CN208681526U - A kind of tooling for the splicing of prefabricated cabin scene - Google Patents
A kind of tooling for the splicing of prefabricated cabin scene Download PDFInfo
- Publication number
- CN208681526U CN208681526U CN201821111643.3U CN201821111643U CN208681526U CN 208681526 U CN208681526 U CN 208681526U CN 201821111643 U CN201821111643 U CN 201821111643U CN 208681526 U CN208681526 U CN 208681526U
- Authority
- CN
- China
- Prior art keywords
- cabin
- tooling
- screw rod
- splicing
- prefabricated cabin
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model provides a kind of tooling for the splicing of prefabricated cabin scene, spliced prefabricated cabin includes multiple cabin modules, cabin module is equipped with container angle, the tooling includes screw rod and two fasteners, screw rod is connected with fastener by trapezoidal thread, the fastener screw rod left and right sides and be installed on it, its thread rotary orientation is opposite, when prefabricated cabin scene is spliced, described two fasteners are separately mounted on the container angle of adjacent compartment module, the gap between adjacent compartment module can be reduced by extension arm pipe wrench rotary screw rod, this tooling is in efficiency, it is all more prominent in safety, the quick splicing of prefabricated cabin cabin can be achieved.
Description
Technical field
The utility model relates to spliced prefabricated cabins more particularly to prefabricated cabin scene to splice the tooling used.
Background technique
Currently, prefabricated cabin formula substation is because its construction period is short, occupied area is small, at low cost is widely used.Usual feelings
The overall dimensions of prefabricated cabin can be bigger under condition, but cabin can be all restricted on length, width dimensions when actual shipment,
So prefabricated cabin must be divided into multiple cabin module fragmented transports carry out splicing sealing again to construction site.In the prior art
It usually uses crane substantially to hang cabin module to predetermined position, still has a small distance needs between adjacent cabin module
Adjustment.Construction site in most cases uses jack to be drawn together adjacent cabin module at present, such method
Shortcoming be:
1. the gap efficiency adjusted between cabin using jack is lower, difficulty of construction is big;
2. adjusting the forced area small deformation for easily causing material in the contact point gap Shi Yinqi between cabin using jack;
3. being easy to happen safety accident caused by wire cable rupture when adjusting gap between cabin using jack;
Summary of the invention
The technical problem to be solved by the utility model is to provide a kind of toolings for the splicing of prefabricated cabin scene, solve
Jack low efficiency is used in the prior art, and difficulty of construction is big, the deformation of cabin material, the defect of Yi Fasheng safety accident.
In order to achieve the above objectives, the utility model adopts the following technical solutions:
A kind of tooling for the splicing of prefabricated cabin scene, it is characterised in that: including screw rod and two for being caught in cabin mould
Fastener in block corner fittings, two fasteners pass through the oppositely oriented two sides for being threadably mounted at screw rod.
The oppositely oriented screw thread is trapezoidal thread.
Aid position is provided among the screw rod.
The cross section at the aid position is polygon.
The fastener bottom has the hook that can be caught in cabin module corner fittings.
The beneficial effects of the utility model are:
The utility model provides a kind of tooling for the splicing of prefabricated cabin scene, and screw rod and fastener are connected using trapezoidal thread
It connects, trapezoidal thread can be driven big torque, and thread rotary orientation at left and right sides of screw rod is on the contrary, when rotary screw rod, matched card
Part can be to movement among screw rod.When the splicing of prefabricated cabin scene, can be spliced simultaneously using multiple toolings, it is time saving and energy saving, it is real
Quick, the safe and efficient adjustment in gap between existing prefabricated cabin.
Detailed description of the invention
Fig. 1 is the tool structure schematic diagram.
Fig. 2 is that position sectional view is accommodated among screw rod.
Fig. 3 is fastener schematic diagram.
In figure: 1, cabin module 1, one corner fittings of cabin module
3, fastener 1, screw rod 5, fastener two
6, two corner fittings 7 of cabin module, cabin module 28, retaining part
Specific embodiment
The utility model is described in further detail presently in connection with attached drawing.These attached drawings are simplified schematic diagram, only
Illustrate the basic structure of the utility model in a schematic way, therefore it only shows composition related with the utility model.
A kind of tooling for the splicing of prefabricated cabin scene as shown in Figure 1, is made of screw rod 4 and fastener 1, fastener 5 two.
When prefabricated cabin module is spliced at the scene, optimal effect is between two neighboring cabin there is no gap, but actual field
Can all there be certain gap when lifting, as shown in fig. 1, there is between cabin module 1 and cabin module 27 certain
Gap, it is quickly safe this gap of reduction that we are to be solved.
As shown in Figure 1, fastener 1 and fastener 25 are separately mounted to the two sides of screw rod 4, wherein the screw thread of 4 two sides of screw rod is
Trapezoidal thread can transmit big torque, 4 two sides thread rotary orientation of screw rod on the contrary, 4 middle section of screw rod be aid position 8, section
Face figure is illustrated in figure 2 polygon, and the fastener 1 and 25 thread rotary orientation of fastener on installation screw rod 4 are also opposite.Fastener 1
It is as shown in Figure 3 with 25 schematic diagram of fastener.
When the splicing of scene, the position of tooling two sides fastener 1 and fastener 25 is adjusted first, fastener 1 is enable to be caught in cabin
In one corner fittings 2 of module, fastener 25 can be caught in two corner fittings 6 of cabin module, it should be pointed out that cabin can be with when splicing
Multiple toolings are used simultaneously, and tooling installation site is respectively the contact position of other corner fittings of two neighboring cabin module.When with
Extension arm pipe wrench, which accommodates, accommodates position 8 in the middle part of screw rod, when rotating pipe wrench, fastener 1 and fastener 25 will be moved to screw rod center
It is dynamic, correspondingly, the gap between cabin module 1 and cabin module 27 will reduce.
It should be pointed out that the arm of pipe wrench is longer, power needed for rotary screw rod will be smaller, and when usual site operation has
Many methods reach this purpose.
It is enlightenment, through the above description, relevant staff with the above-mentioned ideal case according to the utility model
Completely various changes and amendments can be carried out in the range of without departing from this item utility model technical idea.This item is practical
Novel technical scope is not limited to the contents of the specification, it is necessary to determine that its is technical according to scope of the claims
Range.
Claims (5)
1. a kind of tooling for the splicing of prefabricated cabin scene, it is characterised in that: including screw rod and two for being caught in cabin module
Fastener in corner fittings, two fasteners pass through the oppositely oriented two sides for being threadably mounted at screw rod.
2. a kind of tooling for the splicing of prefabricated cabin scene according to claim 1, it is characterised in that: described oppositely oriented
Screw thread be trapezoidal thread.
3. a kind of tooling for the splicing of prefabricated cabin scene according to claim 1, it is characterised in that: among the screw rod
It is provided with aid position.
4. a kind of tooling for the splicing of prefabricated cabin scene according to claim 3, it is characterised in that: the aid position
Cross section be polygon.
5. a kind of tooling for the splicing of prefabricated cabin scene according to claim 1, it is characterised in that: the fastener bottom
With the hook that can be caught in cabin module corner fittings.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821111643.3U CN208681526U (en) | 2018-07-13 | 2018-07-13 | A kind of tooling for the splicing of prefabricated cabin scene |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821111643.3U CN208681526U (en) | 2018-07-13 | 2018-07-13 | A kind of tooling for the splicing of prefabricated cabin scene |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208681526U true CN208681526U (en) | 2019-04-02 |
Family
ID=65881023
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821111643.3U Active CN208681526U (en) | 2018-07-13 | 2018-07-13 | A kind of tooling for the splicing of prefabricated cabin scene |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208681526U (en) |
-
2018
- 2018-07-13 CN CN201821111643.3U patent/CN208681526U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207553393U (en) | Frame curtain wall multi-angle corner structure | |
CN203717730U (en) | Normally closed brake and normally closed brake type slewing mechanism | |
CN205497465U (en) | Production of computer lab floor is with pile up neatly machinery hand | |
CN208681526U (en) | A kind of tooling for the splicing of prefabricated cabin scene | |
CN203212225U (en) | Shear mode nickel ore grab bucket | |
CN112658665A (en) | Self-adaptive electric sleeve for robot and robot | |
CN208218202U (en) | A kind of crane grabbing device | |
CN216711362U (en) | Container assembled hoist and mount fixing device | |
CN217350501U (en) | But angle of rotation's crane boom head pulley gear | |
CN202323727U (en) | Device for adjusting horizontal position of steel box girder | |
CN202208526U (en) | Gripping mechanism with self-locking function | |
CN214237027U (en) | Self-adaptive electric sleeve and robot | |
CN206625410U (en) | Load welding system under keel | |
CN208479358U (en) | A kind of running driver facilitating installation | |
CN110195428B (en) | Ship bearing box of gravity balance ship lift | |
CN203740803U (en) | Adjustable guide rail connecting support | |
CN106207847A (en) | A kind of cable maintenance robot | |
CN204732431U (en) | A kind of solar cell busbar exit alignment automatic air ballooning unit | |
CN208345607U (en) | Automatic yard high-speed track hangs safety work with self-service pusher | |
CN202429899U (en) | Bridge crane and tilting mechanism thereof | |
CN2878632Y (en) | Door structure for large-scale plane maintenance garbage | |
CN201496596U (en) | Adjustable-stroke stop block structure for linear motion valve | |
CN204524226U (en) | A kind of full servo driven type air injection machine | |
CN202716529U (en) | Lifting adjusting device of four-column laminator | |
CN111009051A (en) | Track device and inspection system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |