CN208685750U - A kind of town road rainwater collection irrigation system - Google Patents

A kind of town road rainwater collection irrigation system Download PDF

Info

Publication number
CN208685750U
CN208685750U CN201821305266.7U CN201821305266U CN208685750U CN 208685750 U CN208685750 U CN 208685750U CN 201821305266 U CN201821305266 U CN 201821305266U CN 208685750 U CN208685750 U CN 208685750U
Authority
CN
China
Prior art keywords
reservoir
town road
rainwater
water
irrigation system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821305266.7U
Other languages
Chinese (zh)
Inventor
吴兆文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foshan Jimei Municipal Garden Engineering Co Ltd
Original Assignee
Foshan Jimei Municipal Garden Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Foshan Jimei Municipal Garden Engineering Co Ltd filed Critical Foshan Jimei Municipal Garden Engineering Co Ltd
Priority to CN201821305266.7U priority Critical patent/CN208685750U/en
Application granted granted Critical
Publication of CN208685750U publication Critical patent/CN208685750U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a kind of town road rainwater collection irrigation systems, are related to urban operating mechanism field, its key points of the technical solution are that including town road, the two sides of town road are provided with kerbstone, are provided with inlet for stom water at the contact position of kerbstone and town road;The height of kerbstone is set above the surface of town road;It further include the collection device of a rainwater;Collection device includes the water inlet pipe to link together with inlet for stom water and the reservoir that is connected to the water inlet pipe other end, and reservoir is arranged in underground.The utility model solves the problems, such as directly utilize the rainwater of pavement of road, irrigates by being collected to rainwater, and with rainwater greenbelt, effectively saved water resource.

Description

A kind of town road rainwater collection irrigation system
Technical field
The utility model relates to urban operating mechanism field, in particular to a kind of town road rainwater collection irrigation system.
Background technique
In recent decades, becoming increasingly conspicuous with the contradiction of supply and demand for the water resource, more and more countries recognize rainwater resource Value, and take the carry out rainwater comprehensive utilization of many effective measures, adaptation to local conditions.
With China's expanding economy, road vehicle is increasing, and the demand to town road constantly increases.Town road Construction be directed not only to pavement construction, and be contemplated that the laying of the various pipelines such as electric power, communication, draining, some pairs of rings The more demanding city in border, also puts forward higher requirements the greening of both sides of the road.The side of town road is provided with kerbstone, side Stone is inside towards the side of road, is outside towards outside greenbelt side, traditional town road construction, inlet for stom water setting In the inside of road side stone, rain grid is set, rain grid is made of materials such as concrete, cast irons, rainwater at the top of inlet for stom water Rain pipe of the mouth lower end connection for draining.
Surface gathered water in order to prevent, the rainwater on municipal road surface are directly entered rain pipe discharge after collecting by inlet for stom water, and On the other hand, the greenbelt of both sides of the road needs to irrigate, and needs other municipal water supply to meet irrigation demand, can not be direct Using the rainwater of pavement of road, it be easy to cause water resource waste.
Utility model content
In view of the deficienciess of the prior art, the purpose of this utility model is to provide a kind of fillings of town road rainwater-collecting System is irrigate, greenbelt is irrigated by being collected to rainwater, and with rainwater, has effectively saved water resource.
The above-mentioned purpose of the utility model has the technical scheme that
A kind of town road rainwater collection irrigation system, including town road, the two sides of town road are provided with kerbstone, Inlet for stom water is provided at the contact position of kerbstone and town road;The height of kerbstone is set above the surface of town road;
It further include the collection device of a rainwater;
Collection device includes the water inlet pipe to link together with inlet for stom water and the reservoir that is connected to the water inlet pipe other end, Reservoir is arranged in underground.
By using above-mentioned technical proposal, in rainy days, rainwater flows into water inlet pipe by inlet for stom water, then via water inlet Pipe is flowed into reservoir and is stored, so that rainwater storage when by rainy days in reservoir, is being needed to by town road When the greenbelt on side is poured, directly the rainwater stored in reservoir can be taken out, and for pouring, and then improve water The utilization rate of resource.
The utility model is further arranged to: being also equipped with web plate in inlet for stom water.
By using above-mentioned technical proposal, web plate stops rubble, the rubbish etc. that are mixed in rainwater, prevent rubble, Rubbish etc. enters reservoir.
The utility model is further arranged to: being provided with suction pump in reservoir, and is connected on suction pump useful In the outlet pipe that the water for extracting suction pump out is drained.
By using above-mentioned technical proposal, so that staff is when carrying out the pouring to greenbelt, it can be by drawing water Pump and outlet pipe extract the rainwater stored in reservoir out, so that the rainwater in reservoir be allowed to use convenient for taking out.
The utility model is further arranged to: be provided at the upper side position of reservoir for by reservoir store full water after mistake What the drainpipe of the rainwater discharge of amount, drainpipe and water passage, and drainpipe were connect with reservoir is located proximate to reservoir The edge Chi Kou, be lower than inlet for stom water.
By using above-mentioned technical proposal, due to when heavy rain, with being increasing for amount of rainfall, in reservoir The water of storage is it is possible that store full situation, or even the case where rainwater is diffused out from inlet for stom water occur, to allow on town road Water it is more, and can not effectively be discharged, to be impacted to the vehicle travelled on town road.Therefore rain in order to prevent Water is diffused out from inlet for stom water, and the row for reservoir to be stored to excessive rainwater discharge after full water is provided at the upper side position of reservoir Water pipe, drainpipe and water passage, and the edge Chi Kou for being located proximate to reservoir that drainpipe is connect with reservoir are lower than rain The mouth of a river.Thus when rainy days, rainwater was larger, once the water surface of rainwater is more than the position that drainpipe is connect with reservoir in reservoir Set place, subsequent rainwater is directly flowed out from drainpipe, and is flowed into sewer, allows the water in reservoir will not be from when storing full It is diffused out at inlet for stom water.
The utility model is further arranged to: being provided with multiple reservoirs, one group of suction pump is equipped in each reservoir And outlet pipe.
By using above-mentioned technical proposal, multiple reservoirs are set, so that multiple reservoirs are together to rain in rainy days Water is stored, in rainy days and can store more rainwater, further improves the utilization rate of water resource.
The utility model is further arranged to: connecting tube is provided between multiple reservoirs, connecting tube is arranged adjacent Two reservoirs between, allow the connection between multiple reservoirs for series connection, the position that connecting tube connect with reservoir is positioned at storage Pond is at the position of bottom.
By using above-mentioned technical proposal, allows multiple reservoirs more easily all to store in water storage full, improve the collection of rainwater Efficiency.Wherein, the position that connecting tube is connect with reservoir is located at reservoir at the position of bottom, so that in multiple reservoirs Rainwater is convenient for flowing.And by the rainwater extraction in reservoir in use, the rainwater in multiple reservoirs is in flow regime, Consequently facilitating staff's draws water and pours work.
The utility model is further arranged to: the corresponding inlet for stom water of each reservoir.
By using above-mentioned technical proposal, staff is more convenient to be controlled and adjusts to reservoir.
The utility model is further arranged to: each reservoir corresponds to multiple inlets for stom water.
By using above-mentioned technical proposal, faster reservoir can be stored when collecting rainwater full.
The utility model is further arranged to: installation lid is provided on the ground on the upside of reservoir.
By using above-mentioned technical proposal, when rainy days, rainwater flowed into reservoir via inlet for stom water, although there is web plate Blocking, allow the bulk matter such as rubbish cannot be introduced into reservoir, but rainwater enter reservoir in when can bring a part into Silt enter in reservoir, allow in reservoir and accumulate a large amount of silt, influence the reservoir storage of reservoir.Because of work for convenience Make personnel to clear up reservoir, installation lid is provided on the ground on the upside of reservoir, staff can will pacify Capping opening clears up reservoir to enter in reservoir, so that the silt in reservoir be removed, allows in reservoir not There can be a large amount of silt, so that the reservoir storage of reservoir not will receive the influence of silt.
The utility model is further arranged to: being covered in installation and is offered inlet opening.
By using above-mentioned technical proposal, so that inlet opening can be passed through by falling in the rainwater that installation covers in rainy days It flows into reservoir, rainwater can flow into reservoir together by inlet for stom water and inlet opening, to allow reservoir can be faster It stores full.
In conclusion the utility model has the following beneficial effects:
1, by being collected to rainwater, and greenbelt is irrigated with rainwater, has effectively saved water resource;
2, by the way that multiple reservoirs are arranged, enable rainy days when store more rainwater;
3, by setting installation lid, reservoir is cleared up so that staff is convenient.
Detailed description of the invention
Fig. 1 is the schematic diagram of town road rainwater collection irrigation system in embodiment 1;
Fig. 2 is the schematic diagram of collection device in embodiment 1;
Fig. 3 is the schematic diagram that suction pump is arranged in embodiment 1 in reservoir;
Fig. 4 is the schematic diagram that lid is installed in embodiment 1;
Fig. 5 is the schematic diagram of collection device in embodiment 2;
Fig. 6 is the schematic diagram that lid is installed in embodiment 3.
Appended drawing reference: 1, town road;2, kerbstone;3, inlet for stom water;4, collection device;41, water inlet pipe;42, reservoir; 43, web plate;44, drainpipe;45, connecting tube;5, suction pump;6, outlet pipe;7, installation lid;8, inlet opening.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
Embodiment 1: a kind of town road rainwater collection irrigation system, as shown in Figure 1 and Figure 2, including town road 1, municipal administration The two sides of road 1 are provided with kerbstone 2, are provided with inlet for stom water 3 at the contact position of kerbstone 2 and town road 1.Wherein, kerbstone 2 Height be set above the surface of town road 1.In rainy days, rainwater is fallen on town road 1, and in town road 1 Upper flowing, and flow away via inlet for stom water 3.
As shown in Figure 1 and Figure 2, in order to improve the utilization rate of rainwater, it is provided with the collection device 4 of a rainwater.It is specific next It says, collection device 4 includes the water inlet pipe 41 to link together with inlet for stom water 3 and the reservoir that is connected to 41 other end of water inlet pipe 42, reservoir 42 is arranged in underground.Therefore in rainy days, rainwater flows into water inlet pipe 41 by inlet for stom water 3, then via Water inlet pipe 41 is flowed into reservoir 42 and is stored, so that rainwater storage when by rainy days is in reservoir 42, is being needed pair When the greenbelt on 1 side of town road is poured, directly the rainwater stored in reservoir 42 can be taken out, and for pouring It fills, and then improves the utilization rate of water resource.
As shown in Figure 1 and Figure 2, the net for preventing rubbish, waddy, rubble etc. from flowing into reservoir 42 is also equipped in inlet for stom water 3 Plate 43 stops rubble, the rubbish etc. that are mixed in rainwater by web plate 43, prevents rubble, rubbish etc. from entering reservoir 42.
As shown in Figure 2 and Figure 3, it in order to enable the rainwater in reservoir 42 uses convenient for taking out, is provided in reservoir 42 Suction pump 5, and it is connected on suction pump 5 outlet pipe 6 that the water for extracting suction pump 5 out is drained, so that staff When carrying out the pouring to greenbelt, the rainwater stored in reservoir 42 can be extracted out by suction pump 5 and outlet pipe 6, from And the rainwater in reservoir 42 is allowed to use convenient for taking out.
Actual in use, since the road section length of town road 1 is longer, so being typically provided on town road 1 Multiple inlets for stom water 3 are provided with multiple reservoirs 42 in order to enable the rainwater flowed into inlet for stom water 3 can flow into reservoir 42, And the corresponding inlet for stom water 3 of each reservoir 42, so that more convenient get up rainwater-collecting.Wherein, pacify in each reservoir 42 Equipped with one group of suction pump 5 and outlet pipe 6.By the way that multiple reservoirs 42 are arranged, so that multiple reservoirs 42 are together in rainy days Rainwater is stored, so that in rainy days and more rainwater can be stored, further improves the utilization rate of water resource.
But when heavy rain, with being increasing for amount of rainfall, the water of the storage in reservoir 42 it is possible that Full situation is stored, or even the case where rainwater is diffused out from inlet for stom water 3 occurs, to make the water on town road 1 more, and can not Effective discharge, to be impacted to the vehicle travelled on town road 1.Therefore rainwater is diffused out from inlet for stom water 3 in order to prevent, As shown in Figure 2 and Figure 3, it is provided at the upper side position of reservoir 42 and is discharged for excessive rainwater after reservoir 42 is stored full water Drainpipe 44, drainpipe 44 and water passage, and drainpipe 44 connect with reservoir 42 be located proximate to reservoir 42 The edge Chi Kou is lower than inlet for stom water 3.Thus when rainy days, rainwater was larger, once the water surface of rainwater is more than draining in reservoir 42 At the position that pipe 44 is connect with reservoir 42, subsequent rainwater is directly flowed out from drainpipe 44, and is flowed into sewer, allows storage Water in pond 42 will not be diffused out when storing full at inlet for stom water 3.
As shown in Figure 2 and Figure 3, in staff by the rainwater extraction in reservoir 42 and in use, staff is exhausting It needs that the time is spent to remove replacement reservoir 42 after the rainwater of one reservoir 42 storage, so that the pouring Comparision of staff Complexity, therefore in order to enable the work of staff is more convenient, it is provided with connecting tube 45 between multiple reservoirs 42, connects Pipe 45 is arranged between two adjacent reservoirs 42, allows the connection between multiple reservoirs 42 to be series connection, to realize multiple Rainwater connection between reservoir 42 allows multiple reservoirs 42 more easily all to store in water storage full, improves the collection efficiency of rainwater. Wherein, the position that connecting tube 45 is connect with reservoir 42 is located at reservoir 42 at the position of bottom, so that multiple reservoirs Rainwater is in 42 convenient for flowing.And it extracts out by the rainwater in reservoir 42 in use, the rainwater in multiple reservoirs 42 is in Flow regime, consequently facilitating staff's draws water and pour work.
When rainy days, rainwater flowed into reservoir 42 via inlet for stom water 3, in conjunction with Fig. 2, Fig. 4, although there is the resistance of web plate 43 Gear, allows the bulk matter such as rubbish cannot be introduced into reservoir 42, but rainwater can bring a part into when entering in reservoir 42 Silt enter in reservoir 42, allow in reservoir 42 and accumulate a large amount of silt, influence the reservoir storage of reservoir 42.Because in order to Facilitate staff to clear up reservoir 42, installation lid 7 is provided on the ground of the upside of reservoir 42, allows work people Installation lid 7 can be opened and be cleared up to enter in reservoir 42 reservoir 42 by member, thus by the silt in reservoir 42 It removes, allows in reservoir 42 there is no a large amount of silts, so that the reservoir storage of reservoir 42 not will receive the shadow of silt It rings.
The specifically used method of the present embodiment is, in rainy days, rainwater flows into water inlet pipe 41 by inlet for stom water 3, then It flows into reservoir 42 and is stored via water inlet pipe 41, so that rainwater storage when by rainy days in reservoir 42, is needing When being poured to the greenbelt on 1 side of town road, directly the rainwater stored in reservoir 42 can be taken out, and is used for It pours, and then improves the utilization rate of water resource.And water in reservoir 42 is when storing full, and it is subsequent into reservoir 42 Rainwater can be discharged into sewer via drainpipe 44, be not in the case where rainwater is diffused out from inlet for stom water 3.In addition, setting is multiple Reservoir 42, so that multiple reservoirs 42 together store rainwater in rainy days, in rainy days and can deposit More rainwater are stored up, the utilization rate of water resource is further improved.And it is provided between multiple reservoirs 42 by multiple storages The connecting tube 45 that pond 42 is cascaded allows multiple reservoirs 42 more easily all to store in water storage full, improves the collection of rainwater Efficiency.By the rainwater extraction in reservoir 42 in use, the rainwater in multiple reservoirs 42 is in flow regime, consequently facilitating Staff's draws water and pours work.
Embodiment 2: a kind of town road rainwater collection irrigation system, the present embodiment the difference from embodiment 1 is that, reference Fig. 5, the corresponding multiple inlets for stom water 3 of each reservoir 42, to can faster be stored reservoir 42 when collecting rainwater full.
Embodiment 3: a kind of town road rainwater collection irrigation system, the present embodiment the difference from example 2 is that, reference Fig. 6 offers inlet opening 8 on installation lid 7 to allow reservoir 42 to be easier to store in water storage completely, so that in rainy days, The rainwater fallen on installation lid 7 can be flowed into reservoir 42 by inlet opening 8, and rainwater can pass through inlet for stom water 3 and inlet opening 8 It flows into reservoir 42 together, so that it is full that reservoir 42 can faster be stored.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability Field technique personnel can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but As long as all by the protection of Patent Law in the scope of the claims of the utility model.

Claims (10)

1. a kind of town road rainwater collection irrigation system, it is characterised in that: including town road (1), the two of town road (1) Side is provided with kerbstone (2), is provided with inlet for stom water (3) at the contact position of kerbstone (2) and town road (1);The height of kerbstone (2) Degree is set above the surface of town road (1);
It further include the collection device (4) of a rainwater;
Collection device (4) includes the water inlet pipe (41) to link together with inlet for stom water (3) and connects with water inlet pipe (41) other end Logical reservoir (42), reservoir (42) are arranged in underground.
2. town road rainwater collection irrigation system according to claim 1, it is characterised in that: also pacify in inlet for stom water (3) Equipped with web plate (43).
3. town road rainwater collection irrigation system according to claim 1, it is characterised in that: set in reservoir (42) It is equipped with suction pump (5), and is connected on suction pump (5) outlet pipe (6) that the water for extracting suction pump (5) out is drained.
4. town road rainwater collection irrigation system according to claim 1, it is characterised in that: the upside of reservoir (42) The drainpipe (44) for reservoir (42) to be stored to excessive rainwater discharge after full water is provided at position, drainpipe (44) is under Water channel connection, and the edge Chi Kou for being located proximate to reservoir (42) that drainpipe (44) is connect with reservoir (42), are lower than rainwater Mouth (3).
5. town road rainwater collection irrigation system according to claim 1, it is characterised in that: be provided with multiple reservoirs (42), one group of suction pump (5) and outlet pipe (6) are installed in each reservoir (42).
6. town road rainwater collection irrigation system according to claim 5, it is characterised in that: in multiple reservoirs (42) Between be provided with connecting tube (45), connecting tube (45) is arranged between two adjacent reservoirs (42), allows multiple reservoirs (42) connection between is series connection, and the position that connecting tube (45) is connect with reservoir (42) is located at reservoir (42) close to bottom At position.
7. town road rainwater collection irrigation system according to claim 6, it is characterised in that: each reservoir (42) is right Answer an inlet for stom water (3).
8. town road rainwater collection irrigation system according to claim 6, it is characterised in that: each reservoir (42) is right Answer multiple inlets for stom water (3).
9. town road rainwater collection irrigation system according to claim 1, it is characterised in that: on the upside of reservoir (42) Ground on be provided with installation lid (7).
10. town road rainwater collection irrigation system according to claim 9, it is characterised in that: opened on installation lid (7) Equipped with inlet opening (8).
CN201821305266.7U 2018-08-13 2018-08-13 A kind of town road rainwater collection irrigation system Expired - Fee Related CN208685750U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821305266.7U CN208685750U (en) 2018-08-13 2018-08-13 A kind of town road rainwater collection irrigation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821305266.7U CN208685750U (en) 2018-08-13 2018-08-13 A kind of town road rainwater collection irrigation system

Publications (1)

Publication Number Publication Date
CN208685750U true CN208685750U (en) 2019-04-02

Family

ID=65885201

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821305266.7U Expired - Fee Related CN208685750U (en) 2018-08-13 2018-08-13 A kind of town road rainwater collection irrigation system

Country Status (1)

Country Link
CN (1) CN208685750U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111406624A (en) * 2020-04-27 2020-07-14 宁夏大学 Automatic irrigation system is collected to road rainwater

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111406624A (en) * 2020-04-27 2020-07-14 宁夏大学 Automatic irrigation system is collected to road rainwater

Similar Documents

Publication Publication Date Title
CN205636879U (en) System's device is collected, is purified and utilize to overpass rainwater
CN205444302U (en) Urban road rainwater control valve network system
CN209686564U (en) A kind of small sponge urban ecology rainwater storage cell system
CN109386022A (en) A kind of water storage reclamation set of rain water on roof disconnecting
CN210712423U (en) A pedestrian road for sponge city rainwater utilizes
CN205024981U (en) Light -duty rainwater in environmental protection roof is collected and is utilized device
CN105297645B (en) A kind of stagnant storage of sponge urban rainwater oozes uses heat-extraction system pipe fitting and its construction method only
CN211816758U (en) Irrigation system is collected to town road rainwater
CN107188357A (en) A kind of downpipe coagulated agent automatic adding device handled for roofing early-stage rainwater
CN107217726A (en) A kind of anti-ponding road
CN206319391U (en) Gutter inlet device
CN208685750U (en) A kind of town road rainwater collection irrigation system
CN106087648A (en) A kind of urban road special Quick drainage system
CN206915924U (en) Downpipe coagulated agent automatic adding device for the processing of roofing early-stage rainwater
CN207003595U (en) A kind of urban road automatic rain water collection local use system
CN108056004A (en) A kind of overpass rainwater catchment system irrigation system
CN206267228U (en) Ecologic rainwater collection system
CN214714789U (en) Rainwater processing system for municipal construction
CN212358883U (en) Green roof
CN211873238U (en) Sponge city rainwater shunting hinders dirty anti-reflux discharging equipment
CN209509120U (en) A kind of rain processing system having both fire engine way and concave herbaceous field
CN210031499U (en) Bridge drainage system
CN207499101U (en) Rainwater collecting and treating system under a kind of overpass
CN207017349U (en) A kind of road rainwater collecting reutilization system
CN207469412U (en) A kind of control well device of combined system pollutant

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190402

Termination date: 20210813