CN208660451U - A kind of construction site three-level sedimentation basin - Google Patents

A kind of construction site three-level sedimentation basin Download PDF

Info

Publication number
CN208660451U
CN208660451U CN201820959809.0U CN201820959809U CN208660451U CN 208660451 U CN208660451 U CN 208660451U CN 201820959809 U CN201820959809 U CN 201820959809U CN 208660451 U CN208660451 U CN 208660451U
Authority
CN
China
Prior art keywords
sedimentation basin
level
level sedimentation
construction site
order
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820959809.0U
Other languages
Chinese (zh)
Inventor
李光磊
张芳
张芫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Jianqiao Technology Co Ltd
Original Assignee
Sichuan Jianqiao Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Jianqiao Technology Co Ltd filed Critical Sichuan Jianqiao Technology Co Ltd
Priority to CN201820959809.0U priority Critical patent/CN208660451U/en
Application granted granted Critical
Publication of CN208660451U publication Critical patent/CN208660451U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of construction site three-level sedimentation basins comprising first order sedimentation basin, second level sedimentation basin, third level sedimentation basin and cleaning cylinder;First order sedimentation basin, second level sedimentation basin and third level sedimentation basin are sequentially connected, first order sedimentation basin is equipped with water inlet far from the side of second level sedimentation basin, first order sedimentation basin exchanges mouth by level-one with second level sedimentation basin and is connected to, second level sedimentation basin exchanges mouth by second level with third level sedimentation basin and is connected to, and third level sedimentation basin is equipped with discharge outlet far from the side of second level sedimentation basin;Several cleaning cylinders are equipped in first order sedimentation basin, second level sedimentation basin and third level sedimentation basin.

Description

A kind of construction site three-level sedimentation basin
Technical field
The utility model relates to a kind of construction equipments, and in particular to a kind of construction site three-level sedimentation basin.
Background technique
Construction site can generally generate the sewage of a large amount of cleanings or the ground containing a large amount of silts of dewatering well extraction It is lauched.These water sources need to carry out simple precipitation process before being discharged into underground pipe network, avoid a large amount of silt blocking underground Pipe network.Mode general at present is the three-level sedimentation basin that sunk type or ground type are built in the inside on construction ground, but this The three-level sedimentation basin manually built has following Railway Project:
(1) it requires to spend human and material resources when building and remove, cost is not low;
(2) daily scale removal process is also very complicated, need manually using shovel, spade etc tool will be in sedimentation basin Sediment is dug out;
(3) sedimentation effect is limited, and most sediment is flushed away since water velocity is fast with water flow together.
Utility model content
For above-mentioned deficiency in the prior art, the utility model provides a kind of reusable, easy cleaning, precipitating effect A kind of good construction site three-level sedimentation basin of fruit.
In order to achieve the above object of the invention, the technical solution adopted in the utility model are as follows:
A kind of construction site three-level sedimentation basin is provided, it is characterised in that: including first order sedimentation basin, second level sedimentation basin, Third level sedimentation basin and cleaning cylinder;First order sedimentation basin, second level sedimentation basin and third level sedimentation basin are sequentially connected, and the first order is heavy Shallow lake pond is equipped with water inlet far from the side of second level sedimentation basin, and first order sedimentation basin and second level sedimentation basin exchange mouth by level-one Connection, second level sedimentation basin and third level sedimentation basin exchange mouth by second level and are connected to, and third level sedimentation basin is precipitated far from the second level The side in pond is equipped with discharge outlet;Several cleaning cylinders are equipped in first order sedimentation basin, second level sedimentation basin and third level sedimentation basin.
Further, cleaning cylinder includes cylinder and water hole excessively;Each side of cylinder is respectively equipped with several water holes excessively.
Further, cleaning cylinder is distributed in first order sedimentation basin, second level sedimentation basin and third level sedimentation basin in matrix.
Further, water inlet, level-one exchange mouth, second level exchange mouth and the staggered three-level sedimentation basin of being distributed in of discharge outlet Two sides.
Further, it is symmetrical on the axial direction of cylinder to cross water hole.
The utility model has the following beneficial effects:
(1) this three-level sedimentation basin is integrated, and does not have to installation using preceding, does not have to remove after use, it is only necessary to transport It is reusable to designated place, reduce cost of human and material resources.
(2) proposition can be convenient by setting cleaning cylinder or with changing cleaning cylinder, is convenient for thorough cleaning sedimentation basin.
(3) it by the way that water hole was arranged in the surrounding of cleaning cylinder, is flowed after cleaning cylinder can be moved the water to flow into from different water holes of crossing Out, achieve the purpose that shunt, flow velocity is delayed to extend water channel, further enhance sedimentation effect.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of construction site three-level sedimentation basin.
Fig. 2 is a kind of structural schematic diagram of construction site three-level sedimentation basin A-A section.
Fig. 3 is the structural schematic diagram for clearing up cylinder.
Wherein, 1, first order sedimentation basin;101, water inlet;102, level-one exchanges mouth;2, second level sedimentation basin;201, second level Exchange mouth;3, third level sedimentation basin;301, discharge outlet;4, cylinder is cleared up;401, cylinder;402, water hole is crossed.
Specific embodiment
Specific embodiment of the present utility model is described below, in order to facilitate understanding by those skilled in the art The utility model, it should be apparent that the utility model is not limited to the range of specific embodiment, to the common skill of the art For art personnel, if various change the attached claims limit and determine the utility model spirit and scope in, These variations are it will be apparent that all utilize the innovation and creation of the utility model design in the column of protection.
As illustrated in fig. 1 and 2, which includes first order sedimentation basin 1, second level sedimentation basin 2, third Grade sedimentation basin 3 and cleaning cylinder 4.First order sedimentation basin 1, second level sedimentation basin 2 and third level sedimentation basin 3 are sequentially connected, the first order Sedimentation basin 1 is equipped with water inlet 101 far from the side of second level sedimentation basin 2, and first order sedimentation basin 1 and second level sedimentation basin 2 pass through Level-one exchanges mouth 102 and is connected to, and second level sedimentation basin 2 exchanges mouth 201 by second level with third level sedimentation basin 3 and is connected to, and the third level is heavy Shallow lake pond 3 is equipped with discharge outlet 301 far from the side of second level sedimentation basin 2.Water inlet 101, level-one exchange mouth 102, second level exchange mouth 201 and the staggered two sides for being distributed in three-level sedimentation basin of discharge outlet 301 extend residence time of the water in sedimentation basins at different levels, avoid Water in sedimentation basins at different levels is only flowed in unilateral side.
What matrix was distributed in first order sedimentation basin 1, second level sedimentation basin 2 and third level sedimentation basin 3 is equipped with several cleaning cylinders 4, cleaning cylinder 4 is including cylinder 401 and crosses water hole 402.Each side of cylinder 401 is respectively equipped with several water holes 402 excessively, crosses water Hole 402 is symmetrical on the axial direction of cylinder 401.
The water of water inlet 101 passed through water hole 402 and flowed into the cleaning cylinder 4 closed on, and the water in the cleaning cylinder 4 expires it It crosses water hole 402 by remaining afterwards to flow into adjacent cleaning cylinder 4, each cleaning cylinder 4 crosses water hole 402 by one or more Water inlet is also discharged by multiple water holes 402 of crossing simultaneously, and water flow passed through the direction that water hole 402 constantly changes flowing, extended Flowing time in every first stage precipitation tank, has dispersed water flow, also slows down the speed of water flowing, improves sedimentation effect.It needs The sediment for clearing up cleaning cylinder 4 is, using hook across water hole 402 is crossed, i.e., it is proposed that cleaning cylinder 4 topples over internal siltation Object.
The water precipitated flows into second level sedimentation basin 2 by level-one exchange mouth 102 from first order sedimentation basin 1, further through two Grade exchange mouth 201 flows into third level sedimentation basin 3 from second level sedimentation basin 2, finally flows out from discharge outlet 301.

Claims (5)

1. a kind of construction site three-level sedimentation basin, it is characterised in that: including first order sedimentation basin (1), second level sedimentation basin (2), Third level sedimentation basin (3) and cleaning cylinder (4);The first order sedimentation basin (1), second level sedimentation basin (2) and third level sedimentation basin (3) it being sequentially connected, the first order sedimentation basin (1) is equipped with water inlet (101) far from the side of second level sedimentation basin (2), and first Grade sedimentation basin (1) is connected to second level sedimentation basin (2) by level-one exchange mouth (102), and second level sedimentation basin (2) and the third level are heavy Shallow lake pond (3) is set by second level exchange mouth (201) connection, the third level sedimentation basin (3) far from the side of second level sedimentation basin (2) There are discharge outlet (301);The first order sedimentation basin (1), second level sedimentation basin (2) and third level sedimentation basin (3) are if interior be equipped with Dry cleaning cylinder (4).
2. a kind of construction site three-level sedimentation basin according to claim 1, it is characterised in that: the cleaning cylinder (4) includes Cylinder (401) and mistake water hole (402);Each side of the cylinder (401) is respectively equipped with several mistakes water hole (402).
3. a kind of construction site three-level sedimentation basin according to claim 2, it is characterised in that: the cleaning cylinder (4) is It is distributed in first stage precipitation tank (1), second level sedimentation basin (2) and third level sedimentation basin (3) in matrix.
4. a kind of construction site three-level sedimentation basin according to claim 1, it is characterised in that: the water inlet (101), one Grade exchange mouth (102), second level exchange mouth (201) and the staggered two sides for being distributed in three-level sedimentation basin of discharge outlet (301).
5. a kind of construction site three-level sedimentation basin according to claim 2, it is characterised in that: cross water hole (402) exist It is symmetrical on the axial direction of cylinder (401).
CN201820959809.0U 2018-06-21 2018-06-21 A kind of construction site three-level sedimentation basin Active CN208660451U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820959809.0U CN208660451U (en) 2018-06-21 2018-06-21 A kind of construction site three-level sedimentation basin

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820959809.0U CN208660451U (en) 2018-06-21 2018-06-21 A kind of construction site three-level sedimentation basin

Publications (1)

Publication Number Publication Date
CN208660451U true CN208660451U (en) 2019-03-29

Family

ID=65824011

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820959809.0U Active CN208660451U (en) 2018-06-21 2018-06-21 A kind of construction site three-level sedimentation basin

Country Status (1)

Country Link
CN (1) CN208660451U (en)

Similar Documents

Publication Publication Date Title
CN104174191A (en) Integral grit chamber for treating rainwater and treating method
CN206045496U (en) A kind of efficient up-flow anisotropic flow inclined-plate clarifying basin
CN206380428U (en) A kind of gardens discharge cycle utilizes device
CN208660451U (en) A kind of construction site three-level sedimentation basin
CN207237452U (en) A kind of efficient reversed cleaning device of pipeline Inner filter net
CN205883902U (en) Saline soil reclamation water saving system
CN209778422U (en) Water treatment system
CN203989972U (en) A kind of integrated setting pot of processing rainwater
CN213942383U (en) Water and fertilizer integrated device for yellow river water irrigation
CN207959470U (en) A kind of system including storage pond and online processing pond
CN202730707U (en) Initial-stage rainwater intercepting and shunting as well as later-stage rainwater separating system for flood drainage river channel
CN208660452U (en) Novel construction site three-level sedimentation basin
KR101709908B1 (en) Multipurpose Dam For Eco Friendly
CN204841189U (en) Rain water treatment facilities
CN213652208U (en) River course flood discharge and treatment system
CN204703118U (en) Self-cleaning and water circulation comprehensive at the bottom of a kind of landscape lake pond utilizes device
CN204329410U (en) A kind of high efficiency self-cleaning sewage source heat pump water intake system
CN211312791U (en) Decontamination shunting device for preventing and treating agricultural non-point source pollution
CN204329409U (en) A kind of sewage source heat pump water intaking direct heat transfer system
CN207169125U (en) A kind of sedimentation basin
KR102036353B1 (en) Environment-friendly duct-type eco-beam
CN203769039U (en) Rainwater storage and drainage system for urban road
CN207582650U (en) Sewage lifter
CN205990659U (en) Well system is stored with draining in a kind of municipal administration gardens
CN207002317U (en) A kind of glass post-processing sewage disposal device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant