CN208678771U - A kind of wet-method desulfurized fume processing unit - Google Patents

A kind of wet-method desulfurized fume processing unit Download PDF

Info

Publication number
CN208678771U
CN208678771U CN201821215256.4U CN201821215256U CN208678771U CN 208678771 U CN208678771 U CN 208678771U CN 201821215256 U CN201821215256 U CN 201821215256U CN 208678771 U CN208678771 U CN 208678771U
Authority
CN
China
Prior art keywords
filler
wet
pipeline
desulfurizing tower
processing unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821215256.4U
Other languages
Chinese (zh)
Inventor
张柱
王静波
王艳敏
刘兵
杨佳
杨洁
邵小强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qinhuangdao Zhuochuang Environmental Technology Development Co Ltd
Original Assignee
Qinhuangdao Zhuochuang Environmental Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qinhuangdao Zhuochuang Environmental Technology Development Co Ltd filed Critical Qinhuangdao Zhuochuang Environmental Technology Development Co Ltd
Priority to CN201821215256.4U priority Critical patent/CN208678771U/en
Application granted granted Critical
Publication of CN208678771U publication Critical patent/CN208678771U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treating Waste Gases (AREA)

Abstract

The utility model provides a kind of wet-method desulfurized fume processing unit, including wet desulfuration tower and the former flue gas pipeline and neat stress pipeline that are connect with institute wet desulfuration tower, bypass line is additionally provided between the neat stress pipeline and the former flue gas pipeline, the bypass line is equipped with regulating valve, the outlet end of the neat stress pipeline is connected with filler desulfurizing tower, desulfurization filler is equipped with inside the filler desulfurizing tower, the filler desulfurizing tower is connect with discharge pipe.Instead of traditional GGH system, solves the problems such as traditional GGH system gas leakage, burn into system jams.Chimney breast is also solved simultaneously a large amount of white cigarette (condensing water vapor) phenomenons occurs.

Description

A kind of wet-method desulfurized fume processing unit
Technical field
The utility model relates to technical field of environmental protection facilities, especially a kind of wet-method desulfurized fume processing unit.
Background technique
It is administered about current domestic atmospheric haze, wet desulphurization exhaust emissions is that arch-criminal is gradually held by experts and scholars Recognize, control wet desulphurization tail gas saturation vapour discharge is the key that administer haze.
According to external experience, wet desulphurization island usually requires installation smoke re-heater and (claims GGH, Gas gas in the industry Heater), flue-gas temperature 80 degree or more are lifted to discharge.It is discharged using 80 degree or more high-temperature flue gas, this is in many flourishing states Family is to discharge rigid standard.For example, " large-scale combustion apparatus method " regulation of Germany, chimney inlet temperature must not be lower than 72 DEG C;English State provides that exhaust gas temperature must not be lower than 80 DEG C, and Japan's regulation exhaust gas temperature is at 90-100 DEG C.It is using the technique that GGH heats flue gas External early mature technology, but occur new problem, GGH seriously corroded, system jams in China's large area.It removes other Road flue, when GGH goes wrong and needs repairing, boiler is unable to operate normally.So the GGH built earliest is gradually removed, after Wet desulphurization is built at all just without GGH.Leading to domestic wet desulphurization tail gas is the saturation vapour discharge of temperature 60 C or so, chimney There are a large amount of condensing water vapors in outlet.
Desulfidation tail gas processing is bad, and a large amount of condensation vapors just will appear a large amount of gypsum rains near chimney.Even if not occurring Gypsum rain, a large amount of calcium sulfate, which are diffused into atmosphere, forms aerosol, just will appear haze phenomenon when air humidity is sufficiently large.
So how to provide a kind of wet-method desulfurized fume processing unit, solve because of the too low bring of exhaust emissions temperature Many problem of environmental pollutions are current those skilled in the art technical problems urgently to be resolved.
Utility model content
In view of this, the present invention provides a kind of wet-method desulfurized fume processing unit, solution is deposited in the prior art Defect, concrete scheme is as follows:
A kind of wet-method desulfurized fume processing unit is connect including wet desulfuration tower 10 and with institute wet desulfuration tower 10 Former flue gas pipeline 20 and neat stress pipeline 21 are additionally provided with side between the neat stress pipeline 21 and the former flue gas pipeline 20 Siphunculus road 30, the bypass line 30 are equipped with regulating valve 31, and the outlet end of the neat stress pipeline 21 is connected with filler desulfurization Tower 40, desulfurization filler 41 is equipped with inside the filler desulfurizing tower 40, and the filler desulfurizing tower is connect with discharge pipe 22.
Specifically, the main component of the desulfurization filler 41 is CaO, CaOH.
Specifically, it is 72 degrees Celsius that the regulating valve 31, which adjusts the mixed gas temperature entered in the filler desulfurizing tower 40, More than.
Specifically, it is 80 degrees Celsius that the regulating valve 31, which adjusts the mixed gas temperature entered in the filler desulfurizing tower 40, Or 90 degrees Celsius or 100 degrees Celsius.
The utility model adds flue gas mixing by-pass line between wet desulphurization device inlet and outlet flue, and setting is adjusted Valve is exported between chimney in wet desulphurization neat stress and adds filler desulfurizing tower, and import is connect with neat stress flue, outlet and cigarette Chimney connection, compared with prior art, has the advantage, that 1, instead of traditional GGH system, solves traditional GGH system gas leakage, corruption The problems such as erosion, system jams.2, it solves chimney breast and a large amount of white cigarette (condensing water vapor) phenomenons occurs.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or required attached drawing is briefly described in description of the prior art, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of utility model, for those of ordinary skill in the art, without creative efforts, also Other drawings may be obtained according to these drawings without any creative labor.
Fig. 1 is the utility model structure diagram;
In figure: 10, wet desulfuration tower 20, former flue gas pipeline 21, neat stress pipeline 22, discharge pipe 30, bypass pipe Road 31, regulating valve 40, filler desulfurizing tower 41, desulfurization filler.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1 is the overall structure diagram of the utility model, shown referring to Fig.1, and the utility model is claimed a kind of wet Method flue gas after desulfurization processing unit, including wet desulfuration tower 10 and the former flue gas pipeline 20 being connect with institute wet desulfuration tower 10 with And neat stress pipeline 21, it is additionally provided with bypass line 30 between the neat stress pipeline 21 and the former flue gas pipeline 20, it is described Bypass line 30 is equipped with regulating valve 31, and the outlet end of the neat stress pipeline 21 is connected with filler desulfurizing tower 40, the filler Desulfurization filler 41 is equipped with inside desulfurizing tower 40, the filler desulfurizing tower is connect with discharge pipe 22.
Specifically, the main component of the desulfurization filler 41 is CaO, CaOH, auxiliary material is added and passes through extrusion forming, takes off There is micropore on 41 surface of sulphur filler, can adsorb calcium sulfate particle and dust, so as to further reach dust removing effects, makes wet process Flue gas after desulfurization dust reaches 10mmg/m3 or less.
Specifically, it is 72 degrees Celsius that the regulating valve 31, which adjusts the mixed gas temperature entered in the filler desulfurizing tower 40, More than.
Specifically, it is 80 degrees Celsius that the regulating valve 31, which adjusts the mixed gas temperature entered in the filler desulfurizing tower 40, Or 90 degrees Celsius or 100 degrees Celsius.
System Working Principle: former 150 DEG C of flue gas becomes about 60 DEG C of clean flue gases after entering wet desulfuration tower 10, passes through side Siphunculus road 30 is mixed with the former flue gas in part, becomes 72-100 DEG C of mixed flue gas, mixed flue gas pass through again filler desulfurizing tower 40 into Row SO2 removing eventually becomes 72-100 DEG C degree Celsius of unsaturated neat stress discharge.
The embodiments of the present invention are described above in conjunction with attached drawing, but the utility model is not limited to The specific embodiment stated, the above mentioned embodiment is only schematical, rather than restrictive, this field it is common Technical staff is not departing from the utility model aims and scope of the claimed protection situation under the enlightenment of the utility model Under, many forms can be also made, these are belonged within the protection of the utility model.

Claims (4)

1. a kind of wet-method desulfurized fume processing unit, including wet desulfuration tower and the former flue gas being connect with institute wet desulfuration tower Pipeline and neat stress pipeline, it is characterised in that: be additionally provided with bypass between the neat stress pipeline and the former flue gas pipeline Pipeline, the bypass line are equipped with regulating valve, and the outlet end of the neat stress pipeline is connected with filler desulfurizing tower, the filler Desulfurization filler is equipped with inside desulfurizing tower, the filler desulfurizing tower is connect with discharge pipe.
2. a kind of wet-method desulfurized fume processing unit according to claim 1, it is characterised in that: the desulfurization filler Main component is CaO, CaOH.
3. a kind of wet-method desulfurized fume processing unit according to claim 1 or 2, it is characterised in that: the regulating valve Adjusting the mixed gas temperature entered in the filler desulfurizing tower is 72 degrees Celsius or more.
4. a kind of wet-method desulfurized fume processing unit according to claim 3, it is characterised in that: the adjusting valve regulation It is 80 degrees Celsius or 90 degrees Celsius or 100 degrees Celsius into the mixed gas temperature in the filler desulfurizing tower.
CN201821215256.4U 2018-07-23 2018-07-23 A kind of wet-method desulfurized fume processing unit Expired - Fee Related CN208678771U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821215256.4U CN208678771U (en) 2018-07-23 2018-07-23 A kind of wet-method desulfurized fume processing unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821215256.4U CN208678771U (en) 2018-07-23 2018-07-23 A kind of wet-method desulfurized fume processing unit

Publications (1)

Publication Number Publication Date
CN208678771U true CN208678771U (en) 2019-04-02

Family

ID=65883020

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821215256.4U Expired - Fee Related CN208678771U (en) 2018-07-23 2018-07-23 A kind of wet-method desulfurized fume processing unit

Country Status (1)

Country Link
CN (1) CN208678771U (en)

Similar Documents

Publication Publication Date Title
CN103591599B (en) Discharged flue gas self-heating technology of wet flue gas desulfurization and desulfuration purified flue gas self-heating device
CN208911779U (en) A kind of suitable semi-dry process flue gas desulphurization system takes off white device
CN101357285B (en) Vertical type flue dust, sulphur dioxide eliminator
CN201263947Y (en) Vertical type smoke and sulfuric dioxide canceler
CN201701871U (en) Desulfuration, denitration, decarburization, dedusting and black smoke removing integrated equipment
CN208678771U (en) A kind of wet-method desulfurized fume processing unit
CN105327602A (en) Floating glass melting furnace flue gas waste heat utilization and denitration purification treatment device
CN101837239B (en) System for dehydration of acid mist dust of plaster and dust removal and desulfurization of fluidized bed furnace by baking by using residual heat
CN205550020U (en) Wet flue gas desulfurization dust collector
CN206131026U (en) Industrial boiler flue gas processing system
CN205796897U (en) Two-way Cycle reducing desulfurizing adsorption system
CN208694686U (en) A kind of flue gas for power industry wet desulphurization takes off white system
CN209495343U (en) A kind of device of boiler chimney plume removing
CN102746904A (en) Treating device and treating process for waste gas produced in pyrolysis of waste rubber and plastics
CN207680377U (en) A kind of glass fiber kiln exhaust-gas treatment integration apparatus
CN207716886U (en) A kind of ceramic kiln tails dedusting purification system
CN202315653U (en) Device for lowering humidity of discharged smoke of wet desulphurization system
CN105879588A (en) Double-circulation diameter-variable desulfurization and absorption system and method
CN207894258U (en) It is a kind of to eliminate the flat device for burning sintering flue gas white plume of step-by-step movement
CN108619826A (en) High-temperature dust removal denitration desulfurizer and method
CN208526296U (en) A kind of desulfurizing dust-collector rapidly and efficiently
CN2810729Y (en) Apparatus for increasing fume emission temperature through mixing untreated fume with wet-method desulfurization fume
CN205948674U (en) Ultralow discharging equipment of coal fired boiler smoke pollutants
CN207316955U (en) A kind of desulfurization fume exhaust system
CN101700465B (en) Integrative chimney for smoke dispersal, dust removal and desulphurization

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190402

Termination date: 20200723

CF01 Termination of patent right due to non-payment of annual fee