CN208683196U - Pack driving means - Google Patents

Pack driving means Download PDF

Info

Publication number
CN208683196U
CN208683196U CN201821477199.7U CN201821477199U CN208683196U CN 208683196 U CN208683196 U CN 208683196U CN 201821477199 U CN201821477199 U CN 201821477199U CN 208683196 U CN208683196 U CN 208683196U
Authority
CN
China
Prior art keywords
push
head
connecting rod
control mechanism
cabinet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821477199.7U
Other languages
Chinese (zh)
Inventor
叶鹏
高洪
张乾坤
段陈义
牛康健
杨晨曦
王永强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Polytechnic University
Original Assignee
Anhui Polytechnic University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Polytechnic University filed Critical Anhui Polytechnic University
Priority to CN201821477199.7U priority Critical patent/CN208683196U/en
Application granted granted Critical
Publication of CN208683196U publication Critical patent/CN208683196U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Wrapping Of Specific Fragile Articles (AREA)

Abstract

The utility model discloses a kind of packaging driving means, including cabinet, push executes head and controls assembly along the execution head that setting track is moved for controlling push execution head, executing head control assembly includes connecting with push execution head and executing the first control mechanism that head is moved in a straight line along first direction for controlling push, second control mechanism and the drive rod being connect with the second control mechanism and push execution head, cabinet, which has, executes the sliding slot that head play the guiding role to push, the length direction of sliding slot is parallel with first direction, second control mechanism is oscillating cam mechanism.The packaging driving means of the utility model, structure is simple, install compact, and easily manufacture and maintenance, movement is reliable, and the accuracy that push executes head running track can be improved.

Description

Pack driving means
Technical field
The utility model belongs to packing machinery technology, specifically, the utility model relates to a kind of push of packaging to fill It sets.
Background technique
Traditional manner of packing is based on manual and semi-automatic.The shortcomings that Manual Packaging, has: low efficiency, waste of manpower Material resources are related to recruiting, and stay people, on-the-job training, the problems such as packaging process sanitary control;The shortcomings that semi-automatic packaging, has: peace Full property shortcoming, comparatively laborious to the training of operative employee, in addition product push is not accurate enough, cause damage of product waste material at This, expends resource, it is difficult to adapt to the production and processing mode that current social rapidly changes.In packaging supporting machinery, such as cigarette packet In driving means, it is desirable that it is rectangle that the push for executing push work, which executes the running track of head, but existing push executes head Running track it is not accurate enough, can not achieve the accurate push of part to be packaged.
Utility model content
The utility model aims to solve at least one of the technical problems existing in the prior art.For this purpose, the utility model mentions For a kind of packaging driving means, it is therefore an objective to improve the accuracy that push executes head running track.
To achieve the goals above, the technical solution that the utility model is taken are as follows: packaging driving means, including cabinet, push away It send and executes head and control assembly, the execution head control along the execution head that setting track is moved for controlling push execution head Assembly includes executing the first control that head connect and moves in a straight line for controlling push execution head along first direction with the push Mechanism processed, the second control mechanism and execute the drive rod that head connect with the second control mechanism and push, the cabinet with pair Push executes the sliding slot that head play the guiding role, and the length direction of sliding slot is parallel with first direction, and the second control mechanism is to swing Cam mechanism.
First control mechanism is set on the cabinet and the first control mechanism and the push execute head and cabinet Match composition slider-crank mechanism.
First control mechanism includes the first connecting rod being rotatably arranged on the cabinet and and first connecting rod The second connecting rod of head rotation connection is executed with the push, first connecting rod and second connecting rod are located at the lower section that push executes head.
Second control mechanism and the transmission rod control the push execution head and do straight line in a second direction Movement, first direction and second direction is perpendicular and second direction is vertical direction, the second control mechanism includes rotatable sets Be placed on the cabinet and connect with drive rod rotation third connecting rod, be rotatably arranged on cabinet and for controlling third The cam that connecting rod is rotated and the pin shaft for being set on third connecting rod and matching with cam, the side of cam, which is equipped with, allows pin The track groove of axis insertion.
The pin shaft is set to one end of the third connecting rod, and the other end of third connecting rod and the drive rod rotation connect It connects, third connecting rod is to be set on the cabinet at position between the ends by support shaft.
The drive rod, the cam and the third connecting rod are located at the lower section that the push executes head.
The execution head control assembly further includes connecting and making with first control mechanism and second control mechanism The synchronous drive mechanism that first control mechanism and the second control mechanism operate synchronously.
The synchronous drive mechanism include connect with the first connecting rod and with the driving gear of first connecting rod synchronous rotary, It connect with the cam and matches with the first driven gear of cam synchronous rotary and with driving gear and the first driven gear The transmission belt of conjunction.
The transmission belt is synchronous toothed belt.
The cabinet is equipped with for part to be packaged to be delivered to specified location and is connect with the synchronous drive mechanism Belt conveyor, it is described push execute head have allow the conveyer belt of belt conveyor to pass through escape groove.
The packaging driving means of the utility model, structure is simple, install compact, and easily manufacture and maintenance, movement is reliable, can be with Improve the accuracy that push executes head running track.
Detailed description of the invention
This specification includes the following drawings, and shown content is respectively:
Fig. 1 is the structural schematic diagram of the utility model packaging driving means;
Fig. 2 is internal drive mechanism structure schematic diagram;
Fig. 3 is the structural schematic diagram of oscillating cam mechanism;
Fig. 4 is that push executes head and conveyer belt positional structure schematic diagram;
Fig. 5 is the schematic shapes of cam locus slot;
In the figure, it is marked as 1, cabinet;2, driving gear;3, transmission belt;4, the first driven gear;5, the second driven gear; 6, third driven gear;7, push executes head;8, conveyer belt;9, cam;10, drive rod;11, first connecting rod;12, second connects Bar;13, driving shaft;14, first driven shaft;15, second driven shaft;16, third driven shaft;17, pin shaft;18, first pulley; 19, the second belt wheel;20, third connecting rod;21, first rotating shaft;22, the second shaft;23, third shaft;24, the 4th shaft;25, Five shafts;26, idler wheel;27, sliding slot;28, support shaft.
Specific embodiment
Below against attached drawing, by the description of the embodiment, making to specific embodiment of the present utility model further detailed Thin explanation, it is therefore an objective to help those skilled in the art to the design of the utility model, technical solution have it is more complete, accurate and Deep understanding, and facilitate its implementation.
As shown in Figures 1 to 4, the utility model provides a kind of packaging driving means, including cabinet 1, push execute head 7 Control assembly along the execution head that is moved of setting track with head 7 is executed for controlling push, execute head control assembly include with Push executes the connection of head 7 and executes the first control mechanism, the second control that head 7 is moved in a straight line along first direction for controlling push Mechanism processed and the drive rod 10 connecting with the second control mechanism and push execution head 7, cabinet 1, which has, plays push execution head 7 The sliding slot 27 of guiding role, the length direction of sliding slot 27 is parallel with first direction, and first direction is horizontal direction, the second control Mechanism is oscillating cam mechanism.
Specifically, as depicted in figs. 1 and 2, cabinet 1 is equipped with the skin for part to be packaged to be delivered to specified location Band conveying mechanism, belt conveyor be it is horizontally disposed, push execution head 7 be used for will be conveyed by belt conveyor it is to be packaged Part is pushed up to specified location, and part to be packaged is made to be moved to next process.The belt conveyor includes first pulley 18, the second belt wheel 19 and the conveyer belt 8 being sheathed in first pulley 18 and the second belt wheel 19, first pulley 18 are set to second Driven shaft 15 and first pulley 18 and second driven shaft 15 are coaxial arrangement, the second belt wheel 19 be set on third driven shaft 16 and Second belt wheel 19 and third driven shaft 16 are coaxial arrangement, and the axis of second driven shaft 15 is equal with the axis of third driven shaft 16 It goes and the axis of second driven shaft 15 and the axis of third driven shaft 16 is in the same plane parallel with first direction.It is defeated Send that band 8 is sheathed on first pulley 18 and the second belt wheel 19 and first pulley 18 and the second belt wheel 19 are located at conveyer belt 8 The length direction of one end on length direction, conveyer belt 8 is parallel with first direction.First pulley 18 rotates about the axis thereof, the One belt wheel 18 driving conveyer belt 8 is operated, and conveyer belt 8 simultaneously drives the rotation of the second belt wheel 19.Conveyer belt 8 receives part to be packaged, It is moved to package on the top surface of conveyer belt 8, part to be packaged is delivered to push and executed at head 7 by conveyer belt 8.
As depicted in figs. 1 and 2, the first control mechanism be set on cabinet 1 and the first control mechanism and push execute head 7 and Cabinet 1 matches composition slider-crank mechanism, and the first control mechanism includes the first connecting rod 11 being rotatably arranged on cabinet 1 And the second connecting rod 12 that head 7 is rotatablely connected is executed with first connecting rod 11 and push, first connecting rod 11 and second connecting rod 12 are located at Push executes the lower section of head 7, the rotation centerline of first connecting rod 11 and first direction is perpendicular and the rotation of first connecting rod 11 in Heart line is located in horizontal plane.First connecting rod 11 is set on cabinet 1 by driving shaft 13, the axis of driving shaft 13 namely the first company The rotation centerline of bar 11, driving shaft 13 is set to one end on the length direction of first connecting rod 11 and driving shaft 13 and first connects Bar 11 is fixedly connected, and the other end on the length direction of first connecting rod 11 passes through the length side of first rotating shaft 21 and second connecting rod 12 Upward one end is rotatablely connected, and the other end on the length direction of second connecting rod 12 executes head 7 with push by the second shaft 22 The axis of rotation connection, the axis of first rotating shaft 21 and the second shaft 22 is parallel, the axis of first rotating shaft 21 and the second shaft 22 Line is simultaneously parallel with the axis of driving shaft 13 and second driven shaft 15, and first connecting rod 11 and second connecting rod 12 are simultaneously located at cabinet 1 Inside, the length of second connecting rod 12 are greater than the length of first connecting rod 11.First connecting rod 11 rotates, and is pushed away by the drive of second connecting rod 12 It send execution head 7 to be moved along sliding slot 27, realizes that push executes the moving along first direction of head 7, realize slider-crank mechanism Function, the second control mechanism and drive rod 10 and cooperate slider-crank mechanism synchronize acted, so that push is executed head 7 and carry out It swings, the push end for enabling push to execute head 7 moves linearly in a second direction, realizes the push for treating package and pushes away The reset for executing head 7 is sent, second direction is vertical direction and second direction and first direction are perpendicular.
Therefore, it is matched by the way that the first control mechanism of above structure is arranged with the second control mechanism, preferably goes out " slide crank The combined mechanism design scheme of block mechanism+oscillating cam mechanism ", slider-crank mechanism realize that push executes 7 class rectangle track of head It is vertical that the reciprocating movement of horizontal direction, oscillating cam mechanism and drive rod 10 match realization push execution 7 class rectangle track of head The up and down motion in direction.The components such as slider-crank mechanism, oscillating cam mechanism are combined together, the packaging driving means of formation Structure is simple, install compact, easily manufactures maintenance, and movement is reliable, and the accuracy of push execution 7 running track of head can be improved.
As shown in Figures 1 to 4, the second control mechanism is matched with drive rod 10, and control push executes the push end edge of head 7 Second direction moves in a straight line, and the second control mechanism includes being rotatably arranged on cabinet 1 and being rotatablely connected with drive rod 10 Third connecting rod 20, be rotatably arranged on cabinet 1 and for controlling the cam 9 and be set to that third connecting rod 20 is rotated The pin shaft 17 matched on third connecting rod 20 and with cam 9, the side of cam 9 are equipped with the track groove for allowing pin shaft 17 to be embedded in.Pin Axis 17 is set to one end of third connecting rod 20, and the other end and drive rod 10 of third connecting rod 20 are rotatablely connected, and third connecting rod 20 is It is set on cabinet 1 at position between the ends by support shaft 28.Third connecting rod 20 and drive rod 10 all have certain Length, pin shaft 17 are set to one end on the length direction of third connecting rod 20, the other end on the length direction of third connecting rod 20 It is rotatablely connected by one end on the length direction of third shaft 23 and drive rod 10, it is another on the length direction of drive rod 10 End executes head 7 with push by the 4th shaft 24 and is rotatablely connected, and the length of drive rod 10 is greater than the length of third connecting rod 20.Third The axis of shaft 23 is parallel with the axis of driving shaft 13 and first rotating shaft 21, and the second control mechanism and drive rod 10 are located at push It executes the lower section of head 7 and the second control mechanism and drive rod 10 is located at the inside of cabinet 1, drive rod 10, cam 9 and third connecting rod 20 are located at the lower section that push executes head 7.Support shaft 28 is set on cabinet 1, and cabinet 1 provides a supporting role support shaft 28, branch The axis for supportting axis 28 is parallel with the axis of third shaft 23, support shaft 28 be both ends on the length direction of drive rod 10 it Between position be in drive rod 10 and be fixedly connected, the axis of pin shaft 17 is parallel with the axis of support shaft 28, and pin shaft 17 has one Fixed length, one end on the length direction of pin shaft 17 are connect with third connecting rod 20, the other end on the length direction of pin shaft 17 It is inserted into the track groove of cam 9.
As shown in Figures 1 to 4, cam 9 is disc cam, and cam 9 is set on cabinet 1 by first driven shaft 14, the The axis of one driven shaft 14 namely the rotation centerline of cam 9, first driven shaft 14 are solid with cam 9 at the center of cam 9 Fixed connection, first driven shaft 14 and cam 9 are coaxial arrangement, and cabinet 1 provides a supporting role first driven shaft 14, and first is driven The axis of axis 14 is parallel with the axis of driving shaft 13 and second driven shaft 15, and first driven shaft 14 is located at second driven shaft 15 Lower section.Push, which executes head 7, has certain length and width, and it is along first party that push, which executes one end on the length direction of head 7, To the translation end for doing straight reciprocating motion, it is past to do straight line in a second direction that push executes the other end on the length direction of head 7 The push end moved again, translation end are located at the lower section at push end, and push end pushes end by initial bit for contacting with part to be packaged Beginning is set when moving up in a second direction, push end touches the part to be packaged on conveyer belt 8 first, and then pushing end will be to Package pushes up, and the final end that pushes is moved to the first top dead centre position, and push end stops movement, completes part to be packaged Push.After push execution head 7 completes push work, push executes head 7 and is resetted, and push end is made to be moved to initial position.
As shown in Figures 1 to 4, track groove is on the side for facing third connecting rod 20 of cam 9 initially towards in cam 9 The groove of the recessed formation in portion when cam 9 rotates, drives third connecting rod 20 to be rotated up and down, third connecting rod 20 by pin shaft 17 Drive rod 10 is driven to be swung.Second shaft 22 and the 4th shaft 24 are set to push and execute in the width direction of head 7 Between at position, on the length direction that push executes head 7, the second shaft 22 and the 4th shaft 24 be located at translation end and push end it Between, the second shaft 22 is simultaneously located between the 4th shaft 24 and translation end.The shape of the track groove of cam 9 is to execute head according to push 7 characteristics of motion is designed, and when treating package and being pushed, the motion profile that push executes the push end of head 7 is square Shape track, push end motion profile include the first trajectory line, the second trajectory line, third trajectory line and the 4th trajectory line, first Trajectory line, the second trajectory line, third trajectory line and the 4th trajectory line set gradually and are formed closed rectangular path, the first track Line and third trajectory line is parallel and the first trajectory line and third trajectory line are parallel with second direction, the second trajectory line and the 4th Trajectory line is parallel and the second trajectory line and the 4th trajectory line are parallel with first direction.Push end is moved along rectangular path Process be, push end moved first along the first trajectory line, move namely push end along the first trajectory line by initial position It begins to move up to the first top dead center position, then pushes end and moved along the second trajectory line, moved along the second trajectory line Namely push end is moved to the second top dead center position by the first top dead center position, then pushes end and is moved along third trajectory line It is dynamic, end is moved namely pushed along third trajectory line by the second top dead center position and is moved downward to bottom dead center position, finally pushes end It is moved along the 4th trajectory line, moves namely push initial position when end is moved by bottom dead center position along the 4th trajectory line, push away It send and executes the completion of head 7 push operation and reset.Moving direction and push end edge when push end is moved along the first trajectory line Moving direction when third trajectory line is moved on the contrary, moving direction when push end is moved along the second trajectory line with push away Moving direction when sending end is moved along the 4th trajectory line is opposite.First top dead center position and the second top dead center position be in On the parallel same straight line of first direction, the first top dead center position and the second top dead center position are in sustained height and are located at defeated Send the top of band 8, the distance between axis of the first top dead center position and first pulley 18 is less than the second top dead center position and the The distance between the axis of one belt wheel 18, the first top dead center position is close to first pulley 18, and the second top dead center position is close to second Belt wheel 19.Initial position and bottom dead center position are on the same straight line parallel with first direction, initial position and lower dead center Position is in sustained height and the height and position of initial position and bottom dead center position and the apical side height position of conveyer belt 8 are identical, Namely the either flush of initial position and bottom dead center position and conveyer belt 8, initial position be located at the first top dead center position just under Side, bottom dead center position are located at the underface of the second top dead center position.The direction of rotation of first connecting rod 11 and the direction of rotation of cam 9 Identical, first connecting rod 11 and cam 9 do 360 degree rotation movement, during push end is moved along rectangular path, translate end Straight reciprocating motion is done along first direction.When push end is moved along the first trajectory line, translation end is leaned on along first direction direction The initial position at nearly push end is moved;When push end is moved along the second trajectory line, end is translated along first direction court It is moved to the bottom dead center position close to push end;When push end is moved along third trajectory line, edge is continued at translation end First direction is moved towards at the bottom dead center position for pushing end;When push end is moved along the 4th trajectory line, put down It moves end and is moved along first direction towards the initial position close to push end.
As shown in Figures 1 to 5, when first connecting rod 11 and second connecting rod 12 are overlapped conllinear, idler wheel 26 is in limit on the left position It sets;When first connecting rod 11 and second connecting rod 12 are straightened conllinear, idler wheel 26 is in limit on the right-right-hand limit position.Such as Fig. 5, it is assumed that at idler wheel 26 At Derivative limit on the left or on the right position, angle is θ between two corresponding positions of first connecting rod 11, and driving shaft 13 and cam 9 are counterclockwise Rotation, using the limit on the right-right-hand limit position of idler wheel 26 as initial point, corresponding cam profile is in the position OA, starts in limit on the right-right-hand limit position When movement, then the push end for pushing execution head 7 moves downward, and cam 9 will be in actuating travel section at this time, and corresponding cam angle is Δ α, double solid line of the corresponding cam profile between OA and OB so that push end motion to be lower than translation end;When cam 9 continues When rotating 180 ° of-θ-Δ α, i.e., the position OA ' is turned to from OB, push at this time executes head 7 and moves to limit on the left position, i.e., first connects Bar 11 and second connecting rod 12 are overlapped collinearly, double solid line of the corresponding cam profile between OB and OA ', for etc. radius arcs (section of far stopping);When push movement is done at push end, push end is higher than translation end, it is desirable that cam 9 is in backhaul and rotates, and such as schemes 5, corresponding cam angle is Δ α, double solid line (reverse-running section) of the corresponding cam profile between OA ' and OB ';When cam 9 When continuing to rotate 180 ° of+θ-Δ α, i.e., the position OA turning to from OB ', push executes head 7 and moves to limit on the right-right-hand limit position at this time, i.e., and the One connecting rod 11 and 12 position of second connecting rod are that conllinear, double solid line of the corresponding cam profile between OB ' and OA is straightened, for etc. Radius arc (section of closely stopping).
As shown in Figure 1, Figure 2 and Figure 4, the width direction of push execution head 7 is parallel with the axis of driving shaft 13, and push is held Wardrobe 7 have the escape groove for allowing the conveyer belt 8 of belt conveyor to pass through, and escape groove is since the end face at push end along push The groove that the length direction of head 7 is formed towards the internal recess that push executes head 7 is executed, escape groove is rectangular channel, and escape groove is simultaneously For along the thickness direction for executing head 7 is pushed through setting, the width of escape groove is not less than the width of conveyer belt 8, and be staggered conveyer belt 8, so that it will not interfere conveyer belt 8 to transport part to be packaged.
As shown in Figure 1, Figure 2 and Figure 4, executing head control assembly further includes connecting with the first control mechanism and the second control mechanism The synchronous drive mechanism for connecing and making the first control mechanism and the second control mechanism to operate synchronously, synchronous drive mechanism simultaneously drive with synchronous The belt conveyor of motivation structure connection.Synchronous drive mechanism includes and first connecting rod 11 connects and rotation synchronous with first connecting rod 11 The driving gear 2 that turns, connect with cam 9 and with the first driven gear 4 of 9 synchronous rotary of cam and with driving gear 2 and the The transmission belt 3 that one driven gear 4 matches, transmission belt 3 are synchronous toothed belt.Driving gear 2 is set on driving shaft 13 and master Moving gear 2 is to be fixedly and coaxially connected with driving shaft 13, and the first driven gear 4 is set in first driven shaft 14 and the first driven tooth Wheel 4 is to be fixedly and coaxially connected with first driven shaft 14, and driving gear 2 and the first driven gear 4 are engaged with transmission belt 3.Second from Moving axis 15 is equipped with the second driven gear 5, and the second driven gear 5 is to be fixedly and coaxially connected with second driven shaft 15, and third is driven Axis 16 is equipped with third driven gear 6, and third driven gear 6 is to be fixedly and coaxially connected with third driven shaft 16, the second driven tooth Wheel 5 and third driven gear 6 are engaged with transmission belt 3, transmission belt 3, driving gear 2, the first driven gear 4, the second driven gear 5 It is located at the outside of cabinet 1 with third driven gear 6 and is located at the same side of cabinet 1, driving gear 2, the first driven gear 4, the Two driven gears 5 and 6 synchronous rotary of third driven gear and driving gear 2, the first driven gear 4, the second driven gear 5 and The direction of rotation of three driven gears 6 is identical, realizes operating synchronously for each mechanism.Driving shaft 13 and motor (not shown) connect It connecing, motor is for providing the driving force for rotating driving shaft 13, after motor drive driving shaft 13 rotates, driving gear 2 drive the first driven gear 4,6 synchronous rotary of the second driven gear 5 and third driven gear by transmission belt 3.
As shown in Figure 1, Figure 2 and Figure 4, sliding slot 27 is to be set on the side wall of cabinet 1, sliding slot 27 have certain length and The length direction of sliding slot 27 is parallel with first direction, sliding slot 27 be arranged two and two sliding slots 27 be it is positioned opposite, push is held Wardrobe 7 are located between two sliding slots 27, and push executes head 7 and is equipped with the 5th shaft 25, the axis and driving shaft of the 5th shaft 25 13 axis is parallel, and the 5th shaft 25 is set to translation end and the shifting synchronous with translation end of the 5th shaft 25 that push executes head 7 Dynamic, the 5th shaft 25 is simultaneously stretched out towards the two sides in the width direction of push execution head 7, and the 5th shaft 25 is equipped with and sliding slot 27 Inner wall face contact and rotatable idler wheel 26, idler wheel 26 be cylindrical body, idler wheel 26 and the 5th shaft 25 are to be coaxially disposed, idler wheel The axis of 26 rotation centerline namely the 5th shaft 25.Idler wheel 26 is embedded in sliding slot 27, the periphery and sliding slot 27 of idler wheel 26 In inner wall face contact, push execute head 7 moved along first direction when, push execute head 7 drive 25 He of the 5th shaft 26 synchronizing moving of idler wheel, while idler wheel 26 is rolled along the inner wall of sliding slot 27, is formed rolling friction, can greatly be reduced Push executes required torque when the movement of head 7, increases whole device working efficiency.Idler wheel 26 is arranged two, and two idler wheels 26 are distinguished The side of head 7 is executed positioned at push, two idler wheels 26 are respectively embedded into a sliding slot 27 and form rolling friction with cabinet 1.
In the present embodiment, part to be packaged is the cigarette packet for packing cigarette.
The packaging driving means of the utility model, push execute head 7 and pass through formation turn between the 5th shaft 25 and idler wheel 26 Dynamic pair constitutes prismatic pair further through the sliding slot 27 on idler wheel 26 and cabinet, at the same with second connecting rod 12, first connecting rod 11 constitutes Planar crank and slidermechanism, thus, realize that push executes the horizontal direction linear reciprocating motion of head 7 when first connecting rod 11 rotates; Push executes 7 one side idler wheel 26 of head and constitutes prismatic pair with the sliding slot 27 on cabinet, and on the other hand again with drive rod 10, third connects Bar 20 and cabinet 1 constitute planar five-bar mechanism;One end of third connecting rod 20 is driven by oscillating cam 9, realizes that push executes First 7 up and down motion;By the Precise spraying of 9 contour line of oscillating cam, one end of third connecting rod 20 can be made, drive five bar of plane Mechanism, and then move execution head 7 straight up near an extreme position of its horizontal direction linear reciprocating motion, another One extreme position nearby moves straight down, to realize that packaged part presses the accurate push of rectangular path.
The utility model is exemplarily described in conjunction with attached drawing above.Obviously, the utility model implements not It is limited by aforesaid way.As long as the various unsubstantialities that the method concept and technical solution that use the utility model carry out Improvement;Or it is not improved, the above-mentioned conception and technical scheme of the utility model are directly applied into other occasions, at this Within the protection scope of utility model.

Claims (10)

1. packing driving means, including cabinet, push execute head and execute head for control push and moved along setting track Execution head control assembly, it is characterised in that: executions head control assembly includes connecting and being used for push execution head Control push execute head moved in a straight line along first direction the first control mechanism, the second control mechanism and with the second control machine Structure executes the drive rod that head connects with push, and the cabinet, which has, executes the sliding slot that head play the guiding role, the length of sliding slot to push It is parallel with first direction to spend direction, the second control mechanism is oscillating cam mechanism.
2. packaging driving means according to claim 1, it is characterised in that: first control mechanism is set to the case On body and the first control mechanism executes head with the push and cabinet matches composition slider-crank mechanism.
3. packaging driving means according to claim 2, it is characterised in that: first control mechanism includes rotatable The first connecting rod being set on the cabinet and the second connecting rod with first connecting rod and the push execution head rotation connection, the One connecting rod and second connecting rod are located at the lower section that push executes head.
4. packaging driving means according to claim 3, it is characterised in that: second control mechanism and the drive rod It matches, controls push execution head and move in a straight line in a second direction, first direction and second direction are perpendicular and second Direction is vertical direction, and the second control mechanism includes for being rotatably arranged on the cabinet and connecting with drive rod rotation Three-link is rotatably arranged on cabinet and for controlling the cam and be set to third connecting rod that third connecting rod is rotated And the pin shaft matched with cam, the side of cam are equipped with the track groove for allowing pin shaft to be embedded in.
5. packaging driving means according to claim 4, it is characterised in that: the pin shaft is set to the third connecting rod One end, the other end of third connecting rod are connect with the drive rod rotation, and third connecting rod is to pass through branch at position between the ends Support axis is set on the cabinet.
6. packaging driving means according to claim 4, it is characterised in that: the drive rod, the cam and described Three-link is located at the lower section that the push executes head.
7. according to any packaging driving means of claim 4 to 6, it is characterised in that: the execution head control assembly is also Including connecting and making the first control mechanism and the second control mechanism same with first control mechanism and second control mechanism Walk the synchronous drive mechanism of operating.
8. packaging driving means according to claim 7, it is characterised in that: the synchronous drive mechanism includes and described One connecting rod is connected and is connect with the driving gear of first connecting rod synchronous rotary, with the cam and first with cam synchronous rotary Driven gear and the transmission belt matched with driving gear and the first driven gear.
9. packaging driving means according to claim 8, it is characterised in that: the transmission belt is synchronous toothed belt.
10. packaging driving means according to claim 8, it is characterised in that: the cabinet is equipped with for will be to be packaged The belt conveyor that part is delivered to specified location and connect with the synchronous drive mechanism, the push execution head, which has, to be allowed The escape groove that the conveyer belt of belt conveyor passes through.
CN201821477199.7U 2018-09-11 2018-09-11 Pack driving means Expired - Fee Related CN208683196U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821477199.7U CN208683196U (en) 2018-09-11 2018-09-11 Pack driving means

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821477199.7U CN208683196U (en) 2018-09-11 2018-09-11 Pack driving means

Publications (1)

Publication Number Publication Date
CN208683196U true CN208683196U (en) 2019-04-02

Family

ID=65888486

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821477199.7U Expired - Fee Related CN208683196U (en) 2018-09-11 2018-09-11 Pack driving means

Country Status (1)

Country Link
CN (1) CN208683196U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108910146A (en) * 2018-09-11 2018-11-30 安徽工程大学 Pack driving means

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108910146A (en) * 2018-09-11 2018-11-30 安徽工程大学 Pack driving means
CN108910146B (en) * 2018-09-11 2024-02-23 安徽工程大学 Packaging pushing device

Similar Documents

Publication Publication Date Title
CN204658620U (en) Belt material pressing belt fluting automatic double-end edge bander
CN206759264U (en) A kind of rocker-arm picks and places material manipulator
CN207973177U (en) A kind of pen tip transport mechanism
CN208683196U (en) Pack driving means
CN209431792U (en) Drying device after a kind of cleaning of the automobile gear that using effect is good
CN107986021A (en) A kind of feeding manipulator
CN211253127U (en) Cigarette packet packing system
CN108910146A (en) Pack driving means
CN202038698U (en) Rubber plate conveying device for automatic capsule production line
CN207078407U (en) A kind of Di Cha mechanisms of packaging bag folding machine
US4139090A (en) Article transfer mechanism
CN108455512A (en) A kind of high-speed canning line bottle separating device
CN212862102U (en) Water bamboo head food package is with device of bundling flower
CN105904188B (en) A kind of assembling feeding device of spray filling bottle
CN105692047A (en) Double-track feeding structure
CN109229592B (en) Folding and conveying device and method for cigarette trademark inner frame paper
CN209097730U (en) Turntable rotary lifting mechanism
CN208853505U (en) A kind of formed punch transmission device
CN116160520A (en) Solid wood board splicing machine controlled by mechanical interlocking
CN109835525A (en) A kind of shifting material device of connector package machine
TWI403382B (en) Turning on and off device of a splash guard of a machine tool
CN205852179U (en) A kind of assembling feeding device of spray filling bottle
CN204763732U (en) Automatic transport shoe material equipment
CN210312035U (en) Gantry crane on double-layer oven
CN104118603A (en) Cam mechanism of paper box opening mechanism

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190402

Termination date: 20190911

CF01 Termination of patent right due to non-payment of annual fee