CN208686049U - It is a kind of convenient for quickly above and below scaffold - Google Patents

It is a kind of convenient for quickly above and below scaffold Download PDF

Info

Publication number
CN208686049U
CN208686049U CN201821213413.8U CN201821213413U CN208686049U CN 208686049 U CN208686049 U CN 208686049U CN 201821213413 U CN201821213413 U CN 201821213413U CN 208686049 U CN208686049 U CN 208686049U
Authority
CN
China
Prior art keywords
scaffold
convenient
vertical ladder
quickly
pin rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821213413.8U
Other languages
Chinese (zh)
Inventor
刘少轩
于东建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Fourth Highway Engineering Co Ltd
Original Assignee
CCCC Fourth Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Fourth Highway Engineering Co Ltd filed Critical CCCC Fourth Highway Engineering Co Ltd
Priority to CN201821213413.8U priority Critical patent/CN208686049U/en
Application granted granted Critical
Publication of CN208686049U publication Critical patent/CN208686049U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses a kind of convenient for quickly upper and lower scaffold, including scaffold ontology and the vertical ladder being arranged on scaffold ontology and tubular shield cage;The tubular shield cage ring is around the periphery for being connected to the vertical ladder;Wherein, the scaffold ontology includes four upright bars, rectangle railing;Length extending direction positioned at the surface of the upright bar is provided with multiple location holes;The two sides of the bottom of the vertical ladder are respectively arranged with support pin rod;The scaffold provided by the utility model being convenient for above and below quickly, it is reasonable in design, it is easy to operate;The scaffold convenient for above and below quickly above-mentioned simultaneously also has convenient for quickly up and down and the technical advantages such as security performance is strong.

Description

It is a kind of convenient for quickly above and below scaffold
Technical field
The utility model relates to scaffold equipment technical field more particularly to it is a kind of convenient for quickly above and below scaffold.
Background technique
It is well known that scaffold refer to construction site be worker operation and solving vertically and horizontally transport and the various branch set up Frame.Scaffold, which refers to, is used in exterior wall, interior decoration or the higher place that can not directly construct of layer height on construction site.
Scaffold is worked or perimeter security net is gone along with sb. to guard him and high-altitude installation component etc. up and down mainly for construction personnel.Some works Furthermore journey is also used extensively also with scaffold when template use in departments such as advertising, municipal administration, traffic road bridge, mines.Tradition Scaffold has updated the product structure of many multiplicity by being used for a long time and different application scenarios, while it is with tearing open The features such as dress is simple, load-carrying properties are good, safe and reliable, development speed is quickly.
But research finds that traditional scaffold is also equipped with ladder, but this ladder is typically all to be articulated in foot The side of hand cradle ontology;In this way when specifically used, ladder state generally all in a vertical shape, such operator be typically all along Vertical direction climbs up, and so, climbs along (i.e. ladder use state is along straight up) straight up, time-consuming and laborious, It is inconvenient up and down;There is no safeguard structure around simultaneously, stability and reliability are all poor, affect the use peace of equipment Entirely.
To sum up, how to overcome the above-mentioned technological deficiency of traditional technology is that those skilled in the art's technology urgently to be solved is asked Topic.
Utility model content
The purpose of this utility model is to provide a kind of convenient for quickly upper and lower scaffold, to solve the above problems.
In order to achieve the above object, the technical solution of the utility model is achieved in that
The utility model additionally provide it is a kind of convenient for quickly above and below scaffold, including scaffold ontology and be arranged in foot hand Vertical ladder and tubular on frame ontology protect cage;
The tubular shield cage ring is around the periphery for being connected to the vertical ladder;
Wherein, the scaffold ontology includes four upright bars, rectangle railing;Upright bar two-by-two in four upright bars is opposite Side stands and is arranged in parallel, and two upright bars of one end and side of the rectangle railing connect, the other end of the rectangle railing It is connect with two upright bars of the other side;
Length extending direction positioned at the surface of the upright bar is provided with multiple location holes;The two sides of the bottom of the vertical ladder point It is not provided with support pin rod;First axle part is provided between the vertical ladder and the support pin rod;The vertical ladder and the branch It supports and is rotatably assorted between one end of pin rod by first axle part, the other end of the support pin rod and the positioning in the upright bar The cooperation of hole pin hole.
Preferably, as a kind of implementable solution;Second hinge is provided between the vertical ladder and the scaffold ontology Part;The vertical ladder is rotatably assorted by the second hinge part and the rectangle railing.
Preferably, as a kind of implementable solution;The second hinge part be connected to the vertical ladder top and the square The side-walls of shape railing.
Preferably, as a kind of implementable solution;Handle is also set up on the surface of the rectangle railing.
Preferably, as a kind of implementable solution;The vertical ladder is specially stainless steel vertical ladder.
Preferably, as a kind of implementable solution;The tubular shield cage is specially stainless steel tubular shield cage or carbon fiber Structure tubular protects cage.
Preferably, as a kind of implementable solution;The support pin rod is specially stainless steel or carbon fiber structural bar.
Preferably, as a kind of implementable solution;It is described convenient for quickly above and below scaffold further include universal wheel unit;Institute State the bottom that universal wheel unit is separately positioned on the upright bar.
Preferably, as a kind of implementable solution;The universal wheel unit includes universal wheel wheel body and brake assemblies;It is described Brake assemblies are used to implement braking maneuver to the universal wheel wheel body.
Preferably, as a kind of implementable solution;The universal wheel wheel body is specially resistance to wear wheel of making an uproar.
Compared with prior art, it is the advantages of the utility model embodiment:
It is provided by the utility model a kind of convenient for quickly upper and lower scaffold, analyze the above-mentioned scaffold being convenient for above and below quickly Primary structure known to: the above-mentioned scaffold convenient for above and below quickly, mainly by scaffold ontology, vertical ladder and tubular the shield knot such as cage Structure is constituted;
Above-mentioned tubular shield cage ring is around the periphery for being connected to the vertical ladder;Wherein, the scaffold ontology include four upright bars, Rectangle railing;The opposite side of upright bar two-by-two in four upright bars stands and is arranged in parallel, one end and one of the rectangle railing Two upright bars of side connect, and the other end of the rectangle railing and two upright bars of the other side connect;
Length extending direction positioned at the surface of the upright bar is provided with multiple location holes;The two sides of the bottom of the vertical ladder point It is not provided with support pin rod;First axle part is provided between the vertical ladder and the support pin rod;The vertical ladder and the branch It supports and is rotatably assorted between one end of pin rod by first axle part, the other end of the support pin rod and the positioning in the upright bar The cooperation of hole pin hole.
It should be noted that support pin rod can all be drooped with upright bar state in a vertical shape to be placed in the state of not using; But in the specific use process, upright bar is rotated by a certain angle opening, while needs that pin rod and vertical ladder will be supported to rotate certain Angle (is rotated between one end and the vertical ladder of support pin rod by first axle part), while the other end of pin rod being supported to select It selects and is inserted into corresponding positioning hole in the upright bar.By aforesaid operations, above-mentioned vertical ladder, support pin rod and upright bar A triangular support body is formed, operator's Rapid Implementation down operation can be thus helped.
Using it is provided by the utility model it is a kind of convenient for quickly above and below scaffold, can use vertical ladder, support pin rod Rotation and the positioning of subsequent insertion hole are carried out, a triangle can be formed eventually by vertical ladder, support pin rod and upright bar Supporter (i.e. deformed structural body), then operator can smoothly be climbed up by climbing the triangular support body and be climbed down ?;It will be apparent that the above-mentioned scaffold convenient for above and below quickly, compared to it is more traditional it is vertical above and below vertical ladder its gradient it is smaller, can It is creeped, is creeped more efficient with freely the upper and lower of safety, it is time saving and energy saving, while creep up and down stability and better reliability. Tubular shield cage is also equipped with outside above-mentioned vertical ladder simultaneously, security fence can be further realized using tubular shield cage.
It is provided by the utility model it is a kind of convenient for quickly above and below scaffold, it is reasonable in design, it is easy to operate;Simultaneously The above-mentioned scaffold convenient for above and below quickly also has convenient for quickly up and down and the technical advantages such as security performance is strong.
Detailed description of the invention
It, below will be right in order to illustrate more clearly of specific embodiment of the present invention or technical solution in the prior art Specific embodiment or attached drawing needed to be used in the description of the prior art are briefly described, it should be apparent that, it is described below In attached drawing be that some embodiments of the utility model are not paying creativeness for those of ordinary skill in the art Under the premise of labour, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is the master not installed before tubular shield cage convenient for quickly upper and lower scaffold that the utility model embodiment one provides Depending on structural schematic diagram;
Fig. 2 is that the scaffold being convenient for above and below quick that the utility model embodiment one of Fig. 1 provides does not install tubular shield cage Preceding left view structural representation;
Fig. 3 is that the scaffold being convenient for above and below quick that the utility model embodiment one of Fig. 1 provides does not install tubular shield cage Preceding overlooking structure diagram;
Fig. 4 is that the scaffold being convenient for above and below quick that the utility model embodiment one of Fig. 1 provides does not install tubular shield cage Preceding schematic perspective view;
Fig. 5 is that the vertical ladder being convenient in the scaffold above and below quickly that the utility model embodiment one provides and tubular protect cage group Partial structural diagram after dress;
Fig. 6 be the utility model embodiment one provide convenient for quickly above and below scaffold do not install tubular protect cage before and beat Schematic view of the front view after spending support pin rod;
Fig. 7 is the partial enlargement structural representation of Fig. 6;
Fig. 8 is that the scaffold being convenient for above and below quick that the utility model embodiment one of Fig. 6 provides does not install tubular shield cage Schematic perspective view after preceding and opening support pin rod.
Label: 1- scaffold ontology;2- vertical ladder;3- tubular protects cage;4- upright bar;5- rectangle railing;6- location hole; 7- supports pin rod;8- first axle part;9- second hinge part;10- universal wheel unit.
Specific embodiment
The technical solution of the utility model is clearly and completely described below in conjunction with attached drawing, it is clear that described Embodiment is the utility model a part of the embodiment, instead of all the embodiments.Based on the embodiments of the present invention, originally Field those of ordinary skill every other embodiment obtained without making creative work belongs to practical Novel protected range.
In the description of the present invention, it should be noted that the word of the orientation or positional relationship of certain instructions, only It is the utility model and simplified description for ease of description, rather than the device or element of indication or suggestion meaning must have spy Fixed orientation is constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.
In the description of the present invention, it should be noted that " connection " shall be understood in a broad sense, for example, it may be fixed Connection, may be a detachable connection, or be integrally connected;It can be mechanical connection, be also possible to be electrically connected;It can be directly It is connected, the connection inside two elements can also be can be indirectly connected through an intermediary.For the ordinary skill of this field For personnel, the concrete meaning of above-mentioned term in the present invention can be understood with concrete condition.
The utility model is further described in detail below through specific implementation examples and in conjunction with the accompanying drawings.
Embodiment one
Referring to Fig. 1, Fig. 2, Fig. 3, Fig. 4 (referring also to Fig. 5, Fig. 6, Fig. 7, Fig. 8), the utility model embodiment one is provided A kind of scaffold convenient for above and below quickly, including scaffold ontology 1 and the vertical ladder 2 that is arranged on scaffold ontology and tubular shield cage 3 (referring specifically to Fig. 5);
The tubular shield cage 3 is around the periphery for being connected to the vertical ladder 2;
Wherein, the scaffold ontology 1 includes four upright bars 4, rectangle railing 5;Upright bar two-by-two in four upright bars Opposite side stands and is arranged in parallel, and two upright bars of one end of the rectangle railing and side connect, the rectangle railing it is another Two upright bars of one end and the other side connect;
Length extending direction positioned at the surface of the upright bar 4 is provided with multiple location holes 6;The bottom two of the vertical ladder 2 Side is respectively arranged with support pin rod 7;First axle part 8 is provided between the vertical ladder 2 and the support pin rod 7 (such as Fig. 7 institute Show);It is rotatably assorted between the vertical ladder 2 and one end of the support pin rod 7 by first axle part 8, the support pin rod 7 6 pin hole of location hole on the other end and the upright bar 4 cooperates.It will be apparent that before not installing (shape is not used in above-mentioned support pin rod 7 State) it may refer to Fig. 1-Fig. 4;In the specific use process, the support pin rod 7 needs rotate by a certain angle along vertical ladder 2, together When its other end is inserted into the location hole in upright bar 4, can thus be formed deformed triangular support body structure (tool Body can be found in figure 5-8)
It analyzes known to the above-mentioned primary structure convenient for quickly upper and lower scaffold: the above-mentioned scaffold being convenient for above and below quickly, It is mainly made of structures such as scaffold ontology, vertical ladder and tubular shield cages;
It should be noted that support pin rod can all be drooped with upright bar state in a vertical shape to be placed in the state of not using; But in the specific use process, upright bar is rotated by a certain angle opening, while needs that pin rod and vertical ladder will be supported to rotate certain Angle (is rotated between one end and the vertical ladder of support pin rod by first axle part), while the other end of pin rod being supported to select It selects and is inserted into corresponding positioning hole in the upright bar.By aforesaid operations, above-mentioned vertical ladder, support pin rod and upright bar A triangular support body is formed, operator's Rapid Implementation down operation can be thus helped.
Using it is provided by the utility model it is a kind of convenient for quickly above and below scaffold, can use vertical ladder, support pin rod Rotation and the positioning of subsequent insertion hole are carried out, a triangle can be formed eventually by vertical ladder, support pin rod and upright bar Supporter (i.e. deformed structural body), then operator can smoothly be climbed up by climbing the triangular support body and be climbed down ?;It will be apparent that the above-mentioned scaffold convenient for above and below quickly, compared to it is more traditional it is vertical above and below vertical ladder its gradient it is smaller, can It is creeped, is creeped more efficient with freely the upper and lower of safety, it is time saving and energy saving, while creep up and down stability and better reliability. Tubular shield cage is also equipped with outside above-mentioned vertical ladder simultaneously, security fence can be further realized using tubular shield cage.
It is provided by the utility model it is a kind of convenient for quickly above and below scaffold, it is reasonable in design, it is easy to operate;Simultaneously The above-mentioned scaffold convenient for above and below quickly also has convenient for quickly up and down and the technical advantages such as security performance is strong.
Based on the above embodiment on basis, further, it is provided between the vertical ladder 2 and the scaffold ontology 1 Second hinge part 9;The vertical ladder 2 is rotatably assorted by the second hinge part 9 and the rectangle railing 5.
Based on the above embodiment on basis, further, the second hinge part 9 is connected to the top of the vertical ladder 2 With the side-walls of the rectangle railing 5.
It should be noted that being arranged between vertical ladder described above and the scaffold ontology in specific technical solution There is second hinge part;The main function of second articulation piece is easy for vertical ladder and movement is freely rotated along the realization of scaffold ontology;
Second articulation piece is mostly installed at the top of vertical ladder simultaneously, and at the same time the side wall with rectangle railing realizes company It connects.
Based on the above embodiment on basis, further, handle is also set up on the surface of the rectangle railing 5 (not shown).
It should be noted that can be passed through in specific technical solution on the surface of the rectangle railing with mounting knob The handle can more preferably help operator to implement the movement such as to help and hold.
Based on the above embodiment on basis, further, the vertical ladder is specially stainless steel vertical ladder.
It should be noted that the vertical ladder can choose various structures material in specific technical solution, but optimal The vertical ladder is stainless steel vertical ladder in the technical solution of choosing, which has better using effect and stabilized structure Property.
Based on the above embodiment on basis, further, tubular shield cage be specially stainless steel tubular shield cage or Carbon fiber structural tubular protects cage.
It should be noted that tubular shield cage has also been devised convenient for the scaffold above and below quickly in specific technical solution, The periphery of the vertical ladder for being mainly mounted in two sides of tubular shield cage, protects the staff to creep up and down.Tubular shield Cage its can enhance upper and lower safety to being creeped up and down convenient for worker's protection with high safety of the scaffold above and below quickly.
Based on the above embodiment on basis, further, the support pin rod is specially stainless steel or carbon fiber Structural poles.
It should be noted that support pin rod has also been devised convenient for the scaffold above and below quickly in specific technical solution, The support pin rod can guarantee it with good service life it is preferable to use the good structural poles of material.Simultaneously vertical ladder and Support pin rod, upright bar can form that triangular shaped (triangular shaped more stable, vertical ladder and upright bar can be enhanced in above-mentioned support pin rod Between connection tightness).
Based on the above embodiment basis on, further, it is described convenient for quickly above and below scaffold further include universal wheel Device 10;The universal wheel unit 10 is separately positioned on the bottom of the upright bar 4.The universal wheel unit includes universal wheel wheel body And brake assemblies;The brake assemblies are used to implement braking maneuver to the universal wheel wheel body.
Based on the above embodiment on basis, further, the universal wheel wheel body is specially resistance to wear wheel of making an uproar.
It should be noted that in specific technical solution, it is above-mentioned that universal wheel has also been devised convenient for quickly upper and lower scaffold Device, the universal wheel unit are mostly installed at positioned at the both ends of pony sill: can be pushed by the universal wheel unit convenient for quick Upper and lower scaffold is mobile.
The brake assemblies (modular constructions such as including brake block) are used to implement braking maneuver to the universal wheel;Simultaneously this ten thousand Various structures material is also selected to wheel wheel body, such as the nylon wheel of resistance to make an uproar wear wheel or routine;The wheel body be by nylon return pulley, It is suitable for general work scenes;But in specific application scenarios, it can also be used in the technical solution of the utility model Extraordinary universal wheel wheel body.In addition, the wheel body of the universal wheel unit is it is also preferred that use extra heavy universal wheel (such as certain macromolecule engineerings Plastic part), noise is small, promotion is convenient and is hardly damaged.
The technical advantage convenient for quickly upper and lower scaffold with following aspect provided by the embodiment of the utility model:
One, provided by the embodiment of the utility model convenient for quickly upper and lower scaffold, structure design is more reasonable;Wherein, The above-mentioned scaffold being convenient for above and below quickly is mainly made of structures such as scaffold ontology, vertical ladder and tubular shield cages;The foot hand Frame ontology includes four upright bars, rectangle railing, support pin rod etc..It will be apparent that above-mentioned upright bar, rectangle railing, support pin rod, vertical ladder Connection relationship and positional relationship between the specific structures such as tubular shield cage have reasonable layout designs;Therefore this is practical new Type embodiment provide convenient for the scaffold above and below quickly, technical construction is more reasonable, and function is more perfect, and practicability is also more By force.
Two, provided by the embodiment of the utility model convenient for quickly upper and lower scaffold, in the state of not using, support pin rod It can all droop and place with upright bar state in a vertical shape;But in the specific use process, upright bar is rotated by a certain angle opening, It needs that pin rod and vertical ladder will be supported to rotate by a certain angle (i.e. by the first hinge between one end and the vertical ladder of support pin rod simultaneously Chain element rotation), while the other end of pin rod being supported to select to be inserted into corresponding positioning hole in the upright bar.By above-mentioned behaviour Make, above-mentioned vertical ladder, support pin rod and upright bar can form a triangular support body, can thus help operator Rapid Implementation down operation.
Using it is provided by the utility model it is a kind of convenient for quickly above and below scaffold, can use vertical ladder, support pin rod Rotation and the positioning of subsequent insertion hole are carried out, a triangle can be formed eventually by vertical ladder, support pin rod and upright bar Supporter (i.e. deformed structural body), then operator can smoothly be climbed up by climbing the triangular support body and be climbed down ?;It will be apparent that the above-mentioned scaffold convenient for above and below quickly, compared to it is more traditional it is vertical above and below vertical ladder its gradient it is smaller, can It is creeped, is creeped more efficient with freely the upper and lower of safety, it is time saving and energy saving, while creep up and down stability and better reliability. Tubular shield cage is also equipped with outside above-mentioned vertical ladder simultaneously, security fence can be further realized using tubular shield cage.
Three, provided by the embodiment of the utility model convenient for quickly upper and lower scaffold, reasonable in design, operation side Just;The scaffold convenient for above and below quickly above-mentioned simultaneously also has convenient for quickly up and down and the technical advantages such as security performance is strong.
It is provided by the utility model to be convenient for the scaffold above and below quickly band based on above many significant technical advantages Come good market prospects and economic benefit.
Finally, it should be noted that the above various embodiments is only to illustrate the technical solution of the utility model, rather than it is limited System;Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should Understand: it is still possible to modify the technical solutions described in the foregoing embodiments, or to some or all of Technical characteristic is equivalently replaced;And these are modified or replaceed, it does not separate the essence of the corresponding technical solution, and this is practical new The range of each embodiment technical solution of type.

Claims (10)

1. a kind of convenient for quickly upper and lower scaffold, which is characterized in that including scaffold ontology and be arranged on scaffold ontology Vertical ladder and tubular protect cage;
The tubular shield cage ring is around the periphery for being connected to the vertical ladder;
Wherein, the scaffold ontology includes four upright bars, rectangle railing;It stand tall and upright the opposite side of upright bar two-by-two in four upright bars Vertical and be arranged in parallel, two upright bars of one end and side of the rectangle railing connect, the other end of the rectangle railing and another Two upright bars of side connect;
Length extending direction positioned at the surface of the upright bar is provided with multiple location holes;The two sides of the bottom of the vertical ladder are set respectively It is equipped with support pin rod;First axle part is provided between the vertical ladder and the support pin rod;The vertical ladder and the supporting pin It is rotatably assorted between one end of bar by first axle part, the other end of the support pin rod and the positioning hole pin in the upright bar Hole cooperation.
2. as described in claim 1 convenient for quickly upper and lower scaffold, which is characterized in that
Second hinge part is provided between the vertical ladder and the scaffold ontology;The vertical ladder by the second hinge part with The rectangle railing is rotatably assorted.
3. as claimed in claim 2 convenient for quickly upper and lower scaffold, which is characterized in that
The second hinge part is connected to the top of the vertical ladder and the side-walls of the rectangle railing.
4. as described in claim 1 convenient for quickly upper and lower scaffold, which is characterized in that
Handle is also set up on the surface of the rectangle railing.
5. as described in claim 1 convenient for quickly upper and lower scaffold, which is characterized in that
The vertical ladder is specially stainless steel vertical ladder.
6. as described in claim 1 convenient for quickly upper and lower scaffold, which is characterized in that
The tubular shield cage is specially stainless steel tubular shield cage or carbon fiber structural tubular shield cage.
7. as described in claim 1 convenient for quickly upper and lower scaffold, which is characterized in that
The support pin rod is specially stainless steel or carbon fiber structural bar.
8. as described in claim 1 convenient for quickly upper and lower scaffold, which is characterized in that
It is described convenient for quickly above and below scaffold further include universal wheel unit;The universal wheel unit is separately positioned on the upright bar Bottom.
9. as claimed in claim 8 convenient for quickly upper and lower scaffold, which is characterized in that
The universal wheel unit includes universal wheel wheel body and brake assemblies;The brake assemblies are used for real to the universal wheel wheel body Apply braking maneuver.
10. as claimed in claim 9 convenient for quickly upper and lower scaffold, which is characterized in that
The universal wheel wheel body is specially resistance to wear wheel of making an uproar.
CN201821213413.8U 2018-07-27 2018-07-27 It is a kind of convenient for quickly above and below scaffold Active CN208686049U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821213413.8U CN208686049U (en) 2018-07-27 2018-07-27 It is a kind of convenient for quickly above and below scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821213413.8U CN208686049U (en) 2018-07-27 2018-07-27 It is a kind of convenient for quickly above and below scaffold

Publications (1)

Publication Number Publication Date
CN208686049U true CN208686049U (en) 2019-04-02

Family

ID=65882906

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821213413.8U Active CN208686049U (en) 2018-07-27 2018-07-27 It is a kind of convenient for quickly above and below scaffold

Country Status (1)

Country Link
CN (1) CN208686049U (en)

Similar Documents

Publication Publication Date Title
CN207774604U (en) Lift-on/Lift-off System and its hanging apparatus for ground-connecting-wall steel reinforcement cage
CN104577876A (en) Plug-in hanging basket for live working of helicopter
CN204391605U (en) A kind of helicopter live line working plug-in type hanging basket
CN208686049U (en) It is a kind of convenient for quickly above and below scaffold
CN209040528U (en) A kind of U-shaped operation platform of colored umbrella column
CN208870494U (en) A kind of operation safety guard bar device of underground coal mine
CN207363321U (en) Water supply first-aid repair weather proof enclosure device
CN206636145U (en) A kind of construction scaffold
CN215168698U (en) Protective fence
CN211496725U (en) Hoisting tackle with dustproof function
CN213596814U (en) Movable three-dimensional crossing type multipurpose suspension bridge construction platform
CN206667704U (en) Intelligent automatic warning assembly type safety climbing ladder
CN107740601A (en) Water supply first-aid repair weather proof enclosure device
CN209468987U (en) A kind of portable operating platform for assembled main cable and girder
CN207813477U (en) The special protective frame of ascending a height in stack position
CN207776393U (en) Lighting roof steel construction operating platform
CN209040530U (en) A kind of construction operation hanging cage
CN219570098U (en) Subway looped netowrk construction operation platform
CN107956412B (en) Intelligent security type climbing device
CN110700611A (en) Anti-falling net for power transmission construction
CN215760356U (en) Aerial work platform ladder capable of being quickly assembled and disassembled
CN216740458U (en) High-strength safe balcony railing
CN216811541U (en) Rail transit tunnel climbing operation platform
CN107834428A (en) Overhead line structures error-climbing safety guard
CN216197128U (en) Civil engineering is with protection rail

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant