CN108167533A - A kind of novel sewer Fixed Tube-sheet Reboiler - Google Patents
A kind of novel sewer Fixed Tube-sheet Reboiler Download PDFInfo
- Publication number
- CN108167533A CN108167533A CN201711147598.7A CN201711147598A CN108167533A CN 108167533 A CN108167533 A CN 108167533A CN 201711147598 A CN201711147598 A CN 201711147598A CN 108167533 A CN108167533 A CN 108167533A
- Authority
- CN
- China
- Prior art keywords
- fixed
- upper half
- half ring
- baffle
- ring body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
- F16L3/02—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets partly surrounding the pipes, cables or protective tubing
- F16L3/04—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets partly surrounding the pipes, cables or protective tubing and pressing it against a wall or other support
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
- F16L3/08—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing
- F16L3/10—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing divided, i.e. with two or more members engaging the pipe, cable or protective tubing
- F16L3/1008—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing divided, i.e. with two or more members engaging the pipe, cable or protective tubing with two members engaging the pipe, cable or tubing, both being made of thin band material completely surrounding the pipe
- F16L3/1016—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing divided, i.e. with two or more members engaging the pipe, cable or protective tubing with two members engaging the pipe, cable or tubing, both being made of thin band material completely surrounding the pipe the members being joined by means of two screws
Abstract
The invention discloses a kind of novel sewer Fixed Tube-sheet Reboiler, including wall, upper half ring body, lower hemizonid, fixing bolt, fixing nut, fixed pipe sleeve, installation cavity, first baffle, embeded slot, annular groove, gag lever post, second baffle, fixed bolt, fastening stud, auxiliary connect band, auxiliary connection band edge and spring.The present invention is reasonable in design, change the fixed form that original screw is in direct contact with metope, it is installed in a manner that fixed bolt is mutually spirally connected with fixed pipe sleeve, improve the stability of entire mounting structure, gag lever post on fixed casing surface engages with the annular groove on embeded slot ensure that fixed pipe sleeve and the fixed stability of wall, so as to provide relatively stable mounting platform for entire pipe bundle mounting structure, further promote the stability of pipe bundle mounting structure, auxiliary connect band can be used to carry out sewer pipe further limiting during fixed sewer pipe to fix.
Description
Technical field
The present invention relates to a kind of tube bank, specifically a kind of novel sewer Fixed Tube-sheet Reboiler belongs to tube bank applied technical field.
Background technology
Tube bank is a kind of fixing piece for fixed -piping, in median low structure, in order to discharge the water of roof in time,
The external sewer pipe of generally use discharges the water of roof, needs to pass through pipe in order to which sewer pipe is made to be bonded installation with metope
Sewer pipe is fixed on metope by beam.
Traditional tube bank directly will be socketed in lower water when installing this sewer pipe by the part of screw, bolt etc
The tube bank of pipe surface is directly anchored on metope, and this fixed form stability is poor.Therefore, one is proposed regarding to the issue above
Kind novel sewer Fixed Tube-sheet Reboiler.
Invention content
The purpose of the present invention is that solve the above-mentioned problems and provides a kind of novel sewer Fixed Tube-sheet Reboiler.
The present invention is achieved through the following technical solutions above-mentioned purpose, a kind of novel sewer Fixed Tube-sheet Reboiler, including wall
And surface of wall is arranged on for fixing the tube bank ontology of sewer pipe, the tube bank ontology may make up cyclic structure by two
Upper half ring body and lower hemizonid composition, the junction of the upper half ring body and lower hemizonid pass through fixing bolt and fixing nut
It is fixed, the tube bank chamber body setting auxiliary connect band, and the auxiliary at connect band both ends is assisted to connect band edge through upper half
Ring body surface extends to upper half ring body both ends and lower hemizonid both ends junction, perpendicular through having on the upper half ring body centre
The fastening stud directly set, and the affixed fixed bolt in fastening stud end;
The fixed bolt is threaded io the fixation pipe sleeve for being embedded in surface of wall, and the fixed pipe sleeve passes through embeded slot
It is chimeric to be installed on surface of wall, and embeded slot axial surface is equipped with the annular groove for accommodating gag lever post, the fixed pipe sleeve side
Pars intramuralis is equipped with several gag lever posts for circularizing distribution, and the fixation pipe sleeve interior of gag lever post side is equipped with installation cavity, institute
It states and the first baffle vertical with gag lever post is installed on installation cavity, and first baffle is connected to by horizontally disposed spring and is located at
The second baffle on gag lever post surface.
Preferably, the fastening stud and fixed bolt coaxial arrangement, and fastening stud diameter is less than fixed bolt, it is described
A side end face of the fastening stud far from fixed bolt is equipped with nut.
Preferably, the length of the fixed bolt is consistent with the length of fixed pipe sleeve inner cavity.
Preferably, the first baffle and second baffle are arranged in parallel, and first baffle and second baffle are respectively positioned on
Inside installation cavity.
Preferably, the auxiliary connection band edge is embedded in upper half ring body and lower hemizonid junction, and assists connection band edge
It is fitted closely respectively with upper half ring body and lower hemizonid end.
Preferably, two auxiliary connection band edges at the auxiliary connect band both ends and two junction straight lines of upper half ring body
Distance is less than upper half ring body diameter.
The beneficial effects of the invention are as follows:The present invention is reasonable in design, changes original screw and is in direct contact with metope
Fixed form, installed in a manner that fixed bolt is mutually spirally connected with fixed pipe sleeve, improve the steady of entire mounting structure
Qualitative property, the gag lever post fixed on casing surface engages with the annular groove on embeded slot ensure that fixed pipe sleeve and wall are fixed
Stability so as to provide relatively stable mounting platform for entire pipe bundle mounting structure, further promotes pipe bundle mounting structure
Stability can be used auxiliary connect band to carry out further limiting to sewer pipe during fixed sewer pipe and fix.
Description of the drawings
Fig. 1 is overall structure diagram of the present invention;
Fig. 2 is partial enlargement structural representation at I of the present invention.
In figure:1st, wall, 2, upper half ring body, 3, lower hemizonid, 4, fixing bolt, 41, fixing nut, 5, fixed pipe sleeve,
51st, installation cavity, 52, first baffle, 6, embeded slot, 61, annular groove, 7, gag lever post, 71, second baffle, 8, fixed bolt, 9, tight
Gu stud, 10, auxiliary connect band, 101, auxiliary connection band edge, 11, spring.
Specific embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete
Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, those of ordinary skill in the art are obtained every other without making creative work
Embodiment shall fall within the protection scope of the present invention.
It please refers to Fig.1 shown in -2, a kind of novel sewer Fixed Tube-sheet Reboiler, including wall 1 and is arranged on 1 surface of wall use
It is described to restrain upper half ring body 2 and the lower semi-ring that ontology may make up cyclic structure by two in the tube bank ontology of fixed sewer pipe
Body 3 forms, and the junction of the upper half ring body 2 and lower hemizonid 3 is fixed by fixing bolt 4 and fixing nut 41, Jiang Xiashui
Pipeline is placed between upper half ring body 2 and lower hemizonid 3, and upper half ring body 2 is fixed under by fixing bolt 4 and fixing nut 41
It realizes the fixation to sewer pipe, the tube bank chamber body setting auxiliary connect band 10, and assists connection in 3 both ends of hemizonid
Auxiliary connection band edge 101 with 10 both ends extends to 2 both ends of upper half ring body and lower 3 liang of hemizonid through 2 surface of upper half ring body
Junction is held, auxiliary connect band 10 is tensed, auxiliary connect band 10 is made to fit closely in sewer pipe surface, assisted tensing later
Auxiliary connection band edge 101 and the upper half ring body 2 at 10 both ends of connect band and lower 3 junction of hemizonid be used uniformly fixing bolt 4 and
Fixing nut 41 is fixed, and the fastening stud 9 for having and being vertically arranged, and 9 end of fastening stud are run through on 2 centre of upper half ring body
Hold affixed fixed bolt 8;
The fixed bolt 8 is threaded io the fixation pipe sleeve 5 for being embedded in 1 surface of wall, by fixed bolt 8 with fixing
The Fixed Tube-sheet Reboiler ontology that is spirally connected between pipe sleeve 5, the fixed pipe sleeve 5 are installed on 1 surface of wall, and embedding by the way that embeded slot 6 is chimeric
6 axial surface of slot is closed equipped with the annular groove 61 for accommodating gag lever post 7, fixed 5 interior of pipe sleeve is equipped with several cyclization
The gag lever post 7 of shape distribution, and 5 interior of fixation pipe sleeve of 7 side of gag lever post is equipped with installation cavity 51, pacifies on the installation cavity 51
Equipped with the first baffle 52 vertical with gag lever post 7, and first baffle 52 is connected to by horizontally disposed spring 11 positioned at limiting
The second baffle 71 on 7 surface of bar, the gag lever post 7 fixed on pipe sleeve 5 when horizontally disposed spring 11 would sit idle for are accommodated in fixing pipe
5 interiors are covered, do not influence the installation of fixed pipe sleeve 5.
As a kind of technical optimization scheme of the present invention, the fastening stud 9 and fixed bolt 8 are coaxially disposed, and are fastened
9 diameter of stud is less than fixed bolt 8, and a side end face of the fastening stud 9 far from fixed bolt 8 is equipped with nut, avoids fastening
9 diameter of stud is excessive, and the intensity of 2 structure of upper half ring body is influenced during through upper half ring body 2.
As a kind of technical optimization scheme of the present invention, the length of the fixed bolt 8 and the length of fixed 5 inner cavity of pipe sleeve
Unanimously, convenient for the fixation of fixed bolt 8.
As a kind of technical optimization scheme of the present invention, the first baffle 52 and second baffle 71 are arranged in parallel,
And first baffle 52 and second baffle 71 are respectively positioned on inside installation cavity 51, pass through 71 fixed spring of first baffle 52 and second baffle
11, the gag lever post 7 for ensureing to fix on pipe sleeve 5 when leaving unused using horizontally disposed spring 11 is accommodated in fixed 5 side wall of pipe sleeve
Portion.
As a kind of technical optimization scheme of the present invention, the auxiliary connection band edge 101 is embedded in upper half ring body 2 and lower half
3 junction of ring body, and connection band edge 101 is assisted to be fitted closely respectively with upper half ring body 2 and lower 3 end of hemizonid, it realizes to auxiliary
Help the fixation of connection band edge 101.
As a kind of technical optimization scheme of the present invention, two auxiliary connection band edges at 10 both ends of the auxiliary connect band
101 are less than 2 diameter of upper half ring body with two junction air line distances of upper half ring body 2, make auxiliary connect band 10 and sewer pipe
Contact area bigger.
In the use of the present invention, digging embeded slot 6 on 1 surface of wall, fixed pipe sleeve 5 is put into inside embeded slot 6, is made solid
Fixed tube covers the annular groove 61 on the 7 face embeded slot 6 of gag lever post on 5 surfaces, turns fastening stud 9, and fastening stud 9 drives fixed spiral shell
Column 8 rotates, and fixed bolt 8 is screwed into inside fixed pipe sleeve 5, as fixed bolt 8 enters fixed 5 inner cavity of pipe sleeve, fixed spiral shell
Column 8 squeezes one end of gag lever post 7, and fixed 5 surface of pipe sleeve of the ejection of gag lever post 7 is made to enter in annular groove 61, is realized to fixed pipe sleeve 5
Fixation, so as to fulfill the fixation to upper half ring body 2, sewer pipe is placed inside upper half ring body 2, make auxiliary connect band 10 with
Sewer pipe surface fits closely, and it is solid respectively by fixing bolt 4 and fixing nut 41 that two auxiliary then are connected band edge 101
Upper half ring body 2 and lower 3 junction of hemizonid are scheduled on, is repeated the above steps, tube bank is installed successively on sewer pipe surface.
In the present invention when spring 11 is under normal condition, gag lever post 7 is accommodated in fixed 5 interior of pipe sleeve completely,
And one end of gag lever post 7 is extended to away from fixed 5 inner cavity center of circle 2mm-5mm of pipe sleeve.
It is obvious to a person skilled in the art that the present invention is not limited to the details of above-mentioned exemplary embodiment, Er Qie
In the case of without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter
From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power
Profit requirement rather than above description limit, it is intended that all in the meaning and scope obtained with important document of claim by falling
Variation is included within the present invention.Any reference numeral in claim should not be considered as to the involved claim of limitation.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped
Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should
It considers the specification as a whole, the technical solutions in each embodiment can also be properly combined, forms those skilled in the art
The other embodiment being appreciated that.
Claims (6)
1. a kind of novel sewer Fixed Tube-sheet Reboiler, including wall (1) and wall (1) surface is arranged on for fixing sewer pipe
Tube bank ontology, it is characterised in that:The upper half ring body (2) and lower hemizonid that the tube bank ontology may make up cyclic structure by two
(3) it forms, the junction of the upper half ring body (2) and lower hemizonid (3) is solid by fixing bolt (4) and fixing nut (41)
It is fixed, the tube bank chamber body setting auxiliary connect band (10), and assist the auxiliary connection band edge (101) at connect band (10) both ends
Upper half ring body (2) both ends and lower hemizonid (3) both ends junction, the upper half ring are extended to through upper half ring body (2) surface
Run through the fastening stud (9) for having and being vertically arranged, and the affixed fixed bolt in fastening stud (9) end (8) on body (2) centre;
The fixed bolt (8) is threaded io the fixation pipe sleeve (5) for being embedded in wall (1) surface, and the fixed pipe sleeve (5) is logical
Cross that embeded slot (6) is chimeric to be installed on wall (1) surface, and embeded slot (6) axial surface is equipped with the ring for accommodating gag lever post (7)
Shape slot (61), fixed pipe sleeve (5) interior are equipped with several gag lever posts (7) for circularizing distribution, and gag lever post (7) side
Fixation pipe sleeve (5) interior be equipped with installation cavity (51), vertical with gag lever post (7) the is equipped on the installation cavity (51)
One baffle (52), and first baffle (52) is connected to second positioned at gag lever post (7) surface by horizontally disposed spring (11)
Baffle (71).
2. a kind of novel sewer Fixed Tube-sheet Reboiler according to claim 1, it is characterised in that:The fastening stud (9) and
Fixed bolt (8) is coaxially disposed, and fastening stud (9) diameter is less than fixed bolt (8), and the fastening stud (9) is far from fixed
One side end face of stud (8) is equipped with nut.
3. a kind of novel sewer Fixed Tube-sheet Reboiler according to claim 1, it is characterised in that:The fixed bolt (8)
Length is consistent with the length of fixed pipe sleeve (5) inner cavity.
4. a kind of novel sewer Fixed Tube-sheet Reboiler according to claim 1, it is characterised in that:The first baffle (52) and
Second baffle (71) is arranged in parallel, and first baffle (52) and second baffle (71) are respectively positioned on installation cavity (51) inside.
5. a kind of novel sewer Fixed Tube-sheet Reboiler according to claim 1, it is characterised in that:The auxiliary connection band edge
(101) be embedded in upper half ring body (2) and lower hemizonid (3) junction, and assist connection band edge (101) respectively with upper half ring body
(2) it is fitted closely with lower hemizonid (3) end.
6. a kind of novel sewer Fixed Tube-sheet Reboiler according to claim 1, it is characterised in that:The auxiliary connect band (10)
It is straight that two auxiliary connection band edges (101) at both ends and two junction air line distances of upper half ring body (2) are less than upper half ring body (2)
Diameter.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711147598.7A CN108167533A (en) | 2017-11-17 | 2017-11-17 | A kind of novel sewer Fixed Tube-sheet Reboiler |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711147598.7A CN108167533A (en) | 2017-11-17 | 2017-11-17 | A kind of novel sewer Fixed Tube-sheet Reboiler |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108167533A true CN108167533A (en) | 2018-06-15 |
Family
ID=62527526
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711147598.7A Withdrawn CN108167533A (en) | 2017-11-17 | 2017-11-17 | A kind of novel sewer Fixed Tube-sheet Reboiler |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108167533A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109621806A (en) * | 2018-12-26 | 2019-04-16 | 无锡银燕化工装备科技有限公司 | Vertical vacuum kneader |
CN110454617A (en) * | 2019-09-04 | 2019-11-15 | 温州续影贸易有限公司 | A kind of anti-loosening pvc pipe channel fixing device |
CN110701764A (en) * | 2018-07-10 | 2020-01-17 | 江苏旌翔建材科技有限公司 | Pipeline fixing method for open installation mode of indoor fresh air system |
-
2017
- 2017-11-17 CN CN201711147598.7A patent/CN108167533A/en not_active Withdrawn
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110701764A (en) * | 2018-07-10 | 2020-01-17 | 江苏旌翔建材科技有限公司 | Pipeline fixing method for open installation mode of indoor fresh air system |
CN109621806A (en) * | 2018-12-26 | 2019-04-16 | 无锡银燕化工装备科技有限公司 | Vertical vacuum kneader |
CN110454617A (en) * | 2019-09-04 | 2019-11-15 | 温州续影贸易有限公司 | A kind of anti-loosening pvc pipe channel fixing device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108167533A (en) | A kind of novel sewer Fixed Tube-sheet Reboiler | |
CY1112627T1 (en) | THIN-WALL CONNECTOR PIPELINE WITH A VARIABLE SIGNAL SECTION FOR SOLAR ENERGY TABLES | |
CN105673055B (en) | Suitable for the novel combined grouted anchor bar of roadway floor | |
SE466226B (en) | BRAINSLEPATRON FOR A NUCLEAR REACTOR | |
CN205480253U (en) | Simple to operate's LED fluorescent lamp | |
CN208718479U (en) | A kind of high strength electric wire bar heightening device | |
CN207264891U (en) | A kind of transformer grounding connection structure | |
CN108149862A (en) | A kind of locking Fixed Tube-sheet Reboiler of novel sewer | |
CN208691174U (en) | A kind of photovoltaic bracket floating drum | |
CN201475934U (en) | Adjustable connector for street lamp | |
CN101774298B (en) | Ink jet printer | |
CN202195574U (en) | Cylindrical heat exchanger adopting spiral flow path | |
CN207132427U (en) | Gas furnace supplies backwater pipe holder | |
CN202845191U (en) | Sandwich type feeding pipe with flushing function | |
CN201460311U (en) | Combined ladder of swimming pool | |
CN208763327U (en) | A kind of handrail paste pipes supporting element | |
CN205681368U (en) | Photovoltaic panel installing support | |
CN202183222U (en) | Built-in elastic anti-loosening type peg | |
CN206965291U (en) | A kind of anti-dropout filter flask | |
CN208668902U (en) | A kind of frame pipe combination mounting structure | |
CN212336725U (en) | Hole plugging device is reserved to generating line in electric well | |
CN204327376U (en) | The runner of axial flow hydraulic turbine | |
CN208996326U (en) | A kind of coiled material fixed structure | |
US7159609B2 (en) | Mounting unit of wall faucet | |
CN102809223A (en) | Quartz heating pipe grounding safety device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 210000 288 Qinhuai Road, Yung Yang Street, Lishui District, Nanjing, Jiangsu Applicant after: Jiangsu Yiding Gushan Electromechanical Technology Co Ltd Address before: 210000 Yuhuatai District, Nanjing City, Jiangsu Province, China (Nanjing) Software Guke Chuangcheng C3 Building 7 floors Applicant before: Jiangsu Yiding Gushan Electromechanical Technology Co Ltd |
|
CB02 | Change of applicant information | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20180615 |
|
WW01 | Invention patent application withdrawn after publication |