CN208668902U - A kind of frame pipe combination mounting structure - Google Patents
A kind of frame pipe combination mounting structure Download PDFInfo
- Publication number
- CN208668902U CN208668902U CN201821306938.6U CN201821306938U CN208668902U CN 208668902 U CN208668902 U CN 208668902U CN 201821306938 U CN201821306938 U CN 201821306938U CN 208668902 U CN208668902 U CN 208668902U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- sleeve
- connecting plate
- lantern ring
- stud
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 39
- 239000010959 steel Substances 0.000 claims abstract description 39
- 241001465382 Physalis alkekengi Species 0.000 claims abstract description 34
- 238000009434 installation Methods 0.000 abstract description 9
- 239000000203 mixture Substances 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Abstract
The utility model discloses a kind of frame pipes to combine mounting structure, including the second steel pipe, multiple second lantern rings are socketed on second steel pipe, the second lantern ring upper side wall is fixedly connected there are two symmetrically arranged second connecting plate, one of them described second connecting plate side wall is fixedly connected with the second stud, the second stud other end is arranged through another second connecting plate, screw thread is socketed with the second nut on second stud, second lantern ring side lateral wall is fixedly connected with the first lantern ring, is inserted with sleeve inside first lantern ring.The utility model passes through setting sleeve and the first steel pipe, it rotates the first nut first sleeve is fixed on inside the first lantern ring, it is inserted into the work that the first steel pipe carries out spreading, then the first steel pipe and sleeve are fixed by lock sleeve, since its length is shorter, installation can be completed in one people, greatly improves installation effectiveness.
Description
Technical field
The utility model relates to frame Manifold technology fields more particularly to a kind of frame pipe to combine mounting structure.
Background technique
Existing frame pipe is scale frame pipe, is buckled when support template using frame frame pipe connecting into stereochemical structure,
Level frame pipe is more convenient when installing, and both ends are installed respectively.
But when installing vertical frame pipe, since frame pipe needs are holded up, when height is larger, fixed frame pipe needs artificial auxiliary
It helps, a people helps frame pipe, another people's mounting frame buckle, efficiency is lower, for this purpose, it is proposed that a kind of frame pipe combination installation knot
Structure.
Utility model content
When purpose of the utility model is to solve installing vertical frame pipe in the prior art, since frame pipe needs are holded up
Come, when height is larger, fixed frame pipe needs human assistance, and a people helps frame pipe, another people's mounting frame buckle, efficiency compared with
Low problem, and a kind of frame pipe proposed combines mounting structure.
To achieve the goals above, the utility model adopts the technical scheme that
A kind of frame pipe combines mounting structure, including the second steel pipe, is socketed with multiple second lantern rings, institute on second steel pipe
It states the second lantern ring upper side wall to be fixedly connected there are two symmetrically arranged second connecting plate, one of them described second connecting plate side wall
It is fixedly connected with the second stud, the second stud other end is arranged through another second connecting plate, second stud
Upper screw thread is socketed with the second nut, and second lantern ring side lateral wall is fixedly connected with the first lantern ring, in first lantern ring
Portion is inserted with sleeve, is fixedly connected on first lantern ring there are two symmetrically arranged first connecting plate, one of them described the
The first stud is fixedly connected on one connecting plate, the first stud other end is arranged through another first connecting plate, institute
It states screw thread on the first stud and is socketed with the first nut, the sleeve upper side wall offers slot, is inserted with first in the slot
Lock sleeve is arranged with outside steel pipe, first steel pipe and sleeve jointly, the first steel pipe lower wall is equipped with bottom plate.
Preferably, first steel pipe lower end is placed on side wall.
Preferably, second nut is mutually adjacent to the second connecting plate.
Preferably, first nut is mutually adjacent to the first connecting plate.
Preferably, the sleeve and lock sleeve are transition fit.
Preferably, first steel pipe and lock sleeve are transition fit.
The utility model has the following beneficial effects:
By setting sleeve and the first steel pipe, the first nut is rotated first, sleeve is fixed on inside the first lantern ring, then
It is inserted into the work that the first steel pipe carries out spreading, then the first steel pipe and sleeve are fixed by lock sleeve, due to it
Length is shorter, and installation can be completed in a people, greatly improves installation effectiveness.
Detailed description of the invention
Fig. 1 be the utility model proposes a kind of frame pipe combine mounting structure structural schematic diagram.
In figure: 1 sleeve, 2 first nuts, 3 first lantern rings, 4 lock sleeves, 5 first steel pipes, 6 second nuts, 7 second studs,
8 second steel pipes, 9 second lantern rings, 10 first studs, 11 bottom plates, 12 second connecting plates, 13 first connecting plates.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.
In the description of the present invention, it should be understood that term " on ", "lower", "front", "rear", "left", "right",
The orientation or positional relationship of the instructions such as "top", "bottom", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, and is only
For ease of description the utility model and simplify description, rather than the device or element of indication or suggestion meaning must have it is specific
Orientation, be constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.
Referring to Fig.1, a kind of frame pipe combines mounting structure, including the second steel pipe 8, is socketed with multiple second on the second steel pipe 8
Lantern ring 9,9 upper side wall of the second lantern ring are fixedly connected there are two symmetrically arranged second connecting plate 12, one of them second connecting plate
12 side walls are fixedly connected with the second stud 7, and 7 other end of the second stud is arranged through another second connecting plate 12, the second spiral shell
Screw thread is socketed with the second nut 6 on column 7, and the second nut 6 is mutually adjacent to the second connecting plate 12, and the second lantern ring 9 is set in
Two steel pipes 8 rotate the second nut 6, and the second nut 6 rotates on the second stud 7, so that the second lantern ring 9 carries out the second steel pipe 8
It is fixed.
Second lantern ring, 9 side lateral wall is fixedly connected with the first lantern ring 3, is inserted with sleeve 1 inside the first lantern ring 3, and first
It is fixedly connected on lantern ring 3 there are two symmetrically arranged first connecting plate 13, is fixedly connected on one of them first connecting plate 13
First stud 10,10 other end of the first stud are arranged through another first connecting plate 13, screw thread socket on the first stud 10
There is the first nut 2, the first nut 2 is mutually adjacent to the first connecting plate 13, and 1 upper side wall of sleeve offers slot, is plugged in slot
There is the first steel pipe 5, is arranged with lock sleeve 4 outside the first steel pipe 5 and sleeve 1 jointly, sleeve 1 and lock sleeve 4 are transition fit, first
Steel pipe 5 and lock sleeve 4 are transition fit, and then sleeve 1 is fixed on inside the first lantern ring 3, rotate the first nut 2, the first spiral shell
Mother 2 rotates on the first stud 10, and sleeve 1 is fixed the first lantern ring 3, is inserted into the work that the first steel pipe 5 carries out spreading
Make, then first steel pipe 5 and sleeve 1 are fixed by lock sleeve 4, since its length is shorter, a people can be complete
At installation, installation effectiveness is greatly improved, 5 lower wall of the first steel pipe is equipped with bottom plate 11, and 5 lower end of the first steel pipe is placed on bottom plate 11
Side wall, bottom plate 11 is in order to padded by sleeve 1, so that sleeve 1 is more steady.
In the utility model, the second lantern ring 9 is set in the second steel pipe 8 by user, rotates the second nut 6, the second nut 6
It is rotated on the second stud 7, so that the second steel pipe 8 is fixed in the second lantern ring 9, sleeve 1 is then fixed on the first lantern ring 3
Inside rotates the first nut 2, and the first nut 2 rotates on the first stud 10, and sleeve 1 is fixed the first lantern ring 3, then
It is inserted into the work that the first steel pipe 5 carries out spreading, then first steel pipe 5 and sleeve 1 are fixed by lock sleeve 4, by
Shorter in its length, installation can be completed in a people, greatly improves installation effectiveness.
The preferable specific embodiment of the above, only the utility model, but the protection scope of the utility model is not
It is confined to this, anyone skilled in the art is within the technical scope disclosed by the utility model, practical according to this
Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model
Within enclosing.
Claims (6)
1. a kind of frame pipe combines mounting structure, including the second steel pipe (8), which is characterized in that be socketed on second steel pipe (8)
Multiple second lantern rings (9), the second lantern ring (9) upper side wall are fixedly connected there are two symmetrically arranged second connecting plate (12),
One of them described second connecting plate (12) side wall is fixedly connected with the second stud (7), and the second stud (7) other end runs through
Another second connecting plate (12) is arranged, and screw thread is socketed with the second nut (6) on second stud (7), and described second set
Ring (9) side lateral wall is fixedly connected with the first lantern ring (3), is inserted with sleeve (1) inside first lantern ring (3), and described the
Symmetrically arranged first connecting plate (13) there are two being fixedly connected on one lantern ring (3), one of them described first connecting plate (13)
On be fixedly connected with the first stud (10), the first stud (10) other end is set through another first connecting plate (13)
It sets, screw thread is socketed with the first nut (2) on first stud (10), and sleeve (1) upper side wall offers slot, described to insert
It being inserted in slot the first steel pipe (5), first steel pipe (5) and sleeve (1) are arranged with lock sleeve (4) jointly outside, and described first
Steel pipe (5) lower wall is equipped with bottom plate (11).
2. a kind of frame pipe according to claim 1 combines mounting structure, which is characterized in that the first steel pipe (5) lower end
It is placed on bottom plate (11) upper side wall.
3. a kind of frame pipe according to claim 1 combines mounting structure, which is characterized in that second nut (6) and the
Two connecting plates (12) are mutually adjacent to.
4. a kind of frame pipe according to claim 1 combines mounting structure, which is characterized in that first nut (2) and the
One connecting plate (13) is mutually adjacent to.
5. a kind of frame pipe according to claim 1 combines mounting structure, which is characterized in that the sleeve (1) and lock sleeve
It (4) is transition fit.
6. a kind of frame pipe according to claim 1 combines mounting structure, which is characterized in that first steel pipe (5) and lock
Fixed (4) are transition fit.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821306938.6U CN208668902U (en) | 2018-08-14 | 2018-08-14 | A kind of frame pipe combination mounting structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821306938.6U CN208668902U (en) | 2018-08-14 | 2018-08-14 | A kind of frame pipe combination mounting structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208668902U true CN208668902U (en) | 2019-03-29 |
Family
ID=65837436
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821306938.6U Expired - Fee Related CN208668902U (en) | 2018-08-14 | 2018-08-14 | A kind of frame pipe combination mounting structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208668902U (en) |
-
2018
- 2018-08-14 CN CN201821306938.6U patent/CN208668902U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209165253U (en) | A kind of street lamp for municipal gardens | |
CN203584996U (en) | Connecting piece | |
CN208668902U (en) | A kind of frame pipe combination mounting structure | |
CN206017399U (en) | A kind of bolt nut component for coordinating fastening | |
CN107447978A (en) | A kind of scaffold connecting structure of convenient dismounting | |
CN108167533A (en) | A kind of novel sewer Fixed Tube-sheet Reboiler | |
CN202437837U (en) | Infusion monitoring-alarming device | |
CN208718479U (en) | A kind of high strength electric wire bar heightening device | |
CN206647299U (en) | A kind of combination fan | |
CN208576709U (en) | A kind of fixed device of modified lifebuoy | |
CN208858204U (en) | Oval frame pond | |
CN206368033U (en) | Small-sized wall-hanging oxygenerator | |
CN202015440U (en) | Horizontal bar with Taiji wheel | |
CN204034401U (en) | Large discharge foldable filter element guide support ring | |
CN208659768U (en) | It is a kind of to dismount convenient medical Cribguard | |
CN205081834U (en) | From rapping bar device | |
CN206717775U (en) | A kind of metal bellows built-in pipe pulling device | |
CN211215319U (en) | Novel basketball shooting training device | |
CN202136442U (en) | Mouse brain syringe with illumination function | |
CN211253049U (en) | Unmanned aerial vehicle battery quick plug structure | |
CN216472297U (en) | Horizontal sewage treatment integrated device | |
CN209322289U (en) | A kind of concealed T plate hanging ring easy to disassemble with assembling | |
CN205054978U (en) | Drainage bag is used in medical treatment | |
CN209595009U (en) | A kind of luggage chassis structure | |
CN207776580U (en) | A kind of building construction enclosing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190329 Termination date: 20190814 |