CN208667133U - A kind of boiler water process actual training device - Google Patents

A kind of boiler water process actual training device Download PDF

Info

Publication number
CN208667133U
CN208667133U CN201820916773.8U CN201820916773U CN208667133U CN 208667133 U CN208667133 U CN 208667133U CN 201820916773 U CN201820916773 U CN 201820916773U CN 208667133 U CN208667133 U CN 208667133U
Authority
CN
China
Prior art keywords
carbon steel
steel pipe
switched
elliptical head
boiler water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820916773.8U
Other languages
Chinese (zh)
Inventor
张松林
张恩斌
王锦温
罗邦煊
李红星
张世喆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Shichuang Technology Co Ltd
Original Assignee
Dalian Shichuang Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Shichuang Technology Co Ltd filed Critical Dalian Shichuang Technology Co Ltd
Priority to CN201820916773.8U priority Critical patent/CN208667133U/en
Application granted granted Critical
Publication of CN208667133U publication Critical patent/CN208667133U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electrically Operated Instructional Devices (AREA)

Abstract

The utility model relates to the design of the structure of analog machine and applied technical field, in particular to a kind of boiler water process actual training devices, including two identical water bottles, water bottle include DN250 carbon steel pipe;End closure is standard elliptical head on DN250 carbon steel pipe;Standard elliptical head top is equipped with DN20 carbon steel pipe;DN20 carbon steel pipe is switched to inside DN250 carbon steel pipe, and DN20 carbon steel pipe is switched to external connection pipeline;Standard elliptical head upper side is equipped with DN15 carbon steel pipe and is switched to inside DN250 carbon steel pipe, and DN15 carbon steel pipe is located at the left side of DN20 carbon steel pipe;There are two DN100 carbon steel pipes for the installation of DN250 carbon steel pipe side.

Description

A kind of boiler water process actual training device
Technical field:
The utility model relates to the design of the structure of analog machine and applied technical field, in particular to a kind of boiler water process is real Training apparatus.
Background technique:
Boiler water process is the bad phenomenons such as the fouling for preventing boiler heating power equipment, corrosion and carbonated drink kudo.Traditional pot Boiler water treatment device operator and management training can only be given lessons by teacher's theory and books teaching material scheduling theory on Mode gives examination training, can only cultivate the theoretical level ability of student and student can not be made to obtain actual hands-on Ability can not allow operator to do superpressure, the emergency processings operation such as leakage.Spend student in on-job real work Expense is lot more time to skillfully grasp real work operating ability, and is also the personal safety and production run of student Leave major hidden danger.
Utility model content:
The purpose of the utility model is to overcome in place of the deficiencies in the prior art, a kind of boiler water process actual training device is provided, It is designed rationally, realizes the simulation to boiler water treatment procedure, student is enable to complete in simulation process to links The grasp of process is not required to learn in true hazardous environment, has ensured the life safety of student, has solved in the prior art The problem of.
To achieve the above object, the utility model provides the following technical solutions:
A kind of boiler water process actual training device, including two identical water bottles, the water bottle include DN250 carbon steel pipe;Institute Stating end closure and sealing on DN250 carbon steel pipe is standard elliptical head;The standard elliptical head by the cooperation of flange with DN250 carbon steel pipe is connected and is fixed;The standard elliptical head top is equipped with DN20 carbon steel pipe;The DN20 carbon steel pipe is It is fixedly mounted and is switched to inside DN250 carbon steel pipe, and DN20 carbon steel pipe is also switched to external connection pipeline;The standard ellipse End socket upper side is equipped with DN15 carbon steel pipe and is switched to inside DN250 carbon steel pipe, and DN15 carbon steel pipe is located at DN20 carbon steel pipe Left side;For the installation of DN250 carbon steel pipe side there are two DN100 carbon steel pipe, visor is installed on DN100 carbon steel pipe by bolt;It is described DN100 carbon steel pipe is connected to inside DN250 carbon steel pipe;Support is mounted at left and right sides of DN250 carbon steel pipe lower end;It is described End closure and sealing are standard elliptical head under DN250 carbon steel pipe;Cooperation and DN250 of the standard elliptical head by flange Carbon steel pipe is connected and is fixed;The standard elliptical head lowermost end is equipped with DN20 carbon steel pipe;The DN20 carbon steel pipe is to fix It installs and is switched to inside DN250 carbon steel pipe, and DN20 carbon steel pipe is also switched to external connection pipeline.
The sealing of whole device is realized by the installation of flange, the sight inside for device has been convenient in the installation of visor It examines, convenient for finding various situations, the installation of a variety of carbon steel pipes on device has been convenient for the connection inside device, the setting of support Facilitate installation when water bottle uses;And connected together two water bottles by connecting pipe, it completes to boiler water process The simulation of actual working environment, is learnt by simulation training, makes student's study operation relevant with boiler water process is grasped, maintenance And management skill is utmostly simulated boiler water process actual working environment, is effectively protected while guaranteeing student's personal safety It has demonstrate,proved student and has entered the safe operation after real work.
Further, being bolted with being combined between the flange.
It is bolted and standard elliptical head is affixed on DN250 carbon steel pipe, good airproof performance and be easily installed In disassembly.
Further, the water bottle surface brush silver powder, the difference of two water bottles are there is nameplate on the water bottle of right side.
Silver powder is painted by water bottle surface, not only beauty also functions to corrosion-resistant effect, and the setting of nameplate is convenient for difference two Water bottle.
Detailed description of the invention:
Upon reading the detailed description of non-limiting embodiments with reference to the following drawings, other spies of the utility model Sign, objects and advantages will become more apparent upon.
Fig. 1 is that a kind of boiler water process actual training device connection of the utility model uses schematic diagram;
Fig. 2 is a kind of boiler water process actual training device water bottle side view of the utility model;
Fig. 3 is a kind of boiler water process actual training device water bottle top view of the utility model.
Figure label: 1 is DN20 carbon steel pipe, and 2 be standard elliptical head, and 3 be flange, and 4 be visor, and 5 be DN250 carbon steel Pipe, 6 be support, and 7 be DN15 carbon steel pipe, and 8 be nameplate, and 9 be DN100 carbon steel pipe.
Specific embodiment:
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment;Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
It should be noted that it can directly on the other element when element is referred to as " being fixed on " another element Or there may also be elements placed in the middle.When an element is considered as " connection " another element, it, which can be, is directly connected to To another element or it may be simultaneously present centering elements.Term as used herein " vertical ", " horizontal ", " left side ", " right side " and similar statement are for illustrative purposes only.
In progress in use, staff checks the utility model first, defect is checked for, if deposited Can not just carry out using if defect, need that maintenance personal is notified to repair at this time, if there is no if problem just It may be used.
Refering to fig. 1-3: a kind of boiler water process actual training device, including two identical water bottles, the water bottle include DN250 Carbon steel pipe 5;End closure and sealing are standard elliptical head 2 on the DN250 carbon steel pipe 5;The standard elliptical head 2 passes through method The cooperation of orchid 3 connect and fixes with DN250 carbon steel pipe 5;2 top of standard elliptical head is equipped with DN20 carbon steel pipe 1;Institute DN20 carbon steel pipe 1 is stated to be fixedly mounted and being switched to inside DN250 carbon steel pipe 5, and DN20 carbon steel pipe 1 is also switched to external connection Pipeline;2 upper side of standard elliptical head is equipped with DN15 carbon steel pipe 7 and is switched to inside DN250 carbon steel pipe 5, DN15 carbon Steel pipe 7 is located at the left side of DN20 carbon steel pipe 1;There are two DN100 carbon steel pipe 9, visor 4 passes through the installation of 5 side of DN250 carbon steel pipe Bolt is installed on DN100 carbon steel pipe 9;The DN100 carbon steel pipe is connected to inside DN250 carbon steel pipe;The DN250 carbon steel pipe 5 Support 6 is mounted at left and right sides of lower end;End closure and sealing are standard elliptical head 2 under the DN250 carbon steel pipe 5;It is described Standard elliptical head 2 is connect and is fixed with DN250 carbon steel pipe 5 by the cooperation of flange 3;2 lowermost end of standard elliptical head DN20 carbon steel pipe 1 is installed;The DN20 carbon steel pipe 1 is fixed installation and is switched to inside DN250 carbon steel pipe 5, and DN20 carbon Steel pipe 1 is also switched to external connection pipeline.
The sealing of whole device is realized by the installation of flange 3, the sight inside for device has been convenient in the installation of visor 4 It examines, convenient for finding various situations, the installation of a variety of carbon steel pipes on device has been convenient for the connection inside device, and support 6 is set Set the installation facilitated when water bottle uses;And connected together two water bottles by connecting pipe, it completes at boiler water The simulation for managing actual working environment, is learnt by simulation training, makes student's study operation relevant with boiler water process is grasped, dimension Shield and management skill utmostly simulate boiler water process actual working environment, effectively while guaranteeing student's personal safety It ensure that the safe operation after student enters real work.
Being bolted with being combined between the flange 3.
Be bolted and standard elliptical head 2 be affixed on DN250 carbon steel pipe 5, good airproof performance and convenient for peace Loaded on disassembly.
The water bottle surface brush silver powder, the difference of two water bottles are there is nameplate 8 on the water bottle of right side.
Silver powder is painted by water bottle surface, not only beauty also functions to corrosion-resistant effect, and the setting of nameplate is convenient for difference two Water bottle.
Working principle: in use, all parts of the device are connected together two water bottles according to standard connection, And connecting pipe has the valve of multiple and different positions, and pressure gauge is housed, convenient for the control and observation to whole device;Pass through Water and additive to be treated is added to DN250 carbon steel pipe 5 in DN20 carbon steel pipe 1 and DN15 carbon steel pipe 7, reaction when can By visor 4 to the process observation inside water bottle;The simulation to boiler water process actual working environment is completed, is trained by simulation Instruction study makes student's study operation relevant with boiler water process is grasped, maintenance and management technical ability, is guaranteeing student's personal safety While, boiler water process actual working environment is utmostly simulated, student has been effectively ensured and has entered the operation after real work Safety.
The basic principles and main features of the present invention and the advantages of the present invention have been shown and described above, for For those skilled in the art, it is clear that the present invention is not limited to the details of the above exemplary embodiments, and without departing substantially from this In the case where the spirit or essential attributes of utility model, the utility model can be realized in other specific forms, therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the utility model is by institute Attached claim rather than above description limit, it is intended that will fall within the meaning and scope of the equivalent elements of the claims All changes are embraced therein, and should not treat any reference in the claims as limiting related right It is required that.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiments being understood that.

Claims (3)

1. a kind of boiler water process actual training device, it is characterised in that: including two identical water bottles, the water bottle includes DN250 Carbon steel pipe, end closure and sealing are standard elliptical head on DN250 carbon steel pipe, and end closure passes through flange on DN250 carbon steel pipe Cooperation connect and fixes with DN250 carbon steel pipe;The standard elliptical head top is equipped with DN20 carbon steel pipe;The DN20 carbon Steel pipe is to be fixedly mounted and be switched to inside DN250 carbon steel pipe, and DN20 carbon steel pipe is also switched to external connection pipeline;The mark Quasi- ellipse head upper side is equipped with DN15 carbon steel pipe and is switched to inside DN250 carbon steel pipe, and DN15 carbon steel pipe is located at DN20 carbon The left side of steel pipe;For the installation of DN250 carbon steel pipe side there are two DN100 carbon steel pipe, visor is installed on DN100 carbon steel by bolt Pipe;The DN100 carbon steel pipe is connected to inside DN250 carbon steel pipe;Branch is mounted at left and right sides of DN250 carbon steel pipe lower end Seat;End closure and sealing are standard elliptical head under the DN250 carbon steel pipe;The cooperation that the standard elliptical head passes through flange It is connect with DN250 carbon steel pipe and fixed;The standard elliptical head lowermost end is equipped with DN20 carbon steel pipe;The DN20 carbon steel pipe To be fixedly mounted and being switched to inside DN250 carbon steel pipe, and DN20 carbon steel pipe is also switched to external connection pipeline.
2. boiler water process actual training device according to claim 1, it is characterised in that: matching between the flange is combined into spiral shell It tethers and connects.
3. boiler water process actual training device according to claim 1, it is characterised in that: the water bottle surface brush silver powder.
CN201820916773.8U 2018-06-13 2018-06-13 A kind of boiler water process actual training device Active CN208667133U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820916773.8U CN208667133U (en) 2018-06-13 2018-06-13 A kind of boiler water process actual training device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820916773.8U CN208667133U (en) 2018-06-13 2018-06-13 A kind of boiler water process actual training device

Publications (1)

Publication Number Publication Date
CN208667133U true CN208667133U (en) 2019-03-29

Family

ID=65825043

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820916773.8U Active CN208667133U (en) 2018-06-13 2018-06-13 A kind of boiler water process actual training device

Country Status (1)

Country Link
CN (1) CN208667133U (en)

Similar Documents

Publication Publication Date Title
CN208667133U (en) A kind of boiler water process actual training device
Nolen et al. Motivation development in novice teachers: The development of utility filters.
CN204143749U (en) Harmful influence production area simulated leakage trainer
CN105096676B (en) A kind of sludge of sewage treatment plant anaerobic digester training operation platform and wire examination method
RU2279140C1 (en) Device for training specialists in removal of gas leaks from gas pipelines
CN203406006U (en) Chemical process automation comprehensive training device
CN105390059A (en) Multi-technology body feeling type chemical safety training device
CN210515736U (en) Self-evaluation mobile anti-sinking simulation training device
CN203982683U (en) Chemical equipment checking maintenance instructional device
CN212460900U (en) Special anti-abrasion and anti-explosion examination training device
CN207570928U (en) A kind of latent device spherical shape form detection experimental rig
CN221632111U (en) Portable pipeline damage leaking stoppage trainer capable of being repeatedly utilized
CN204166786U (en) A kind of collection batch reaction, isolated by filtration, fluid carry multi-functional actual training device
CN214624040U (en) Comprehensive training examination system for chemical finite space
CN204965900U (en) Cold state production analogue means of five workshop sections of methanol production from coal
CN204332185U (en) Buoyancy generating cause teaching demonstration instrument
CN210920253U (en) Simulation device for online repair of high-pressure valve seat
CN204029266U (en) A kind of styrene school workshop for teaching, training
CN103280150A (en) Chemical process automation comprehensive training device
Ahmed et al. The importance of training on engineering control of hazardous materials using pilot plant
CN204045042U (en) Mathematical education curved surface projection exhibiting device
CN204596308U (en) Heat-transfer equipment teaching controlling device
Yang et al. Research on Practical Teaching Reform of Mine Gas Prevention and Control under the Background of Engineering Education
CN202563757U (en) Triangle interior angle sum demonstrator
Geng et al. Internationalizing instructional methodology for postgraduates in green manufacturing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant