CN208683670U - A kind of material chute pipe with buffer structure - Google Patents
A kind of material chute pipe with buffer structure Download PDFInfo
- Publication number
- CN208683670U CN208683670U CN201821294807.0U CN201821294807U CN208683670U CN 208683670 U CN208683670 U CN 208683670U CN 201821294807 U CN201821294807 U CN 201821294807U CN 208683670 U CN208683670 U CN 208683670U
- Authority
- CN
- China
- Prior art keywords
- elephant trunk
- separator tube
- lower section
- section elephant
- buffer structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Chutes (AREA)
Abstract
A kind of material chute pipe with buffer structure, including upper section elephant trunk, lower section elephant trunk and separator tube, upper section elephant trunk top connects material export pipeline, the separator tube is mounted between upper section elephant trunk and lower section elephant trunk, the lower section elephant trunk outlet connection screw machine material inlet, the lower section elephant trunk and screw machine material inlet right angle setting, the separator tube are a hollow tube being transversely mounted, right angle setting between the separator tube and lower section elephant trunk.After the utility model increases separator tube, prevent the risk that screw machine wall is worn through.
Description
Technical field
The utility model belongs to industrial material transport, unloading field, and in particular to dry-mixed mortar elephant trunk is into screw machine part
Elephant trunk improved technology.
Background technique
In dry-mixed mortar production process, due to production engineering specifications, have in the production line many places elephant trunk into screw machine into
The design of row transport, generally, certain tilt angle can be arranged in view of buffering and transportation range problem in elephant trunk, but due to
The angle problem of elephant trunk causes material that can directly rush at screw machine wall along the angle of elephant trunk in dropping process, in this process
Middle screw machine wall is just worn seriously, and the phenomenon that screw machine wall is worn through occurs in long-time service.Screw machine intensity after being worn through
It declines to a great extent, there are security risks.
Summary of the invention
The technical problem to be solved by the utility model is to provide a kind of dry-mixed mortar elephant trunk with buffer function is into spiral shell
Rotation machine part elephant trunk structure.
The utility model uses following technical scheme to solve above-mentioned technical problem:
A kind of material chute pipe with buffer structure, including upper section elephant trunk, lower section elephant trunk and separator tube, on the upper section elephant trunk
Portion connects material export pipeline, and the separator tube is mounted between upper section elephant trunk and lower section elephant trunk, and the lower section elephant trunk outlet connects
Screw machine material inlet, the lower section elephant trunk and screw machine material inlet right angle setting are connect, the separator tube is a laterally peace
The hollow tube of dress, right angle setting between the separator tube and lower section elephant trunk.
Preferably, wearing layer is installed at the upper section elephant trunk protrusion pipeline.
Preferably, guide tongue, the guide tongue size and buffering tube inlet size are installed at the separator tube material inlet
Matching.
Preferably, the guide tongue is connect with separator tube by vulcanie, and guide tongue lid lives to buffer when no material falls
The material inlet of pipe, when having material whereabouts, vulcanie deformation, guide tongue is bent downward.
Preferably, dust mouth is installed on the separator tube top.
Compared with prior art, the utility model has the following beneficial effects:
1, pass through in elephant trunk into the place of screw machine and increase a separator tube, the material swept away is done into a step and is stopped, is protected
Exhibit material is not to enter screw machine along elephant trunk angle.After increasing this separator tube, screw machine wall can be prevented and be worn through.
2, increase guide tongue on the basis of separator tube, further decrease impact dynamics, meanwhile, effectively material is introduced
Discharge port prevents material from excessively accumulating in separator tube.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the material chute pipe with buffer structure.
Specific embodiment
The structure of the utility model and the course of work are described further with reference to the accompanying drawing.
A kind of material chute pipe with buffer structure, including upper section elephant trunk 1, lower section elephant trunk 2 and separator tube 3, on upper section elephant trunk
Portion connects material export pipeline, and separator tube is mounted between upper section elephant trunk and lower section elephant trunk, lower section elephant trunk outlet connection screw machine 4
Material inlet, lower section elephant trunk and screw machine material inlet right angle setting, separator tube are a hollow tube being transversely mounted, separator tube
The right angle setting between lower section elephant trunk.
Upper section elephant trunk, which protrudes, installs wearing layer 5 at pipeline, prevent excessive wear elephant trunk in material dropping process, increase maintenance
Cost.
Guide tongue 6 is installed, guide tongue size is matched with buffering tube inlet size at separator tube material inlet.Guide tongue and slow
Washing pipe is connected by vulcanie, and guide tongue lid lives the material inlet of separator tube, when having material whereabouts, hard when no material falls
Rubber deformation, guide tongue are bent downward.The effect of separator tube is first is that in order to further buffer material whereabouts, second is that by object
Material imported into the whereabouts mouthful of separator tube, prevents excessive material from accumulating in separator tube.It needs to guarantee upper section elephant trunk on this basis
Angle under, the feeding inlet position of upper section elephant trunk discharge port extended position and lower section elephant trunk just matches, the present embodiment middle and lower sections
The feeding inlet of elephant trunk is located at the distance that upper section elephant trunk discharge port position translates a radius.
Dust mouth 7 is installed on separator tube top, and dust mouth is the round tube that one section and separator tube form 60 ° -90 °, the dust mouth
It can also be used as air stream port.
A kind of embodiment of the utility model above described embodiment only expresses, the description thereof is more specific and detailed,
But it should not be understood as limiting the scope of the patent of the utility model.It should be pointed out that for the common of this field
For technical staff, without departing from the concept of the premise utility, various modifications and improvements can be made, these all belong to
In the protection scope of the utility model.
Claims (5)
1. a kind of material chute pipe with buffer structure, which is characterized in that described including upper section elephant trunk, lower section elephant trunk and separator tube
Upper section elephant trunk top connects material export pipeline, and the separator tube is mounted between upper section elephant trunk and lower section elephant trunk, the lower section
Elephant trunk outlet connection screw machine material inlet, the lower section elephant trunk and screw machine material inlet right angle setting, the separator tube are
One hollow tube being transversely mounted, right angle setting between the separator tube and lower section elephant trunk.
2. the material chute pipe according to claim 1 with buffer structure, which is characterized in that the upper section elephant trunk protrudes pipeline
Place's installation wearing layer.
3. the material chute pipe according to claim 1 with buffer structure, which is characterized in that at the separator tube material inlet
Guide tongue is installed, the guide tongue size is matched with buffering tube inlet size.
4. the material chute pipe according to claim 3 with buffer structure, which is characterized in that the guide tongue and separator tube are logical
Vulcanie connection is crossed, guide tongue lid lives the material inlet of separator tube when no material falls, and when having material whereabouts, vulcanie becomes
Shape, guide tongue are bent downward.
5. the material chute pipe according to claim 1 with buffer structure, which is characterized in that install out on the separator tube top
Dirt mouth.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821294807.0U CN208683670U (en) | 2018-08-10 | 2018-08-10 | A kind of material chute pipe with buffer structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821294807.0U CN208683670U (en) | 2018-08-10 | 2018-08-10 | A kind of material chute pipe with buffer structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208683670U true CN208683670U (en) | 2019-04-02 |
Family
ID=65884902
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821294807.0U Active CN208683670U (en) | 2018-08-10 | 2018-08-10 | A kind of material chute pipe with buffer structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208683670U (en) |
-
2018
- 2018-08-10 CN CN201821294807.0U patent/CN208683670U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203857473U (en) | Ash discharge delivery system of coal economizer | |
CN208683670U (en) | A kind of material chute pipe with buffer structure | |
CN205555382U (en) | Prevent stifled dirt streamline coal breakage pipe that presses down based on EDEM design | |
CN205932073U (en) | A wear -resisting elephant trunk for dry sand carries | |
CN205815944U (en) | A kind of novel wear resistant heavy medium cyclone | |
CN201961727U (en) | Pneumatic block clearing device for coal dropping pipe | |
CN205278645U (en) | Slurry transportation pipeline falls structure | |
CN203702241U (en) | Unloading pit connecting unloading chamber and drop shaft | |
CN103845979A (en) | Gas dedusting device | |
CN206439549U (en) | A kind of wear-resisting bracing means of elbow | |
CN206231904U (en) | Detachable drawing mechanism | |
CN208007905U (en) | A kind of wind stopping device including scraper | |
CN204114405U (en) | Anti-plugging water conservancy diversion expansion joint | |
CN204602741U (en) | The safe clearing apparatus of coal dust medium-speed pulverizer hot air duct | |
CN104295831B (en) | Anti-clogging water conservancy diversion expansion joint | |
CN102730419A (en) | Method and device for preventing cone pump fluidized plate from being damaged | |
CN206418152U (en) | A kind of blast furnace coal gun clear rifle coal powder collection bag | |
CN202621317U (en) | Raw coke oven gas swirl dust remover of blast furnace | |
CN212975463U (en) | Device for preventing blockage of mixing box and upper and lower coal dropping pipes thereof | |
CN203558526U (en) | Wearproof, anti-blocking and dustproof blanking pipe | |
CN203648856U (en) | Separating device installed in vertical discharging pipeline for large blocks of mineral aggregates | |
CN206872860U (en) | A kind of afterbody regions of turbulent flow installs the high furnace coal fines lance of wear-resistant tubing additional | |
CN203269954U (en) | Blast furnace top centering device | |
CN204619415U (en) | Unpowered moisture separator | |
CN201961823U (en) | Discharge funnel for conveyor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |