again the first climbing device 1, build pipe support 3 on the second climbing device 2;Entire use process is simple and convenient
Reliably, and it is easily installed fixation, promotes working efficiency and maintenance efficiency, reduces maintenance cost.
The above descriptions are merely preferred embodiments of the present invention, not makees in any form to the utility model
Limitation.Anyone skilled in the art, it is all available in the case where not departing from technical solutions of the utility model ambit
The methods and technical content of the disclosure above makes many possible changes and modifications to technical solutions of the utility model, or is revised as
The equivalent embodiment of equivalent variations.Therefore all contents without departing from technical solutions of the utility model, the shape according to the utility model
Equivalence changes made by shape, construction and principle should all be covered by the protection scope of the utility model.
Claims (7)
1. a kind of elevator climbing system, including elevator, it is provided with out well head on the elevator front face, in the elevator
Two fixed notch are provided on rear surface, it is characterised in that: further include be disposed in parallel in it is described go out between well head, fixed notch
Identical first climbing device of structure and the second climbing device, first climbing device include moving arm and are movably connected on institute
The movable supporting leg of moving arm front and back ends is stated, the moving arm is arranged along well head to the fixed notch direction out, the shifting
It is provided with pipe support at the top of swing arm, is respectively arranged with mounting base in the bottom of the moving arm front and back ends, the movable supporting leg passes through spiral shell
Bolt is articulated on the moving arm, is connect between the mounting base by elastomeric element on the movable supporting leg.
2. a kind of elevator climbing system according to claim 1, which is characterized in that the movable supporting leg include load receiving part,
First articulated section and the second articulated section, the load receiving part include pedestal and several are juxtaposed in the pedestal by spacing distance
Bearing block, a limiting slot is formed between the pedestal and the top of the bearing block, the moving arm is set to the limit
In slot, first articulated section is connected to the pedestal upper end, and first articulated section and the moving arm are hinged, and described second is hinged
Portion is connected to the pedestal lower end, which is connect by the elastomeric element with the mounting base.
3. a kind of elevator climbing system according to claim 2, which is characterized in that first articulated section includes setting side by side
It is placed in the first link block and the second link block of the pedestal upper end, first link block and the second link block are sandwiched in described
The left and right end of moving arm, second articulated section include third link block and the 4th connection for being juxtaposed on the pedestal lower end
Block, the elastomeric element activity are arranged between the third link block, the 4th link block.
4. according to a kind of any elevator climbing system of Claims 2 or 3, which is characterized in that the load receiving part, the first hinge
Socket part and the second articulated section are an integral molding structure, and the load receiving part front end and the second articulated section are vertically arranged and are formed with bayonet.
5. a kind of elevator climbing system according to claim 1, which is characterized in that the elastomeric element includes the first connection
Arm, the bullet for extending transversely through the second linking arm for being set to first linking arm front end and being sheathed on first linking arm
Spring, the first linking arm back end activity are set in the mounting base, which is vertically arranged with the mounting base, institute
The second linking arm is stated to be movably connected on the movable supporting leg, the spring be located at second linking arm and the mounting base it
Between.
6. a kind of elevator climbing system according to claim 4, which is characterized in that the load receiving part lower end court is arranged with
Several convex blocks for increasing friction force.
7. a kind of elevator climbing system according to claim 1, which is characterized in that press spacing distance in the moving arm upper end
Several boss for being used to install pipe support are provided with, are provided through mounting groove at the top of the boss, in outside the boss face transverse direction
It is provided through the fixing threaded hole fixed with screw.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821165225.2U CN208686052U (en) | 2018-07-23 | 2018-07-23 | A kind of elevator climbing system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821165225.2U CN208686052U (en) | 2018-07-23 | 2018-07-23 | A kind of elevator climbing system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208686052U true CN208686052U (en) | 2019-04-02 |
Family
ID=65881962
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821165225.2U Expired - Fee Related CN208686052U (en) | 2018-07-23 | 2018-07-23 | A kind of elevator climbing system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208686052U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108661302A (en) * | 2018-07-23 | 2018-10-16 | 广东快建模架科技有限公司 | A kind of elevator climbing system and its application method |
CN110318529A (en) * | 2019-06-27 | 2019-10-11 | 联建建设工程有限公司 | The construction method of structure is climbed in a kind of elevator shaft |
CN114059758A (en) * | 2021-11-10 | 2022-02-18 | 中铁八局集团建筑工程有限公司 | Assembled double-layer integral elevator shaft platform |
-
2018
- 2018-07-23 CN CN201821165225.2U patent/CN208686052U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108661302A (en) * | 2018-07-23 | 2018-10-16 | 广东快建模架科技有限公司 | A kind of elevator climbing system and its application method |
CN110318529A (en) * | 2019-06-27 | 2019-10-11 | 联建建设工程有限公司 | The construction method of structure is climbed in a kind of elevator shaft |
CN114059758A (en) * | 2021-11-10 | 2022-02-18 | 中铁八局集团建筑工程有限公司 | Assembled double-layer integral elevator shaft platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208686052U (en) | A kind of elevator climbing system | |
CN204781884U (en) | Prop builder's jack of structure down | |
CN204738226U (en) | Arched bridge main arch bottom plate rail formula tool car | |
CN208454342U (en) | A kind of safety of tower crane platform and standard knot install conjoined device | |
CN208533994U (en) | A kind of suspension scaffold for disk buckle scaffold | |
CN213268983U (en) | Self-climbing discharging platform | |
CN204940133U (en) | Hydraulic pressure sliding sash climbing frame | |
CN204924803U (en) | Hoisting point is instrument for loading test | |
CN108661302A (en) | A kind of elevator climbing system and its application method | |
CN105932560A (en) | Power distribution cabinet convenient to repair | |
CN203296367U (en) | Cantilever type lifting platform | |
CN215519816U (en) | Detachable bolt-replacing protection platform for steel truss girder | |
CN205209584U (en) | Square structure groundwater on -line monitoring all -in -one | |
CN2922944Y (en) | Insulated anti-drop protection frame | |
CN213418456U (en) | Building scaffold wall connecting piece | |
CN204826697U (en) | Railway continuous beam construction safety protective guard strides | |
CN201339311Y (en) | Turning plate device of hanging rack | |
CN204038917U (en) | Dismountable external hanging service platform | |
CN209780180U (en) | Insulating scaffold for power transmission line construction | |
CN203007920U (en) | Gravity penetration sounding heavy punch lifting device | |
CN202308947U (en) | Cable trough of thin seam scraper conveyor | |
CN107340188B (en) | Intensity test device of anti-falling guide seat for climbing frame | |
CN210316098U (en) | Connection structure of infilled wall and concrete column | |
CN211850683U (en) | Combined scaffold for civil engineering | |
CN215488007U (en) | Anti-seismic support and hanger with anti-shearing force device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190402 Termination date: 20210723 |
|
CF01 | Termination of patent right due to non-payment of annual fee |