CN205948674U - Ultralow discharging equipment of coal fired boiler smoke pollutants - Google Patents
Ultralow discharging equipment of coal fired boiler smoke pollutants Download PDFInfo
- Publication number
- CN205948674U CN205948674U CN201620755193.6U CN201620755193U CN205948674U CN 205948674 U CN205948674 U CN 205948674U CN 201620755193 U CN201620755193 U CN 201620755193U CN 205948674 U CN205948674 U CN 205948674U
- Authority
- CN
- China
- Prior art keywords
- pollutants
- flue gas
- dust
- dust removal
- coal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A50/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE in human health protection, e.g. against extreme weather
- Y02A50/20—Air quality improvement or preservation, e.g. vehicle emission control or emission reduction by using catalytic converters
- Y02A50/2351—Atmospheric particulate matter [PM], e.g. carbon smoke microparticles, smog, aerosol particles, dust
Landscapes
- Treating Waste Gases (AREA)
- Chimneys And Flues (AREA)
Abstract
一种燃煤锅炉烟气污染物超低排放装置,涉及燃煤烟气污染物排放设备的改进,其特征是:锅炉排烟口通过脱硝SCR反应器与布袋除尘器密闭联通,布袋除尘器与高效脱硫除雾除尘一体化装置密闭联通,在高效脱硫除雾除尘一体化装置出口增加湿式静电除尘器,烟道经过湿式静电除尘器、烟气换热器密闭联通烟囱。有益效果是:对单一设备进行局部技术改造,利用多种设备对多种污染物“协同脱除”的方式,使烟囱排放大气中的污染物达到:粉尘≤5mg/Nm3;SO2≤35mg/Nm3;NOX≤50mg/Nm3。
An ultra-low emission device for coal-fired boiler flue gas pollutants, which relates to the improvement of coal-fired flue gas pollutant emission equipment. The high-efficiency desulfurization, fog and dust integrated device is sealed and connected, and a wet electrostatic precipitator is added at the outlet of the high-efficiency desulfurized, fog and dust integrated device. The flue passes through the wet electrostatic precipitator and the flue gas heat exchanger to seal the chimney. The beneficial effect is: local technical transformation of a single device, and the use of multiple devices to "coordinated removal" of multiple pollutants, so that the pollutants in the chimney discharge atmosphere can reach: dust ≤ 5mg/Nm 3 ; SO 2 ≤ 35mg /Nm 3 ; NO X ≤50mg/Nm 3 .
Description
技术领域technical field
本实用新型属于环保设备技术领域,涉及燃煤烟气污染物排放设备的改进。The utility model belongs to the technical field of environmental protection equipment and relates to the improvement of coal-fired flue gas pollutant discharge equipment.
背景技术Background technique
目前,在燃煤过程中产生的废气排放,要进行粉尘、SO2、NOX、等处理,以达到环保要求,而现有的污染物治理设备是单一设备脱除单一污染物,在使用过程中都已达到国家现执行的GB13223-2011《火电厂大气污染物排放标准》要求,除尘设备除尘≤30mg/Nm3、脱硫设备脱SO2≤100mg/Nm3、脱硝设备脱NOX≤100mg/Nm3。而除尘、脱硫、脱硝同时进行就会使设备复杂化,对维护、运行费用高,有时排放污染处理不达标。At present, the exhaust gas generated in the process of burning coal needs to be treated with dust, SO2, NOX, etc. to meet the requirements of environmental protection. However, the existing pollutant treatment equipment is a single equipment to remove a single pollutant. It has met the requirements of GB13223-2011 "Emission Standard of Air Pollutants for Thermal Power Plants" currently implemented by the country. Dust removal equipment for dust removal is ≤30mg/Nm3, SO2 removal for desulfurization equipment is ≤100mg/Nm3, and NOX removal for denitrification equipment is ≤100mg/Nm3. Simultaneous dedusting, desulfurization, and denitrification will complicate the equipment, increase maintenance and operation costs, and sometimes discharge pollution treatment is not up to standard.
针对我国日益严峻的大气污染形势及国家对重点地区“超低排放”的严格要求,烟囱排放的固体浓度不大于10mg/Nm3。In view of my country's increasingly severe air pollution situation and the country's strict requirements for "ultra-low emissions" in key areas, the solid concentration discharged from the chimney is not greater than 10mg/Nm3.
发明内容Contents of the invention
本发明的目的是:提供一种燃煤锅炉烟气污染物超低排放装置,它利用协同脱除的方式,对烟囱排放污染物综合处理,使烟囱排放大气中的污染物达到:粉尘≤5mg/Nm3;SO2≤35mg/Nm3;NOX≤50mg/Nm3。The object of the present invention is to provide an ultra-low emission device for flue gas pollutants of coal-fired boilers, which comprehensively treats pollutants discharged from chimneys by means of collaborative removal, so that the pollutants discharged from chimneys in the atmosphere can reach: dust≤5mg /Nm 3 ; SO 2 ≤35mg/Nm 3 ; NO X ≤50mg/Nm 3 .
本实用新型的技术方案是:锅炉排烟口通过脱硝SCR反应器与布袋除尘器密闭联通,布袋除尘器与高效脱硫除雾除尘一体化装置密闭联通,在高效脱硫除雾除尘一体化装置出口增加湿式静电除尘器,烟道经过湿式静电除尘器、烟气换热器密闭联通烟囱。The technical scheme of the utility model is: the exhaust port of the boiler is airtightly connected with the bag filter through the denitrification SCR reactor, and the bag filter is airtightly connected with the integrated device of high-efficiency desulfurization, fog removal and dust removal. Wet electrostatic precipitator, the flue passes through the wet electrostatic precipitator, the flue gas heat exchanger is sealed and connected to the chimney.
本实用新型的有益效果是:对单一设备进行局部技术改造,利用多种设备对多种污染物“协同脱除”的方式,使烟囱排放大气中的污染物达到:粉尘≤5mg/Nm3;SO2≤35mg/Nm3;NOX≤50mg/Nm3。The beneficial effects of the utility model are: carry out partial technological transformation on a single device, and use multiple devices to "coordinately remove" multiple pollutants, so that the pollutants in the chimney discharge atmosphere can reach: dust≤5mg/Nm 3 ; SO 2 ≤35mg/Nm 3 ; NO X ≤50mg/Nm 3 .
附图说明Description of drawings
图1是本实用新型多种设备“协同脱除”多种污染物整体系统结构图;Fig. 1 is a structural diagram of the overall system of "coordinated removal" of various pollutants by various equipment of the present utility model;
图2是本实用新型高效脱硫除雾除尘一体化装置结构图;Fig. 2 is a structural diagram of an integrated device for high-efficiency desulfurization, mist removal and dust removal of the utility model;
图3是本实用新型两层异形除雾除尘S弯叶片放大图;Fig. 3 is an enlarged view of two layers of special-shaped demisting and dedusting S-curved blades of the present invention;
图4是本实用新型气流分布板俯视结构图。Fig. 4 is a top structural view of the airflow distribution plate of the present invention.
具体实施方式detailed description
下面结合附图对本发明做进一步描述:The present invention will be further described below in conjunction with accompanying drawing:
如图1所示,1是锅炉、2是脱硝SCR反应器、3是HDF袋式除尘器、4是高效脱硫除雾除尘一体化装置、5是湿式静电除尘器、6是GGH烟气换热器、7是烟囱。As shown in Figure 1, 1 is a boiler, 2 is a denitrification SCR reactor, 3 is a HDF bag filter, 4 is an integrated device for high-efficiency desulfurization, mist removal and dust removal, 5 is a wet electrostatic precipitator, and 6 is GGH flue gas heat exchange Device, 7 are chimneys.
如图2、3、4所示,4-1是脱硫塔本体、4-2是内循环液喷淋嘴、4-3是异形除雾除尘S弯叶片、4-4是刺状凸形物、4-5是气流分布环、4-6是气流分布板、4-7是通孔、4-8是进气道。As shown in Figures 2, 3 and 4, 4-1 is the main body of the desulfurization tower, 4-2 is the spray nozzle for the internal circulating fluid, 4-3 is the special-shaped S-curved blade for fog and dust removal, and 4-4 is the thorn-shaped convex object , 4-5 is an air distribution ring, 4-6 is an air distribution plate, 4-7 is a through hole, and 4-8 is an air inlet.
1、除尘1. Dust removal
①对布袋除尘器进行技术改造,开发出HDF袋式除尘器,使粉尘排放浓度≤20mg/Nm3;① Carry out technical transformation on the bag filter and develop the HDF bag filter to make the dust emission concentration ≤ 20mg/Nm 3 ;
②对脱硫塔进行技术改造,开发出高效脱硫除雾除尘一体化装置,使粉尘排放浓度≤10mg/Nm3;② Carry out technical transformation on the desulfurization tower, and develop an integrated device for desulfurization, mist removal and dust removal, so that the dust emission concentration is ≤10mg/Nm 3 ;
③增加湿式静电除尘器,使粉尘排放浓度≤5mg/Nm3;③ Increase the wet electrostatic precipitator to make the dust emission concentration ≤ 5mg/Nm 3 ;
2、脱硫2. Desulfurization
①对脱硫塔进行技术改造,开发出高效脱硫除雾除尘一体化装置,使SO2排放浓度对≤50mg/Nm3;① Carry out technical transformation on the desulfurization tower, and develop an integrated device for desulfurization, mist removal and dust removal, so that the SO 2 emission concentration is ≤50mg/Nm 3 ;
②增加湿式静电除尘器,使SO2排放浓度≤35mg/Nm3;②Add wet electrostatic precipitator to make SO 2 emission concentration ≤35mg/Nm 3 ;
3、脱硝3. Denitrification
①增加SCR反应器,使NOx排放浓度≤80mg/Nm3;①Add SCR reactor to make NO x emission concentration ≤80mg/Nm 3 ;
②对脱硫塔进行技术改造,开发出高效脱硫除雾除尘一体化装置,使NOx排放浓度≤65mg/Nm3;② Carry out technical transformation on the desulfurization tower, and develop an integrated device for desulfurization, mist removal and dust removal, so that the NO x emission concentration is ≤65mg/Nm 3 ;
③增加湿式静电除尘器,使NOx排放浓度≤50mg/Nm3。③Add wet electrostatic precipitator to make NO x emission concentration ≤50mg/Nm 3 .
高效脱硫除雾除尘一体化装置结构是:The structure of the high-efficiency desulfurization, mist and dust removal integrated device is:
在脱硫塔本体4-1内进气通道上方的水平断面上安装固定有气流分布板4-6,在气流分布板4-6上分布有通孔4-7。An airflow distribution plate 4-6 is installed and fixed on the horizontal section above the air intake passage in the desulfurization tower body 4-1, and through holes 4-7 are distributed on the airflow distribution plate 4-6.
在脱硫塔本体4-1内的喷嘴4-2喷出的水流打击处安装固定有环形气流分布环4-5。An annular air flow distribution ring 4-5 is installed and fixed at the blowing place of the water flow ejected from the nozzle 4-2 in the desulfurization tower body 4-1.
在脱硫塔本体4-5内上部安装有两层异形除雾除尘S弯叶片4-3,在异形除雾除尘S弯叶片的内板面上固定有刺状凸形物4-4。Two layers of special-shaped fog and dust removal S-curved blades 4-3 are installed on the upper part of the desulfurization tower body 4-5, and thorn-shaped convex objects 4-4 are fixed on the inner plate surface of the special-shaped fog and dust removal S-curved blades.
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620755193.6U CN205948674U (en) | 2016-07-19 | 2016-07-19 | Ultralow discharging equipment of coal fired boiler smoke pollutants |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620755193.6U CN205948674U (en) | 2016-07-19 | 2016-07-19 | Ultralow discharging equipment of coal fired boiler smoke pollutants |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205948674U true CN205948674U (en) | 2017-02-15 |
Family
ID=57971108
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620755193.6U Expired - Lifetime CN205948674U (en) | 2016-07-19 | 2016-07-19 | Ultralow discharging equipment of coal fired boiler smoke pollutants |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205948674U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110614028A (en) * | 2019-08-28 | 2019-12-27 | 江苏新中金环保科技股份有限公司 | Low-temperature flue gas SO in cement kiln2、NOxAnd Hg0Cooperative control system and method |
-
2016
- 2016-07-19 CN CN201620755193.6U patent/CN205948674U/en not_active Expired - Lifetime
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110614028A (en) * | 2019-08-28 | 2019-12-27 | 江苏新中金环保科技股份有限公司 | Low-temperature flue gas SO in cement kiln2、NOxAnd Hg0Cooperative control system and method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN206762557U (en) | The biomass electric power plant system for cleaning fume of dry desulfurization and low-temperature denitration | |
| CN106861350A (en) | The biomass electric power plant gas cleaning handling process and system of dry desulfurization and low-temperature denitration | |
| CN204005957U (en) | A kind of cooperation-removal system that realizes the minimum discharge of coal steam-electric plant smoke multi-pollutant | |
| CN202497799U (en) | Fire coal flue gas adsorption mercury removal device | |
| CN205164417U (en) | Purification unit of high temperature flue gas | |
| CN203043801U (en) | Flue gas pollutant removal device | |
| CN205948658U (en) | Power plant gas cleaning system | |
| CN110013750B (en) | Device and method for desulfurizing, denitrifying and demercurating based on oxidation method and condensation absorption | |
| CN203635060U (en) | Tail gas purification system in circulating treatment manner | |
| CN205613239U (en) | Desulfurization and denitrification dust remover | |
| CN203764071U (en) | Environment-friendly treatment and purification system for flue gas of cremation machines | |
| CN203663677U (en) | Smoke elimination, dust removal, deodorization and desulfurization equipment | |
| CN207680377U (en) | A kind of glass fiber kiln exhaust-gas treatment integration apparatus | |
| CN106943838A (en) | Alternative waste gas cleaning system | |
| CN206240329U (en) | Flue gas desulfurization denitration dust-removing system | |
| CN201643961U (en) | Purification device based on wet treatment of gas pollutants | |
| CN205867959U (en) | Flue gas processing system and coal -fired power plant | |
| CN207102235U (en) | A kind of low concentration VOC purifying processing devices | |
| CN107952296A (en) | A kind of agglomerates of sintered pellets flue gas multiple pollutant cooperated purification system based on bag-type dusting | |
| CN105879635A (en) | Boiler flue gas desulfurization and denitrification device | |
| CN205627481U (en) | Dual thorough tail gas dust processor | |
| CN210009815U (en) | A device for removing NOx, SOx and Hg based on oxidation and condensation and absorption | |
| CN201899982U (en) | Dedusting and denitration integrated device | |
| CN207507243U (en) | A boiler flue gas denitrification and dust removal device | |
| CN107149866B (en) | Circulating fluidized bed boiler flue gas recirculation and SNCR denitration system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CP03 | Change of name, title or address | ||
| CP03 | Change of name, title or address |
Address after: No. 33-5, 2nd Floor, Building B3, Industrial Phase I, Beihu Science and Technology Park, Beihu Science and Technology Development Zone, Changchun City, Jilin Province, 130033 Patentee after: JILIN ANJIE NEW ENERGY GROUP Co.,Ltd. Address before: Room 1303, Shenghao Huishang, No. 5445 Linhe Street, Changchun City, Jilin Province 130033 Patentee before: JILIN ANJIE NEW ENERGY GENERATE ELECTRICITY Co.,Ltd. |
|
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20220908 Address after: 730000 room 816, strategic emerging industry incubation base, Qinchuan Park, Lanzhou New Area, Lanzhou City, Gansu Province (east of Kunlun Mountain Avenue and north of Yilihe Street) Patentee after: Lanzhou Lide Intelligent Technology Co.,Ltd. Address before: No. 33-5, 2nd Floor, Building B3, Industrial Phase I, Beihu Science and Technology Park, Beihu Science and Technology Development Zone, Changchun City, Jilin Province, 130033 Patentee before: JILIN ANJIE NEW ENERGY GROUP Co.,Ltd. |
|
| CX01 | Expiry of patent term |